HomeMy WebLinkAbout40-20 Renewal 2024 Town of Surf CityPermit Class
RENEWAL
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
,permit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Permit Number
40-20
Issued to Town of Surf City, PO Box 2475, Surf City, NC 28445
Authorizing development in Pender/Onslow Counties in Banks Channel and beaches adjacent to
the Atlantic Ocean . as requested in the permittee's application letter dated 2/23/24-
This permit, issued on August 1, 2024 is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terns may
1) All conditions and stipulations of the active permit remain in force under this renewal. [07J .0209(a)]
2) In order to protect threatened and endangered species and to minimize adverse impacts to offshore,
nearshore, intertidal and beach resources, no excavation, fill, beach nourishment or associated
activities, including mobilization, demobilization, remediation measures, or the use of any heavy
equipment on the beach shall occur from April 1 to November 15 of any year without prior approval
from the Division of Coastal Management in consultation with the appropriate resource agencies.
[G.S. 113- 229(e); G.S. 113A-120; 07H .0312(4)(a)]
(See attached sheet for Additional Conditions)
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on -site to Department
personnel when the project is. inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2025
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
For Tancred Miller, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
Town of Surf City Permit No. 40-20
Page 2 of 2
ADDITIONAL CONDITIONS
NOTE: This Renewal shall be attached to Permit No. 40-20, which was issued as amended to the
permittee on 4/14/20, and copies of both documents shall be readily available on site when a
Division representative inspects the project for compliance.
NOTE: The U.S. Army Corps of Engineers assigned the proposed project COE Action Id. No. SAW
2019-00658.
NOTE: The N.C. Division of Water Resources assigned the proposed project DWR Project No. 2005-
20160.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
Permit Class Permit Number
RENEWAL 40-20
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Town of Surf City, PO Box 2475, Surf City, NC 28445
Authorizing development in Pender/Onslow Counties in Banks Channel and beaches adjacent to
the Atlantic Ocean , as requested in the permittee’s application letter dated 2/23/24.
This permit, issued on August 1, 2024 is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
This permit action may be appealed by the permittee or
other qualified persons within twenty (20) days of the issuing
date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
December 31, 2025
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
For Tancred Miller, Director
Division of Coastal Management
This permit and its conditions are hereby accepted.
Signature of Permittee
1) All conditions and stipulations of the active permit remain in force under this renewal. [07J .0209(a)]
2) In order to protect threatened and endangered species and to minimize adverse impacts to offshore,
nearshore, intertidal and beach resources, no excavation, fill, beach nourishment or associated
activities, including mobilization, demobilization, remediation measures, or the use of any heavy
equipment on the beach shall occur from April 1 to November 15 of any year without prior approval
from the Division of Coastal Management in consultation with the appropriate resource agencies.
[G.S. 113- 229(e); G.S. 113A-120; 07H .0312(4)(a)]
(See attached sheet for Additional Conditions)
Town of Surf City Permit No. 40-20
Page 2 of 2
ADDITIONAL CONDITIONS
NOTE: This Renewal shall be attached to Permit No. 40-20, which was issued as amended to the
permittee on 4/14/20, and copies of both documents shall be readily available on site when a
Division representative inspects the project for compliance.
NOTE: The U.S. Army Corps of Engineers assigned the proposed project COE Action Id. No. SAW
2019-00658.
NOTE: The N.C. Division of Water Resources assigned the proposed project DWR Project No. 2005-
2016v3.
NOTE: A permit renewal application processing fee of $100 was received by DCM for this project.
pF SUq�,
O j►—<Town of Surf City
7949
Teresa B. Batts, Mayor
John Koloski, Councilman
Alicia Hawley, Councilwoman
February 23, 2024
Tara MacPherson
District Manager
Division of Coastal Management
Re: CAMA Major Permit 40-20
Dear Ms. MacPherson,
Jeremy Shugarts, Mayor ProTem
Hugh Cannady, Councilman
Trudy Solomon, Councilwoman
On behalf of the Town of Surf City, I am respectfully requesting an extension to CAMA Major Permit 40-20 for
Major Development in an Area of Environmental Concern and Excavation and/or filling pursuant to NCGS 113-
229. Specifically, the Town is seeking an extension to be able to provide beach nourishment activities along
the oceanfront for the Town of Surf City.
When the Town sought the authorization to complete a beach nourishment project through the issuance of
this Major Permit, it was unaware of funding authorization for the Surf City/North Topsail Beach Coastal Storm
Risk Management project. Due to the withdrawal of North Topsail Beach, the Town has been faced with delays
from the US Army Corps of Engineers and is seeking to potentially provide nourishment to our beaches in the
interim. The lack of protection and habitat is of concern and this permit will help the Town pursue those goals.
I am available for any questions you may have; I would also like to note that this permit was only valid for a
three-year period, and consideration of the previously noted setback as well as effects of COVID-19 should
provide for the Town additional opportunities to utilize the permit in which it was intended for.
Regards,
i
v i
Kyle M . Breuer, Town Manager
214 W Florence Way PO BOX 2475 PHONE (910) 328-4131