HomeMy WebLinkAbout176-05 Renewal 12/2017 Rial Corporation Permit Class Permit Number
RENEWAL 176-05
STATE OF NORTH CAROLINA
Department of Environmental Quality
and
Coastal Resources Commission
,Perm it
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Rial Corporation,PO Box 2444, Greenville, NC 29602
Authorizing development in Bertie County adj. to the Chowan River, at the end of SR
1502,near Merry Hill , as requested in the permittee's application dated letter
dated 9/27/17.
This permit, issued on December 1,2017 , is subject to compliance with the application(where consistent
with the permit), all applicable regulations, special conditions and notes set forth below.Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to Permit No. 176-05, which was issued to the permittee on 11/9/05,
as well as all subsequent modifications, refinements, and renewals, and copies of all documents shall
be readily available on site when a Division representative inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No.
05-1871 V2.
NOTE: The U.S. Army Corps of Engineers has assigned the proposed project SAW Action Id. No.
2006-10026 and 2010-00731.
NOTE: A permit renewal application processing fee of$100 was received by DCM for this project.
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
Braxto . Davis, Director
Any maintenance work or project modification not covered esion of Coastal Management
hereunder requires further Division approval.
All work must cease when the permit expires on This permit and its conditions are hereby accepted.
January 22,2019
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program. Signature of Permittee
ROY COOPER
J, Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON C. DAVIS
ENVIRONMENTAL QUALITY Director
December 4,2017
Rial Corporation
P.O. Box 2444
Greenville,N.C. 29602
Dear Sir or Madam:
The enclosed permit constitutes authorization under the Coastal Area Management Act, and
where applicable,the State Dredge and Fill Law, for you to proceed with your project proposal.The
original(buff-colored form)is retained by you and it must be available on site when the project is
inspected for compliance. Please sign both the original and the copy and return the copy to this office in
the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal
described below.
If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS
113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter
150B with the Office of Administrative Hearings, 6714 Mail Service Center,Raleigh,NC 27611-6714,
(919)733-2698 within twenty(20)days of this decision on your permit.You should also be aware that
another qualified party may submit an objection to the issuance of this permit within twenty(20)days.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work
must be carried out in accordance with your application. Modifications,time extensions, and future
maintenance requires additional approval. Please read your permit carefully prior to starting work and
review all project plans,as approved. If you are having the work done by a contractor,it would be to your
benefit to be sure that he fully understands all permit requirements.
From time to time,Department personnel will visit the project site. To facilitate this review,we
request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if
questions arise concerning permit conditions,environmental safeguards,or problem areas,you may
contact Department personnel at any time for assistance. By working in accordance with the permit,you
will be helping to protect our vitally important coastal resources.
Sincerely,
Enclosure
A
ouglas V.Hu e
Major Permits Manager
N.C. Division of Coastal Management
Nothing Compares--,,-,-
State of North Carolina I Environmental Quality I Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead City,NC 28557
252 808 2808
DCM Coordinator: Permit#:
MAH G DISTRIBUTION SHEET--._._.
Permitee:
Agents:
DCM Field Offices ` w�
Elizabeth City (with revised work plan drawings)
Morehead City
Washington `
Wilmington
US ALOE Offices:
Washington: Raleigh Bland(Beaufort, Camden,Chowan,Craven,Hertford,Hyde,Perquimans,
Tyrrell)
Josh Peletier(Bertie, Currituck,Dare,Gates,Pamlico,Pasquotank,Washington)
Tom Steffan(NC DOT-Beaufort,Carteret,Craven,Pamlico)
Bill Biddlecome(NC DOT-Remainder ECitff ashington District)
Wilmington: Tyler Crumbley(Brunswick,New Hanover)
Liz Hair(Carteret,Onslow,Pender)
Brad Shaver(NCDOT-Brunswick,New Hanover,Onslow,Pender)
Cultural Resources: Renee Gledhill-Earley
.Public Water Supply: Heidi Cox(WIRO)
Clif Whitfield(WARO)
Marine Fisheries: Shane Staples
Curt Weychert
NC DOT: David Harris
Shellfish Sanitation: Shannon Jenkins
State Property: Tim Walton
DEMLR/DWR: Karen Higgins
Kristy Lynn Carpenter(NC DOT-All Projects)
Washington: Anthony Scarbraugh-401
Roger Thorpe-Stormwater
Garcy Ward-(NCDOT-Beaufort,Bertie,Camden,Carteret,Chowan,Craven,Currituck,
Dare,Gates,Hertford,Hyde,Pamlico,Pasquotank,Perquimans,Tyrrell,Washington)
Wilmington: Robb Mairs—401 (Carteret,Onslow,Pender,New Hanover)
Chad Coburn—401 (Brunswick)
Georgette Scott-Stormwater
Joanne Steenhuis-401 (NCDOT-Brunswick,New Hanover,Onslow,Pender)
Wildlife Resources: Maria Dunn(WARO)
LPO:
Fax Distribution: Permittee#: Agent#
Quible
Quible &Associates, P.C. P.O.Drawer870
T Kitty Hawk,NC 27949
ENGINEERING•ENVIRONMENTAL SCIENCES•PLANNING•SURVEYING i Phone:252-491-8147
SINCE 1959 ! r° Fax:252-491-8146
web:quible.com
OCT 02 2017
September 27, 2017 �(V� ARO
Mr. Kevin Hart
NC Division of Coastal Management
943 Washington Square Mall REC I
VIED
Washington, NC 27889
OCT I S' 017
RE: Renewal of CAMA Major 138-06
DIM M`-'L,, C i T
Dear Mr. Hart:
I am writing to request the renewal of CAMA Major #176-05 (the "Permit'), issued to Rial
Corporation. The Permit was originally issued on 11/09/2005 for a new subdivision, golf course
with clubhouse, shoreline stabilization, access roads and parking areas. Since then, Quible &
Associates, P.C. (Quible) was engaged to assist with permitting of a marina on Salmon Creek
and a Major Modification to permit #176-05 was issued on 12/09/2010 for a 92 slip marina on
Salmon Creek. Based on the applicable permit extension acts, the expiration date was
1/22/2015. On 12/30/2014, Quible requested what constituted the first renewal of the marina
permit which was granted on 3/3/2015, with an expiration date of 1/22/2017.
This is a broad CAMA Major Permit that has been relied on for many facets of the development
with the intent of being able to utilize this for future work and modifications thereof. The tract is
bound on 3 side by water bodies, including the Albemarle Sound and Salmon Creek. The
following is a summary of work completed and ongoing:
■ On 5/03/2012, a Letter of Refinement was issued for fencing, pool patio and associated
grading in the Clubhouse area at Scotch Hall Preserve. This work has been completed.
• On 2/27/2013, a Minor Modification was issued for shoreline stabilization bulkhead and
associated grading in the vicinity of what is referred to as Lot 158-160. These are
Albemarle sound-fronting lots. This work has been completed.
■ In 2012-2013, a portion of the marina was constructed which is limited to Pier #3 with
associated boat slips and the boat ramp area. In association with this activity:
■ On 1/14/2013, a Letter of Refinement was issued for constructing rectangular finger
piers instead of triangular (on Pier 3), addition of 63 ft to Pier 3 in a landward direction to
provide upland access, 22 ft long extension to the Pier 4 (boat ramp staging pier). This
work has been completed.
■ On 3/12/2013, a Letter of Refinement was issued to allow vinyl sheet piling with cap
boards to prevent underwashing of the ramp. This work has been completed.
■ On 4/29/2013, a Letter of Refinement was issued for an increase of the width of the
sheet piling cap boards from 24" to 36". This is to be used as a catwalk on each side of
the boat launch ramp. This work has been completed.
■ On 12/9/2015, SHP coordinated with NCDCM and the HOA to include the addition of
provisions for private docks by individual homeowners on waterfront (amendment to
HOA covenants).
■ 8/1/2016— 10/1/2016, Comprehensive planning and pricing associated with the
permitted fuel system at the existing marina. Quible worked closely with SHP and
OESSCO to develop a plan for this component. The capital expenditure to complete
that effort was not financially feasible, but there are plans to accomplish this in the
future.
In the marina area, none of the remainder of the piers, slips and boardwalks have been
constructed at this time and neither has the parking area and ship store. Rial has undertaken
substantial development activity in reliance upon the Permit as described above. Rial remains
committed to the marina and other development activities at Scotch Hall Preserve, as permitted.
As regional economic conditions have begun gaining momentum and new markets are realized,
SHP is ready to continue developing the permitted project.
I have enclosed the $100 renewal processing fee along with (3) full sized copies of the marina
area CAMA plan which was last updated on 3/06/2013 in association with the last Letter of
Refinement.
We appreciate your continued attention to the project. If you have questions regarding this
request for the renewal of CAMA Major 176-05, please contact me at (252) 261-3300 or
brubino@quible.com.
Sincerely,
"w
Quible & Associates, P.C. �, ,. *° k s;
OCT 0 2 ZU17
Brian Rubino
cc: Doug Huggett, NCDCM Major Permits Coordinator
W :.
Tom Turri, SHP
Daniel Sumerel, SHP
RECEIVED
OCT 18 2017
DCWI- W'i ID CITY
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON C. DAVIS
ENVIRONMENTAL QUALITY Director
MEMORANDUM
TO: Gregg Bodnar
THROUGH: Jonathan Howell's*
FROM: Kevin Hart Y-9
DATE: 11 October 2017
SUBJECT: Renewal of Permit No. 176-05 issued to Innsbrook, for the Rial Corporation, on
November 2005, near Merry Hill, Bertie County
CAMA Major Permit No. 176-05 was issued to Innsbrook for the Rial Corporation to
develop a 399 single family lot subdivision, a golf course with clubhouse, shoreline stabilization,
access roads, and parking areas adjacent to the Chowan River. On 9 December 2010 a Major
Modification was issued for the development of a 92 slip marina with 3 piers and associated boat
ramp,parking areas,roads, ship store and pool adjacent to Salmon Creek. There has been multiple
Letter of Refinements and a Minor Modification to the original Major CAMA permit. This is the
second renewal, The permit was last renewed on 3 March 2015 with an expiration date of 22
January 2017
The shoreline stabilization, boat ramp, one of the piers, pool and pool patio have been
completed. The docking facility is partially complete. Therefore, I recommend the renewal of this
permit.
The $100 fee to cover the cost of the renewal has been deposited in the Department's
account. If you have any questions,please give me a call.
ATTACHMENTS
RECEIVED
OCT 18 2017
DCM- MHO CITY
Nothing Compares_
State of North Carolina I Environmental Quality I Coastal Management
Washington Office 1 943 Washington Square Mall I Washington,North Carolina 27889
252 946 6481