HomeMy WebLinkAbout81-24 Pasquotank River Yacht ClubPermit Class
NEW
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
Permit
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-I IS
_ Excavation and/or filling pursuant to NCGS 113-229
Permit Number
81-24
Issued to Pasguotank River Yacht Club, Inc., PO Box 612, Elizabeth City, NC 27907
Authorizing development in Camden County at adi. to the Pasquotank River, at 390 Camden
Causeway, in Camden, as requested in the pennittee's application dated 3/6/23, including attached workplan
drawing (1) Drawing 1 of 1 dated "Rec DCM MHD City 7/26/24".
This permit, issued on July 29, 2024 , is subject to compliance with the application (where
consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation
rt these terms may ne subject to civil or crimmal penalties; or may cause me permit to oe nun anu voru.
Marina Expansion
I} This permit authorizes only the docks, piers, floating platforms, finger piers, pilings, and other
structures and uses located in or over the water that are expressly and specifically set forth in the
permit application. No other structure, whether floating or stationary, may become a permanent part
of this marina without permit modification. No non -water dependent uses of structures may be
conducted on, in or over public trust waters without permit modification. [07J .0202(c); 07H
.0208(a)(1)]
2) This permit authorizes 13 additional formalized boat slips for a maximum of 45 formalized boat slips
at this commercial marina, as depicted on the attached workplan drawing 1 of 1 dated "Ree DCM
MHD City 7/26/24". [07J .0202(c)]
(See attached sheets for Additional Conditions)
This permit action may be appealed by the pennittee or other
qualified persons within twenty (20) days of the issuing date.
This permit must be accessible on -site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered
hereunder requires further Division approval.
All work must cease when the permit expires on
July 29, 2029
In issuing this permit, the State of North Carolina agrees that
your project is consistent with the North Carolina Coastal
Management Program.
Signed by the authority of the Secretary of DEQ and the Chair
of the Coastal Resources Commission.
For Tattered Miller, Director
Division of Coastal Management
This permit and its copffiN are hgreby accepted.
Signature of Permittee
Pasquotank River Yacht Club, Inc.
ADDITIONAL CONDITIONS
Permit No. 81-24
Page 2 of 3
3) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S.
Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent
reflectors shall be attached to the structure in order to make it more visible during hours of darkness or
inclement weather. [07H .0208(a)(2)(G); 07J .0209(a); G.S. 113-229(a)]
4) No portion of the authorized marina expansion shall extend beyond the wateiward most portion of the
existing marina. [07H .0208(b)(6)(G)]
5) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the
marina. Any sewage discharge at the docking facility shall be considered a violation of this permit for
which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire
existence of the permitted structure. [07H .0208(a)(2)(B)]
6) Prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal
facility shall be available in an easily accessible location and maintained in operable condition for the
life of the marina. [07H .0208(b)(5)(M); 07J .0209(a)]
7) Prior to the occupancy of any slips authorized by this permit, the permittee shall meet on -site with a
representative of the Division to ensure that the required pumpout facility is in place and operable. [07H
.0208(b)(5)(M); 07J .0209(a)]
8) The marina shall display a sign showing the location of the on -site pumpout facility, including other
appropriate waste disposal information, at the entrance and exit from the main pier(s). [07H
.0208(b)(5)(M); 07J .0209(a)]
9) The authorized structures and associated activity shall not cause an unacceptable interference with
navigation and shall not exceed the dimensions shown on the attached permit drawings. [07H
.0208(a)(2)(G)]
10) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work. [07H .0208(a)(2)(G)]
11) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts
of the structure and the adjacent property owner's area of riparian access. [07H .0208(b)(6)(I)]
12) In order to reduce the potential for negative effects on the spawning migration of anadromous fish, no
pile driving shall be permitted between February 15 and June 30 of any year without the prior approval
of the Division of Coastal Management. [07H .0208(a)(2)(F)]
General
13) All mechanized equipment will be regularly inspected and maintained to prevent contamination of waters
and wetlands from fuels, lubricants, hydraulic fluids, or other toxic materials. In the event of a spill of
petroleum products or any other hazardous waste, the pennittee shall immediately report it to the National
Response Center at (800) 424-8802 and provisions of the North Carolina Oil Pollution and Hazardous
Substances Control Act will be followed. [07H .0208(a)(2)(A); 07H .0208(a)(2)(B)]
Pasquotank River Yacht Club, Inc.
ADDITIONAL CONDITIONS
Permit No. 81-24
Page 3 of 3
14) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the
written approval of the Division of Coastal Management. [07J .0406(b)]
15) All constriction debris associated with the removal or construction of the permitted development shall
be contained within the authorized project area and disposed of in an approved upland location. [07J
.0209(a); G.S. 113A-120(b)]
16) The permittee and/or their contractor shall meet with a representative of the Division prior to project
initiation. [07J .0209(a)]
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
approvals or authorizations that may be required, including but not limited to any authorizations
required by Camden County.
NOTE: The N.C. Division of Water Resources authorized the proposed project by way of Individual
Water Quality Certification No. 006055 and assigned the project DWR Project No. 2023-0697.
NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General
Permit No. 198000291 (Action ID SAW-2023-01039).
NOTE: Future development of the pennittee's property may require a modification of this permit.
Contact a representative of the Division at (252) 621-6450 prior to the commencement of any
such activity for this determination. The permittee is further advised that many non -water
dependent activities are not authorized within 30 feet of the nornial water level.
NOTE: An application processing fee of $400 was received by DCM for this project.