HomeMy WebLinkAboutTerminal Groin Construction Observation Report #031 03/04/20222021-2022 OCEAN ISLE BEACH -TERMINAL GROIN PROJECT CONSTRUCTION OBSERVATION REPORT Date: March 04, 2022 Observation Report No.: 031 Observer: Brad Rosov Commencement Date: November 16, 2021 Contract Date: 109 Arrival/Departure Times: 12:45 - 13:20 Weather Conditions: Wave Height & Direction Wind Speed & Direction: Marine Mattress Installed BTWN: Armor Stone Installed BTWN: Sheet Pile Installed BTWN: Completed Armor Stone: Completed Armor Stone: Completed Marine Mattress: Completed Sheet Pile: Partly Sunny, warm 1-2 Feet, S 5-10 MPH, W N/A N/A Today: N/A Tons (Size A) Today: N/A Tons (Size B) Today: N/A Sq. Ft. Today: N/A Ft. To Date: 12,450 Tons (Size A) To Date: 7,105 Tons (Size B) To Date: 57,325 Sq. Ft. To Date: N/A Ft. OBSERVATIONS Approach to Site Yes/No/NA 1. Is the contractor using the approved construction accesses and vehicle routes? N/A Notes: N/A 2. Are construction warning signs in place? Yes Notes: N/A 3. Are construction and staging areas fenced off to prevent public access? Yes Notes: N/A Resorts/Plans/Specifications 4. Are the construction plans and specifications located at the project site? Yes Notes: N/A 5. Are the permits located and notices displayed at the project site? Yes Notes: N/A 6. Has the contractor provided the Daily Reports for the previous day? Yes If incomplete, list deficiencies of contractor's Daily Report: N/A Project Site 7. Are construction operations being conducted today? No Notes: N/A 8. Is the marine mattress foundation being constructed today? No Notes: N/A 9. Is armor stone being placed today? No Notes: N/A 10. Is the steel sheet pile wall being constructed today? No Notes: N/A 11. Is the accretion fillet being constructed today? No Notes: N/A COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. I PAGE 1 2021-2022 OCEAN ISLE BEACH -TERMINAL GROIN PROJECT CONSTRUCTION OBSERVATION REPORT Date: March 04, 2022 Observation Report No.: 031 12. Is the contractor using approved staging storage areas (marked, neat & orderly)? Yes Notes: N/A 13. Is the public being kept out of the construction area? Yes Notes: N/A 14. Is the acceptance survey for a completed section being conducted today? No Location: N/A 15. Was any environmental monitoring (turbidity, turtle, bird, etc.) conducted today? No Describe environmental monitoring: N/A Measurements and Samalin 16. Was the constructed structure verified to meet the plans and specifications? No Measurement: N/A 17. Was the constructed sheet pile verified to meet the plans and specifications? Yes Measurement: Lengths and widths of representative sheetpile sections were measured 18. Were any photographs taken? Yes 19. Was the drone flown today? Yes Detailed Observations: 1. No construction activity was occurring today. 2. The test section located at the seaward end of structure was visually inspected to ensure that it meets the project design template. No noticeable deficiencies were observed (See Photo #2). 3. Stone fragments were observed within various locations within the structure including in proximity to Sta. 9+00 (See Photo #3). 4. Sheet pile sections were observed staged at the northern and western portions of the staging areas (See {Photo #4). 5. Measurements of the sheet pile sections were observed to be within the specifications (See Photos #5, 6, and 7). 6. Two sheet pile sections were observed to be partially installed in proximity to Sta. 3+00 (See Photo #8). 7. Construction debris was observed along East 4t" Street just west of Shallotte Blvd. and at the northern end of Shallotte Blvd. (See Photos #9 and #10). 8. Broken asphalt was observed at the NE corner of East 4th Street just west of Shallotte Blvd. (See Photo #11). Items Discussed with Contractor's Superintendent, Surveyor, Regulatory Agencies, ... etc.: 1. No items were discussed today. Were any issues identified today which may result in a field adjustment report, contract modificatio request for interpretation, or noncompliance? If so, describe: 1. No issues were discussed today. Cnn P■�ru,�n E■u■uun COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. I PAGE 2 2021-2022 OCEAN ISLE BEACH -TERMINAL GROIN PROJECT CONSTRUCTION OBSERVATION REPORT Date: March 04, 2022 Observation Report No.: 031 Equipment List: • (1) frontend loader, • (2) off road dump trucks, • (3) excavators, • (1) bulldozer • (1) wheel mounted crane • (1) power unit COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. I PAGE 3 2021-2022 OCEAN ISLE BEACH -TERMINAL GROIN PROJECT CONSTRUCTION OBSERVATION REPORT Date: March 04, 2022 Observation Report No.: 031 Photo 1. Ocean conditions at approximately 1:00 pm. Photo 2. Rubble mount test section located at the seaward end of the structure. Rif„Ui COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. PAGE 4 hu■uu.n 2021-2022 OCEAN ISLE BEACH -TERMINAL GROIN PROJECT CONSTRUCTION OBSERVATION REPORT Date: March 04, 2022 Observation Report No.: 031 Photo 3. Stone fragments within the terminal groin located at -Sta. 9+00. -1\ - i Photo 4. View of the sheet pile sections within the staging area. Cnn v■«<,„ COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. E■u■uun PAGE 5 2021-2022 OCEAN ISLE BEACH -TERMINAL GROIN PROJECT CONSTRUCTION OBSERVATION REPORT Date: March 04, 2022 Observation Report No.: 031 Photo 5. The length of sheet pile sections were measured. Photo 6. The distance from the end of the sheet pile section to the coal tar epoxy coating and hole was measured along with the diameter of the hole. Rif„Ui COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. PAGE 6 hu■uu.n 2021-2022 OCEAN ISLE BEACH -TERMINAL GROIN PROJECT CONSTRUCTION OBSERVATION REPORT Date: March 04, 2022 Observation Report No.: 031 Photo 7. The thickness of the sheet pile section was measured. jig 11111; Y _ ^� Photo 8. First sheet pile sections installed at Sta. 3+00. COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. PAGE 7 2021-2022 OCEAN ISLE BEACH -TERMINAL GROIN PROJECT CONSTRUCTION OBSERVATION REPORT Date: March 04, 2022 Observation Report No.: 031 Photo 9. Misc. construction debris located along the southern portion of East 41" Street near Shallotte Blvd. Cnn P■�ru,�n E■u■uun Photo 10. Misc. construction debris located on the northern end of Shallotte Blvd. COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. I PAGE 8 2021-2022 OCEAN ISLE BEACH -TERMINAL GROIN PROJECT CONSTRUCTION OBSERVATION REPORT Date: March 04, 2022 Observation Report No.: 031 �6. ��.�1 Gf'OOHSkuiGNi, _ � , PfS)cWl[RkfFIGGMV'i — u1 Photo 11. Broken asphalt on the NE corner of East 4tn Street and Shallotte Blvd. Photo 12 View of the terminal groin facing north. Rif„Ui COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. PAGE 9 hu■uu.n 2021-2022 OCEAN ISLE BEACH -TERMINAL GROIN PROJECT CONSTRUCTION OBSERVATION REPORT Date: March 04, 2022 Observation Report No.: 031 Photo 13. View of the terminal groin facing west. COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. I PAGE 10