Loading...
HomeMy WebLinkAbout176-05 Renewal 02/2021 Rial Corporation ------------------- --- - - ----------- ------------ Permit Class Permit Number RENEWAL 176-05 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Comt ission �L for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Rial Corporation,PO Box 2444, Greenville,NC 29602 Authorizing development in Bertie County ad1.to the Chowan River, at the end of SR 1502, near Merry Hill , as requested in the permittee's application dated letter dated 1/5/21. This permit,issued on February 2,2021 , is subject to compliance with the application(where consistent with the permit), all applicable regulations,special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action;or may cause the permit to be null and void. 1) This renewal shall be attached to Permit No. 176-05,which was issued to the permittee on 11/9/05, as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 05-1871 V2. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2006-10026 and 2010-00731. NOTE: A permit renewal application processing fee of$100 was received by DCM for this project. This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the Chair other qualified persons within twenty (20) days of the issuing of the Coastal Resources Commission. date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered Braxton C. Davis, Director hereunder requires further Division approval. Division of Coastal Management All work must cease when the permit expires on This permit and its conditions are hereby accepted. January 22,2023 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee DCM Coordinator: til Permit#• l Z MAILING DISTRIBUTION SHEET Permittee: Rt { 0 Za. MYC Z GvZ Agents: toA6,1Apf Q,A•ble, /cam DCM Field Offices Elizabeth City C wiJy, �l�s ( Washington (with revised work plan drawings) Morehead City Wilmington (OBJECTIONS ) US ACOE Offices: Washington: Raleigh Bland(Beaufort, Camden, Chowan, Craven, Hertford, Hyde,Perquimans, Tyrrell) Josh Pelletier(Bertie, Currituck, Dare, Gates, Pamlico,Pasquotank, Washington) Tom Steffans(NC DOT-Beaufort, Carteret, Craven, Pamlico) Bill Biddlecome(NC DOT-Remainder ECity/Washington District) Wilmington: Greg Curry(Brunswick,New Hanover) Liz Hair(Carteret,Onslow, Pender) Brad Shaver(NCDOT-Brunswick,New Hanover, Onslow, Pender) Cultural Resources: Renee Gledhill-Earley at Environmental.Review@ncdcr.gov - Public Water Supply: Heidi Cox(WIRO) Clif Whitfield(WARD) Marine Fisheries: Kim Harding Jimmy Harrison NC DOT: David Harris Shellfish Sanitation: Shannon Jenkins/Sharon Gupton State Property: Tim Walton/Mike Moser DEMLR/DWR: Sheri Montalvo/Shelton Sullivan Washington: Chris Pullinger—401 Tina Martin -401 Roger Thorpe-Storm water Garcy Ward-(NCDOT-Beaufort,Bertie,Camden,Carteret, Chowan, Craven, Currituck, Dare,Gates, Hertford, Hyde, Pamlico, Pasquotank, Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs—401 (Brunswick,New Hanover) Holley Snider—401 (Carteret,Onslow, Pender) Christine Hall - Stormwater Joanne Steenhuis-401 (NCDOT-Brunswick,New Hanover,Onslow, Pender) Wildlife Resources: Maria Dunn(WARD) (NCDOT)Travis Wilson Natural Heritage Program Rodney Butler LPO: Quible 70 Quible &Associates, P.C. pa.c.C27949 RECEIVED '�"° "y28149 ENGINFFRi`(i•ENVI&O.W TNTAL SCENCES•PLANNING•SUMBING Fh:xt2 252-491-9146 Fay:252-491.81 a6 SINCE K59 web g_tYe.ccm J A N 0 7 2021 January 5, 2021 Ms. Cynthia Roundtree DCM-EC NC Division of Coastal Management 401 South Griffin Street, Suite 300 Elizabeth City, NC 27909 RE: Renewal of CAMA Major 176-05 Dear Ms. Roundtree: I am writing to request the renewal of CAMA Major #176-05 (the"Permit"), issued to Riai Corporation. The Permit was originally issued on 11/09/2005 for a new subdivision, golf course with clubhouse, shoreline stabilization, access roads and parking areas. Since then, Quible & Associates, P.C. (Quible) was engaged to assist with permitting of a marina on Salmon Creek and a Major Modification to permit #176-05 was issued on 12/09/2010 for a 92 slip marina on Salmon Creek. Based on the applicable permit extension acts, the expiration date was 1/22/2015. On 12/30/2014, Quible requested what constituted the first renewal of the marina permit which was granted on 3/3/2015, with an expiration date of 1/22/2017. The second renewal was issued on December 1, 2017 and we have recently received a third renewal that was issued on September 1, 2020 with an expiration date of January 22, 2021. Therefore, this constitutes the fourth renewal request. This is a broad CAMA Major Permit that has been relied on for many facets of the development with the intent of being able to utilize this for future work and modifications thereof. The tract is bound on 3 side by water bodies, including the Albemarle Sound and Salmon Creek. The following is a summary of work completed and ongoing: • On 5/03/2012, a Letter of Refinement was issued for fencing, pool patio and associated grading in the Clubhouse area at Scotch Hall Preserve. This work has been completed. • On 2/27/2013, a Minor Modification was issued for shoreline stabilization bulkhead and associated grading in the vicinity of what is referred to as Lot 158-160. These are Albemarle sound-fronting lots. This work has been completed. • In 2012-2013, a portion of the marina was constructed which is limited to Pier#3 with associated boat slips and the boat ramp area. In association with this activity: ■ On 1/14/2013, a Letter of Refinement was issued for constructing rectangular finger piers instead of triangular (on Pier 3), addition of 63 ft to Pier 3 in a landward direction to RECEIVED 1AN 0 1 2021 provide upland access, 22 ft long extension to the Pier 4 (boat ramp staging pier). This work has been completed. DC /t_eGC ■ On 3/12/2013, a Letter of Refinement was issued to allow vinyl sheet piling with cap boards to prevent underwashing of the ramp. This work has been completed. • On 4/29/2013, a Letter of Refinement was issued for an increase of the width of the sheet piling cap boards from 24" to 36". This is to be used as a catwalk on each side of the boat launch ramp. This work has been completed. ■ On 12/9/2015, SHP coordinated with NCDCM and the HOA to include the addition of provisions for private docks by individual homeowners on waterfront (amendment to HOA covenants). • 8/1/2016 — 10/1/2016, Comprehensive planning and pricing associated with the permitted fuel system at the existing marina. Quible worked closely with SHP and OESSCO to develop a plan for this component. The capital expenditure to complete that effort was not financially feasible, but there are plans to accomplish this in the future. ■ On 6/22/2020, Quible and representatives from SHP met with Cynthia Rountree of DCM to discuss CAMA Major renewal and also to visually review and discuss future repair and maintenance for portions of the soundfront bulkhead. In the marina area, none of the remainder of the piers, slips and boardwalks have been constructed at this time and neither has the parking area and ship store. Riai has undertaken substantial development activity in reliance upon the Permit as described above. Enclosed the $100 renewal processing fee, authorization statement and a copy of the current permit. We appreciate your continued attention to the project. If you have questions regarding this request for the renewal of CAMA Major 176-05, please contact me at (252) 261-3300 or brubinoQquible.com. Sincerely, Quible & Associates, P.C. � �� Brian Rubino cc: Gregg Bodnar, NCDCM Assistant Major Permits Coordinator Daniel Sumerel, SHP Tom Turri, SHP 6GENT AUTHORIZATION FOR CAMA PERMIT APPLICATION RECEIVED 1AN 01 2021 Name of Property Owner Requesting Permit: Rial Corporation M-EC Mailing Address: scotch Hall Preserve P.O. Box 159, Merry Hill, NC 27957 Phone Number: Email Address: dsumerel@scotchhallpreserve.com I certify that I have authorized Quible s Associates, P.C. Agent/Contractor to act on my behalf, for the purpose of applying for and obtaining all CAMA permits necessary for the following proposed development: Renewal. Request for LAMA Major 176-05 at my property located at 105 scotch Hall C:. , Merry Hill, VC in Bert-le County. 1 furthermore certify that 1 am authorized to grant, and do in fact grant permission to Division of Coastal Management staff, the Local Permit Officer and their agents to enter on the aforementioned lands in connection with evaluating information related to this permit application. Property Owner Information: o 6) 1 Gnw, Signature DGn;cz F. SJi►►Gre, Print or Type Name Pres;d&%t- Title Date 12 3�i �C;?_ ' This certification is valid through 1 1 Permit Class Permit Number RENEWAL 176-05 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission RECEIVED Vermtt !AN 01 2021 for X Major Development in an Area of Environmental Cobrp�M_EC pursuant to NCGS 113A-118 ((,.JJ��,,rr X Excavation and/or filling pursuant to NCGS 113-229 Issued to Rial Corporation,PO Box 2444 Greenville NC 29602 Authorizing development in Bertie County ad'. to the Chowan River at the end of SR 1502 near Merry Hill , as requested in the permittee's application dated letter dated 7/20120. This permit, issued on September 1,2020 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terns may be subject to fines, imprisonment or civil action;or may cause the permit to be null and void. 1) This renewal shall be attached to Permit No. 176-05, which was issued to the pennittee on 11/9/05, as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 05-1871 V2. VOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2006-10026 and 2010-00731. NOTE: A permit renewal application processing fee of$100 was received by DCM for this project. This permit action may be appealed by the perrnittee or Signed by the authority of the Secretary of DEQ and the other qualified persons within twenty (20) days of the issuing Chainnan of the Coastal Resources Commission. date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Braxton G. Davis,Director Any maintenance work or project modification not covered Division of Coastal Management hereunder requires further Division approval. All work must cease when the permit expires on This permit and its conditions are hereby accepted, January 22,2021 In issuing this permit, the State of Notch Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee