Loading...
HomeMy WebLinkAbout176-05 Renewal 03/2015 Rial Corporation ,rmit Class Permit Number RENEWAL 176-05 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission ,Perm it for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Rial Corporation, PO Box 2444, Greenville,NC 29602 r Authorizing development in Bertie County adi. to the Chowan River, at the end of SR 150.2,near Merry Hill as requested in the permittee's email dated 12/30/14 This permit, issued on March 3,2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. � shall e attached to the original of Permit No. 176-05 1) This renewal sha b ,which was issued on 11/9/05, as well Y as all subsequent renewals and modifications, and copies of all documents shall be readily available on site when Division personnel inspect the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: A permit renewal application processing fee of$100 was received by DCM for this project. This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. This permit must be accessible on-site to Department ' personnel when the project is inspected for compliance. Any maintenance work or project modification not covered yy,/ Braxton C. Davis Director hereunder requires further Division approval. i" Division of Coastal Management All work must cease when the permit expires on / i This permit and its conditions are hereby accepted. #y January 22,2017 In issuing this permit, the State of North Carolina agreesg that your project is consistent with the North Carolina Coastal ¢ Management Program. Signature of Permittee fiC4tr^.•M-0OOO•YrY.K?YNC�4J'}')-}C•C<ti?:K9.LdL t.G+}T�i4''P).tr7p4CK•?::K .'!•}{-0L<•!-}�S.Y.. NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary March 3,2015 Rial Corporation P.O. Box 2444 Greenville,N.C. 29602 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act,and where applicable,the State Dredge and Fill Law,for you to proceed with your project proposal.The original(buff- colored form)is retained by you and it must be available on site when the project is inspected for compliance.Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or 113-229.Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center,Raleigh,NC 27611-6714,(919)733- 2698 within twenty(20)days of this decision on your permit.You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty(20)days. The project plan is subject to those conditions appearing on the permit form. Otherwise,all work must be carried out in accordance with your application.Modifications,time extensions,and future maintenance requires additional approval.Please read your permit carefully prior to starting work and review all project plans,as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time,Department personnel will visit the project site.To facilitate this review,we request that you complete and mail the enclosed Notice Card just prior to work initiation.However,if questions arise concerning permit conditions,environmental safeguards,or problem areas,you may contact Department personnel at any time for assistance. By working in accordance with the permit,you will be helping to protect our vitally important coastal resources. Sincerely, T .r Douglas V.Huggett Major Permits and Consistency Manager Enclosure 400 Commerce Avenue, Morehead City,North Carolina 28557 Phone:252-808-28081 FAX 252-247-33301 Internet:www.nocoastalmanagement.net An Equal Opportunity/Affirmative Action Employer DCM Coordinator:-- - �(Jddw Permit#: 9 MAILING DISTRIBUTION SHEET Permitee: J � Agents: DCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City Washington Wilmington US ACOE Offices: Washington: Raleigh Bland Tracey Wheeler William Westcott (NC DOT) Bill Biddlecome (NC DOT) U Wilmington: Tyler Crumbly Cultural Resources: Renee Gledhill-Early Public Water Supply: Diane Williams (WIRO) Joey White (WARD) Marine Fisheries: Shane Staples Jessi Baker NC DOT: Ken Pace Shellfish Sanitation: Patti Fowler State Property: Tim Walton C� l Water Quality: Karen Higgins (Raleigh)" / John Hennessy (NC DOT) Washington: Anthony Scarbraugh-401 ✓ Scott Vinson-Stormwater 11 AA Wilmington: Joanne Steenhuis—401 Chad Coburn- 401 Linda Lewis - Stormwater Wildlife Resources: Maria Dunn (WARD) Vacant (WIRO) LPO: Fax Distribution: Permitee#: Vz Agent#: Quible Quible &Associates, P.C. P.O.Drawer870 Kitty Hawk,NC 27949 ENGINEERING•ENVIRONMENTAL SCIENCES•PLANNING•SURVEYING Phone.252-261-3300 SINCE 1959 Fax.252-261-1260 web'.quible.com December 30, 2014 Mr. Doug Huggett NC Division of Coastal Management 400 Commerce Avenue Morehead City, NC 28557 i RE: Renewal of CAMA Major 1c38=66 Dear Mr. Huggett: I am writing to request the renewal of CAMA Major #176-05 (the "Permit"), issued to Rial Corporation. The Permit was originally issued on 11/09/2005 for a new subdivision, golf course with clubhouse, shoreline stabilization, access roads and parking areas. Since then, Quible & Associates, P.C. was engaged to assist with permitting of a marina on Salmon Creek and a Major Modification to permit #176-05 was issued on 12/09/2010 for a 92 slip marina on Salmon Creek. Based on the applicable permit extension acts, the expiration date is 1/22/2015. On 5/03/2012, a Letter of Refinement was issued for fencing, pool patio and associated grading in the Clubhouse area at Scotch Hall Preserve. This work has been completed. On 2/27/2013, a Minor Modification was issued for shoreline stabilization bulkhead and associated grading in the vicinity of what is referred to as Lot 158-160. These are Albemarle sound-fronting lots. This work has been completed. In 2012-2013, a portion of the marina was constructed which is limited to Pier #3 with associated boat slips and the boat ramp area. In association with this activity: ■ On 1/14/2013, a Letter of Refinement was issued for constructing rectangular finger piers instead of triangular (on Pier 3), addition of 63 ft to Pier 3 in a landward direction to provide upland access, 22 ft long extension to the Pier 4 (boat ramp staging pier). This work has been completed. ■ On 3/12/2013, a Letter of Refinement was issued to allow vinyl sheet piling with cap boards to prevent underwashing of the ramp. This work has been completed. ■ On 4/29/2013, a Letter of Refinement was issued for an increase of the width of the sheet piling cap boards from 24" to 36". This is to be used as a catwalk on each side of the boat launch ramp. This work has been completed. RECEIVED 1AN 0 1015 In the marina area, none of the remainder of the piers, slips and boardwalks have been constructed at this time and neither has the parking area and ship store. Rial has undertaken substantial development activity in reliance upon the Permit as described above. Rial remains committed to the marina and other development activities at Scotch Hall Preserve, as permitted, and intends to move forward with the remaining work as economic conditions improve and consumer sentiment improves. I have enclosed the $100 renewal processing fee along with copies of the CAMA Major Permit and Modifications and (3) full sized copies of the marina area CAMA plan which was last updated on 3/06/2013 in association with the last Letter of Refinement. We appreciate your continued attention to the project. If you have questions regarding this request for the renewal of CAMA Major 176-05, please contact me at (252) 261-3300 or brubino@quible.com. Sincerely, Quible & Associates, P.C. I V, Brian Rubino cc: Kevin Hart, NCDCM Field Representative Dutch Remkes, SHP RECEIVED JAN 0 5 2015 �'QNM-M11[!q Io1T�y MEMORANDUM TO: Daniel Govoni THROUGH: Kelly Spivey:�5 FROM: Kevin Hart�� DATE: 8 January 2015 SUBJECT: Renewal of Permit No. 176-05 issued to Innsbrook, for the Rial Corporation, on November 2005,near Merry Hill, Bertie County CAMA Major Permit No. 176-05 was issued to Innsbrook for the Rial Corporation to develop a 399 single family lot subdivision, a golf course with clubhouse, shoreline stabilization, access roads, and parking areas adjacent to the Chowan River. On 9 December 2010 a Major Modification was issued for the development of a 107 slip marina with 3 piers and associated boat ramp,parking areas,roads, ship store and pool adjacent to Salmon Creek. There has been multiple Letter of Refinements and a Minor Modification to the original Major CAMA permit. The shoreline stabilization, boat ramp, one of the piers, pool and pool patio have been completed. The docking facility is partially complete. Therefore, I recommend the renewal of this permit. The $100 fee to cover the cost of the renewal has been deposited in the Department's account. If you have any questions, please give me a call. ATTACHMENTS Permit Class , rermn ivumoer MODIFICATIONlMAJOR 176-05 STATE OF NORTH CAROLINA Department of Environment and Natural Resources f and Coastal Resources Commission t 1 a for X Major Development in an Area of Environmental Concern Y pursuant to NCGS I I3A-118 RECEIVED BAN 0 5 2015 X Excavation and/or filling pursuant to NCGS 113-229 Kkt r�, Issued to Rial Corporation,PO Box 2444, Greenville,NC 29602 Authorizing development in Bertie County at adi. to the Chowan River, at the end of s SR 1502._near Merry Mill , as requested in the permittee's application dated _ 4/5110, including the attached drawings (2) all dated revised 7/14/10 This permit, issued on December 9, 2010 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Marina t 1) Prior to the occupancy of any new slips authorized under this permit, a marine pumpout sewage disposal facility shall be installed in an easily accessible location, and a representative of the Division f of Coastal Management shall meet on-site with the permittee to ensure that the required pumpout facility is in place and operable. The pumpout facility shall be operable and maintained for the life of the marina. 2) The marina shall display a sign showing the location of the on-site pumpout facility, including other appropriate waste disposal information, at the entrance and exit from each of the main piers. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or 88# continuance as the case may be. oThis permit shall be accessible on-site to Department personnel when the project is inspected for compliance. James H. Gr son, Director Any maintenance work or project modification not covered Ysion of Coastal Management t hereunder requires further Division approval. All work shall cease when the permit expires on This permit and its conditions are hereby accepted. January 22,2015 In issuing this permit, the State of North Carolina agrees f that your project is consistent with the North Carolina Coastal Management Program. ;t Signature of Permittee �r`/r:T7.%/iO4<Q+'-P6+h}}PWX?'1.4Y}C�.(•CMFG-N/M-0•:+i'Ni itiKKti`.{...`a}f•C.Y}PYIMOPM-0i-0i+.-Y:}�.'.f:•1.4Y64'704>:YtVr6CKCSJOC•:-}FYC^>aYn`N.WiK4CK•:•1.tii•}40JM:l+r:-:�•Y�'u-:K4bT�}+r:-(�.hJCr�dT1'1'PC S Mal Corporation RECEIVED Permit# 176-05 Page 2 of 5 JAN 0 5 1015 a ADDITIONAL CONDITIONS rsrn�_��urs r .r, 3) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the marina. Any sewage discharge at the marina shall be considered a violation of this permit for which the Y permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. } 4) Unless specifically altered herein, this permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this marina facility { without permit modification. No non-water dependent uses of structures may be conducted on, in or . over public trust waters without permit modification. s: 5) The authorized structure shall not extend more than '/a of the width of the waterbody, as measured from , the waterward edge of the marsh on both sides of the waterbody immediately in front of the project site. A 6) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts $ of the structure and the adjacent property owner's riparian access corridor. The Division has determined S that the attached workplan drawings accurately depict the riparian corridor lines for the property. 7) In order to ensure compliance with Condition No. 5 and No. 6 of this permit, an as-built survey showing the location and dimensions of the constructed structure shall be performed on the facility, including the riparian Iines and width of the waterbody. Copies of the survey shall be provided to the Division of Coastal Management within 60 days of completion of the marina facility. 8) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable 3 waters at or adjacent to the authorized work. 9) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 10) This permit does not authorize the interference with any existing or proposed Federal project, and the s Vpermittee shall not be entitled to compensation for damage to the authorized structure or work, or injury that may be caused from existing or future operations undertaken by the United States in the public f interest. 11) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a rninimunl, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 3 K L 2' v �'.�e :< »o-t:�-rs-?attara.:-.tom:wc+.o�' aoot .. aw+.+,�+.�t+.axc.+o-:baoo-r.,o:�c+.ro-aso+�.oKsoaKeo•'���iot�;.-rx-»' RECEIVED Rial Corporation JAN tl 5 2015 Permit# 176-05 � Page 3 of 5 z K�f,a A°Auh�?-HJ, ADDITIQNAI, CONDITIONS 12) This permit authorizes a maximum of 92 docking spaces. At no time shall more than 92 vessels be moored or docked at the facility. The restriction of the number of vessels shall apply to all marine vessel types, including but not limited to motorboats, sailing vessels and personal watercraft. 13) In accordance with commitments made by the permittee, the permittee shall construct a continuous railing along the entire length of the boardwalk and all shallow water portions of the piers. Additionally no boat mooring will be allowed in these areas. i Boat Ramp 1.4) Unless specifically altered herein, this permit authorizes the reconstruction of the boat ramp facility, all as indicated on the attached workplan drawings. 1 15) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. Easement 16) The permittee may be required to apply for a submerged land Iease from the Department of Administration's State Property Office. Contact the Department of Administration's State Property Office directly at (919) 807-4650 for this determination. Should it be determined that an Easement is required, the permittee shall supply a copy of the easement to the Division within 30 days of issuance of the Easement. f Upland Development 17) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the ship/store, fueling for vehicles and boats, pool area, 36 associated parking spaces, and the required access infrastructure, all as expressly and specifically set forth in the attached permit application and workplan drawings. Any additional land disturbing activities and/or construction may require a ;modification of this permit. s Contact a Division of Coastal Management representative at (252) 946-6481 for this determination. s s 3 i A • t J. l� �:-titi•Jhf?iOY.�.h`+i4trYAAVfi•. }4:1i-T4?.`M Mir'AMS+p4d-W.+ri!+`tY^Oi9+t-�,.'J}24PJP]-0i��YM6h`hYtJ{.:+�Y)-}P:.}in M��+rWiTYNh.YC!4ti0iNiJPY4P:+WPKtiJ4Ptr'+YW+t�i4J4{.i}Y>Y .t Rial Corporation , Permit # 176-05 Page 4 of S Y s. RECEIVED s ADDITIONAL CONDITIONS JAN 0 5 2015 Stormwater Management K?■i„I"AyA61 K?N,: f 18) The Division of Water Quality approval of this project under stormwater management rules of the f x Environmental Management Commission is covered by way a Redevopment Exclusion Permit No. A SW7101006 issued on=1112,8V'10. If a modified Stormwater permit is required, it shall be obtained prior A to initiation of any development. Any violation of the permit approved by the DWQ shall be 4 f considered a violation of this CAMA permit. Sedimentation and Erosion Control A 19) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). s _NOTE: An Erosion and Sedimentation Control Plan shall be required for this project. This plan shall be filed at least thirty (30) days prior to the beginning of any land disturbing activity. Submit this plan to the Department of Environment and Natural Resources, Land Quality Section, 127 Cardinal Drive Extension, Wilmington, NC 28405. General 20) The permittee understands and agrees that, if future operations by the United States requires the ' removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon due, notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No ' claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 21) In order to protect anadramous and resident fish species, no in-water work is permitted between February 15 and September 30 of any year without prior approval from the Division of Coastal Management in coordination with the U.S. Army Corps of Engineers. :T ? 22) Unless specifically altered herein, any mitigative measures or environmental commitments specifically r made by the applicant in the Environmental Assessment for this project should be implemented, regardless of whether or not such commitments are addressed by individual conditions of this permit. Y ti is 5 .t Sy ;t T •'i e 3 ..yr tii�4\}PC?K V4%A-0<v?'�/Y.+`•.Yr•Y370.7$JJ'7hW?}?W}?.dNP.KK-X•?'l'fiVTh�iC?ti}MO.:T){•✓F}o-hh`4u7+r4•W.``C4Y.-)h`ioY.Yr7v:l.?�i:+.•'+09.'K{v4PS^ism}J7iC'i•:bYi:<JOQd'STi }M•Y.•:+'+i:Jc•).}yp¢,q` Dial Corporation Permit# 176-05 Page 5 of 5 RECEIVED a` ADDITIONAL CONDITIONS AN 0 5 tO1S J �• 9 KPt1,ii_AiItJf51tN'� 23) No Coastal Wetlands shall be excavated or filled, even temporarily. Y 24) The permittee and/or his contractor shall meet with a representative of the Division of Coastal Management prior to project initiation in order to discuss the conditions set forth in this permit. 3, 25) This minor modification shall be attached to the original Permit No. 176-05, which was issued on 11/9/05, as well as all subsequent renewals, modifications, and letters of refinement, and copies of all documents shall be readily available on site when Division personnel inspect the project for compliance. A 26) All conditions and stipulations of the active permit remain in force under this minor modification unless ? specifically altered herein. p y t NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, a approvals or authorizations that may be required, including any local approvals or approvals from the North Carolina Department of Transportation. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division of Coastal Managment at (252) 946-6481 prior to the i commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water x Quality Certification No. 3641 (DWQ Project No. 05-1.871 V2), which was issued on 7/6/10. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under COE Action Id. No. SAW- 2010-00731. y i 'f v 1 l� is v..•y}}Yv}•OT}otiMYQ•}}{-P:�J•:'rW.i•}Y•`J7}7'0'?•?"i�+'6J40'>•.h`<K'i>d?M}F-0OOP•YtKObY.•:.v{...4Jh}}i}}Yn`?.Y^X•Cti•Pd'b!^})iOOCK�•:4:•`PY}TJ+iNi•?i{iJ+n?h`/+t`T VSM..}h}1AYCtWWbY..J:d,-h's�}f:'•S}:�iJN}tt Permit Class Permit Number MODI<FTCAT1pN/MiNpR 1,7tS-OS STATE OF NO] TH CARULTNA Department of Enviro nt and Natural Resources RECEIVED d Coastal Resou s Commission JAN 0 5 2015 r X Major Developmen in an Area of Environmental Concern Pursuant to NCGS l 3A-11 R X Excavation and/or Bin&pursuant to NCGS 113-229 Issued to Rial Corporation,Pp Box 2444 Greenville NC 29602 Authorizing development in Bertie County adi.to tlne Chowan River,at the end orSR 102.near MCM Hill as requested in t permittee's email dated _._ 12/21/12, including_ the attached'work lan drawin s 2 both dated 12/5/12 This permit, issued on February 27_.20.13 , i subject to compliance with tlx:application (where consistent with the permit), all applicable regulations, special conditior s and notes set forth below.Any violation of these terms may be subject to fines, imprisonment or civil action,or may can a the permit to be null and void, 1) Unless specifically altered herein, this tninoT modification authorizes the additional bulkhead and construction entrance, all as indicated on the ai tached workplan drawings. 2) The authorized additional bulkhead shall adhEre to the alignment depicted on the attached workplan drawings. (See attached sheet foi Additional Conditions) This permit action may be appealed by dic permittee or Signed by the authority of the Secretary of DFNtt and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered Braxton . Davis,Director Division Of Coastal Management hereunder requires further Division approval, All work must cease when the permit expires on This permit and its conditions ure hereby accepted. January 22,2015 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management program. Signature of Pertninee 2/2:a6Pd 092TT922S2T6:Oi Ai90HW W30:wOJd 9S:9T ET02-k2-e3d Rial Corporation RECEIVED Permit# 17.5-06 JAN 0 b 1015 Page 2 of 2 ADDITIONAR CONDITIONS r-?rn_nnWrn r.;TV 3) The bulkhead shall be constructed prior to any ackfilling activities. 4) The bulkhead shall be structurally tight so to prevent seepage of backfill materials through the structure. 5) The bulkhead wall shall be solid and construe d of treated wood, concrete slabs, metal or vinyl sheet piles or other suitable materials approved by diN ision personnel, 6) All backfill material shall be clean and tree of a ly pollutants except in trace quantities. 7) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. Gei ieral 8) This permit does not eliminate the need to obtai i any additional state, federal or local permits, approvals or authorizations that may be required, including any authorisation required. 9) Prior to the initiation of any land-disturbing activities authorized by this modification, the permittee shall, in coordination with the N.C.Department of Cultural Resources (NCDCR),develop and implement an archaeological survey of the pro sed proiect area. initiation of permitted land-disturbing activities shall not begin until written approval i obtained from NCDCR,and a copy of such approval has been received by the Division of. Coastal M agement. 10) This minor modification shall be attached to the original Permit No, 176-05, which was issued on 1 1/9/05, as well as all subsequent modifications and refinements, and copies of all documents shall be readily available on site when Division personnel inspect the project for compliance. 11) All conditions and stipulations of the active pernit remain in force under this minor modification unless specifically altered herein. 2,2:aeed 092TT922S2T6:Oi J,190HW WOO:wOJJ 9S:9T ZT02-22-83d