Loading...
HomeMy WebLinkAbout109-84 Minor Mod./Renewal 04/1988 Minnesott Yacht Basin, Keith A. Wolfenbarger Permit Class Permit Number Minor Modification/ STATE OF NORTH CAROLINA 109-84 renewal Department of Natural dCommunity Development at FG„A !t _ ti C92 etS6 ice's ion Majoc��e loprrientin' onmental Co nc W�to. � Ly � a Excavatioit*nd!6)r- 'suaiii toNCGS 113-229 Issued to Keith A. Wolfenbarger, Minnesott Beach Yacht Basin, P,0. Box 128. Arapahoe, Nr %w, authorizing development in Pamlico County at the Neuse River, Alligator Gut as requeste in the permittee's application dated 3/28184 including attached plats, 5 1 dated 1/2/83 2AaXed rec. 3/29/84 1 dated rec. 3/22/88 & plan view dated , not attached. This permit,issued on Z , is s ject to compliance with the application (where consistent with the permit), all applicable regulations, specialqo (d.Oo d of set forth below. Any violation of these terms may subject permittee to a fine,imprisonment or civil action;or c se/ a p5ennit to be null and void. For Wo h ag]Jn$ f (1 ) No marsh grass will be excavated and/or fled/ 1 (2) All excavated materials will be confined ve n high water and landward of regularly or irregularly flooded mars h' d adequate dikes or other retaining structures to prevent spillover o s ids into any marsh or surroun- ding waters. (3) Silt fences and/or other erosion and ' sediment control devices must be utilized throughout active construction to minimize sediment from entering into adjacent creeks, streams, properties, basins, waters, wetlands, etc. (4) Slopes created by excavation of the basin must be left at an angle which can be provided with a vegetative cover. (5) All slopes, whether cut and/or filled, must be adequately stabilized by vege- tative cover within 30 working days of any phase of such activity. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee Signed by the authority of the Secretary of DNRCD and or other qualified persons within twenty (20) days of the the Chairman of the Coastal Resources Commission. issuing date. An appeal requires resolution prior to work initiation or continuance,as the case may be. 4_�� This permit must be accessible on-site to Department iit �personnel when !i:e !,,oj,,,t is inspected for,,�-tpliance Any maintenance work or project modification David W.Owens,Director not covered hereunder requires further Departmental Division of Coastal Management approval. All work must cease when the permit expires on This permit and its conditions are hereby accepted. March 31 1989 for new work pu g or mgin ep c n i �lti s permit, the tate o or urng Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee Keith A. Wolfenbarger Permit #109-84 Page 2 of 3 ADDITIONAL CONDITIONS For Maintenance Work With Hydraulic Dredge (1 ) All excavated materials must be confined on highground behind adequate dikes or other retaining structures to prevent spillover of solids into any marsh or surrounding waters. (2) The disposal area efflebhe t be contained by pipe, trough or similar device to a point at or mean low water mark to prevent gully erosion and resultant unnecesson. (3) The terminal end of the u. t be positioned at or greater than 50' from any part of the dike a d, a/maximum distance from spillways to allow adequate settlement of suspe did lsi1idFl. (4) A water control structure must b i tal d at the intake end of the effluent pipe so as to assure compliance wi if;-co it N). 5 (5) In order to protect water quality, r f from the construction area must not visibly increase the amount of un d sediments in adjacent waters. (6) The diked disposal area must be constructed a sufficient distance from the mean high water line or any marshland to eliminate the possibility of dike erosion into or upon the adjacent waters and/or marshland. 0 General (1 ) An erosion/sedimentation control plan must be submitted and must contain all temporary and permanent measures to be utilized during construction. The plan should be sent to: N.C. Dept. of Natural Resources & Community Development Division of Land Resources P. 0. Box 1507 Washington, NC 27889 (2) The activity will be conducted in such a manner as to prevent significant increases in turbidity outside the area of construction or construction-related discharge. (3) In the event that archaeological materials are encountered during excavation or any other ground disturbing activities, work shall cease and a representative of the Department of Cultural Resources, Division of Archives and History (telephone 919/733-4763) must be contacted immediately. (4) A pumpout facility will be provided for boats with holdinq tanks prior to Ceptemue,­ 3C, i 988. (5) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structures, whether floating or stationary, may become a permanent part of this marina without permit modification. No non-water dependent uses or structures may be conducted on, in, or over public trust waters without permit modification. Keith A. Wolfenbarger Permit #109-84 Page 3 of 3 ADDITIONAL CONDITIONS (6) The marina shall prominently post and enforce a "no sewage discharge" policy for boats without holding tanks. (7) No septic tank systems may be placed in filled areas. NOTE: Approval for all septic tank systems must come from the local health depar ment. NOTE: Any future development or harbor expansion as indicated on the plan view dated 3/85 will require a modification of this permit. NOTE: It is strongly d that the permittee exercise all available precautions in y-to-day operation of the ship facility to prevent sand blasting res e, if applicable, and/or other facility waste from entering the adjacent Tht ch discharge, either directly or indirectly, to adjacent waters cn ene state water quality standards, thereby violating state law. a Clause The Division of Coastal Managem t: 1 b notified in writing at least two (2) weeks in advance of any maintenance w re ,after Dec. 31 , 1988) authorized by this permit and that notification inc e: t A. the number of the original permit, B. a statement that no dimensional changes are proposed; C. a copy of the original permit plat(s) with cross-hatching indicating the area to be maintained, the area to be used for spoil , and the estimated amount of material to be removed; D. the date of map revision and the permittee' s signature shown anew on the original plat. �M$tA7j o� State of North Carolina Department of Natural Resources and Community Development Division of Coastal Management 512 North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor David W Owens S. Thomas Rhodes, Secretary Director April 25, 1988 Mr. Keith A Wolfenbarger Minnesott Beach Yacht Basin P. O. . Box 128 Arapahoe, NC 28510 Dear Sir: The enclosed permit constit4es authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff colored form) is retained by you and it must be available on-site when the project is inspected for cmpliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with N.C.G.S. Chapter 150E with the Office of Administrative Hearings, P..O. Drawer 11666, Raleigh, NC 27611 (919) 733-2698 within 20 days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Cormnission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. Fran time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Very sincerely, h R. Parker, Jr., Chief Major Permits Processing Section JRP:jr/aw P.O Box 27687 Raleigh, North Carolina 2 761 1-768 7 Telephone 919-733-2293 Enclosure An Equal Opportunity Ahirmanve Action Employer DEPARTMENT OF THE ARMY WILMINGTON DISTRICT,CORPS OF ENGINEERS i I P.O. BOX 1890 WILMINGTON, NORTH CAROLINA 28402-1890 IN REPLY REFER TO May 6, 1988 Regulatory Branch SUBJECT: File No. SAWC083-N-069-0226 and State Permit No. 109-84 Mr. Keith A. Wolfenbarger and Ms. Judy H. Wolfenbarger Minnesott Beach Yacht Basin Post Office Box 128 Arapahoe, North Carolina 28510 Dear Mr. and Ms. Wolfenbarger: Reference your application for renewal/minor modification of Federal and State authorization to maintain an access channel/canal and basin and marina facilities on the Neuse River, Minnesott Beach, Pamlico County, North Carolina. lour proposal has been reviewed and found to be consistent with the provisions and objectives of general permit No. SAWC080- N-000-0291. Therefore, you may continue activity in strict accordance with State authorization No. 109-84. Failure to comply with the State authorization or conditions of the general permit could result in a violation of Federal law. if any additional change in your work is required for any reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to Mr. Ernest Jahnke, telephone (919) 343-4467. Sincerely, Charles W. Hollis -- Chief, Regulatory Branch -2- Copies Furnished: Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 DEPARTMENT OF THE ARMY WILMINGTON DISTRICT,CORPS OF ENGINEERS P.O.BOX 1890 WILMINGTON,NORTH CAROLINA 28402-1890 April 27, 1989 IN REPLY REFER TO Regulatory Branch SUBJECT: File No. CESAW-0083-N-069-0226 and State Permit No. 109-84 Mr. Keith A. Wolfenbarger Minnesott Beach Yacht Basin Post Office Box 128 Arapahoe, North Carolina 28510 Dear. Mr. wolfenbarger: Reference your State/Federal permit which authorizes you to maintain a channel, canal and basin and construct marina facilities on the Neuse River, Minnesott Beach, Pamlico County, North Carolina. Through coordination with the North Carolina Division of Coastal Management, we have learned of the renewal of your State permit. Your work continues to be consistent with the provisions and objectives of general permit No. CESAW-CO80-N-000-0291 . Therefore, you may continue work in strict accordance with your renewed State authorization. Failure to comply with the State authorization or conditions of the general permit could result in a violation of Federal law. If any change in your work is required because of unforeseen or altered conditions or for any other reason, plans revised to show the change must be sent promptly to this office and the North Carolina Division of Coastal Management prior to performing any such change or alteration. Such action is necessary as revised plans must be reviewed and the authorization modified. Questions or comments may be addressed to Mr. Ernest Jahnke, telephone (919) 251 -4467. Sincerely, Charles W. Hollis Chief, Regulatory Branch -2- Copies Furnished: Mr. William Mills Water Quality Section Division of Environmental Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. John Parker Division of Coastal Management North Carolina Department of ✓ Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 MEMO Date: TO: Subject: A-% k I-IT 7 er a an�--t, North Carolina Department of Natural � Resources & Community Development Resou Y ""°°" Division of Coastal Management r J-1 L iGl1011l'1L\L Vl'1: COASN t RESOIJ n�.TO: GEORGE MATTHIS FROM: W. DAVID NOBLE SUBJECT: PERMIT RENEWAL & MINOR MODIFICATION - PERMIT #109-84 - MINNESOTT BEACH YACHT BASIN DATE: MARCH 24, 1988 Attached is a request from Minnesott Beach Yacht Basin for renewing Permit #109-84. Also, they are requesting a modification to enable the relocation of their fuel dock. I previously sent (John Parker) a memo on this same project, on February 26 , 1987 . WDN/dh Enclosures cc: Charles S. Jones -nD)rp PM REP minnesott beach po box 128 J yacht basin MAR 2 21988 arapahoe, nc 28510 919-249-1424 ---------------------- March 18, 1988 Office of Coastal Management Box 769 Morehead City, NC 28577 ATTENTION: David Noble In reference to our phone conversation of this date, I wish to renew our state permit for new work at the yacht basin (permit number 109-84) The intended work is the construction/ relocation of our fuel dock, to (a.) make it more accessible and (b) to get the fuel pumps et.al. removed from the center of the marina Because of limits of personnel and lack of time to work on this project, we would request at least 15 months from date of issuance to complete this project. I will appreciate your forwarding this request to the Department of Natural Resources and Community Development in Raleigh. Thank you. Yours truly, Judy H. Wolfenbarger Owner/gen. Mgr. attachment: 1 drawing � K f. FEB MEMORANDUM TO: JOHN PARKER FROM: W. DAVID NOBLE SUBJECT: MINOR MODIFICATION - MAJOR PERMIT #109-84 - K. A. WOLFENBARGER, PAMLICO COUNTY DATE: FEBRUARY 26, 1988 The permittee is proposing to relocate their fuel dock by digging into a 100 ' x 30 ' highground area to construct a dock and move their fuel tanks adjacent to the new dock. The spoils from excavation will be placed on highground. The applicant is also proposing to construct 100 ' of bulkhead at the proposed fuel dock. John, I have no objections to the proposed modification. However, their original permit #109-84 expired on December 31, 1987 for new work but is good for maintenance through 1990 . Also, please note that this action was initiated January 11, 1988 . Sorry for the delay but the file was difficult to locate. WDN/dh cc: Charles S. Jones minnesott beach MAN 0 po box 128 yacht basin1988 arapahoe, nc 28510 919-249-1424 1-11-88 Dave Noble Office of Coastal Management BGx 7u9 Morehead City, NC 28577 CERTIFIED MAIL Dear David: Per our phone conversation of last week, please find attached a scale drawing of our proposed new fuel dock area. The only digging involved would be with drag line and involve only pulling back the bank involved. The bulkheading will be capped with a walkway and the W- will not be a pier as such being built out into the basin. As I stated, our present fuel dock is almost inaccessible to larger vessels and causing alot of congestion. Further I am eager to get the fuel pumps out and away from the center of the basin. Our plans regarding exact placement of the new fuel tanks is uncertain but we will work on that aspect when ready. I will appreciate your attention to this as we'd like to get started soon on the project. . .but because of our shortage of help and the lack of time to work at various projects, I would request the permit allow us at least 15 months from time of issuance to complete the project. Please give me a call before you come over to look at this proposed project. . .so I will be here, or ask for "Paul" , my dockmaster who has done the drawing, etc. and will basically be in charge of the construction. Looking forward to hearing from you. Sincerely, A/ Judy Wolfenbarger Gen. MGR MBYB