Loading...
HomeMy WebLinkAbout109-84 Minnesott Yacht Basin, Keith A. Wolfenbarger ti Permit Class Permit Number Reriewal STATE OF NORTH CAROLINA 109-84 Department of Natural Ije�b . Community Development n?r( Y N)rce i �� Cg Re�O � biK'f lis ion `f `"f•. ' '. I Cl ' u.l A Mai di, elcjp nt'in fP�t�nionmental u i � Concan-to_ 3A 17:F#` 0 Excavation W36r)f iu�il��rsu2ri to NCGS 113 229 ~�SI.ti.-S:\.5. Issued to Ybith AL Tnb1_fodbM=, EduamAAABaach Yacht Eosin P G 0C1C 128, AOWM, NC 28510 authorizing development in Partliao 1117 County at tl-n Nose liver. Allicmtcr Gut as equested i permittee's application dated 3/28/84 and plat dated received 5 2 88. 1,41 /11� This permit,issued o 1 �- , i su j t o c nee with the application (where consistent with the permit), all applicable rAgulations, special con ' 'o s an n tes s fo h o . Any violation of these terms may subject permittee to a fine,imprisonment or civil action;or may cause the e it o be nu oid. (-1 U 11/ I *This renewal must be attached to the permit issued on May 20, 1988, and be available on site when Division personnel inspect the project for compliance. All conditions and stipulations of the renewal apply to the project under this renewal. This permit action may be appealed by the permittee Signed by the authority of the Secretary of DNRCD and or other qualified persons within twenty (20) days of the the Chairman the Coastal Resources Commission. issuing date. An appeal requires resolution prior to work initiation or continuance,as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. George T. Everett Any maintenance work or project modification not covered hereunder requires further Departmental Division of Coastal Management approval. All work must cease when the permit expires on This permit and its conditions are hereby accepted. March 31, 1990 for new work JU'Y n'issuing thisMpermt , e State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee STA C ` -r ;4 J lei State of North Carolina Department of Natural Resources and Community Development Division of Coastal Management 51) North Salisbury Street • Raleigh, North Carolina 27611 James G. Martin, Governor George T. Everett William W. Cobey, Jr., Secretary April 4, 1989 Director Keith A. Wolfenbarger Minnesota Beach Yacht Basin P.O. Box 128 Arapahoe, North Carolina 28510 The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original (buff colored form) is retained by you and it must be available on-site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with N.C.G.S. Chapter 150E with the Office of Administrative Hearings, P. 0. Drawer 11666, Raleigh, NC 27611 (919) 733-2698 within 20 days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter crust be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work mast be carried out in accordance with your application. Modifications, time extensions and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. Ha4ever, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Very sincerely, �oh R. Parker, Jr., Chief Major Permits Processing Section JRP:jr/aw P.O. Box 27687, Raleigh, Notch Carolina 27611-7687 Telephone 919-733-2293 Fnrinylra DEPARTMENT OF THE ARMY . '` � �t ,: WILMINGTON DISTRICT,CORPS OF ENGINEERS + a " e h11 P.O.BOX 1890 n� _ • , f WILMINGTON,NORTH CAROLINA 28402-1890 hAAt't 'd �989 �i March 24, 1989 ; IN REPLY REFER TO Regulatory Branch SUBJECT: File No. CESAW-0083-N-069-0226 and State Permit No. 109-84 Mr. John Parker Division of Coastal Management North Carolina Department of Natural Resources and Community Development Post Office Box 27687 Raleigh, North Carolina 27611-7687 Dear Mr. Parker: Through coordination with Mr. David Noble, we have learned of the request of Minnesott Beach Yacht Basin, represented by Mr. Keith A. Walkenbarger, for renewal of their State/Federal permit to maintain a channel, canal and basin and construct marina facilitites on the Neuse River, Minnesott Beach, Pamlico County, North Carolina. We have no objections to this renewal and do not recommend any additional conditions for inclusion in the renewed State authorization. Questions or comments may be addressed to Mr. Ernest Jahnke, telephone (919) 251-4467. Sincerely, o s W. Ho lis Regulatory Branch Copy Furnished: Mr. Charles Jones Morehead City Regional Office North Carolina Division of Coastal Management Post Office Box 769 Morehead City, North Carolina 28557 MEMORANDUM: MAR -1 1989 TO: JOHN PARKER COASTAL RESOURCES FROM: W. DAVID NOBLE SUBJECT: RENEWAL REQUEST - MAJOR CAMA PERMIT #109-84 - MINNESOTT BEACH YACHT BASIN/K. A. WOLFENBARGER, PAMLICO COUNTY DATE: MARCH 14 , 1989 Enclosed is a renewal request for Minnesott Beach Yacht Basin major Permit #109-84 . The proposed work which has not been completed was authorized under two ( 2 ) recent modifications. The $25 . 00 renewal check is also enclosed. I have no objections to the project being renewed. WDN/dh Enclosures cc: Charles S. Jones Cliff Winefordner, COE • 31��w minnesott beach po box 128 yacht basin arapahoe, nc 28510 919-249-1424 PC &3L 176�I �C � S5s7 MAR s Igo minnesott beach po box 128 rp yacht basin arapahoe, nc 28510 919-249-1424 UP February 7, 1989 '� °�y t6B 0 9 1989' Mr. David Nobles Coastal Management NC Department of Natural Resources PO Box 769 Morehead City, NC 28557 Dear David: In reference to our permit # 109-84 issued 5/20/88, I realized that completion of new work at the marina must be done by March 31 , 1989. Due to circumstances beyond our control. . . i.e. being so short handed and simultaneously so busy, we are not going to be able to complete the new fuel dock nor the bulkheading on the beach by this date. I spoke breifly with Preston about this today, since you were out of your office and he feels certain there will be no problem with your granting us an extension. If this could be for 1 year it would be of great help. . .especially for the work on the beach site. Please let me hear from you regarding this at your earliest convenience. Thank you. Judy H. Wolfenbarger, Gen. Mgr.