HomeMy WebLinkAboutOcean Isle As-Built Final 4/27/2022M
N
a
v
K
0
a
z
0
g
O
1�
L0
N
O
UD
UD
U
Z
Z
Z
Z
Z
E 2,185,250
N
N
N
N
N
N
N
Z
Z
Z
Z
Z
O
O
O O O
O O O
O
O
O
O
O
O
O
O
O
o
O
O
O
O
+
O O
O Lo
+ +
E
2, 185, O
± N M
u')
(o
00
0p0
NOTE: CONCRETE CAP AT TIME OF AS -BUILT
J
SURVEY WAS COVERED WITH SAND. TOP OF
1�
CONCRETE CAP ELEVATION IS 4.5' FROM STA.
1 +73 TO 0+00 AND WERE SUPPLIED BY
-10
- -10.5
-
-
-10_
�70.8
CONTRACTORS SURVEYS AND OBSERVATIONS.
-1
-5.6 - . s
_34.g9
_4 6-
_-5.s
SHEETPILE
TOP=3.47'
- -4.9
- -5
-5. =6.
-
-
_
-
-7
-_
-1.9
_
_
-2.1
-3.7
-2.8
-
-2.9
5.7 -2 3
-3.3
-
-21:
-
-2.1
CONC. CAP -2.2
- -2.2 -2.2
-2.2 -2.3 -2.6
-2.4
-2.4 _
2.4 -
- -
-_
-4
8
-0.6
-0.6 -1.5
-0 9 -1.5
-2.9
-2.2
-
-2.0
022.6
-2.1
-0.5
-1.2 0 1
0.4
-0.6
1
5
-0.6
0.9
2.5
�
TOP=4.88'
4
2.0 1.� 1.8
1.4 1.3
11 4
Ilu_
1
pp
1: T.�
11 -0.1
21.6 1.5
0.9
_1
3.4
2.4
_
21: 2.3
_
1.6
5
1.6
-1.7
2.4
-0.8
1.8
3.�
-1.3
2.7
1.4
_
1.8
-0.
3:0
3.2
2.2
2.2 3.5
4.4 5.5
2
6
2.3
3.9
4:1
4.4 4.
4.
3.9
2:Z 7
.6
9
3d'
55
4.7
53
5.4?J�
5.4
4.
4.
5.3
6.0
5.3
�o rn
cn
-
2-2.7
2.7
3.0 2.7
2.7
2.0
2.4 2.4
2.4 3.2
3 6 2 5
1.3 -0.3
6
2.8
4.0
1.8
1.72.0
.6
2.4
35���
Z:(T
2.3
3.9
1.3
4
2
4.3
4
r'4.39
SHEETPILE
-2.1 -3.1
_1: -2.6
_31.3
_
-0.7
_ 1
-14 -2.3
-.--0.6
- .9
-1.3
0.6
L72
.7
0.2
0.0
0.
0.4
-0.9
1.0
1
p_
0.94fD2.1
TOP=3.30'
-
-2.7
-1.8.8
1.9
-3.2
-1.
-
0.8 0.1
-1.0
-1.5
-0.8
SILT FENCE
CONC. CAP
CONC. CAP
_
-4
7
.7
-3.2
4.3 -1 9
-2
8-51.
_
_
1.
TOP=4.86'
TOP=4.88'
-9
_ 3 8
-3.6
_
-42.67
_
-
_
-
-5.0
- .1
-
E 2, 184, 750
VINYL FENCE
SAND BAG
SURVEY NOTES:
1. ELEVATIONS ARE IN FEET REFERRED TO NORTH AMERICAN VERTICAL DATUM
OF 1988 (NAVD88), SURVEY DATES SHOWN ADJACENT TO TERMINAL GROIN.
2. END OF STONE PLACEMENT LOCATIONS AND ELEVATIONS WERE SUPPLIED
BY CONTRACTORS SURVEYS AND OBSERVATIONS.
3. COORDINATES ARE IN U.S. SURVEY FEET REFERRED TO THE NORTH CAROLINA
STATE PLANE COORDINATE SYSTEM AND ARE BASED ON NAD 83.
4. BENCHMARK IS NCGS MONUMENT STAMPED "BRU 63", ELEV.= +5.25' NAVD88.
v
Q)
`% "q, ESS OZ/ "
SEAL
L-3406 `
l
04/27/22
50 0 50 100
Scale Feet
GRAPHIC SCALE
a
vi
w
U
Q
0
g
uj
uj
W
0
Ln
N
N
N
a
0
T
U
0
z
Lu
0
zEf
0
z
U
z
W
I
w
Cf)U
0
z
T_C
o
O
�
0
z
�
U)
W
z�
�
U
J
z
06
D
J
r
o
MMLu
0
V_
0
>
U,
U)
U
C�
ZD
Q
U
w
m
Q
0
Lu
J
w
Q
Cf)
Cf)
z
Q
w
0
0
0
0
SURVEYED
DESIGNED
G.M.R.
N/A
DRAWN
REVIEWED
M.S.P.
R.L.T.
SCALE
DATE
1 "=50'
04/27/22
DRAWING NO.
5857-00-91-01
S-0
i
SHEET
1 OF 7
g
1 20
1 10
1 0
-10
-70 -60 -50 -40 -30 -20 -10 0 10
10/26/2021 PRE -CONSTRUCTION 0 + 0 0
20
1 10
1 0
-1070 -60 -50 -40 -30 -20 -10 0 10
10/26/2021 PRE -CONSTRUCTION 0 + 40
20
1 10
1 0
-1070 -60 -50 -40 -30 -20 -10 0 10
10/26/2021 PRE -CONSTRUCTION 0 + 8 0
NOTE:
WERE
TOP OF CON
SUPPLIED BY
RETE CAP ELEVATIONS
CONTRACTOR'S
SURVEYS.
—
EXISTING
GROUND
�CONC.
CAP
SHEET
PILE
—
20 20
0 0
NOTE:
TOP OF CON
RETE CAP ELEVATIONS
WERE
SUPPLIED BY
CONTRACTOR'S
SURVEYS.
—
EXISTING
GROUND
CONC.
CAP
—
SHEET
PILE
20 1 '
G* ■
20 30 40 50 60 70 10 -1070-60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 10
10/26/2021 PRE -CONSTRUCTION 0 + 2 0
20 20 20
NOTE:
WERE
TOP OF CON
SUPPLIED BY
-_RETIE CAP ELEVATIONS
CONTRACTOR'S
SURVEYS.
EXISTING
GROUND
CONC.
CAP
PILE
—
SHEET
0 0
NOTE:
WERE
TOP OF CON
SUPPLIED BY
-_RETIE CAP ELEVATIONS
CONTRACTOR'S
SURVEYS.
EXISTING
GROUND
0 C. CAP
SHEE
PILE
—
r§ ■
20 30 40 50 60 7010 -1070 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 10
10/26/2021 PRE -CONSTRUCTION 0 + 6 0
I
20 20 20 I
NOTE:
WERE
TOP OF CON
SUPPLIED BY
-_RETIE CAP ELEVATIONS
CONTRACTOR'S
SURVEYS.
—
—EXISTING
GROUND �
. CAP
�,HEET
PILE
—
0 0
NOTE:
WERE
TOP OF CON
SUPPLIED BY
-_RETIE CAP ELEVATIONS
CONTRACTOR'S
SURVEYS.
EXISTING
GROUND
—CONC.
_
CAP
�,HEET
PILE
C§ ■
20 30 40 50 60 7010 -10-70-60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 10
10/26/2021 PRE -CONSTRUCTION
1 +00
CA
8Q`o ESS
SEAL
L-3406
4b SURv�yo
0 %%
04/27/22
10 0 10 20
Scale Feet
GRAPHIC SCALE
r
J
Q'
�
Q
a
�
m
w
U
Q
K
Z
0
W
0)
O
H
w
�
g
o
a
w
o
F
w
Ckf
H
U
p
LLJ
W
p
(/1
d'
W
\
p
O
M
U
U
z
w
0
z
0
z
0
U
0
Q
z
Lu
I—
If
Lu
0
z
0
o�z(3
w°
0
JQ
�
Jui
C
z
Oo
0
m
O
LL
v
Cf)
(f)
_
Cf)
ZD
Q
U
w
CE
m
<m
0
Lu
W
�
Lu
J
Q
Cf)
U)
z
Q
0
Lu
0
0
0
SURVEYED
DESIGNED
G.M.R.
N/A
DRAWN
REVIEWED
M.S.P.
R.L.T.
SCALE
DATE
1"=10'
04/27/22
DRAWING NO.
5857-00-35-02
S-02
SHEET
2 OF 7
g
F20
1 10
1 0
—1070 —60 —50 —40 —30 —20 —10 0 10
10/26/2021 PRE -CONSTRUCTION 1 + 2 0
20
NOTE:
WERE
P OF CONCRETE
EPPLIEDBY
CAP
CONTRACTO
LEVATIONS
S SURVEYS.
EXISTING
GROUND
CONC.
CAP
PILE
�—
—
SHEET
1 10
1 0
—1070 —60 —50 —40 —30 —20 —10 0 10
10/26/2021 PRE -CONSTRUCTION 1 + 6 0
nn
20 30 40 50 60
20 20
10 10
0 0
NOTE:
WERE
TOP OF CON
UPPLIED BY
RETE CAP ELEVATIONS
-CONTRACTORS
SURVEYS.
EXISTING
GROUND
CONC.
CAP
SHE
PILE
20
70 10 —1070 —60 —50 —40 —30 —20 —10 0 10 20 30 40 50 60 70 10
10/26/2021 PRE -CONSTRUCTION 1 + 40
i
I
nn nn nn
NOTE:
WERE
TOP OF CON
UPPLIED BY
RETE CAP ELEVATIONS
CONTRACTOR'S
SURVEYS.
EXISTING
GROUND
CONC.
CAP
PILE
SHE
1 10
EXISTING GROUND
1 0
_ i n
CONC. CAP
=70 —60 —50 —40 —30 —20 —10 0 10
10/26/2021 PRE -CONSTRUCTION 2 + 0 0
04/06/2022 AS -BUILT
1 10
CONC. CAP
EXISTING GROUND
1 0
PILE
20 30 40 50 60
20 30 40 50 60
-- SHEEN PILE —
=70 —60 —50 —40 —30 —20 —10 0 10
10/26/2021 PRE -CONSTRUCTION 2 + 40
04/06/2022 AS -BUILT
1 10
CAP
EXISTIN BOTTOM
:\
SHE PILE
0 —
—
=70 —60 —50 —40 —30 —20 —10 0 10
10/26/2021 PRE -CONSTRUCTION 2 + 8 0
04/06/2022 AS -BUILT
20 30 40 50 60
20 30 40 50 60
CAP
EXISTING I GROUND
SHEEN PILE L —
I
70 =70 —60 —50 —40 —30 —20 —10 0 10 20 30 40 50 60 7010
10/26/2021 PRE -CONSTRUCTION 2 + 6 0
04/06/2022 AS -BUILT
nn nn nn
10 10
0 0
NOTE:
WERE
TOP OF CON
SUPPLIED BY
RETE CAP ELEVATIONS
CONTRACTOR'S
SURVEYS.
EXISTING
GROUND �
CONC.
CAP
—
PILE
—
SHE
� fr
7010 —101010
—60 —50 —40 —30 —20 —10 0 10 20 30 40 50 60 70
i
10/26/2021 PRE -CONSTRUCTION
1 +80
20 20 20
10 10
—EXISTING GROUND— — —L — I —
0 0
7"
CAP
�SHEEIT PILE
70 —70 —60 —50 —40 —30 —20 —10 0 10 20 30 40 50 60 7120
10/26/2021 PRE -CONSTRUCTION
04/06/2022 AS -BUILT 2+20
20 20
10 10
0 0
1 C - 1 o
10 10
LV ■
0
70 —70 —60 —50 —40 —30 —20 —10 0 10 20 30 40 500 10
10/26/2021 PRE -CONSTRUCTION 3+00 c>F-.,vy�,y
11/19/2021 AS-BUILT(MATTRESS) 04/27/22
04/06/2022 AS -BUILT 10 0 10 20
Scale GRAPHIC SCALE Feet
0 0
10 10
NOTE:
END OF STONE
PLACEMENT
LOCATION
AND S
ONE MATTRESS
ELEVATIO
S WERE
SUPPLIED
BY CONTRACTORS
SURVEYS.
— —
— —
g�......... •
ROZ���'
EXISTINGBOTTOM
i
\
00 DES
•/°ti ?v'.
z0
Q
i
6--s
——
--
—
i
--
_SEAL_
= L-306
im
SU
v�y0 ��`;
�, ..
MA •
• 0 �.
,.
1111111100
a
�
a
a
vi
m
W
U
z
w
g
o
raj
N
w
�
r
g
o
z
o
F
w
a
x
�
r
N
w
o
N
N
N
�
w
N
a
0
7;
U
0
z
w
0
zCE
0
z
�
O
U
v
Q
z
ILIJ
m�
LL
I—
-i
CE
ui
0
0
0
�
w
(D
U
z
(n
z
�
z
o
J
LJJ
Ccz
Q
O
U
z
U
_
U)
D
Q
U
ui
m
Q
0
L
[n
J
J
QCf)
Cf)
z
Q
w
0
0
U
0
SURVEYED
DESIGNED
G.M.R.
N/A
DRAWN
REVIEWED
M.S.P.
R.L.T.
SCALE
DATE
1"=10'
04/27/22
DRAWING NO.
5857-00-35-03
S-03
SHEET
3 OF 7
10
1 0
-10
-20
-70 -60 -50 -40 -30 -20 -10 0 10
10/26/2021 PRE -CONSTRUCTION 3 + 2 0
11/20/2021 AS-BUILT(MATTRESS)
04/06/2022 AS -BUILT
10
1 0
1-10
-20 70 -60 -50 -40 -30 -20 -10 0 10
10/26/2021 PRE -CONSTRUCTION 3 + 6 0
11/23/2021 AS-BUILT(MATTRESS)
04/06/2022 AS -BUILT
10
1 0
1-10
-2-70 -60 -50 -40 -30 -20 -10 0 10
10/26/2021 PRE -CONSTRUCTION 4 + 0 0
11/29/2021 AS-BUILT(MATTRESS)
04/06/2022 AS -BUILT
10
1 0
1-10
-20
-70 -60 -50 -40 -30 -20 -10 0 10
10/26/2021 PRE -CONSTRUCTION 4 + 40
11/JU/LULI A,)-UUILIkMHIIKLJJ)
04/06/2022 AS -BUILT
10
1 0
1-10
-20
-70 -60 -50 -40 -30 -20 -10 0 10
11/16/2021 PRE -CONSTRUCTION 4 + 8 0
12/03/2021 AS-BUILT(MATTRESS)
03/28/2022 AS -BUILT
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRE
S ELEVATIO
S WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
10 10
0 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRE
S ELEVATIO
S WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
■1
C
�E
20 30 40 50 60 70 20 -20 70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 20
10/26/2021 PRE -CONSTRUCTION 3 + 40
11/22/2021 AS-BUILT(MATTRESS)
04/06/2022 AS -BUILT
10 10 10
EXISTING
BOTTOM
NOTE:
AND S
SUPPLIED
END OF STONE
ONE MATTRESS
BY CONTRACTORS
PLACEME
ELEVATIONS
SU
T LOCATION
WERE
VEYS.
0 0
EXISTING
BOTTOM
�\
NOTE:
AND S
SUPPLIED
END OF STONE
ONE MATTRESS
BY CONTRACTORS
PLACEME
ELEVATIONS
SU
T LOCATION
WERE
VEYS.
�E
20 30 40 50 60 70 20 -20 70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 20 I
10/26/2021 PRE -CONSTRUCTION 3 + 8 0
11/23/2021 AS-BUILT(MATTRESS)
04/06/2022 AS -BUILT
10 10 10 I
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
0 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
� ff
20 30 40 50 60 70 20 -20-70-60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 20
10/26/2021 PRE -CONSTRUCTION 4 + 2 0
11/30/2021 AS-BUILT(MATTRESS) 1
04/06/2022 AS -BUILT '
I
10 10 10 ;
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIO
S WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
0 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
- -
- -
- -
-
- -
- -
- -
- -
- -
- -
-
-
-
�E
-20 -20.-20
20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
10/26/2021 PRE -CONSTRUCTION 4 + 6 0
i i � JU/ LUL I HJ-LSUIL I �MHI I KLJJ�
04/06/2022 AS -BUILT
10 10 10
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
OTTOM
0 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM�\
Q.
SEAL
=
L-3406
. 46, 3 U
,,�njAS
,.
1111110`
�E
-20 -20 -20
20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 60 70
11/16/2021 PRE -CONSTRUCTION cJ+00",•
12/03/2021 AS-BUILT(MATTRESS) 04/27/22
03/28/2022 AS -BUILT 10 0 10 20
Scale Feet
GRAPHIC SCALE
J
�
�
a
a
N
m
V1
z
z
W
0
O
H
Ln
a,
w
w
g
o
z
o
W
�
H
U
W
p
N_
al
d'
N
�
W
C
o
0
U
v
zLu
0
z
a_
0
z
0
U
0
Q
z
Lu
C1�
_
Lu
�
0
�
z
' z
°
O
CE
�
�
LLJ
z
CD
U
JQ
0
J
z
z
ov
mLLJ
U
US
C/
_
U)
Q
U
Lj
m
MQ
Lu
W
J
QCn
Cf)
z
0
Lu
U
U
0
SURVEYED
DESIGNED
G.M.R.
N/A
DRAWN
REVIEWED
M.S.P.
R.L.T.
SCALE
DATE
1"=10'
04/27/22
DRAWING NO.
5857-00-35-04
S-04
SHEET
4 OF 7
g
owe]
-10
20
IN1
I
v
N
T
O
3
d
0
20
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 0
11/16/2021 PRE -CONSTRUCTION 5 + 2 0 11/16/2021 PRE -CONSTRUCTION 5 + 40
12/03/2021 AS-BUILT(MATFRESS) 12/03/2021 AS-BUILT(MATTRESS)
03/28/2022 AS -BUILT 03/28/2022 AS -BUILT
NOTE:
END OF STONE
PLACEME
T LOCATION
AND STONE
MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM3
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRE
S ELEVATIO
S WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM:�
10 10
0 0
-10 -10
20 20
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRE
S ELEVATIO
S WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM�\
I V xx
L
0
a
a
0
c
O
O
V
C
O
.q
fll
O
0
a
m
-10 E
E
U
O
a
T
C
O
O
L
W
O
C
E
20
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 T
c
11/16/2021 PRE -CONSTRUCTION 11/16/2021 PRE -CONSTRUCTION
5+ 6 0 5+ 8 0
12/03/2021 AS-BUILT(MATTRESS) 12/03/2021 AS-BUILT(MATTRESS) o
03/28/2022 AS -BUILT 03/28/2022 AS -BUILT o
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
EXISTING
orroM
/'
- - -
- - - \
\
SUPPLIED
BY CONTRACTORS
SU
VEYS.
/
\
10 10
0 0
-10 -10
20 20
NOTE:
END OF STONE
PLACEME
T LOCATION
AND STONE
MATTRESS
ELEVATIO
S WERE
=
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
/
NOTE:
END OF STONE
PLACEME
T LOCATION
AND STONE
MATTRESS
ELEVATIO
S WERE
EXISTING
BOTTOM
-
SUPPLIED
BY CONTRACTORS
SU
VEYS.
—
\
LZ
c
r
�
J
Q'
�
Q
a
m
w
U
Q
K
Z
�
W
�
O
w
�
g
o
a
w
O
H
F
w
�
w
o
d'
N
�
W
o
0
10
0
L
O
U
U
U
a
z
Lu
c
z
0
0
z
c
0
-10
`
U
U
O
M
z Lu
IS
ir LEI 0
o
0 > z
20
o
a
z
=��
o
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40
50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10
20 30 40 50 60 70
0
:
D
LLI
11/16/2021 PRE -CONSTRUCTION
6+00
11/16/2021 PRE -CONSTRUCTION
2 0
U
z
U)
z6+
J
12/13/2021 AS-BUILT(MATfRESS)
12/14/2021 AS-BUILT(MATFRESS)
�
�
J
a
03/28/2022 AS -BUILT
03/28/2022 AS -BUILT
a
�
z
J
w
�
Z
cc)O
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
EXISTING
BOTTOM
SUPPLIED
BY CONTRACTORS
SU
VEYS.
10 10
0 0
-10 -10
20 20
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIO
S WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
orroM
10
aLu
°
ILLv m
U Cn
°
`n _
Q
U
Cf)D
U
0
rn
I I I
W
CE
M
W
r
0
Lu
M
W
c
2
J
Q
Lu
J
0
o
Cn
—
—10
w
�
QLu
z
Q
a
q
d
0
U
20
0
z
.F
U
0
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
11/16/2021 PRE -CONSTRUCTION 11/16/2021 PRE -CONSTRUCTION
12/15/z021 AS-BUILT(MHIIML33) 6+40 12/15/2021 AS-BUILT(MATTRESS) 6+60
03/28/2022 AS -BUILT 03/28/2022 AS -BUILT '
10 10 10 10
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM:\
/
\
0 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIO
S WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
—
�`Q'CN ......ROB'%,
; ess/0��;.�.i
'
SEAL
L-3406
.11
,yo ...._�o
�''�,,,�1AS
%
G```
..
,ff ■
I "I a
-20 -20 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 20 -2070 -60 -50 -40 -30 -20 -10 0 10 20 30 40 5 60 70 20
11/16/2021 PRE -CONSTRUCTION 6+80 11/16/2021 PRE -CONSTRUCTION 7+00
12/16/2021 AS-BUILT(MATFRESS) 12/16/2021 AS-BUILT(MATTRESS) 04/27/22
03/28/2022 AS -BUILT 03/28/2022 AS -BUILT 10 0 10 20
Scale GRAPHIC SCALE Feet
SURVEYED
DESIGNED
G.M.R.
N/A
DRAWN
REVIEWED
M.S.P.
R.L.T.
SCALE
DATE
1"=10'
04/27/22
DRAWING NO.
5857-00-35-05
S-05
SHEET
5 OF 7
Fio
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRE
S ELEVATIO
S WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
—
\ \
\
— — — —
\
10 10
0 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRE
S ELEVATIO
S WERE
_
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
77
:�
-
mi
9
—20 —20 —60 —50 —40 —30 —20 —10 0 10 20 30 40 50 60 70 20 —2020
70 —60 —50 —40 —30 —20 —10 0 10 20 30 40 50 60 70
11/16/2021 PRE -CONSTRUCTION 11/16/2021 PRE -CONSTRUCTION
7+20 7+40
12/27/2021 AS-BUILT(MATTRESS) 12/28/2021 AS-BUILT(MATTRESS)
03/17/2022 AS -BUILT 03/17/2022 AS -BUILT
10 10 10 10
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
0 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
rF,,
\
\
—20 20 —60 —50 —40 —30 —20 —10 0 10 20 30 40 50 60 70 20 —2020
70 —60 —50 —40 —30 —20 —10 0 10 20 30 40 50 60 70
11/16/2021 PRE -CONSTRUCTION 11/16/2021 PRE-CONSTRUCTION
7+60 7+80
12/29/2021 AS-BUILT(MATTRESS) 12/30/2021 AS-BUILT(MATTRESS)
03/17/2022 AS -BUILT 03/17/2022 AS -BUILT
10 10 10 10
•
NOTE:
END OF STONE
PL.ACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
/
r- -
-
- _-
—
—
—
— —
—
0 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM�\
/
/
/
\
\
/
\
mulmw
—2070 —60 —50 —40 —30 —20 —10 0 10 20 30 40 50 60 70 20 —2070 —60 —50 —40 —30 —20 —10 0 10 20 30 40 50 60 70 20
11/16/2021 PRE -CONSTRUCTION $ + O 0 11/16/2021 PRE -CONSTRUCTION $ + 2 0
12/31/2021 AS-BUILT(MATTRESS) 01/04/2022 AS-BUILT(MATTRESS)
03/17/2022 AS -BUILT 03/17/2022 AS -BUILT
i
10 10 10 10
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
0 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
—
r�
001111111111ff
—20 —20 —60 —50 —40 —30 —20 —10 0 10 20 30 40 50 60 70 20 —2070 —60 —50 —40 —30 —20 —10 0 10 20 30 40 50 60 70 20 I
11/16/2021 PRE -CONSTRUCTION $ + 40 11/16/2021 PRE -CONSTRUCTION $ + 6 0
01/11/z022 AS-BUILT(MHllnt33) 01/12/2022 HJ-BUILIkm/Aii rjS)
03/17/2022 AS -BUILT 03/17/2022 AS -BUILT '
10 10 10 10 ,
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
\
\
\
\
---
--F-
--�—�
—
----
--
\�-
r—
0 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
CA
•�FESS/p�
: •.
1.
SEAL
L-3406
:��'
S U RvGO�
0 ,
`�:
—20 70 —60 —50 —40 —30 —20 —10 0 10 20 30 40 50 60 70 20 —20 70 —60 —50 —40 —30 —20 —10 0 10 20 30 40 60 70 20
11/16/2021 PRE -CONSTRUCTION 11/16/2021 PRE-CONSTRUCTION,y1,,�
01/13/2022 AS-BUILT(MATTRESS) 8+80 01/14/2022 AS-BUILT(MATTRESS) 9+00 04/27/22
03/17/2022 AS -BUILT 03/17/2022 AS -BUILT 10 0 10 20
Scale Feet
GRAPHIC SCALE
77V
U
v
z
w
—
D
0
z
a_
0
z
1—
0
U
v
Q
Lu
OTC
-i
I—
U
Lu
0
z
CE
0-0
O
�
0
z
�
Cf)
LLJ
z
c�
U
z
LU
J
Z
D
J
CE:
—
z
O
0
°°
0
zCf)
_
U)
ZD
QIf
U
Lij
m
QLMMLI
W
J
J
Q�
Cf)
z
Q
w
0
U
U
0
SURVEYED
DESIGNED
G.M.R.
N/A
DRAWN
REVIEWED
M.S.P.
R.L.T.
SCALE
DATE
1"=10'
04/27/22
DRAWING NO.
5857-00-35-06
S-06
SHEET
6 OF 7
10
1 0
1-10
-20
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
11/16/2021 PRE -CONSTRUCTION 9 + 2 0
01/15/2022 AS-BUILT(MATTRESS)
03/17/2022 AS -BUILT
10
1 0
1-10
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRE
S ELEVATIO
S WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
LILL--
10 10
0 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIO
S WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
'
\
■1
�E
-20 -20 -20
70 -70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
11/16/2021 PRE -CONSTRUCTION
9+40
01 /18/2022 AS-BUILT(MATTRESS)
03/17/2022 AS -BUILT
10 10 10
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIO
S WERE
\
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING BOTT
M
\
/
/
—
— —
— —
— —
I —
— —
— —
— —
I
0 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING BOTTO
/
— —
—F==—
—
—
Tr
—
� E
-2070 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 20 -2070 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 20
11/16/2021 PRE -CONSTRUCTION 9 + 6 0 11/16/2021 PRE -CONSTRUCTION 9 + $ 0
01/25/2022 AS-BUILT(MATTRESS) 01/27/2022 AS-BUILT(MATTRESS)
03/17/2022 AS -BUILT 03/01/2022 AS -BUILT
10 10 10 10
1 0
1-10
-2070 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
11/16/2021 PRE -CONSTRUCTION 1 0 + 0 0
01/29/2022 AS-BUILT(MATTRESS)
03/01/2022 AS -BUILT
10
1 0
1-10
-2070 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60
11/16/2021 PRE -CONSTRUCTION 1 0 + 40
02/09/LULL A3-UUILIkmATTRESS)
03/01/2022 AS -BUILT
10
1 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING BOTTOM
�
�
/ �
\
0 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIONS
WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING BO
M
\ \
\
\
/
Fl!
� ff
70 20 -2070 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70 20
11/16/2021 PRE -CONSTRUCTION 1 0 + 2 0
02/01/2022 AS-BUILT(MATTRESS)
03/01/2022 AS -BUILT
10 10 10
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIO
S WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING BOTTOMI
\
FF
0 0
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIO
S WERE
SUPPLIED
BY CONTRACTORS
SU
VEYS.
EXISTING
BOTTOM
/
I
� E
70 20 -2020
70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
11/16/2021 PRE -CONSTRUCTION
02/1 1/LULL AS-BUILIIMHI TRESS) 10+60 i
03/01/2022 AS -BUILT '
10 10 10
EXISTING
BOTTOM
NOTE:
AND S
SUPPLIED
END OF STONE
ONE MATTRESS
BY CONTRACTORS
PLACEME
ELEVATIONS
SU
T LOCATION
WERE
VEYS.
I
I
I
I
.7
-20 -20
-70 -60 -50 -40 -30 -20 -10 0 10 20 30 40 50 60 70
11/16/2021 PRE -CONSTRUCTION 1 0 + 8 0
02/14/2022 AS-BUILT(MATTRESS)
03/17/2022 AS -BUILT
0
-10
�Q FES
9
SEAL
L-3406
:fn%9iL� SUR'
-10 , ,yo • .
`%%`.
20 2 04/27/22
10+30 10+40 10+50 10+60 10+70 10+80 10+90 11+00 11+100
11/16/2021 PRE -CONSTRUCTION END SECTION ON CENTERLINE
02/09-14/2022 AS-BUILT(MATTRESS)
03/01/2022 AS -BUILT 10 0 10 20
Scale Feet
GRAPHIC SCALE
NOTE:
END OF STONE
PLACEME
T LOCATION
AND S
ONE MATTRESS
ELEVATIO
S WERE
—
SUPPLIED
BY CONTRACTORS
SU
VEYS.
\ \
EXISTING
BOTTOM
—
-4—
J
a
N
0
Z
J
0
H
a
r
LLj
x
r
N
�i
N
o
04
04
0
T
U
0
z
Lu
0
z
0
z
0
U
0
Q
J
W
LL
I_
Cc
Lu
0
Z
Ef
CIL
0
0
CE
0�ZO
::)
LuCE
U
z
Luz
J
J
C
z
o
°°Lu
02
z
U)
_
(�
D
Q
LijQ
m
WMM
W
J
J
QU)
U)
z
Q
0
W
0
U
0
SURVEYED
DESIGNED
G.M.R.
N/A
DRAWN
REVIEWED
M.S.P.
R.L.T.
SCALE
DATE
1"=10'
04/27/22
DRAWING NO.
5857-00-35-07
S-07
SHEET
7 OF 7