Loading...
HomeMy WebLinkAbout152-03 Amended 11/2003 r� Permit Class Permit Number AMENDED 152-03 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission ,Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Maritime Place,c/o Stuart Cooke, 1 Causeway Drive, Ocean Isle Beach,NC 28469 Authorizing development in Brunswick County at adi, AIWW,near intersect of E. Seventh St& Shallotte Blvd.. Ocean Isle Beach , as requested in the permittee's application dated 7/24/03 (MP-I) 11/6/03 (MP-2) &7/18/03 (MP-3),including the attached workplan drawings(4),listed in Condition 1 &the AEC Hazard Notice dated 8/25/03. This permit, issued on November 6,2003 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) The workplan drawings applicable to this permit are as follows: Sheet 2 of 7 dated revised 10/2/03, Attachment 1 dated 4/1/03, and Sheets 3 and 5 of 7 both dated 7/18/03. 3 Subdivision Development 2) This permit authorizes only the land disturbing activities associated with establishment of the Maritime Place Subdivision as well as the construction of the swimming pool, pool house and the wooden pedestrian bridge that are expressly and specifically set forth in the permit application and depicted on the attached workplan drawings. Any additional land disturbing activities and/or construction on individual lots, including the construction of single-family homes, shall be evaluated on a case-by-case basis by a representative of the Division of Coastal Management to determine additional permit requirements. Contact a representative of the Division at (910) 395-3900 prior to the commencement of any such activity for this determination. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department /l personnel when the project is inspected for compliance. 1/ 'f Any maintenance work or project modification not covered onna D. Moffitt, Director hereunder requires further Division approval. Division of Coastal Management All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31, 2006 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee Maritime Place Permit#152-03 Page 2 of 3 ADDITIONAL CONDITIONS 3) Any portion of the swimming pool deck located within 30 feet of the mean high water mark shall not exceed 200 square feet, and shall be elevated, slatted and constructed of wood. 4) Any portion of the permitted pedestrian bridge built over coastal wetlands must not exceed six feet in width and must be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. 5) No vegetated wetlands will be excavated or filled. 6) Any building constructed shall comply with the North Carolina Building Code and the local flood damage prevention ordinance as required by the National Flood Insurance Program. NOTE: The building code or flood damage prevention ordinance may impose additional more restrictive requirements than the Division's standards for development in areas of environmental concern (AECs). 7) The impacts associated with the permitted development shall not directly result in any closure of any waters that are open to the taking of shellfish. Any such closure directly attributable to the permitted development will require that the permittee undertake remedial actions to remedy the situation. Shoreline Stabilization 8) The alignment of the authorized bulkhead must be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of construction. 9) In accordance with commitments made by the permittee, the permitted bulkhead shall be aligned landward of all vegetated wetlands. 10) The bulkhead must be constructed prior to any backfilling activities. 11) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 12) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 13) The backfill material will be clean and free of any pollutants except in trace quantities. 14) All backfill material will be obtained from a high ground source and confined behind the permitted bulkhead. ,t Maritime Place Permit#152-03 Page 3 of 3 ADDITIONAL CONDITIONS 15) No backfill material is to be placed within 30 feet of the normal high water line, except that which will be used to backfill the area behind the permitted bulkhead. Sedimentation and Erosion Control 16) An Erosion and Sedimentation Control Plan will be required for this project. This plan must be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environment and Natural Resources, Land Quality Section127 Cardinal Drive Extension, Wilmington, NC 28405. 17) In order to protect water quality, runoff from construction must not visibly increase the amount of suspended sediments in adjacent waters. 18) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, sand fence, etc.). Stormwater Management 19) The N.C. Division of Water Quality approved this project under stormwater management rules of the Environmental Management Commission under Stormwater Permit No. SW8030731 on 9/5/03. Any violation of the permit approved by the DWQ will be considered a violation of this CAMA permit. General NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The N.C. Division of Water Quality has assigned the proposed project DWQ Project No. 031238. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under General Permit No. 197800056 (COE Action Id. No. 200400072) which was issued on 10/21/03. Permit ' /5W— 0 3 DCM Coordinator: -� MAILING DISTRIBUTION: Permitee: z f io � Agent: DCM Field Offices: / Eey Morehead City -W-&&hiag.t@n Wilmington US Army Corps of Engineers(USACE): ton: Mike Bell (NC ecome(NCDOT) Ra eigh Blan Wilmington: ) Henry Wicker Others: Cultural Resources: Renee Gledhill-Early Environmental Health: Beverly Sanders Marine Fisheries: Mike Street NCDOT: Roberto Canales Shellfish Sanitation: Patti Fowler State Property Office: Joseph Henderson Water Quality: John Domey J T) Water Resources: John Sutherland Wildlife Resources: Da*444eHettry Bennett Wynne T T) FAXING DISTRIBUTION: G q Permitee at /l0 -5-7-/ / J Agent at /Zo d o q DCM Field Offices: F}' Morehead City washifig4OR Wilmington US Army Corps of Engineers(USACE): Ws%hW&ton* Mike Bell (NCDOT) c�IPC''bOT) ,Ra eigh Blan Wilmington: Henry Wicker Updated as 2/28/03 Sent by :EGST CORST ENGINEERI Nov-06-03 11 :00am from 91075480494919 733 1495 Page 2i 3 Form DCM-MP-2 EXCAVATION AND FILL (Except bridges and culverts) Attach this fcrm to Joint Application for CAMA Major Permit, Form 0CM-MP-1, Be sure to complete ail 1. EXCAVATION other sections of the Joint Application that relate to this proposed project. a. Amount of material to be excavated from below Describe below the purpose of proposed excavation or MHW or NWL in cubic yards - -b-fill activities, All values to be given in feet. b, 'Type of material to be excavated A-�R N1 Avcragt Final F31StW Project c. Does the area to be excavated include coastal Length Width Depth Depth wetlands (marsh), submerged aquatic vegetation /V11 Access (SAVs) or other wetlands' Yes No channel (MI W) or(NWL) d. Nighground excavation in cubic yards IVA Canal 2. DISPOSAL OF EXCAVATED Boat MATERIAI. basin " a. ,Location of disposal area Nljq _ Boat ramp b. Dimensions of disposal area IVZA Rock groin c. Do you claim title to disposal area? /tl/A Yes No Rock If no, attach a letter granting permission from the breakwater owner. Other d- Will a disposal area be available for future maintenance? Yes No (Excluding If yes, where? shoreline 3teb11jAL10n) Revised 019-5 Sent by :EAST COAST ENGINEERI Nou-06-03 11 :00am from 9107549049)919 733 1495 Page 3i 3 Forrn DCM-MV-2 e. Does the disposal area include any coastal wetlands If yes, (marsh), SAVs or other wetlands? Ailh (1) Amount of material to be placed in the Yes - No water /h (2) Dimeluions of fill area NfR f, Does the disposal include any area in the water? a'�A Yes No (3) Purpose of fill A0 b. Will fill material be placed in coastal wetlands 3. SKORELINI E STABILIZATION (marsh), SAVs or other wetlands? Yes 1K No If yes, �rA a. Type of shoreline stabilization (1) Dimensions of fill area 44 _ Bulkhead Riprap (2) Purpose of fill AVA b. Length _6` 0 ECIET c. Average distance waterward of M. HW or NWL N/A - LAAlLk.1A�, �F 117Hk� 5. GENERAL d. Maximum distance waterward of M. HW or NWL N � ` L�NQuIR�D a. How will excavated or fill material be kept on site e. Shoreline erosion during preceding 12 months and erasion controlled? (Source of infornwnom) 4 �� 774A) f. Type of bulkhead or riprap material wan jEAZ _ b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic g. Amount of fill in cubic yards to be placed below dredge)? water level AIIA CfroC� (1) Riprap (2) Bulkhead backfill c. Will wetlands be cr:ssed in transporting equipment h, Type of fill material SAND to project site? Yes _)� _ No If yes, axplain steps that will be taken to lessen environmental impacts, iuA i. Source of fill material 4N-5 fre 4. OTHER FILL ACTIVITIES (4VIVIS,'aV Appdmt or P'troloet Name (Excluding Shoreline Stabilization) a, Will fill material be brought to site? Yes jC No T keriwd n3i4S