HomeMy WebLinkAbout176-05 Renewal 02/2021 Rial Corporation ------------------- --- - - -----------
------------
Permit Class Permit Number
RENEWAL 176-05
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Comt
ission
�L
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS I I3A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Rial Corporation,PO Box 2444, Greenville,NC 29602
Authorizing development in Bertie County ad1.to the Chowan River, at the end of SR
1502, near Merry Hill , as requested in the permittee's application dated letter
dated 1/5/21.
This permit,issued on February 2,2021 , is subject to compliance with the application(where consistent
with the permit), all applicable regulations,special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action;or may cause the permit to be null and void.
1) This renewal shall be attached to Permit No. 176-05,which was issued to the permittee on 11/9/05,
as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall
be readily available on site when a Division representative inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
05-1871 V2.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No.
2006-10026 and 2010-00731.
NOTE: A permit renewal application processing fee of$100 was received by DCM for this project.
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the Chair
other qualified persons within twenty (20) days of the issuing of the Coastal Resources Commission.
date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered Braxton C. Davis, Director
hereunder requires further Division approval. Division of Coastal Management
All work must cease when the permit expires on This permit and its conditions are hereby accepted.
January 22,2023
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program. Signature of Permittee
DCM Coordinator: til
Permit#• l Z
MAILING DISTRIBUTION SHEET
Permittee: Rt { 0 Za. MYC Z GvZ
Agents: toA6,1Apf Q,A•ble, /cam
DCM Field Offices
Elizabeth City C wiJy, �l�s
( Washington (with revised work plan drawings)
Morehead City Wilmington (OBJECTIONS )
US ACOE Offices:
Washington: Raleigh Bland(Beaufort, Camden, Chowan, Craven, Hertford, Hyde,Perquimans,
Tyrrell)
Josh Pelletier(Bertie, Currituck, Dare, Gates, Pamlico,Pasquotank, Washington)
Tom Steffans(NC DOT-Beaufort, Carteret, Craven, Pamlico)
Bill Biddlecome(NC DOT-Remainder ECity/Washington District)
Wilmington: Greg Curry(Brunswick,New Hanover)
Liz Hair(Carteret,Onslow, Pender)
Brad Shaver(NCDOT-Brunswick,New Hanover, Onslow, Pender)
Cultural Resources: Renee Gledhill-Earley at Environmental.Review@ncdcr.gov -
Public Water Supply: Heidi Cox(WIRO) Clif Whitfield(WARD)
Marine Fisheries: Kim Harding Jimmy Harrison
NC DOT: David Harris
Shellfish Sanitation: Shannon Jenkins/Sharon Gupton
State Property: Tim Walton/Mike Moser
DEMLR/DWR: Sheri Montalvo/Shelton Sullivan
Washington: Chris Pullinger—401
Tina Martin -401
Roger Thorpe-Storm water
Garcy Ward-(NCDOT-Beaufort,Bertie,Camden,Carteret, Chowan, Craven, Currituck,
Dare,Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington)
Wilmington: Robb Mairs—401 (Brunswick,New Hanover)
Holley Snider—401 (Carteret,Onslow, Pender)
Christine Hall - Stormwater
Joanne Steenhuis-401 (NCDOT-Brunswick,New Hanover,Onslow, Pender)
Wildlife Resources: Maria Dunn(WARD)
(NCDOT)Travis Wilson
Natural Heritage Program Rodney Butler
LPO:
Quible
70
Quible &Associates, P.C. pa.c.C27949
RECEIVED '�"° "y28149
ENGINFFRi`(i•ENVI&O.W TNTAL SCENCES•PLANNING•SUMBING Fh:xt2 252-491-9146
Fay:252-491.81 a6
SINCE K59 web g_tYe.ccm
J A N 0 7 2021
January 5, 2021
Ms. Cynthia Roundtree DCM-EC
NC Division of Coastal Management
401 South Griffin Street, Suite 300
Elizabeth City, NC 27909
RE: Renewal of CAMA Major 176-05
Dear Ms. Roundtree:
I am writing to request the renewal of CAMA Major #176-05 (the"Permit"), issued to Riai
Corporation. The Permit was originally issued on 11/09/2005 for a new subdivision, golf course
with clubhouse, shoreline stabilization, access roads and parking areas. Since then, Quible &
Associates, P.C. (Quible) was engaged to assist with permitting of a marina on Salmon Creek
and a Major Modification to permit #176-05 was issued on 12/09/2010 for a 92 slip marina on
Salmon Creek. Based on the applicable permit extension acts, the expiration date was
1/22/2015. On 12/30/2014, Quible requested what constituted the first renewal of the marina
permit which was granted on 3/3/2015, with an expiration date of 1/22/2017. The second
renewal was issued on December 1, 2017 and we have recently received a third renewal that
was issued on September 1, 2020 with an expiration date of January 22, 2021. Therefore, this
constitutes the fourth renewal request.
This is a broad CAMA Major Permit that has been relied on for many facets of the development
with the intent of being able to utilize this for future work and modifications thereof. The tract is
bound on 3 side by water bodies, including the Albemarle Sound and Salmon Creek. The
following is a summary of work completed and ongoing:
• On 5/03/2012, a Letter of Refinement was issued for fencing, pool patio and associated
grading in the Clubhouse area at Scotch Hall Preserve. This work has been completed.
• On 2/27/2013, a Minor Modification was issued for shoreline stabilization bulkhead and
associated grading in the vicinity of what is referred to as Lot 158-160. These are
Albemarle sound-fronting lots. This work has been completed.
• In 2012-2013, a portion of the marina was constructed which is limited to Pier#3 with
associated boat slips and the boat ramp area. In association with this activity:
■ On 1/14/2013, a Letter of Refinement was issued for constructing rectangular finger
piers instead of triangular (on Pier 3), addition of 63 ft to Pier 3 in a landward direction to
RECEIVED
1AN 0 1 2021
provide upland access, 22 ft long extension to the Pier 4 (boat ramp staging pier). This
work has been completed. DC /t_eGC
■ On 3/12/2013, a Letter of Refinement was issued to allow vinyl sheet piling with cap
boards to prevent underwashing of the ramp. This work has been completed.
• On 4/29/2013, a Letter of Refinement was issued for an increase of the width of the
sheet piling cap boards from 24" to 36". This is to be used as a catwalk on each side of
the boat launch ramp. This work has been completed.
■ On 12/9/2015, SHP coordinated with NCDCM and the HOA to include the addition of
provisions for private docks by individual homeowners on waterfront (amendment to
HOA covenants).
• 8/1/2016 — 10/1/2016, Comprehensive planning and pricing associated with the
permitted fuel system at the existing marina. Quible worked closely with SHP and
OESSCO to develop a plan for this component. The capital expenditure to complete
that effort was not financially feasible, but there are plans to accomplish this in the
future.
■ On 6/22/2020, Quible and representatives from SHP met with Cynthia Rountree of DCM
to discuss CAMA Major renewal and also to visually review and discuss future repair and
maintenance for portions of the soundfront bulkhead.
In the marina area, none of the remainder of the piers, slips and boardwalks have been
constructed at this time and neither has the parking area and ship store. Riai has undertaken
substantial development activity in reliance upon the Permit as described above.
Enclosed the $100 renewal processing fee, authorization statement and a copy of the current
permit. We appreciate your continued attention to the project. If you have questions regarding
this request for the renewal of CAMA Major 176-05, please contact me at (252) 261-3300 or
brubinoQquible.com.
Sincerely,
Quible & Associates, P.C.
� ��
Brian Rubino
cc: Gregg Bodnar, NCDCM Assistant Major Permits Coordinator
Daniel Sumerel, SHP
Tom Turri, SHP
6GENT AUTHORIZATION FOR CAMA PERMIT APPLICATION RECEIVED
1AN 01 2021
Name of Property Owner Requesting Permit: Rial Corporation
M-EC
Mailing Address: scotch Hall Preserve
P.O. Box 159, Merry Hill, NC 27957
Phone Number:
Email Address: dsumerel@scotchhallpreserve.com
I certify that I have authorized Quible s Associates, P.C.
Agent/Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development:
Renewal. Request for LAMA Major 176-05
at my property located at 105 scotch Hall C:. , Merry Hill, VC
in Bert-le County.
1 furthermore certify that 1 am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
o 6)
1 Gnw,
Signature
DGn;cz F. SJi►►Gre,
Print or Type Name
Pres;d&%t-
Title
Date
12 3�i �C;?_ '
This certification is valid through 1 1
Permit Class Permit Number
RENEWAL 176-05
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission RECEIVED
Vermtt !AN 01 2021
for
X Major Development in an Area of Environmental Cobrp�M_EC
pursuant to NCGS 113A-118 ((,.JJ��,,rr
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Rial Corporation,PO Box 2444 Greenville NC 29602
Authorizing development in Bertie County ad'. to the Chowan River at the end of SR
1502 near Merry Hill , as requested in the permittee's application dated letter
dated 7/20120.
This permit, issued on September 1,2020 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terns may
be subject to fines, imprisonment or civil action;or may cause the permit to be null and void.
1) This renewal shall be attached to Permit No. 176-05, which was issued to the pennittee on 11/9/05,
as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall
be readily available on site when a Division representative inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
05-1871 V2.
VOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No.
2006-10026 and 2010-00731.
NOTE: A permit renewal application processing fee of$100 was received by DCM for this project.
This permit action may be appealed by the perrnittee or Signed by the authority of the Secretary of DEQ and the
other qualified persons within twenty (20) days of the issuing Chainnan of the Coastal Resources Commission.
date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Braxton G. Davis,Director
Any maintenance work or project modification not covered Division of Coastal Management
hereunder requires further Division approval.
All work must cease when the permit expires on This permit and its conditions are hereby accepted,
January 22,2021
In issuing this permit, the State of Notch Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program. Signature of Permittee