Loading...
HomeMy WebLinkAbout176-05 Renewal 09/2020 Rial Corporation Permit Class Permit Number RENEWAL 176-05 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission e r tu tt for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Rial Corporation, PO Box 2444, Greenville, NC 29602 Authorizing development in Bertie County adj. to the Chowan River, at the end of SR 1502 near Merry Hill , as requested in the permittee's application domed letter dated 7/20/20 This permit, issued on September 1,2020 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal shall be attached to Permit No. 176-05, which was issued to the permittee on 11/9/05, as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 05-1871 V2. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2006-10026 and 2010-00731. NOTE: A permit renewal application processing fee of$100 was received by DCM for this project. This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Braxton C. Davis, Director Any maintenance work or project modification not covered Division of Coastal Management hereunder requires further Division approval. All work must cease when the permit expires on This permit and its conditions are hereby accepted. January 22, 2021 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Signature of Permittee Management Program. DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAlL AND PROCESSING RECORD APPLICANT: Cgi wt to P&*NUf fLu�4fior► COUNTY: Choose an item. PROJECT NAME: �'7�o OS LOCATION OF PROJECT: DATE APPLICATION RECEIVED COMPLETE BY FIELD: Click or tap to enter a date. FIELD RECOMMENDATION: Attached: Choose an item. To Be Forwarded: Choose an item. FIELD REPRESENTATIVE: Choose an item. DISTRICT OFFICE: XXXXXXX DISTRICT MANAGER REVIEW: Date B) DATE RECEIVED BY MAJOR PERMITS UNIT: FEE REC'D: Choose an item. #Click or tap here to enter text. APPLICATION ASSIGNED TO: Choose an item. PUBLIC NOTICE REC'D: Click or tap to enter a date. END OF NOTICE DATE: Click or tap to enter a date. ADJ. RIP. PROP NOTICES REC'D: DEED REC'D: Yes C) 75 DAY DEADLINE: Click or tap to enter a date. 150 DAY DEADLINE: HOLDS: EMAIL OUT DATE: Click or tap to enter a date. STATE DUE DATE: Click*aZl&�O date PERMIT FINAL ACTION: ISSUE DENY AGENCY DATE NOTES COMMENTS OBJECTIONS: RETURNED YES NO DCM—Field Rep DCM—LUP Consistency Determination Local Permit Officer Corps of Engineers—Regulatory Branch DWR—401 Section DWR—Public Water Supply 7 Zo k DEMLR—Stormwater ev l C7 DEMLR—Sed and Erosion DOA—State Property Office Wildlife Resources Commission DMF—Shellfish Section 7 DMF—Habitat&Enhancement �l DNCR—Archives&History 21 DNCR—Natural Heritage Program NCDOT NC Dept of Commerce DCM Coordinator: "AK Permit #: M -05- MAILING DISTRIBUTION SHEET Permittee: I��r�,rp 70 � ��/� G�rCGh✓s* AC 01 �Z' Agents: l-lt�( p r DI I. God DCM Field Offices Elizabeth City t!�µ �a f Rq Washington (with revised work plan drawings) Morehead City Wilmington (OBJECTIONS ) US ACOE Offices: Washington: Raleigh Bland(Beaufort,Camden,Chowan,Craven,Hertford,Hyde, Perquimans, Tyrrell) Josh Pelletier(Bertie,Currituck,Dare,Gates, Pamlico,Pasquotank,Washington) Tom Steffans(NC DOT-Beaufort, Carteret,Craven,Pamlico) Bill Biddlecome(NC DOT-Remainder ECity/Washington District) Wilmington: Greg Curry(Brunswick,New Hanover) Liz Hair(Carteret,Onslow,Pender) Brad Shaver(NCDOT-Brunswick,New Hanover, Onslow, Pender) Cultural Resources: Renee Gledhill-Earley at Environmental.Review@ncdcr.gov Public Water Supply: Heidi Cox(WIRO) Clif Whitfield(WARD) Marine Fisheries: Kim Harding Jimmy Harrison NC DOT: David Harris Shellfish Sanitation: Shannon Jenkins/Sharon Gupton State Property: Tim Walton/Mike Moser DEMLR/DWR: Sheri Montalvo/Shelton Sullivan Washington: Anthony Scarbraugh-401 Roger Thorpe-Stormwater Garcy Ward-(NCDOT-Beaufort, Bertie,Camden, Carteret,Chowan,Craven,Currituck, Dare, Gates,Hertford,Hyde, Pamlico,Pasquotank,Perquimans, Tyrrell, Washington) Wilmington: Robb Mairs—401 (Brunswick,New Hanover) Holley Snider—401 (Carteret,Onslow, Pender) Christine Hall- Stormwater Joanne Steenhuis-401 (NCDOT-Brunswick,New Hanover, Onslow, Pender) Wildlife Resources: Maria Dunn(WARO) (NCDOT)Travis Wilson Natural Heritage Program Rodney Butler LPO: Bodnar, Gregg From: Thorpe, Roger Sent: Wednesday, August 12, 2020 11:33 AM To: Bodnar, Gregg Subject: CAMA Renewal - Scotch Hall - Bertie County G reg The Stormwater Section does not have any objection to renewal of the CAMA permit for the subject project. Roger Roger K. Thorpe Environmental Engineer Division of Energy, Mineral, and Land Resources North Carolina Department of Environmental Quality 252-948-3923 office roger.th orpe(g)-ncden r.gov Washington Regional Office 943 Washington Square Mall Washington, NC 27889 D 16oparieHaal al F4*irW WIal Wall" Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1 Bodnar, Gregg From: Bodnar, Gregg Sent: Friday, August 7, 2020 8:32 AM To: Gledhill-earley, Renee Subject: FW: CAMA Renewal Circulation for Rial Corp (Scotch Hall) #176-05 Part 3 of 3 Morning Renee, Yesterday I sent a renewal notice to your Environmental.Review mailbox. Below Maria brought up the potential for Cultural artifacts at the site. A renewal has been requested for the project and we are circulating the renewal request to our agencies to determine if any changes to the site or rules for any agencies would prohibit the renewal from being authorized. So if you have any questions or concerns let me know and I can make sure DCM staff is aware. Thanks, G regg From: Dunn, Maria T. <maria.dunn@ncwildlife.org> Sent: Friday, August 7, 2020 8:14 AM To: Bodnar, Gregg<gregg.bodnar@ncdenr.gov> Subject: RE: CAMA Renewal Circulation for Rial Corp (Scotch Hall)#176-05 Part 3 of 3 1 just didn't see her name.The site is/was an excellent Indian and colonial site that should have had more stops to it during initial development. So much pottery, pipes, etc.They should have been pulled in more earlier and with the Lost Colony efforts since 2005, 1 didn't know. From: Bodnar, Gregg<eregg.bodnar@ncdenr.gov> Sent: Friday, August 07, 2020 8:11 AM To: Dunn, Maria T. <maria.dunn c ncwildlife.org> Subject: RE: CAMA Renewal Circulation for Rial Corp (Scotch Hall)#176-05 Part 3 of 3 It is Renee. Goes to their environmental.review mailbox. G From: Dunn, Maria T. <maria.dunn ncwildlife.org> Sent: Friday, August 7, 2020 6:24 AM To: Bodnar, Gregg<gregg.bodnar(@ncdenr.gov> Subject: RE: CAMA Renewal Circulation for Rial Corp (Scotch Hall) #176-05 Part 3 of 3 Thanks Gregg. Who was the SHPO person on this one? I don't recognize all the recipient names. From: Bodnar, Gregg<aregg bodnarC@ncdenr.gov> Sent:Thursday,August 06, 2020 3:43 PM To: Pelletier,Josh R CIV CESAW CESAD (USA)<Josh R.Pelletier usace.army.miI>; DCR- Environmental_Review <Environmental.Review@ncdcr.gov>; Whitfield, Clif<clif.whitfield@ncdenr.gov>; Harrison,James A <James.Harrison@ncdenr.gov>; Harris, David B<davidharris@ncdot.gov>;Jenkins, Shannon 1 Bodnar, Gregg From: Dunn, Maria T. Sent: Friday, August 7, 2020 8:14 AM To: Bodnar, Gregg Subject: RE: CAMA Renewal Circulation for Rial Corp (Scotch Hall) #176-05 Part 3 of 3 1 just didn't see her name.The site is/was an excellent Indian and colonial site that should have had more stops to it during initial development. So much pottery, pipes, etc.They should have been pulled in more earlier and with the Lost Colony efforts since 2005, 1 didn't know. From: Bodnar, Gregg<gregg.bodnar@ncdenr.gov> Sent: Friday, August 07, 2020 8:11 AM To: Dunn, Maria T. <maria.dunn@ncwildlife.org> Subject: RE: CAMA Renewal Circulation for Rial Corp (Scotch Hall) #176-05 Part 3 of 3 It is Renee. Goes to their environmental.review mailbox. G From: Dunn, Maria T. <maria.dunn ncwildlife.org> Sent: Friday, August 7, 2020 6:24 AM To: Bodnar, Gregg<gregg-bodnar@ncdenr.eov_> Subject: RE: CAMA Renewal Circulation for Rial Corp (Scotch Hall) #176-05 Part 3 of 3 Thanks Gregg.Who was the SHPO person on this one? I don't recognize all the recipient names. From: Bodnar, Gregg<gregg.bodnarCa@ncdenr.gov> Sent:Thursday,August 06, 2020 3:43 PM To: Pelletier,Josh R CIV CESAW CESAD(USA) <Josh.R.PelletierPusace.army.mil>; DCR- Environmental—Review <Environmental.Review@ncdcr.gov>;Whitfield, Clif<clif.whitfield@ncdenr.gov>; Harrison,James A <James.Harrison@ncdenr.gov_>; Harris, David B<davidharris@ncdot.gov>;Jenkins, Shannon <shannon.ienkins@ncdenr.gov>; Gupton, Sharon <sharon.gupton@ncdenr.gov>; Walton,Tim <tim.walton@doa.nc.gov_>; Moser, Mike<mike.moser@doa.nc.gov>; Hilliard, Wanda <wanda.hilliard@doa.nc.eov>; Montalvo, Sheri A<sheri.montalvo@ncdenr.govv_>; Sullivan, Shelton <shelton.sullivan@ncdenr.gov>; Pullinger, Robert C <chris.pullinger@ncdenr.gov>;Thorpe, Roger<roger.thorpeC@ncdenr.gov>; Dumpor, Samir <samir.dumpor@ncdenr.eov>; Dunn, Maria T.<maria.dunn ncwildlife.org>; Butler, Rodney A <Rodnev.Butler@ncdcr.gov>;Traci White<traci.white@bertie.nc.gov> Cc: Renaldi, Ronald <ronald.renaldi(@ncdenr.eov>; Godfrey, Ella M <EIIa.Godfrev@ncdenr.gov> Subject: RE: CAMA Renewal Circulation for Rial Corp (Scotch Hall)#176-05 Part 3 of 3 From: Bodnar, Gregg Sent:Thursday,August 6, 2020 3:40 PM To: 'Pelletier,Josh R CIV CESAW CESAD (USA)' <Josh.R.Pei letier@usace.army.mil>; DCR - Environmental—Review <Environmental.Review@ncdcr.gov>; Whitfield, Clif<clif.whitfield@ncdenr.gov>; Harrison,James A <James.Harrison@ncdenr.gov>; Harris, David B<davidharris(@ncdot.gov>;Jenkins, Shannon 1 <shannon.ienkins@ncdenr.gov>; Gupton, Sharon<sharon.gupton@ncdenr.gov>; Walton,Tim <tim.walton@doa.nc.gov>; Moser, Mike <mike.moser@doa.nc.gov>; Hilliard,Wanda <wanda.hilliard@doa.nc.gov>; Montalvo, Sheri A<sheri.montalvo@ncdenr.gov>; Sullivan, Shelton <shelton.sullivan@ncdenr.gov>; Pullinger, Robert C <chris.pullinger@ncdenr.gov>;Thorpe, Roger<roger.thorpe@ncdenr.gov>; Dumpor, Samir <samir.dumpor ncdenr.gov>; Dunn, Maria T. <maria.dunn c ncwildlife.org>; Butler, Rodney A <Rodney.Butler@ ncdcr.gov>; 'traci.white@bertie.nc.gov' <traci.white@bertie.nc.gov> Cc: Renaldi, Ronald <ronald.renaldi@ncdenr.gov>; Godfrey, Ella M <EIla.Godfrey@ncdenr.gov> Subject: RE: CAMA Renewal Circulation for Rial Corp (Scotch Hall)#176-05 Part 2 of 3 From: Bodnar, Gregg Sent:Thursday,August 6, 2020 3:39 PM To: Pelletier,Josh R CIV CESAW CESAD(USA)<Josh.R.Pelletier@usace.army•mil>; DCR- Environmental—Review <Environ mental.Review@ncdcr.gov>; Whitfield, Clif<clif.whitfield@ncdenr.gov>; Harrison,James A <James.Harrison@ncdenr.gov>; Harris, David B<davidharris@ncdot.gov>;Jenkins, Shannon <shannon.ienkins@ncdenr.gov>; Gupton, Sharon <sharon.gupton@ncdenr.gov>; Walton,Tim <tim.walton@doa.nc.go_v>; Moser, Mike<mike.moser@doa.nc.gov>; Hilliard, Wanda <wanda.hilliard@doa.nc.gov>; Montalvo, Sheri A<sheri.montalvo@ncdenr.gov>; Sullivan,Shelton <shelton.sullivan@ncdenr.gov>; Pullinger, Robert C <chris.Pullinger@ncdenr.gov>;Thorpe, Roger<roger.thorpe@ncdenr.gov>; Dumpor, Samir <samir.dumpor@ncdenr.gov>; Dunn, Maria T.<maria.dunn@ncwildlife.org>; Butler, Rodney A <Rodney.Butler@ncdcr.gov>; traci.white@bertie.nc.gov Cc: Renaldi, Ronald <ronald.renaldi@ncdenr.gov>; Godfrey, Ella M <EIIa.Godfrey@ncdenr.gov> Subject: CAMA Renewal Circulation for Rial Corp (Scotch Hall)#176-05 Part 1 of 3 Afternoon all, FYI this is a 3 part email. Please refer to the above attachment(s) for materials associated with a renewal request for an active CAMA permit. It has been determined that "no substantial development" has occurred on site since the last permit action. Due to this determination, the active permit cannot be renewed under CRC rule, but the rule does allow for circulation of the request to resource agencies to provide comment to any changes in circumstances or site conditions, or changes in your agency's rules or development standards that warrant a new application and CAMA major permit review. Therefore, DCM is requesting that your agency review the above materials to determine if site conditions or circumstances, or agency rules would prohibit DCM from issuing a renewal of the CAMA permit. Please provide comment within 21 days of receipt of this email to any changes in site conditions or rules that would prohibit DCM from issuing a permit renewal. If no reply is provided within 21 days of receipt, then DCM will assume that your agency intends a NO COMMENT. Thanks, Gregg 2 ROY COOPER �rcnrrnur MICHAEL S. REGAN co ,Semlarb BRAXTON DAVIS Mrcclnr,lNrisrnn n/Coastal nlunugemcm August 6, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) gregq.bodnar(ancdenr.gov SUBJECT: CAMA Major Permit Renewal Review Applicant: Rial Corp. Scotch Hall Permit No: 176-05 Project Location: at the end of SR 1502 in Merry Hill DCM has determined that no substantial development has occurred since the last permit action, therefore, this project does not qualify for a renewal under CRC rule 15A NCAC 07J.0404(b). However, subsection (c) allows the Division of Coastal Management to circulate the request to the state agencies to determine if any changes in circumstances or in development standards warrant a new application and CAMA major permit review. DCM is not aware of any proposed changes to the previously authorized project. Please indicate below your agency's position or viewpoint on the proposed renewal request and Gregg Bodnar at the address above by August 28, 2020. If you have any questions regarding the proposed project, contact Gregg Bodnar at(252) 725-0515. When appropriate, in-depth comments with supporting data is requested. REPLY: X This agency has no objection to the renewal request as proposed. **Additional comments may be attached** This agency has determined that circumstances or development standards have changed and warrant a new CAMA major permit application review. See attached. PRINT NAME James Harrison As long as the recommendations provided by NMFS on 14 June 2010 and any avoidance, minimization, and/or NCDMF mitigation measures detailed in the EA AGENCY are adhered to. Any deviation may warrant a new CAMA review. JAH - NCDMF SIGNATURE REC:EI ' ..�' DATE 28 August 2020 AUG 2 g State of North Carolina I Environmental Quality I Coastal Management MP SECTION M H D 400 Commerce Ave.Morehead City,NC 28557 (252)808-2808 ROY COOPER .•v:,. tiurenwr . MICHAEL S. REGAN BRAXTON DAVIS Oireclnr,i)fwsjun ol('aasral NORTH CAROLINA tlanagen,<nr Environmental Quality August 6, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ- Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) grew.bodna1Dncdenr.gov SUBJECT: CAMA Maior Permit Renewal Review Applicant: Rial Corp. Scotch Hall Permit No: 176-05 Project Location: at the end of SR 1502 in Merry Hill DCM has determined that no substantial development has occurred since the last permit action, therefore, this project does not qualify for a renewal under CRC rule 15A NCAC 07J.0404(b). However, subsection (c) allows the Division of Coastal Management to circulate the request to the state agencies to determine if any changes in circumstances or in development standards warrant a new application and CAMA major permit review. DCM is not aware of any proposed changes to the previously authorized project. Please indicate below your agency's position or viewpoint on the proposed renewal request and Gre Bodnar at the address above by August 28, 2020. If you have any questions regarding the proposed project, contact Gregg Bodnar at(252) 725-0515. When appropriate, in-depth comments with supporting data is requested. REPLY: _X_This agency has no objection to the renewal request as proposed. .Additional comments may be attached" This agency has determined that circumstances or development standards have changed and warrant a new CAMA major permit application review. See attached. PRINT NAME_Clif Whitfield AGENCY ,Public Water Supply Section SIGNATURE A U G 7 2020 DATE 8-7-2020 State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave.Morehead City,NC 28557 (252)808-2808 ROY COOPER Governor MICHAEL S. REGAN sec r,ar, BRAXTON DAVIS NOR I H C;AROLIWi Director,Division q/Coastal E)tvi,,*nt)tFt(?rit<_r(,,7r+.�,iiv, Management August 6, 2020 MEMORANDUM: FROM: Gregg Bodnar, Assistant Major Permits Coordinator NCDEQ - Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Fax: 252-247-3330 (Courier 04-16-33) greq,.bodnarCaD_ncdenr.gov SUBJECT: CAMA Major Permit Renewal Review Applicant: Rial Corp. Scotch Hall Permit No: 176-05 Project Location: at the end of SR 1502 in Merry Hill DCM has determined that no substantial development has occurred since the last permit action, therefore, this project does not qualify for a renewal under CRC rule 15A NCAC 07J.0404(b). However, subsection (c) allows the Division of Coastal Management to circulate the request to the state agencies to determine if any changes in circumstances or in development standards warrant a new application and CAMA major permit review. DCM is not aware of any proposed changes to the previously authorized project. Please indicate below your agency's position or viewpoint on the proposed renewal request and Greg Bodnar at the address above by August 28, 2020. If you have any questions regarding the proposed project, contact Gregg Bodnar at(252) 725-0515. When appropriate, in-depth comments with supporting data is requested. REPLY: X This agency has no objection to the renewal request as proposed. ""Additional comments may be attached" This agency has determined that circumstances or development standards have changed and warrant a new CAMA major permit application review. See attached. PRINT NAME Kacee C Zinn AGENCY NCDMF-Shellfish Sanitation RECEIVED SIGNATURE /,)C2a� for Shannon Jenkins AUG 7 2020 DATE 8ni2020 FAP SECTION !l HD State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Ave.Morehead City,NC 28557 (252)808-2808 Quible Quible &Associates, P.C. P.o.Exawo'870 Ktly Hawk.NC 27949 ENGINEERING•ENVIRONMENTAL SCIENCES•PLANNING•SURVEYING Phone:252-491-8147 SINCE 1959 Fax:252-491-8146 web:gJble com July 20, 2020 Ms. Cynthia Roundtree ?t;�� �jEat�� NC Division of Coastal Management 401 South Griffin Street, Suite 300 Elizabeth City, NC 27909 AA RE: Renewal of CAMA Major 138-06 Dear Ms. Roundtree: I am writing to request the renewal of CAMA Major #176-05 (the"Permit'), issued to Rial Corporation. The Permit was originally issued on 11/09/2005 for a new subdivision, golf course with clubhouse, shoreline stabilization, access roads and parking areas. Since then, Quible & Associates, P.C. (Quible) was engaged to assist with permitting of a marina on Salmon Creek and a Major Modification to permit #176-05 was issued on 12/09/2010 for a 92 slip marina on Salmon Creek. Based on the applicable permit extension acts, the expiration date was 1/22/2015. On 12/30/2014, Quible requested what constituted the first renewal of the marina permit which was granted on 3/3/2015, with an expiration date of 1/22/2017. The second renewal was issued on December 1, 2017. Therefore, this constitutes the third renewal request. This is a broad CAMA Major Permit that has been relied on for many facets of the development with the intent of being able to utilize this for future work and modifications thereof. The tract is bound on 3 side by water bodies, including the Albemarle Sound and Salmon Creek. The following is a summary of work completed and ongoing: • On 5/03/2012, a Letter of Refinement was issued for fencing, pool patio and associated grading in the Clubhouse area at Scotch Hall Preserve. This work has been completed. • On 2/27/2013, a Minor Modification was issued for shoreline stabilization bulkhead and associated grading in the vicinity of what is referred to as Lot 158-160. These are Albemarle sound-fronting lots. This work has been completed. • In 2012-2013, a portion of the marina was constructed which is limited to Pier #3 with associated boat slips and the boat ramp area. In association with this activity: • On 1/14/2013, a Letter of Refinement was issued for constructing rectangular finger piers instead of triangular (on Pier 3), addition of 63 ft to Pier 3 in a landward direction to provide upland access, 22 ft long extension to the Pier 4 (boat ramp staging pier). This work has been completed. DECEIVED A U G 0 5 2020 r`AA-HAND CITY ■ On 3/12/2013, a Letter of Refinement was issued to allow vinyl sheet piling rnliT ' p1; boards to prevent underwashing of the ramp. This work has been completed. • On 4/29/2013, a Letter of Refinement was issued for an increase of the width of the sheet piling cap boards from 24" to 36". This is to be used as a catwalk on each side of the boat launch ramp. This work has been completed. ■ On 12/9/2015, SHP coordinated with NCDCM and the HOA to include the addition of provisions for private docks by individual homeowners on waterfront (amendment to HOA covenants). ■ 8/1/2016— 10/1/2016, Comprehensive planning and pricing associated with the permitted fuel system at the existing marina. Quible worked closely with SHP and OESSCO to develop a plan for this component. The capital expenditure to complete that effort was not financially feasible, but there are plans to accomplish this in the future. ■ On 6/22/2020, Quible and representatives from SHP met with Cynthia Rountree of DCM to discuss CAMA Major renewal and also to visually review and discuss future repair and maintenance for portions of the soundfront bulkhead. In the marina area, none of the remainder of the piers, slips and boardwalks have been constructed at this time and neither has the parking area and ship store. Rial has undertaken substantial development activity in reliance upon the Permit as described above. Rial remains committed to the marina and other development activities at Scotch Hall Preserve, as permitted. As regional economic conditions have begun gaining momentum and new markets are realized, SHP is ready to continue developing the permitted project. I have enclosed the $100 renewal processing fee, a copy of the permit modification and renewals, and a copy of the marina area CAMA plan which was last updated on 3/06/2013 in association with the last Letter of Refinement. We appreciate your continued attention to the project. If you have questions regarding this request for the renewal of CAMA Major 176-05, please contact me at (252) 261-3300 or brubino@quible.com. Sincerely, Quible & Associates, P.C. < mtk---_-_� Brian Rubino cc: Jonathan Howell, NCDCM Major Permits Coordinator Daniel Sumerel, SHP Tom Turri, SHP 1RECEIVED A'UG 0 5 2020 I"CIM-MHD CITY Permit Class Permit Number RENEWAL 176-05 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission V,C ''V e erm tt for � �IV�" : � X Major Development in an Area of Environmental Concern pursuant to NCGS l 13A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Rial Corporation, PO Box 2444___ p , Greenville, NC 29602 Authorizing development in Bertie County adj. to the Chowan River, at the end of SR 1502, near Merry I-Iill ,as requested in the pennittee's application dated letter dated 9/27/17. This permit,issued on December 1,2017 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal shall be attached to Permit No. 176-05, which was issued to the permittee on 11/9/05, as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force tinder this renewal. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No, 05-1871 V2. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No. 2006-10026 and 2010-00731. NOTE: A permit renewal application processing fee of$100 was received by DCM for this project. This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the other qualified persons within twenty(20)days of the issuing Chairman of the Coastal Resources Commission. date. This permit must be accessible on-site to Department 1/ personnel when the project is inspected for compliance. (� Braxto . Davis, Director Any maintenance work or project modification not covered ivision of Coastal Management hereunder requires further Division approval, All work must cease when the permit expires on This permit and its conditions are hereby accepted. January 22,2019 In issuing this permit, the State of North Carolina agrees AUG 0 5 2020 that your project is consistent with the North Carolina Coastal Management Program. S� isgt ro-satao-}waauaco-»a}wx-}oo->et• »oo-woas<awva+}raen.+o-ttt+.daact-��cttrsack+.rovw:ott•ace.t-amttt-u-:ttt-x,}ctt.:t�.c-w,sro+rr•r.>::t<+�»aw».vou!�-o-ocoaco' Permit Class Permit Number RENEWAL 176-05 STATE OF NORTH CAROLINA Department of Environment and Natural Resources r � � �lv1 and Coastal Resources Commission ��I11it DMEC for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 a X Excavation and/or filling pursuant to NCGS 113-229 Issued to Rial Corporation, PO Box 2444,Greenville, NC 29602 } Authorizing development in Bertie County adi.to the Chowan River,at the end of SR r 1502, near M_ r.ry Hill as requested in the permittee's email dated 12/30/14 t This permit, issued on March 3. 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action;or may cause the permit to be null and void. 1) This renewal shall be attached to the original of Permit No. 176-05,which was issued on 11/9/05,as well ti as all subsequent renewals and modifications, and copies of all documents shall be readily available on site when Division personnel inspect the project for compliance. f 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: A permit renewal application processing fee of$100 was received by DCM for this project. t This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty(20)days of the issuing Chairman of the Coastal Resources Commission. ?- date. + This permit must be accessible on-site to Department personnel when the project is inspected for compliance. c' Y Any maintenance work or project modification not covered y;-,J Braxton C. Davis, Director hereunder requires further Division approval. 1 ' Division of Coastal Management All work must cease when the permit expires on EC1=I1/E® This permit and its conditions are hereby accepted. x January 22, 2017 In issuing this permit, the State of North Carolina agrees 'UG 0 5 2020 that your project is consistent with the North Carolina Coastal '%11(��� CITY- Signature 1 h Management Program. ]y4xy� of Permittee C+4t•'�Y.-0Ct-h`4'.K4404)ai+ai•da}}ti1•(+`h'Y1J0 Wb}?NPT?}TWaYJai}Y+i-ia!a`•>Mk4:�iaNOt<AC?}hV Oaix�'i^Wi:.:-0??f v%N.t•n}:�Yn}J iSKti�.::e!�/+ra!-\I.+iaii�iCit<+/-:K�I/laP4i'-'Nit4:•`!.•�•� Permit Class Permit Number MODTFTCATION/MTNOR 1.76-05 STATE OF NO TH CAROLINA Department of E vironInt and Natural Resourccs Coastal ResouIr s Commission PMt } t X Major Developmen in an Area of Environmental Concern pursuant to NCGS I 13A-11 R ; X Fxcavation and/or f1ling pursuant to NCGS 113-229 Issued to Rial Corporation, PO.Bux 2444 Greenville NC 29602 Authorizing development in Bertie County adi. the howan River,at the end of SR 1 Q2, near M.Q Hill.___, as requested in t permittee's email dated _ 12/21/12, inc ditt-iap, the attached wurkalim drawin }s(2),both dated 12/5/12 This pennit, issued on V�uary27.2013 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditior s and notes set forth below.Any violation of these terms may be subject to fines, imprisonment or civil action;or may"u a the permit to be null and void, 1) Unless specifically altered herein, this minOT modification authorizes the additional bulkhead and construction entrance, all as indicated on the al lathed workplan drawings. 21 The authorized additional bulkhead shall adhere to the alignment depicted on the attached workplan drawings. (See attached sheet foi Additional Conditions) This pcmiit action may be appealed by flit permittee or Signed by the authority of the Secretary of 17p.NK and the other qualified persons widtut twenty (20) days of the issuing Chairman of the Coastal Resources CommiWon. date. An appeal rmquires resolution prior to work initiation or cuntinuance as the case may be. This permit must be accessible on-site to Dopartmeot personnel when the prujcet is inspected for compliance. Any mnintcnanee work or project modification not covered Braxton . Davis,Director 17ivision of Coastal Management hercunder requires fuer rth Division approval. 3ECEIVED All work must cease when the permit expires on This permit and its conditions ure hereby accepted. January 22, 2015 AUG ® 5 202 In issuing this permit, the State of North Carolina agrees �, _k��® CI that your project is consistent with the North Carolina Coastal Management Program. Signature of Pertnittee �,�:a6ed 092TT922S2TG:01 AIXHW W9a:woJd 9S:91 ET02-L2-HHJ Rial Corporation Permit# 175-06 r�� Page 2 of 2 ll K, ADDITIONAL CONDITIONS 3) The bulkhead shall be constructed prior to any t acki.illing activities. 4) The bulkhead shall be structurally tight so a, to prevent seepage of baekfrll materials through the structure. ,) The bulkhead wall shall be solid and coristruct.,d of treated wood, concrete slabs, metal or vinyl sheet piles or other suitable materials approved by diN ision personnel, 6) All backtill material shall be clean and free of a iy pollutants except in trace quantities. 7) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. General 8) This permit does not eliminate the need to obtai any additional slate, federal or local permits, approvals or authorizations that may be required, fiicluding any authorization required. 9) Prior to the initiation of any land-disturbing activities authorized by this modification, the permittee shall, in coordination with the N.C. Department of Cultural Resources (NCDCR),develop and implement an archaeological survey of the propbsed project area. Initiation ol'permitted land-disturbing activities shall not begin unti I written approval i i obtained from NCDCR,and a copy of such approval has been received by the Division of Coastal Management. 10) This minor modification shall be attached to the original Permit No. 176-05, which was issued on 1 1/9/05, as well as Al subsequent modifications and refinements,and copies of all documents shall be readily available on site when Division personnel inspect the project for compliance. 11) All conditions and stipulations of the active per it remain in force under this minor modification unless specifically altered herein. RECEIVED U G 0 5 2020 } A-MHD CITY �,�:ased 09zTT9�zSZT6 �l J.190HW W90awOJJ 9S=9T 2T02—L2—GD.J