HomeMy WebLinkAbout115-05 Renewal 11/2008 �gOwV}Y'rJ}i{rr5ti};�.1i ti .:iY`ar.iJv-•.•.J+O»bw;M.K;.••?iti.:.;}>:riti<.4'ti-:.'rTr^;-;.>•i+isyY.K-:^rv.KwTP•}O}.Y:.+}:-55tii�•???:^}C�%eM^:nM.;.{^YM'A+}GJ^�ti�`iti'W4.:K-+ai:^bh`CPC{^Y.+4'O�ti?+XK�'{.:.T90°49-000{.}4C+XnC'^.C+.-0K4904^C�
Permit Class Permit Number
RENEWAL 115-05
l t
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources i i Commsson
Y
Permit }
r for
r X Major Development in an Area of Environmental CN&rg 5 2008
pursuant to NCGS 113A-118
Moreh
X Excavation and/or filling pursuant to NCGS 113-2299Sd C� / �CM
Issued to H.E. Whichard,Jr., P.O. Box 1863, Greenville,NC 27835-1863
Authorizing development in Hyde County at Pungo River, end of SR 1150,Durants
Point as requested in the permittee's letter dated received in Morehead
City on 10/6/08
This permit, issued on November 20,2008 , is subject to compliance with the application(where consistent
with the permit),all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines,imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to the original Permit No. 115-05,which was issued on 7/20/05 and
copies of both documents shall be readily available on site when Division personnel inspect the project
for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the
other qualified persons within twenty(20) days of the issuing Chairman of the Coastal Resources Commission.
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit must be accessible on-site to Department
�. ,Ae -
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered VL'Fames H. Gregson, Director
hereunder requires further Division approval. Division of Coastal Management
All work must cease when the permit expires on This permit and its conditions are hereby acce ed.
December 31, 2010
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program. Signature of Permittee
ALTO-NAA
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley,Governor James H. Gregson, Director William G. Ross Jr., Secretary
November 20, 2008
H.E. Whichard,Jr.
PO Box 1863
Greenville NC 27835-1863
Dear Mr. Whichard:
The enclosed permit constitutes authorization under the Coastal Area Management Act, and where
applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. Please sign both the
original (buff-colored form) and the Xerox stamped "Copy". Return the copy to this office in the enclosed
envelope. Signing the permit and proceeding means you have waived your right of appeal described below. Please
retain the original (buff-colored form), as it must be available on site when the project is inspected for
compliance.
If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-
121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office
of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty
(20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid
objection to the issuance of this permit within twenty(20)days, the matter must be resolved prior to work initiation.
The Coastal Resources Commission makes the final decision on any appeal.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be
carried out in accordance with your application. Modifications, time extensions, and future maintenance require
additional approval. Please read your permit carefully prior to starting work and review all project plans, as
approved. If you are having the work done by a contractor, it is to your benefit to be sure that he fully understands
all permit requirements.
From time to time, Department personnel will visit the project site. However, if questions arise concerning
permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time
for assistance. By working in accordance with the permit, you will be helping to protect our vitally important
coastal resources.
Sincerely,
Douglas V. Huggett
Major Permits and Consistency Manager
Enclosure
400 Commerce Avenue, Morehead City, NC 28557
Phone: 252-808-2808\FAX: 252-247-3330\ Internet: www.nccoastalmanagement.net
An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper
MEMORANDUM
Vrl�
TO: Doug Huggett NICE
FROM: Steve Trowell�' Jd n- O C T 62008
THROUGH: Terry Moore oWm �,- to -6-0r,1
DATE: 1 October 2008 Moreheacr C, �,
SUBJECT: H.E. Whichard CAMA/Dredge and Fill Permit No. 115-05 y �.+�
This memo is in regards to a request to renew Major CAMA/Dredge and Fill Permit No. 115-
05 issued on 20 July 2005 to Mr. H. E. "Woody" Whichard for excavation of a highground boat
basin, access channel,riprap shoreline, riprap groins, a pier and boathouse onsite Mr. Whichard's
property located on the east side of the Pungo River off SR 1150 in Hyde County near Scranton,
North Carolina. This is the first renewal of this permit. Mr.Whichard has undertaken the permitted
shoreline stabilization and repair to the existing pier. This work was completed in November 2005.
The boat basin with associated amenities and additional pier with a boathouse have not been built. I
recommend that the permit be renewed. The$100 check to cover the cost of the permit renewal has
been deposited.
RECEIVED
NOVA`*`�Ar
2 2010
WDENR Vorehead City DCM
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Beverly Eaves Perdue James H. Gregson Dee Freeman
Governor Director Secretary
29 October 2010
Mr. H. E. Whichard, Jr.
Post Office Box 1863
Greenville,North Carolina 27835
Dear Mr. Whichard:
This letter confirms receipt of your 2 October 2010 email concerning the status of Major CAMA/Dredge
and Fill Permit No. 115-05 issued to you on 20 July 2005 for development of a 76 acre farm located on the east
side of the Pungo River downstream of Durants Point in Hyde County near Scranton, North Carolina. Your
inquiry concerned the impact Session Law 2009-406 had on the current expiration date of 31 December 2010
for the aforementioned permit. This permit has been renewed once on 20 November 2008.
Based on the Division of Coastal Management's interpretation of Session Law 2009-406 your current
expiration date has been changed from 31 December 2010 to 31 December 2014. Please file this letter with the
permit in your files for the purposes of tracking the new permit expiration date.
Thanks for your efforts to comply with the permit requirements of this Division. If you have any further
questions please do not hesitate to contact me (252) 948—3854.
Sincerely,
Steve J. Trowell
Coastal Management Representative
Cc: Tpd Tyndall—Assistant Director, DCM
,.,'Doug Huggett—Major Permit Coordinator,DCM
David Moye—District Manager, Washington Regional Office, DCM
943 Washington Square Mall,Washington,NC 27889 NorthCarolina
Phone:252-946-6481 1 FAX:252-948-0478 Internet:www.nccoastalmanagement.net Naturally
An Equal Opportunity 1 Affirmative Action Employer Natu all y