HomeMy WebLinkAboutAccretion Fillet Observation Report #009 02/18/20222021-2022 OCEAN ISLE BEACH - BEACH NOURISHMENT PROJECT CONSTRUCTION OBSERVATION REPORT Date: February 18, 2022 Observation Report No.: 009 Observer: Brad Rosov Commencement Date: February 9, 2022 Contract Date: 010 Arrival/Departure Times: 09:10 —10:30 Weather Conditions: Rainy and warm Wave Height & Direction: 4-5 Feet, S Wind Speed & Direction: 25-30 MPH, W Seaward Pipe Outfall Location: Sta. 10+50 (At Time of Last Observation) Landward Pipe Outfall Location: Sta. 11+50 (At Time of Last Observation) Completed Fill Sections: Sta. 2+00 to Sta. 6+00 Progress Made in Last 24 Hours (Length): 100 ft OBSERVATIONS Approach to Site Yes/No/NA 1. Is the contractor using the approved construction accesses and vehicle routes? Yes Notes: N/A 2. Are construction warning signs in place? Yes Notes: N/A 3. Are construction and staging areas fenced off to prevent public access? Yes Notes: N/A Reports/Plans/Saecifications 4. Are the construction plans and specifications located at the project site? Yes Notes: N/A 5. Are the permits located and notices displayed at the project site? Yes Notes: N/A 6. Has the contractor provided the Daily Reports for the previous day? N/A If incomplete, list deficiencies of contractor's Daily Report: N/A Proiect Site 7. Are dredging and discharge operations being conducted today? Yes Notes: N/A 8. Is the contractor using approved staging and storage areas (marked, neat, and orderly)? Yes Notes: N/A 9. Are the sand bags, natural dunes, and vegetation being avoided? Yes Notes: N/A 10. Is the public being kept out of the construction area? Yes Notes: N/A 11. Are sand ramps constructed and maintained for public access to the beach? Yes Notes: N/A 12. Are sand dikes being constructed for placement of fill? Yes Notes: N/A 13. Is debris being removed prior to placement of fill? Yes Notes: N/A Pnru,� COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. PAGE 1 2021-2022 OCEAN ISLE BEACH - BEACH NOURISHMENT PROJECT CONSTRUCTION OBSERVATION REPORT Date: February 17, 2022 Observation Report No.: 009 14. Is there any material within the fill that does not meet the specification? No A. Describe the lack of sediment compatibility: N/A B. When was this first observed? N/A C. Did you notify the engineer? N/A D. Did the contractor take action to avoid non -conforming material? N/A E. What steps did the contract take to avoid non -conforming material? N/A 15. Does the construction berm appear level and uniform along the graded beach? Yes Notes: N/A 16. Are escarpments being leveled? No Notes: Escarpments were observed in proximity to Sta. 2+00 through —Sta. 4+50 17. Are grading and dressing operations of completed fill sections being conducted today? No Location: N/A 18. Is the acceptance survey for a completed section being conducted today? No Location: N/A 19. Was any environmental monitoring (turbidity, turtle, bird, etc.) conducted today? No Describe environmental monitoring: N/A Measurements and Samolin 20. Was representative sand sample collected today? No Location of samples: N/A 21. Were all sand samples within the range of acceptable limits as defined in the Sediment QA/QC Plan? N/A If not, explain: N/A 22. Was the constructed beach verified to meet the plans and specifications? No Measurement: N/A 23. Were any photographs taken? Yes 24. Was the drone flown today? No Detailed Observations 1. The dredge Charleston was operational today (2/18) and was observed dredging within Shallotte Inlet along the western side of the inlet (near Ocean Isle Beach). At 9:30 am, one (1) seaward outfall was located near Sta. 10+50 and one (1) landward outfall was located near Sta. 11+50. Sand was being pumped through the landward outfall at the time of observation. 2. The on -site representative observed the shore pipeline for leaks where it came ashore from the dredge running west across the east end spit along the shoreline to the beach disposal area. No leaks were observed. 3. The on -site observer observed the landward outfall pipe segment separate from the pipeline and the NDC crew re -attach it with heavy machinery. While they were reattaching it, the discharge was re-routed to the seaward outfall. 4. Escarpments were observed along the seaward edge of the fill in proximity to Sta. 2+00 to 4+50. (See Photo #5). 5. Large waves and the rough sea were observed offshore of the project area. 6. Surveyors from TI Coastal were observed in the project area at 10:00 am. Cnn P■�ru,�n E■u■uun COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. PAGE 2 2021-2022 OCEAN ISLE BEACH - BEACH NOURISHMENT PROJECT CONSTRUCTION OBSERVATION REPORT Date: February 17, 2022 Observation Report No.: 009 Items Discussed with Contractor's Superintendent, Surveyor, Regulatory Agencies, ... etc.: 1. Jody Bowen (NDC) and Brad Rosov (CPE) discussed beach fill operations at 9:30 am. Jody stated that the landward outfall pipe was currently located at Sta. 11+50 and the seaward outfall pipe was located at Sta. 10+50. Were any issues identified today which may result in a field adjustment report, contract modification, request for interpretation, or noncompliance? 1. No issues were discussed today. Equipment List 5 Bulldozers, 2 loaders, 1 excavator, 2 ATVs, 2 light plants, 3 "Dump" Shacks Cnn P■�ru,�n E■u■uun COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. I PAGE 3 2021-2022 OCEAN ISLE BEACH - BEACH NOURISHMENT PROJECT CONSTRUCTION OBSERVATION REPORT Date: February 17, 2022 Observation Report No.: 009 Photos Photo 1. Ocean conditions at 9:30 am. Photo 2. Seaward outfall located at Sta. 11+50 at 9:40am. COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. I PAGE 4 2021-2022 OCEAN ISLE BEACH - BEACH NOURISHMENT PROJECT CONSTRUCTION OBSERVATION REPORT Date: February 17, 2022 Observation Report No.: 009 Photo 3. Dislodged pipe segment in proximity to the landward outfall near Sta. 11+50. U Photo 4. View of pipeline crossing over the terminal groin. Rif„Ul COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. PAGE 5 hu■uu.n 2021-2022 OCEAN ISLE BEACH - BEACH NOURISHMENT PROJECT CONSTRUCTION OBSERVATION REPORT Date: February 17, 2022 Photo 5. Escarpment in proximity to Sta. 3+00. Observation Report No.: 009 Photo 6. View of the seaward outfall actively discharging material to the fill area at -Sta. 10+50 facing east. COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. PAGE 6 2021-2022 OCEAN ISLE BEACH - BEACH NOURISHMENT PROJECT CONSTRUCTION OBSERVATION REPORT Date: February 17, 2022 Observation Report No.: 009 Photo 7. Rough sea conditions observed just west of the project area. COASTAL PROTECTION ENGINEERING OF NORTH CAROLINA, INC. I PAGE 7