Loading...
HomeMy WebLinkAboutCoastal Storm Risk Management PlansCU I U z O Q 75 ry O H z 0 w H U) U) Q U z D 0 W J J O ry z O U C U I RTA cul U z O Q ry O H z 0 w LL U) U) Q J U z Z) 0 W J J O ry z O U c u I RTA 1 2 IK El k CU I 9 rA 9 10 G F Es Ic C 11, 0 OCEAN ISLE BEACH o N Z W "�• 8 1 -9 4.2 '9.4 3•? •3.0 . 8 �2.6 'S.gS.S -4.7 -3 > 3, 3.1 .3.3 -3.0 •?.6 °0 2 '2.9 '2.6 '2.6 '2.S l - '�'1• ��; -q.4 ,4.0,3•S 2 -3.3 ,3.1 3.0 -2.9 •2.9 3, -. l.Z ^`•!�• 5. '4.B •3.3 - 2 3, 3.7 -3.4 ° -2.8 -3.0 SHI-V-21-001 '4.1 .3•g ,3 0 3• 1 ,3.0 ,3 3 "3.0 ® N : 52973.7 3 9 3.> , 3., -,3 3 2 3.3 ?.5 -7.6 ,i w.0 3,2 3.1 .g•3 .3. 3.5 '1.J 7.4 E: 2187750.1 q a q q°3 4.1 3,g D # .3.5 3.4 3,2 3,g ' ` 2°' 2°0 ?•3 > SHI-V-09-17 E: 2686785.7 ROCK AND/OR '4.6 '4.5.q.6 3.S3.2 '2.0 N: 55047.2 0 ,S •4.6 "4.> W.>. "3.43.7 '2.S?.1 STA. 18+56.6464 _ `5• '4.8 3'9 ,2°0 1.J N: 55024.4 -. 5.7 - s, s,q, 24.0 ,4j 4.0 3 , E: 2187587.4 CENTERLINE AREA SEE NOTE 7 y _ E: 2187296.3 N: 56873.7-� S 4.9- 59 5, 2_ 5.7 •5.1 .q.8,gl "a.3 .q.2 "4.2 5 3.2'2.1�2.4�2.3 -2.1 9, 2 �7.4�7.0 ,7.7 1.0 E: 2187005.2 S -V-21- 2 � _ - 1 .{ .S•8 58 S,gS.6 "S.4 '4.8-5,,'4.J 3.8 '3.5 "3.0 '1.5 ,1.6 .7.47.0 .p.8, BORROW AREA -5,2 '6.7 .6.4 , 5.3 "So 4.5 .q•4 '2.S ?, 7.S 1.0 -0.6 -0. t- 6.0 .6.6 .,• >.0 .6.8 5. '4.7 - 4.1.9 '1.4 -1.4 1 "0.7 A4 (D I- 2 6.2 2 'S"?3.9 3.> 3.42.8 . b9 ,. -1.4 _ 70.2 -E. N 56 210.E N: 56593.4 $ > •a '>.2 -6 8 "6.6 •5.9 '4.9 "4.6 2.6.2.S - 8 q.8 y.9 •IJ 7.0 -o.s ,p 4 ,0 3 '0.7 -0.6 N: 57053.3 •' r -,,3 5.8 6,3 -6,6. .6,p. 'a•3'4.7 .3,>3 •2.3'2.1 yg 1,, .7 0.1 -0. -0.7. E 2,187,797.1 E: 2186956.8 E: 2186852.4 >.5 >• >.5 8 ' . 5.6 .S 8 4 '3.0 1.J •1.7 0.0 1-1 ° '6.> • -.0 ,g.3 ° 5 ° "4.9 -4. 2.8 -2.6 '7.9 -1.8 "0.8 `0°4 ,0.7 'E.1 -0 .3 ,p.9 3. *+ ! '6.S 8.5 -J,g 6 4 6.8 "J.4 d.9 8* _8°2 '>.1 '6-'-6 .6.3 S 8 6 -4.'1-4.7 ,3.5 3 ?.4 .2.S '2.0 .1.6 p• 0.0 . 8 g• 7.0 -7. 0. "S.9 8 } '>.4. 4,9.1 8 sfgI V-09-14 3.0 '2.3. • 8 0,, ,02 .p 4 "0.8 8'0.9 N: 56487.8 T.1 . '9.0 - -6.9 -4.6 '2 8 . 2 3 2.7 •a 0°4. 0, @ " .8 8.9 J.S "8.7 _8.6 ,g >.8 •6.9 .,.8 ,,.3 ''•0 -6.9 .6 ,6 `4.4 'F 2.> -2.6 '2.4 '7.9 '?.1 "1.6 ,, 0.3 .p.0 5 - ' "1.1 -1.3 ,1 E' 21869937 ,6 5• "3.8;% J y ,g•2 g• p�g J• .6 . J S.6 . -3•� 'z.3 .2 .0 2 0, -0_9 .4 ., 2 '1.0 -0 •4 '6. 1 .8-g3 .g.S 28,9 -8@'@ SI"(I-9.6 2 q 8 0-.6 .6.9 ,6•S '•S >.3 6.> 5, ,5.0-4.6.q°q q.2 ,g33.0 ".a-, -2.3 .?.1 -?.0 .1.> 1.4 1.1.02 E.z 0.50.9•0.2. 4 -1. 1-0.9 , 1. 1 .-1.? .S.p g.,2 ,7.3 •3 N: 56196.3 3 6.Jl -6. ° -.2 0.> I- -21-00 C9 STA 50+79.87 CENTERLINE 4 @4 6•g. 3 @ 6• '6.5 2 .g• '8J 9.9 -9.4 "8.J- 8 J.0 ,,.4 -6•? .S.J ° 7.8 ., O.S '0'8 1. `'°0 -0•J - E: 21 87293.5 l•4 -J. '4 g BORROW AREA 6.4 8.3.S.J ° >.6 -6.6 . 3.p.S 2 7.2 .0 g 6.0 9 N: 57242.5 -S.6 8 0 5.8 -S• 8,q 8•' 8.6 8 8 8 8 9.7 -9.4 ,g.4 -g•0 •S,, -6 6 2 ,6.4 ,6.9 _,• '•2 -6.9 .6.6 "6.7 S.1 .q.9 3J 3.4 -3.1 2.4 "2.3 0.4 0.2 .p.4 0, •2 1.0 y.5 ,7. ,,•2, 0.9 .1.0 .,.2 '7.3 '1.6 -2.3 8.4 .2 6.9 ' ' J°2 .S '2.4 E: 2187078.3 N 52,997.2 5.2 'S.4 S 2 4 60 6 2.1,5. 5.@ 3.0 , @ 0.2' p 0.@, 2 ,.0 6 '4.J ,q 4 . S °7 .q.1 • 2 "6.5 ° '°2 >•0 -6 g -S.1 .5.0 . 2.9 -2.0 .7.9 O.S -0.1 .p g 0.4 > .,.? Deg 0.6 "p.6 -0.9 •7.1 7 '1.0 7.? .7.5 . ° '8.0 -8.7 ,,.1 0 ' .9 -6.1 ,g• E 271 887049.1 -4.9 -S.0 4.7 -q,5. "4°7 -q �!.0 3, 8 6.8 ,• ,6.5 4.6 -4.2 . 1.> . 0 @ -'°2 7 •2 -0.9 . , ?.5 2.@ g ->.4 6.1 0 _ 0.> 0. 2.$?.6>. '4.6 _3.9 3.8 ,3 g 7 •4.5 '4.J "4.4 -3.4 ° 4 .q°? '4.9 5 ->.0 •l, 6 ., $ "6.7 .5.6 ,S q 3J ,3 3 4 '0.61. 2 .p.8.0 6 '°2 •7.6 '2.8 3 .$ 0 -4.9 '>.4 6 8 .6 '3.J 4.6 4.TS,p S.1 3.> .3, • 5.4 ,6, SHI-V-O9- 13'° '6.9. SFfkV'21 Q22.o 3.0 •2.> '?. 1.0 ° '0.6'0.9 0. , q,� 1.5 •7.8 -2.0 le. , "'2.8. 3 q 5 .9 3.6 z -?.2 ., -,.4 "8.3 '>,p ->° ., 2 -6.2 / a 6 N: 57655.2 4.0 4.0 6 3 2. 07.4 'E.B 6 SI1-V-CI-O2O/.3 2.7 77 2.2 '4.4 '4.6 '4.9 ? '4.2 '$.8 6. 7 -3.3 '0.? ,p. • 8 4 > , 1 Z, q `4• 3 '4° 3e -0.0 W '6.6 6 `6. S 6.6 -4.1 .3.6 . 5.1 '4.9 ,5• 6.? 6.8 •J, 2.2 2 0. 'E.6 . • •7.6 . '1.4 ' ., S J. 4 6. '2. N: 53005.0 '4.5 . 3.43,g3.1 -5.0 ,q 5.5.4 7 "J.3 6.6 -6.7 1. ' 3 -0.8 -1.6 0 7 . 0.6 , 1.8 , -2.1 gg E: 21 86814.5' a.3 -4. 6 'J.4 � J 0.3 0.3 0.>.0.6 - 7.8 '2.Q.9 .7 '2.32.3 -?.4 3, �4.7 -7.2 'z.8 .q >.6 .,•4 s S 6 E: 2188148.8 4 3 4.1 3.6 3.6 3.9 4.3 2 4.1 -4.1 6.2.5.5 5.9 6.J - >.7 "6.6 6.4 S.6 6.2 4.8 7.6.7.3 0 2.7.0.0 -0.2 -0.7 -0.2 "2.9 4.7 Za .6 3, 2 -4.2 -0.5 3 ,° 8.0 '.5 6.8 6.3 ,6sS ' 6.3 . 3 0°9 0 3.S 6 -4. -3.> .3.4 . 3$>3.0 3.4 '4.2 4, S p 8 5.0 '4.2 -q. S 0 5.3 , 5° -6.2 -6J >, > 5 2 6.6 6.2 442.9 .?,2 .7.9 .8 1°• O 1 °°' ? -0.1 0 2 0.0 -0.4 `oo ?07W`0 A ' -1. -2. u 7. 6`2 3 p 3 q '4.7 S .8 3 .p.5 , - 3 J 5 3 8 8 6 4 6 5 5 3 g ,S ° 6.,- 1. - 3.3 4. '4.2 4 ?.9 .' '4.S 4 ? 'S.S 8 6, 5.4 1-4 • .7J . 0.0 0. ,p.8 .1.0 0.7 ° 7. '7.3 9 2°5 •2.6 - .0 W. 3.0 4 'l.1 6 J, '' -6.2 -6.2 3 7.2 7 4.,.q• S,g p, 6, q g Q4 4.7 4.1 4. 3.03.S S.2 S.8 2 '4.8 5 Hl-v5-q9- J.8 6.2 . 3°> '?.8 . 6 "0.4 .p 1 8 ,, 4 '1y3>' 6 2.? SHI-V 21 O3i% 4.8 5.2 6 >.0 -8. '8 6 3 "2.7 3 0 8 3 73.2 0 '3.? 3.O .2.S '4.0 ,4 '6.0 '6.3 ., , _6 g '>.9 .8.0 •3 6.S -6. S.9 7.8 .2•J, SHI -V-G�t qq 0.8 .p• J '0.1 .p.3 '0 6 °®c6 1.3 '178j 'F ®"2.3 3.0 '3.8 .q• '4.4 3 3°J ., , '>.3 _g.8 -6.0 ' .7 .6.2 6.4 -4.8 " .8 8 - ' O p-° 8 ,' -1 $ 4 AYPOI�IT'@.E >, S.S ?.3. 60.>-p d,,33 P�> 8 - 6 '1.6 >, 7 -4.2 WAYPOINT 1'° '2.S 6, W8-4.9 6.0 - 3 '4.63.9. ?.0-7.6 4 "0.0 ee�..�I-V-21'®ap 72 -?.9 S4'S.3 q 6.2->.3_6, -6. s.9 sHI-v-2 -(Y4 .> 'sHi:�- - p. .1 4.0 . 4.5 ,q.2 "3,8 -2. '?.6 ° 6.4 -6.8 6.4 -5.8 6.9 -6. S . 6. J ,,.2 ° 3.6 3 0.3 .0.9 '7. S Qi'F3 p 0; 8"O. J-2. 3, 'a e 3 S.2 6.9 6. S -0.6 4. S 0 3.8 -".8 8 2.6 3.2 -3°, ,4.4 4.9 ,5.4 `S• "6J . 8 S 6.8 0 -6.5 , 6.9 `-0 ,6.9 8 ° J.8 �. • S -3.1 •2.9 2.6 .?• 0.3 -0.1 2. ° 'b6 0.9 -1.0 6 -0 .3 _ �7. 5 '7.4 .b3 7.9 4 7.8 3.4 8 ® SH6 V 21-016.s 8 9 -6.J '6.0 6.1 S. .8 S. '0.3 .@ 8.3 2.3 3. 5.6 S, 5, 6.l -6, '•4 2 4.7 - 8 _ 8 • • - 6, '1.9 °° 8 /1 6 n 76 '7.2 9 3. a 1 - 8 "4.9 .6 J.0 9. Oy.9. --- �uI 8 -3. 2.8. 9 _ 6 >.2 . >, >. 0 . 4 0, '0:4 J 7. 4. 6 '6.0 4 _ J -- ',-___ .0 '3.6'3,q ,36 07.3 ° '4.0 "6.J 9 -6J-6. 4.6• 8.0 >.l, 7.3. , 0.4. -0.4 'Ol•� 7.8 -1.S '2.S S- .S0 "0.4 3.1 .8 6,2 '6.S '6.S ° 0 3 '2.7 - 0 '0.0 7 -4.5 '2.4. '4.1 4, 6.0 3'S.6-S.8'6.6 J.1 S 6.9 .,.1 ,• 8' 9"l.9 , 8 '° >.S 6, 4 / '3.0 .2 7.7 0, 0.0. 3 O,g 0.8 .LLO.6 o. °' 1.> 4.> -6.1, °�IellrV-09-3 -o.l I �07 z -4. 9 9 6, 0.S . -7.2 �.i0.1 7.2. '3.6 4. '6.> 0 '6.7 . '4.1 -,?-a . '4. � 6 •>, S. 2 7.1 -1.5 1. 7. 2.6 'S,g S 6.0-S. 0 '6 4. 9.6 -0.5 � .9 Je 4.7 ?.8 3.7 '?.4 4.S -q.9 .q.6 , • 3 -4.6 .q 8 '>.0 •J.0 9 8.2 -@•6 .g• 8 '$.3 .q.8,•7.S . '7.9 .p 4 p 2 37.6 '2.6 5 6. '6.9 4 '8. S - 1-009-3. 1. O.l 74. .3.8 ,4.7 . 2.4 "2.3 2.4 "2.8 2.8 -3.1 4 6 -q.9 .S•2 "5.6 5.6 "6.9 ? "8.3 .g•4 4.8 ,4 1.0 ..6 -7.2'2.0 -0.8 ,0• 0.8 -0.4 .3 .Q p3 6.S - . 1 '00. 0, '7.7 -7.1 2.4 -3.6 4. 6 '4.8 6 9 6.9 4 4.2 W ' 2.5 8,, 3.8 3.3 . '?.4 •z.6 - • 3.6 3 6 '6.4S.S '6.J �6. '.? ->,6 ,g•, 8.8 ,8 3 '4.2 •3.9 -3. '0.4 , 9 'O.S 0.3 6 '6.2 '?.J " .S .5.9 6°2 6a.g S q !fed p T 4 S I- -UOrJ -4.6 2. 2. '2.0 2 3 '3.9 S. a "�.7 d, '8.4 6 8. .8 0 - 6 ,p 0 -0 �. , -0. J ' .7P.2 "0.0 '7.8 ° 3 '4.0 4.9 ' .4 .5 -- 8. 6 4. ' a �7 '2. 7.6 '4.3 7.3 2-2.J 'a.7 . a 'J.0 . g• a '?.4 7.5 �° 7 3 -0.2 p 'O.l 6.3 .6 S ,, --- 8.0 9 rSFi9-V=�9-95.6 9 @ ' .6 4.8 '4.03.5 4.43.932'2.3 .2 '7.9 -2.0 ,1.4 '2.9 "3.7 "32 4?�°4'4.S "4.8 .q•6 5S 6.6 -6•, -,,1 -,.8 ., '•q `'•4.8.1 3.1 48.S `8.6 -8.8 ,g.o 9, `8'3 -8.2 -g.O .,.J .,.O 57 S.6-4.8 .3.J ?.33s 7.4 '0I•. .p. ,641`7 '7J 0.>'0,q '0.6-o.J°.S �'0.3 -0.10.3SO -0.2 0.0 .0_9 °.6 .7.7 -7.8'4.0 "6•J 5°4 6 -2.S '4.0 4S•3 `6°5 •S -4. -0.6 -4• S•9 82 9J 8. 6, 68 '6.9 .5.5 -3.2 1-��9S I ,�4.8 6 'S.2.3.9 -3.9 ,3sg 3, 0 -2.1 -7.8 -2.1 '1.5 .1.6 '7.8 '2.0 -3°3 '3.6 3 1 -6• 6, .S >, •1.9 .8 8° 9.3 3 3 -8.8 6° 6.> .6. 2 '?.S 2•, SHIN-V 4 ot1$ 0 '0.8 3 C®®�!! 3 -p . 8• ° -70.4 ' .2 - 2 7 9 ? 6 - 9. 5' 0.0 'S.0 •9 'S. 7 8. > 7 6 ?s -2. 1.> z.o 6 3 3 -6. 7 '8.6 9.3 6J s. 4 s.> z.0 -0, •1.8 o J .pA, -o 2 O.s 2.3 2 I - 3.> 91.4 SH9-V-21s.Q 1 0 HI-V-2J 1,7608 s.7 @ 4. '6.4 -4.0 6 -2.1 3.8 - 6 -6.6 ,• -8.5 .g.8 •9.6 9• 2 "g.0 .,•8-4.6-5.0.q.6 ? "0.3 -7.7 -7.5 7. O.S 0-&4.7.@-0 4 • `O;q'0.0 0°S 0.2 0'7.0 '7.4 • -3.;, '4.3 '4.0 1. S "6.4 J• .8 3,g 4 11.3 7 .1p 6'9.8 8.1 7p '77, 1 j°1 ,,7.5 -4 •8 8 4 "74. '2.1 4.3 -S, 3 _6. 5 "9.9 -9, '0.0 7. •2 ' .3 'S.3 4.0 .3.J - '1.8 •?.? "2.7 ° -4•g _6. -6.? J'J.4 .,•8 "l.9 . "6.8 -9.3 - 6 -9.6 -8.3 . S.p.6 . 7. 0. 0 ,0 '7 3 -4.6 4 '77.J -73.4 2.3 -10 ,,30 - S '4.4-3.6 W.2.• 3.4 "2.8.1. '7J .,•S ?.3 -2.7 "1.9. '2.>3.0 "3.2 .3.5 '4.1 6.8 ,,.6">.0 8,p 8.7 9.l 70.0 70.T70. S.,g• 9.J 9.>989 l9 ',.S-6.8`5.9.,2 0.0 '0.6 .1.4 0$.° (�6.0.2"4 -O,q�S i@ 2.93.9 02 '3.? -3.6 .p°6-4.>- 6°2 9 1q 4.4 -9- ��373.3 7q'74.372.9 .39• '7q. '3.J.3.0 12.1'.4 -7J -7.9 '2.0 •7.6 .ps'0.5 "0.4.0.J .1.0 -7.6 '7.l•3 $8 3°3 "3.8 �•4 �•4 W.8 -q.6-S S T.5 -J•6 .g.0 3 ,8.5 9.0 8 8 9. 0.0 ., G,, 2 10e8 8 10 4 "9.3 g 1 9 S.B,J 0 4 3 '0.0 '0.6.0.3 g.> "2.0 °.8` • -p• .S 6 •0.3 '0.5 '1.2'2.2 •2.3 -2•, - "0.3 °.5 §1�Il Y-21-O;f 36 ,g•2 77.7 7a.2 `@ ° .4 6.7 •' ° -,3,0 .@ ',.2 1. 7.9 •4.6 2 .> 8, ' ' 0.6.1 • 10, .8 1 8. '4.0 '2.8 -2. 0.> �,e 1 0 0. "0.3 O.S-0°' -?.0 O,J 1, 4 13• , ' > 0 , 1 o, 4 zs ®SHI-V 21-01d}2' s,p z, J,S ,, o 1.8 b> -7.6 -1.7 "0.4 7.2 .,2 -7.7 ,1.4.2.E '2.? ,?.6 `a•9 '4.9 ,5.4 ,6°g >,S .g•2 ,8 g -s.0 .g.7 .g.6-7p.7 10.> 1 ?.11.9,,,•4 ., 1.@,7 °.l -11.1 '70.9 •70.J 9.2 9.1 .,•g ,,2 6 7.9 -1.4 -7.2 .9.6 5 °`1.B I-v o�-OGJ"0.5 "0.5 .1.4 .,•, -?.6 "2.J 2.1,1.6 °.5 S• ' s 7j `13 .,2 g 1.9 ?.7 93.3 - .5 5 g 8 - 6 WAYP NT '2.1 "4.8 6.2 '6.@ ->.7 -E.7 ,.p '1.2 4. 1 '6.> 1, z SId6V8094166-z.1 -Z4 2. 3'3.6, 4.2 4.g 6.6 >.3 S. g 828g0 '9.1 s.4 9,4 g.6 g877`67'22 2.3?72.7'2.072.272.872.51, 72.4104 g2.3 6.41'S 456 7 °>8? 57.8° '92 8 p SHIV2E1 -015° 1. '7.6 1.6 S2.8 °2 0 EO2.fi14.>,,4 73.8 2179.>1j°'1.1 0`g 4, 4"6.6 a s. "2.1 a7E 2 @ 3 >. N: 57869.5 °° 7 94.5 >. 1, 2 2 . 8.9 _ 2--6-7 '3.9 0 4 '7.0 1q '2p. 13. 3.8 4.8.S.6. 9.5 _g8 1 0 ''•2'12.0 ,2 2.673.E-73.T73.673.3 72.4-11.6d2.1., >>$,g>•0 ,64 B'l'� .3, e 3 -1.2 0,5 7 .8 7.2 1 1.3 3 -4.J 6, .,S• -7q.J , 0.4?°°q '27.1 2°• 78.2 E: 2187048.6 •7.9 •2.7 1.0 9 7 'E. 'O.l 1, 4 2 6 2.7 '4.2 6.8 -6°6 "6.9 •J,2 11t�-,. I 0 3 70.@70, 6 , 73.8 1.8 .,, 0 ' .8 "l.0 ., q '4.7 ,• - -7.0 -0 .S 7 '13 ° •20 ` 9•8 "27.1 ;16 7.9 .2.2 4,3 0 .1 4-S - 2 S°' 6.2'• 6.g "JH V9-O998 10 E7j' y1.6 -12.2 7? ,3,3.>,4'2 "-?' -76.1 -15.07S 27S4g 8�+p z71.,0, 2.8973 0•, 9'� 699 -9 47-a B , �0 -6 0.0 8'• > 9.J 9'•8 5,8 3 7p.2 8.2 -72.0 1. 10.0 1 12.4 T 85 - 8 , 2 79,?,.72p• 'g.>20 2p•3 SHIN-V-09-1 1 J'f"I�-V7 /� 0 q 3 9, 9, J.1 0.8 7 •3 w°2 '4.6 8.5 -9.0 -9. .8 .71. 4."16.9 '76,274 6 2.2-72. q.12. �77.0 •5 "11.0 12.0 •0 �73.1 "°2 -23.6 2.2 '4.9 -4.8 ,5.7 -11.6-72.2 .1 • 16.E 11.9 .16• •5 "76.0 781 .g •'4.2 13.2 °j%183 -12 �2. 17.7 , • 13.2 .6 14. -'4.S 8.0 °6 23 `23.6 YP7fi�7�, J ? 67 6'14 1 1g, .&1g , S 5 `'4• 2 8 2 - 2.9 3 4 "14. 15.4 9-16 j�6� •2 ° 5 N: 56896.8 ,.8 0.4 3. 4'78 314. 13 7 70.S '70.8 .,g °376.0 .16.7, .58.3'7>,9 , .,>7 '�'S74.0.7 -1S.5 8 1> .> 4.6 ,q.@ d,3 .S,J 0 .@ ., 1.?-77, 7>•21@.0-18e .578.3°�6.2 ., > >*� `14.97>.4 ' ? 2 E: 2187648.9 .1 •6.6 ->,0 "6.S 3 '7,,,,?• g 78.>-7g 4., -��.4 @•2 ?•4'. 71,, _'S•> -11.6 A1��01 NT 4 -S.6. 9 74.S76. 9.4-79. 1 6 1 -76.9 -79. N: 56691.9 5•J 'S. 2 �7,.>7 2 "78 gS•7, '7s. ` ? 4 '18 9 -6.0 -6.3 .,.3 ->,4 8.3.1g.0-18s�7g.6 °8-ig1�®�0-2p°l�.g•%02p•S 6 -7g, `1g.3 •9 E: 2187859.7 B.S.9.0.8• �.3.1> 7g R20.8 19.9 9-9.4'10.3-10.3 `16.3 9.3702 .g.S70.7 i DREDGING LIMITS WIDTH VARIES 0' MLLW - EXISTING BOTTOM �- s.71, 1J -15' MLLW WIDTH VARIES A TYPICAL SECTION - SHALLOTTE INLET 10 NOT TO SCALE u4 i 1. ELEVATIONS ARE IN FEET AND REFER TO NOAA'S REPORTED MEAN LOWER LOW WATER (MLLW) RELATIVE TO THE 1983-2001 TIDAL EPOCH. 2. DATE OF IMAGERY: JANUARY 2021. 3. DATE OF SURVEY: APRIL 26, 2021 AND JUNE 16 AND 30, 2021. 4. PROJECT SURVEYED WITH DISTRICT SURVEY VESSEL "POTTER" AND "ROGERS", USING RTK-G.P.S. HORIZONTAL POSITIONING EQUIPMENT AND 200 KHZ SOUNDING EQUIPMENT. 5. ALL COORDINATES ARE BASED ON NORTH CAROLINA STATE PLANE FEET (NAD83). VERTICAL DATUM BASED ON MLLW, FEET. 6. TIDE GAGE FOR SHALLOTTE INLET SURVEY LOCATED AT: LIGHT 83. 7. THE DREDGING SHALL BE ACCOMPLISHED SO THAT THE MOST SUITABLE MATERIAL AVAILABLE FOR BEACH RENOURISHMENT IS PLACED WITHIN THE PRESCRIBED SECTION. THIS MATERIAL SHOULD BE PREDOMINATELY OF SAND (SP, SP-SM) GRAIN SIZE WITH NO MORE THAN 10% BY WEIGHT PASSING THE NO. 200 SIEVE. SHOULD THE MATERIAL BEING PLACED ON THE BEACH CONTAIN AN AMOUNT OF SILT AND CLAY THAT EXCEEDS THE 10% BY WEIGHT PASSING THE NO. 200 SEIVE AND CONSIDERED NOT SUITABLE FOR PLACEMENT ON THE BEACH, THE CONTRACTOR SHALL MOVE THE DREDGE TO A MORE SUITABLE LOCATION WITHIN THE BORROW AREA AND NOTIFY THE CONTRACTING OFFICER OF THE LOCATION OF THE UNSUITABLE MATERIAL WITHIN THE BORROW AREA. 8. CONTRACTORS DREDGING SHALLOTTE INLET AND THE AIWW IN THE PAST HAVE ENCOUNTERED ROCK AND/OR HARD MATERIAL WITHIN THE HATCHED AREA AS SHOWN AND AT ELEVATIONS ABOVE THE BORROW AREA EXCAVATION LIMITS (-15' MLW) AS SHOWN ON THE PLANS. THE APPROXIMATE LOCATION OF THIS ROCK AND/OR HARD MATERIAL IS WITHIN THE HATCHED AREA AND BETWEEN THE EAST END OF OCEAN ISLE BEACH AND THE BORROW AREA DREDGING LIMITS AND WITHIN THE AREA BETWEEN THE BORROW AREA DREDGING LIMITS AND THE ADJACENT AIWW CHANNEL LIMITS. HOLDEN BEACH ELEVATIONS OF TIDAL DATUMS REFERRED TO NORTH AMERICAN VERTICAL DATUM-1988 (NAVD 88) ARE AS FOLLOWS: MEAN HIGHER HIGH WATER (MHHW) = 4.73' MEAN HIGH WATER (MHW) = 4.40' NORTH AMERICAN VERTICAL DATUM-1988 (NAVD) = 2.78' MEAN SEA LEVEL (MSL) = 2.32' MEAN TIDE LEVEL (MTL) = 2.28' NATIONAL GEODETIC VERTICAL DATUM-1929 (NGVD) = 1.72' LOCAL MEAN LOW WATER (MLW) = 0.15' MEAN LOWER LOW WATER (MLLW) = 0.00' LEGEND Ti'* �i' ✓'ri r . • r STA. 0+00 CENTERLINE N 579775.0 E 29186,797.3 DREDGING LIMITS Z 7t J HARD MATERIAL AREA PIPELINE ROUTE ® BOREHOLE LOCATION (2009) ® BOREHOLE LOCATION (2021) 0 250 500 SCALE: 1" = 250' ■ US Army Corps of Engineers° O z CD W CD z m Z CD O 0 O ¢N QN U U' CNJ DO J2 Q oQCD� o wUN > CDzJ-z OOL� > � 0 0 W Q z Lu co} 00 -1 } m 0 LU z LL W W m W w W Z H Z� Y 0 z U Q< Q U 2 Q M wU2U=§M�Niv D�D�U2cn�cnc�1 M O N W LLJ Q Z U z J Z W U) QLL Q 0ESz W0�� 00zo UZ� }�QZ g00 Q�(D(D z u D >J_ Q z Z � w 0 � w O U Q== �w0 CO J W Z - Q cYnmz w 2E z ~ O oULLJ o Q O _jOU 100 Q z O 0 m SHEET ID IG-101-01 D U Z 0 I0 Ii Z W �c//) vo Q J U Z D w J 0 Z 0 U CU I RTA CU I a- r G G)�- �'` O' PROJECT BASELIN r: ov m W- O r— Ov C �— o M z z o O W _ W .: co LAS- F lw 90+00 80+00 70+00Mwwww A` +0 60+00 # :44, 4it 0a9, I+ I+ I +I +I i-i I+ I+ I +++ I I I+ + + I I +++ + I II+ I I ++ + I I-+ I+ I I + + + I +I + I--f I+ + + F-4 i V Ic C 11, 0 OCEAN ISLE BEACH EASEMENT LINE POINT EASTING(FT) NORTHING(FT) 1 2,184,996.2 54,868.5 2 2,184,899.9 54,857.4 3 2,184,912.6 54,758.1 4 2,184,812.8 54,744.9 5 2,184,825.9 54,645.0 6 2,184,387.1 54,525.0 7 2,184,337.6 54,518.0 8 2,184,089.7 54,518.0 9 2,184,102.8 54,386.1 10 2,183,934.8 54,364.2 11 2,183,835.0 54,451.3 12 2,183,450.6 54,399,7 13 2,183,473.6 54,201.2 14 2,183,234.1 54,107.5 15 2,183,185.7 54,101.0 16 2,183,135.8 54,094.5 17 2,183,085.6 54,087.9 18 2,183,036.2 54,081.4 19 2,182,986.6 54,074,9 20 2,182,938.2 54,068.5 21 2,180,887.6 54,061.9 22 2,182,839.6 54,055.6 23 2,182,789.0 54,049.0 24 2,182,738.2 54,042.3 25 2,182,738.3 54,041.9 26 2,182,689.9 54,035.9 27 2,182,639.5 54,028.9 28 2,182,652.5 53,926.9 29 2,182,604.4 53,920.7 30 2,182,601.9 53,894.0 31 2,182,552.5 53,890.6 32 2,182,503.7 53,887.2 33 2,182,500.0 53,880.4 34 2,182,453.3 53,981.1 35 2,182,404.0 53,969.5 OCEAN ISLE BEACH EASEMENT LINE POINT EASTING(FT) NORTHING(FT) 36 2,182,403.3 53,894.0 37 2,182,378.5 53,890.6 38 2,182,353.8 53,887.2 39 2,182,303.5 53,880.4 40 2,182,291.3 53,981.1 41 2,182,194.3 53,969.5 42 2,182,230.8 53,790.2 43 2,182,132.4 53,743.7 44 2,181,925.1 53,693.4 45 2,181,756.9 53,659.5 46 2,181,528.9 53,613.4 47 2,181,330.4 53,576.4 48 2,180,945.7 53,460.5 49 2,180,953.2 53,425.2 50 2,180,797.5 53,392.8 51 2,180,794.9 53,402.2 52 2,180,740.3 53,390.0 53 2,180,735.5 53,411.6 54 2,180,603.2 53,385.5 55 2,180,557.3 53,356.6 56 2,180,563.5 53,329.1 57 2,180,520.5 53,319.4 58 2,180,416.8 53,293.7 59 2,180,102.9 53,228.1 60 2,180,016.6 53,229.0 61 2,180,018.7 53,212.8 62 2,179,677.7 53,115.7 63 2,179,538.3 53,091.1 64 2,179,489.5 53,062.1 65 2,179,199.4 52,969.9 66 2,179,109.5 52, 926.6 67 2,179,022.5 52,889.9 68 2,179,028.8 52,868.5 69 2,178,961.5 52,848.7 70 2,178,953.1 52,877.2 v k t: '' { . ,.,yam HARD MATERIAL AREA E = Q m _ O � EASEMENT LINE 01, co s �n OCEAN ISLE BEACH EAS E M E N T L I N E POINT EASTING(FT) NORTHING(FT) 71 2,178,811.3 52,850.1 72 2,178,618.5 52,790.3 73 2,178,476.1 52,751.5 74 2,178,435.6 52,730.2 75 2,178,100.4 52,622.7 76 2,177,677.2 52,486.5 77 2,177,434.8 52,410.4 78 2,177,388.5 52,393.9 79 2,177,129.7 52,309.3 80 2,176,914.2 52,248.1 OCEAN ISLE BEACH BASELI NE STATION G.P.S. POINTS STATION EASTING(FT) NORTHING(FT) -1 +66.30 2,185,047-X 54,395-Y 0+00.76 2,184,881-X 54,374-Y 9+99.99 2,183,890-X 54,241-Y 20+00.00 2,182, 898-X 54,109-Y 30+20.99 2,181,887-X 53,974-Y 39+92.97 2,181,010-X 53,555-Y 50+34.10 2,179,991-X 53,338-Y 59+70.37 2,179,090-X 53,084-Y 70+47.24 2,178,062-X 52,763-Y 80+42.34 2,178,062-X 52,467-Y APPROXIMATE PIPELINE RO TERMINAL GROIN (TO BE CONSTRUCTED BY OTHERS) NOTES z 1. SAND RAMPS SHALL BE CONSTRUCTED OVER PIPE ALONG THE PIPELINE ROUTE AT EACH BEACH ACCESS. IN NO CASE SHALL DISTANCE BETWEEN RAMPS EXCEED 400 FEET. CONTRACTOR MAY BE REQUIRED TO BURY PIPE AT HANDICAPPED RAMPS OR VEHICULAR BEACH ACCESS POINTS. 2. TILLING OF THE BEACH FILL SHALL BE PERFORMED IN ACCORDANCE WITH CONTRACT SPECIFICATION SECTION 01 57 19 AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE. LEGEND 3. HORIZONTAL CONTROL IN FEET, N.C. STATE PLANE COORDINATES NAD 83. VERTICAL CONTROL IN FEET NAVD 88. 4. IMAGERY DATE: JANUARY 2021. 5. PIPELINE ROUTE ON THE OCEAN ISLE BEACH PORTION OF THE PROJECT SHALL BE COORDINATED WITH THE TOWN OF OCEAN ISLE BEACH AND RESOURCE AGENCIES AND BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION. POINT OF CONTACT WITH THE TOWN OF OCEAN ISLE BEACH IS MS. DAISEY IVEY, TOWN ADMINISTRATOR PHONE No. 910-579-2166. THE CONTRACTOR IS REQUIRED TO GIVE CONTRACTING OFFICER 15 DAY ADVANCE NOTICE OF NEED OF PIPELINE DELINEATION. 6. ALL CONTRACTOR OPERATIONS SHALL BE PERFORMED IN A MANNER THAT AVOIDS DAMAGE TO EXISTING SANDBAGS, STRUCTURES AND ROADS. SANDBAGS, STRUCTURES AND ROADS DAMAGED BY CONTRACTOR OPERATIONS SHALL BE REPAIRED TO THE SATISFACTION OF THE CONTRACTING OFFICER OR HIS/HER DESIGNATED REPRESENTATIVE AT NO COST TO GOVERNMENT OR THE OWNERS OF THE DAMAGED PROPERTY. IN ORDER TO MINIMIZE THE RISK OF DAMAGE, WHEELED OR TRACKED EARTH MOVING EQUIPMENT SHALL NOT WORK CLOSER THAN 10 FEET FROM SANDBAGS AND STRUCTURES DURING ALL WORK INCLUDING DISTRIBUTION AND MOVEMENT OF BEACH FILL MATERIAL. IN AREAS WHERE IT IS NOT POSSIBLE TO TIE INTO THE 6-FOOT CONTOUR, THE CONTRACTOR SHALL CONSTRUCT THE BACKSLOPE AT 5 HORIZONTAL TO 1 VERTICAL. 7. PAST STORMS IN THE NORTH CAROLINA AREA SINCE THE CONTRACT SURVEYS WERE TAKEN 0 MAY HAVE ERODED PORTIONS OF THE PROJECT AREA AND PIPELINE ROUTE. ALL CONTRACTORS ARE ENCOURAGED TO VISIT THE SITE PRIOR TO SUBMITTING A BID TO INVESTIGATE POTENTIAL PIPELINE ROUTES. ALL PIPELINE ROUTES MUST BE APPROVED PRIOR TO ANY PLACEMENT OF MATERIAL ON THE BEACH. SHALLOTTE INLET BORROW AREA EXISTING BASELINE PROPOSED PIPELINE ROUTE APPROXIMATE SLOPE INTERCEPT BEACH FILL (NEW WORK) BORROW AREA I:/_1V9]LMAN IaIVF_1I OPTION ITEM 1 AREA 1000 2000 Feet I I US Army Corps of Engineers° 0 ZCD o .. w w om° oN Q N Q N U O 0 CD Q z CDw N U N > O Z J J� z0 Q� Ln °� 0 05 w Q z co} In J } of 0 w z w w M w w Z H Z� Y 0 z - U Q Q U J g Q M w U 2 U S D N N 0 -), 0 w —), n c�1 M O 0' Coll), w w Q Z U =) z Z W U) QLL Q 0 ZU C/)oO� ouzo UZ� � :E 2i 0 0 Q�co z D J_ Q z z w w � U U QQ� U � �w0 w Q Ymz m2�i Z �n� w0 �Z� H 0<0 z Q P- w U Q U Q0v O O Q z 0 U [Y m SHEET ID I G- 102-01 D U Z O Q O LL z 0 W LL W U) Q J U Z D 0 W J O z O U C U I RTA OCEAN ISLE BEACH EASEMENT LINE POINT EASTING(FT) NORTHING(FT) 36 2,182,403.3 53,894.0 37 2,182,378.5 53,890.6 38 2,182,353.8 53,887.2 39 2,182,303.5 53,880.4 40 2,182,291.3 53,981.1 41 2,182,194.3 53,969.5 42 2,182,230.8 53,790.2 43 2,182,132.4 53,743.7 44 2,181,925.1 53,693.4 45 2,181,756.9 53,659.5 46 2,181,528.9 53,613.4 47 2,181,330.4 53,576.4 48 2,180,945.7 53,460.5 49 2,180,953.2 53,425.2 50 2,180,797.5 53,392.8 51 2,180,794.9 53,402.2 52 2,180,740.3 53,390.0 53 2,180,735.5 53,411.6 54 2,180,603.2 53,385.5 55 2,180,557.3 53,356.6 56 2,180,563.5 53,329.1 57 2,180,520.5 53,319.4 58 2,180,416.8 53,293.7 59 2,180,102.9 53,228.1 60 2,180,016.6 53,229.0 61 2,180,018.7 53,212.8 62 2,179,677.7 53,115.7 63 2,179,538.3 53,091.1 64 2,179,489.5 53,062.1 65 2,179,199.4 52,969.9 66 2,179,109.5 52, 926.6 67 2,179,022.5 52,889.9 68 2,179,028.8 52,868.5 69 2,178,961.5 52,848.7 70 2,178,953.1 52,877.2 v k t: '' { . ,.,yam HARD MATERIAL AREA E = Q m _ O � EASEMENT LINE 01, co s �n OCEAN ISLE BEACH EAS E M E N T L I N E POINT EASTING(FT) NORTHING(FT) 71 2,178,811.3 52,850.1 72 2,178,618.5 52,790.3 73 2,178,476.1 52,751.5 74 2,178,435.6 52,730.2 75 2,178,100.4 52,622.7 76 2,177,677.2 52,486.5 77 2,177,434.8 52,410.4 78 2,177,388.5 52,393.9 79 2,177,129.7 52,309.3 80 2,176,914.2 52,248.1 OCEAN ISLE BEACH BASELI NE STATION G.P.S. POINTS STATION EASTING(FT) NORTHING(FT) -1 +66.30 2,185,047-X 54,395-Y 0+00.76 2,184,881-X 54,374-Y 9+99.99 2,183,890-X 54,241-Y 20+00.00 2,182, 898-X 54,109-Y 30+20.99 2,181,887-X 53,974-Y 39+92.97 2,181,010-X 53,555-Y 50+34.10 2,179,991-X 53,338-Y 59+70.37 2,179,090-X 53,084-Y 70+47.24 2,178,062-X 52,763-Y 80+42.34 2,178,062-X 52,467-Y APPROXIMATE PIPELINE RO TERMINAL GROIN (TO BE CONSTRUCTED BY OTHERS) NOTES z 1. SAND RAMPS SHALL BE CONSTRUCTED OVER PIPE ALONG THE PIPELINE ROUTE AT EACH BEACH ACCESS. IN NO CASE SHALL DISTANCE BETWEEN RAMPS EXCEED 400 FEET. CONTRACTOR MAY BE REQUIRED TO BURY PIPE AT HANDICAPPED RAMPS OR VEHICULAR BEACH ACCESS POINTS. 2. TILLING OF THE BEACH FILL SHALL BE PERFORMED IN ACCORDANCE WITH CONTRACT SPECIFICATION SECTION 01 57 19 AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE. LEGEND 3. HORIZONTAL CONTROL IN FEET, N.C. STATE PLANE COORDINATES NAD 83. VERTICAL CONTROL IN FEET NAVD 88. 4. IMAGERY DATE: JANUARY 2021. 5. PIPELINE ROUTE ON THE OCEAN ISLE BEACH PORTION OF THE PROJECT SHALL BE COORDINATED WITH THE TOWN OF OCEAN ISLE BEACH AND RESOURCE AGENCIES AND BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION. POINT OF CONTACT WITH THE TOWN OF OCEAN ISLE BEACH IS MS. DAISEY IVEY, TOWN ADMINISTRATOR PHONE No. 910-579-2166. THE CONTRACTOR IS REQUIRED TO GIVE CONTRACTING OFFICER 15 DAY ADVANCE NOTICE OF NEED OF PIPELINE DELINEATION. 6. ALL CONTRACTOR OPERATIONS SHALL BE PERFORMED IN A MANNER THAT AVOIDS DAMAGE TO EXISTING SANDBAGS, STRUCTURES AND ROADS. SANDBAGS, STRUCTURES AND ROADS DAMAGED BY CONTRACTOR OPERATIONS SHALL BE REPAIRED TO THE SATISFACTION OF THE CONTRACTING OFFICER OR HIS/HER DESIGNATED REPRESENTATIVE AT NO COST TO GOVERNMENT OR THE OWNERS OF THE DAMAGED PROPERTY. IN ORDER TO MINIMIZE THE RISK OF DAMAGE, WHEELED OR TRACKED EARTH MOVING EQUIPMENT SHALL NOT WORK CLOSER THAN 10 FEET FROM SANDBAGS AND STRUCTURES DURING ALL WORK INCLUDING DISTRIBUTION AND MOVEMENT OF BEACH FILL MATERIAL. IN AREAS WHERE IT IS NOT POSSIBLE TO TIE INTO THE 6-FOOT CONTOUR, THE CONTRACTOR SHALL CONSTRUCT THE BACKSLOPE AT 5 HORIZONTAL TO 1 VERTICAL. 7. PAST STORMS IN THE NORTH CAROLINA AREA SINCE THE CONTRACT SURVEYS WERE TAKEN 0 MAY HAVE ERODED PORTIONS OF THE PROJECT AREA AND PIPELINE ROUTE. ALL CONTRACTORS ARE ENCOURAGED TO VISIT THE SITE PRIOR TO SUBMITTING A BID TO INVESTIGATE POTENTIAL PIPELINE ROUTES. ALL PIPELINE ROUTES MUST BE APPROVED PRIOR TO ANY PLACEMENT OF MATERIAL ON THE BEACH. SHALLOTTE INLET BORROW AREA EXISTING BASELINE PROPOSED PIPELINE ROUTE APPROXIMATE SLOPE INTERCEPT BEACH FILL (NEW WORK) BORROW AREA I:/_1V9]LMAN IaIVF_1I OPTION ITEM 1 AREA 1000 2000 Feet I I US Army Corps of Engineers° 0 ZCD o .. w w om° oN Q N Q N U O 0 CD Q z CDw N U N > O Z J J� z0 Q� Ln °� 0 05 w Q z co} In J } of 0 w z w w M w w Z H Z� Y 0 z - U Q Q U J g Q M w U 2 U S D N N 0 -), 0 w —), n c�1 M O 0' Coll), w w Q Z U =) z Z W U) QLL Q 0 ZU C/)oO� ouzo UZ� � :E 2i 0 0 Q�co z D J_ Q z z w w � U U QQ� U � �w0 w Q Ymz m2�i Z �n� w0 �Z� H 0<0 z Q P- w U Q U Q0v O O Q z 0 U [Y m SHEET ID I G- 102-01 D U Z O Q O LL z 0 W LL W U) Q J U Z D 0 W J O z O U C U I RTA v k t: '' { . ,.,yam HARD MATERIAL AREA E = Q m _ O � EASEMENT LINE 01, co s �n OCEAN ISLE BEACH EAS E M E N T L I N E POINT EASTING(FT) NORTHING(FT) 71 2,178,811.3 52,850.1 72 2,178,618.5 52,790.3 73 2,178,476.1 52,751.5 74 2,178,435.6 52,730.2 75 2,178,100.4 52,622.7 76 2,177,677.2 52,486.5 77 2,177,434.8 52,410.4 78 2,177,388.5 52,393.9 79 2,177,129.7 52,309.3 80 2,176,914.2 52,248.1 OCEAN ISLE BEACH BASELI NE STATION G.P.S. POINTS STATION EASTING(FT) NORTHING(FT) -1 +66.30 2,185,047-X 54,395-Y 0+00.76 2,184,881-X 54,374-Y 9+99.99 2,183,890-X 54,241-Y 20+00.00 2,182, 898-X 54,109-Y 30+20.99 2,181,887-X 53,974-Y 39+92.97 2,181,010-X 53,555-Y 50+34.10 2,179,991-X 53,338-Y 59+70.37 2,179,090-X 53,084-Y 70+47.24 2,178,062-X 52,763-Y 80+42.34 2,178,062-X 52,467-Y APPROXIMATE PIPELINE RO TERMINAL GROIN (TO BE CONSTRUCTED BY OTHERS) NOTES z 1. SAND RAMPS SHALL BE CONSTRUCTED OVER PIPE ALONG THE PIPELINE ROUTE AT EACH BEACH ACCESS. IN NO CASE SHALL DISTANCE BETWEEN RAMPS EXCEED 400 FEET. CONTRACTOR MAY BE REQUIRED TO BURY PIPE AT HANDICAPPED RAMPS OR VEHICULAR BEACH ACCESS POINTS. 2. TILLING OF THE BEACH FILL SHALL BE PERFORMED IN ACCORDANCE WITH CONTRACT SPECIFICATION SECTION 01 57 19 AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE. LEGEND 3. HORIZONTAL CONTROL IN FEET, N.C. STATE PLANE COORDINATES NAD 83. VERTICAL CONTROL IN FEET NAVD 88. 4. IMAGERY DATE: JANUARY 2021. 5. PIPELINE ROUTE ON THE OCEAN ISLE BEACH PORTION OF THE PROJECT SHALL BE COORDINATED WITH THE TOWN OF OCEAN ISLE BEACH AND RESOURCE AGENCIES AND BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION. POINT OF CONTACT WITH THE TOWN OF OCEAN ISLE BEACH IS MS. DAISEY IVEY, TOWN ADMINISTRATOR PHONE No. 910-579-2166. THE CONTRACTOR IS REQUIRED TO GIVE CONTRACTING OFFICER 15 DAY ADVANCE NOTICE OF NEED OF PIPELINE DELINEATION. 6. ALL CONTRACTOR OPERATIONS SHALL BE PERFORMED IN A MANNER THAT AVOIDS DAMAGE TO EXISTING SANDBAGS, STRUCTURES AND ROADS. SANDBAGS, STRUCTURES AND ROADS DAMAGED BY CONTRACTOR OPERATIONS SHALL BE REPAIRED TO THE SATISFACTION OF THE CONTRACTING OFFICER OR HIS/HER DESIGNATED REPRESENTATIVE AT NO COST TO GOVERNMENT OR THE OWNERS OF THE DAMAGED PROPERTY. IN ORDER TO MINIMIZE THE RISK OF DAMAGE, WHEELED OR TRACKED EARTH MOVING EQUIPMENT SHALL NOT WORK CLOSER THAN 10 FEET FROM SANDBAGS AND STRUCTURES DURING ALL WORK INCLUDING DISTRIBUTION AND MOVEMENT OF BEACH FILL MATERIAL. IN AREAS WHERE IT IS NOT POSSIBLE TO TIE INTO THE 6-FOOT CONTOUR, THE CONTRACTOR SHALL CONSTRUCT THE BACKSLOPE AT 5 HORIZONTAL TO 1 VERTICAL. 7. PAST STORMS IN THE NORTH CAROLINA AREA SINCE THE CONTRACT SURVEYS WERE TAKEN 0 MAY HAVE ERODED PORTIONS OF THE PROJECT AREA AND PIPELINE ROUTE. ALL CONTRACTORS ARE ENCOURAGED TO VISIT THE SITE PRIOR TO SUBMITTING A BID TO INVESTIGATE POTENTIAL PIPELINE ROUTES. ALL PIPELINE ROUTES MUST BE APPROVED PRIOR TO ANY PLACEMENT OF MATERIAL ON THE BEACH. SHALLOTTE INLET BORROW AREA EXISTING BASELINE PROPOSED PIPELINE ROUTE APPROXIMATE SLOPE INTERCEPT BEACH FILL (NEW WORK) BORROW AREA I:/_1V9]LMAN IaIVF_1I OPTION ITEM 1 AREA 1000 2000 Feet I I US Army Corps of Engineers° 0 ZCD o .. w w om° oN Q N Q N U O 0 CD Q z CDw N U N > O Z J J� z0 Q� Ln °� 0 05 w Q z co} In J } of 0 w z w w M w w Z H Z� Y 0 z - U Q Q U J g Q M w U 2 U S D N N 0 -), 0 w —), n c�1 M O 0' Coll), w w Q Z U =) z Z W U) QLL Q 0 ZU C/)oO� ouzo UZ� � :E 2i 0 0 Q�co z D J_ Q z z w w � U U QQ� U � �w0 w Q Ymz m2�i Z �n� w0 �Z� H 0<0 z Q P- w U Q U Q0v O O Q z 0 U [Y m SHEET ID I G- 102-01 D U Z O Q O LL z 0 W LL W U) Q J U Z D 0 W J O z O U C U I RTA OCEAN ISLE BEACH EAS E M E N T L I N E POINT EASTING(FT) NORTHING(FT) 71 2,178,811.3 52,850.1 72 2,178,618.5 52,790.3 73 2,178,476.1 52,751.5 74 2,178,435.6 52,730.2 75 2,178,100.4 52,622.7 76 2,177,677.2 52,486.5 77 2,177,434.8 52,410.4 78 2,177,388.5 52,393.9 79 2,177,129.7 52,309.3 80 2,176,914.2 52,248.1 OCEAN ISLE BEACH BASELI NE STATION G.P.S. POINTS STATION EASTING(FT) NORTHING(FT) -1 +66.30 2,185,047-X 54,395-Y 0+00.76 2,184,881-X 54,374-Y 9+99.99 2,183,890-X 54,241-Y 20+00.00 2,182, 898-X 54,109-Y 30+20.99 2,181,887-X 53,974-Y 39+92.97 2,181,010-X 53,555-Y 50+34.10 2,179,991-X 53,338-Y 59+70.37 2,179,090-X 53,084-Y 70+47.24 2,178,062-X 52,763-Y 80+42.34 2,178,062-X 52,467-Y APPROXIMATE PIPELINE RO TERMINAL GROIN (TO BE CONSTRUCTED BY OTHERS) NOTES z 1. SAND RAMPS SHALL BE CONSTRUCTED OVER PIPE ALONG THE PIPELINE ROUTE AT EACH BEACH ACCESS. IN NO CASE SHALL DISTANCE BETWEEN RAMPS EXCEED 400 FEET. CONTRACTOR MAY BE REQUIRED TO BURY PIPE AT HANDICAPPED RAMPS OR VEHICULAR BEACH ACCESS POINTS. 2. TILLING OF THE BEACH FILL SHALL BE PERFORMED IN ACCORDANCE WITH CONTRACT SPECIFICATION SECTION 01 57 19 AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE. LEGEND 3. HORIZONTAL CONTROL IN FEET, N.C. STATE PLANE COORDINATES NAD 83. VERTICAL CONTROL IN FEET NAVD 88. 4. IMAGERY DATE: JANUARY 2021. 5. PIPELINE ROUTE ON THE OCEAN ISLE BEACH PORTION OF THE PROJECT SHALL BE COORDINATED WITH THE TOWN OF OCEAN ISLE BEACH AND RESOURCE AGENCIES AND BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION. POINT OF CONTACT WITH THE TOWN OF OCEAN ISLE BEACH IS MS. DAISEY IVEY, TOWN ADMINISTRATOR PHONE No. 910-579-2166. THE CONTRACTOR IS REQUIRED TO GIVE CONTRACTING OFFICER 15 DAY ADVANCE NOTICE OF NEED OF PIPELINE DELINEATION. 6. ALL CONTRACTOR OPERATIONS SHALL BE PERFORMED IN A MANNER THAT AVOIDS DAMAGE TO EXISTING SANDBAGS, STRUCTURES AND ROADS. SANDBAGS, STRUCTURES AND ROADS DAMAGED BY CONTRACTOR OPERATIONS SHALL BE REPAIRED TO THE SATISFACTION OF THE CONTRACTING OFFICER OR HIS/HER DESIGNATED REPRESENTATIVE AT NO COST TO GOVERNMENT OR THE OWNERS OF THE DAMAGED PROPERTY. IN ORDER TO MINIMIZE THE RISK OF DAMAGE, WHEELED OR TRACKED EARTH MOVING EQUIPMENT SHALL NOT WORK CLOSER THAN 10 FEET FROM SANDBAGS AND STRUCTURES DURING ALL WORK INCLUDING DISTRIBUTION AND MOVEMENT OF BEACH FILL MATERIAL. IN AREAS WHERE IT IS NOT POSSIBLE TO TIE INTO THE 6-FOOT CONTOUR, THE CONTRACTOR SHALL CONSTRUCT THE BACKSLOPE AT 5 HORIZONTAL TO 1 VERTICAL. 7. PAST STORMS IN THE NORTH CAROLINA AREA SINCE THE CONTRACT SURVEYS WERE TAKEN 0 MAY HAVE ERODED PORTIONS OF THE PROJECT AREA AND PIPELINE ROUTE. ALL CONTRACTORS ARE ENCOURAGED TO VISIT THE SITE PRIOR TO SUBMITTING A BID TO INVESTIGATE POTENTIAL PIPELINE ROUTES. ALL PIPELINE ROUTES MUST BE APPROVED PRIOR TO ANY PLACEMENT OF MATERIAL ON THE BEACH. SHALLOTTE INLET BORROW AREA EXISTING BASELINE PROPOSED PIPELINE ROUTE APPROXIMATE SLOPE INTERCEPT BEACH FILL (NEW WORK) BORROW AREA I:/_1V9]LMAN IaIVF_1I OPTION ITEM 1 AREA 1000 2000 Feet I I US Army Corps of Engineers° 0 ZCD o .. w w om° oN Q N Q N U O 0 CD Q z CDw N U N > O Z J J� z0 Q� Ln °� 0 05 w Q z co} In J } of 0 w z w w M w w Z H Z� Y 0 z - U Q Q U J g Q M w U 2 U S D N N 0 -), 0 w —), n c�1 M O 0' Coll), w w Q Z U =) z Z W U) QLL Q 0 ZU C/)oO� ouzo UZ� � :E 2i 0 0 Q�co z D J_ Q z z w w � U U QQ� U � �w0 w Q Ymz m2�i Z �n� w0 �Z� H 0<0 z Q P- w U Q U Q0v O O Q z 0 U [Y m SHEET ID I G- 102-01 D U Z O Q O LL z 0 W LL W U) Q J U Z D 0 W J O z O U C U I RTA OCEAN ISLE BEACH BASELI NE STATION G.P.S. POINTS STATION EASTING(FT) NORTHING(FT) -1 +66.30 2,185,047-X 54,395-Y 0+00.76 2,184,881-X 54,374-Y 9+99.99 2,183,890-X 54,241-Y 20+00.00 2,182, 898-X 54,109-Y 30+20.99 2,181,887-X 53,974-Y 39+92.97 2,181,010-X 53,555-Y 50+34.10 2,179,991-X 53,338-Y 59+70.37 2,179,090-X 53,084-Y 70+47.24 2,178,062-X 52,763-Y 80+42.34 2,178,062-X 52,467-Y APPROXIMATE PIPELINE RO TERMINAL GROIN (TO BE CONSTRUCTED BY OTHERS) NOTES z 1. SAND RAMPS SHALL BE CONSTRUCTED OVER PIPE ALONG THE PIPELINE ROUTE AT EACH BEACH ACCESS. IN NO CASE SHALL DISTANCE BETWEEN RAMPS EXCEED 400 FEET. CONTRACTOR MAY BE REQUIRED TO BURY PIPE AT HANDICAPPED RAMPS OR VEHICULAR BEACH ACCESS POINTS. 2. TILLING OF THE BEACH FILL SHALL BE PERFORMED IN ACCORDANCE WITH CONTRACT SPECIFICATION SECTION 01 57 19 AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE. LEGEND 3. HORIZONTAL CONTROL IN FEET, N.C. STATE PLANE COORDINATES NAD 83. VERTICAL CONTROL IN FEET NAVD 88. 4. IMAGERY DATE: JANUARY 2021. 5. PIPELINE ROUTE ON THE OCEAN ISLE BEACH PORTION OF THE PROJECT SHALL BE COORDINATED WITH THE TOWN OF OCEAN ISLE BEACH AND RESOURCE AGENCIES AND BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION. POINT OF CONTACT WITH THE TOWN OF OCEAN ISLE BEACH IS MS. DAISEY IVEY, TOWN ADMINISTRATOR PHONE No. 910-579-2166. THE CONTRACTOR IS REQUIRED TO GIVE CONTRACTING OFFICER 15 DAY ADVANCE NOTICE OF NEED OF PIPELINE DELINEATION. 6. ALL CONTRACTOR OPERATIONS SHALL BE PERFORMED IN A MANNER THAT AVOIDS DAMAGE TO EXISTING SANDBAGS, STRUCTURES AND ROADS. SANDBAGS, STRUCTURES AND ROADS DAMAGED BY CONTRACTOR OPERATIONS SHALL BE REPAIRED TO THE SATISFACTION OF THE CONTRACTING OFFICER OR HIS/HER DESIGNATED REPRESENTATIVE AT NO COST TO GOVERNMENT OR THE OWNERS OF THE DAMAGED PROPERTY. IN ORDER TO MINIMIZE THE RISK OF DAMAGE, WHEELED OR TRACKED EARTH MOVING EQUIPMENT SHALL NOT WORK CLOSER THAN 10 FEET FROM SANDBAGS AND STRUCTURES DURING ALL WORK INCLUDING DISTRIBUTION AND MOVEMENT OF BEACH FILL MATERIAL. IN AREAS WHERE IT IS NOT POSSIBLE TO TIE INTO THE 6-FOOT CONTOUR, THE CONTRACTOR SHALL CONSTRUCT THE BACKSLOPE AT 5 HORIZONTAL TO 1 VERTICAL. 7. PAST STORMS IN THE NORTH CAROLINA AREA SINCE THE CONTRACT SURVEYS WERE TAKEN 0 MAY HAVE ERODED PORTIONS OF THE PROJECT AREA AND PIPELINE ROUTE. ALL CONTRACTORS ARE ENCOURAGED TO VISIT THE SITE PRIOR TO SUBMITTING A BID TO INVESTIGATE POTENTIAL PIPELINE ROUTES. ALL PIPELINE ROUTES MUST BE APPROVED PRIOR TO ANY PLACEMENT OF MATERIAL ON THE BEACH. SHALLOTTE INLET BORROW AREA EXISTING BASELINE PROPOSED PIPELINE ROUTE APPROXIMATE SLOPE INTERCEPT BEACH FILL (NEW WORK) BORROW AREA I:/_1V9]LMAN IaIVF_1I OPTION ITEM 1 AREA 1000 2000 Feet I I US Army Corps of Engineers° 0 ZCD o .. w w om° oN Q N Q N U O 0 CD Q z CDw N U N > O Z J J� z0 Q� Ln °� 0 05 w Q z co} In J } of 0 w z w w M w w Z H Z� Y 0 z - U Q Q U J g Q M w U 2 U S D N N 0 -), 0 w —), n c�1 M O 0' Coll), w w Q Z U =) z Z W U) QLL Q 0 ZU C/)oO� ouzo UZ� � :E 2i 0 0 Q�co z D J_ Q z z w w � U U QQ� U � �w0 w Q Ymz m2�i Z �n� w0 �Z� H 0<0 z Q P- w U Q U Q0v O O Q z 0 U [Y m SHEET ID I G- 102-01 D U Z O Q O LL z 0 W LL W U) Q J U Z D 0 W J O z O U C U I RTA APPROXIMATE PIPELINE RO TERMINAL GROIN (TO BE CONSTRUCTED BY OTHERS) NOTES z 1. SAND RAMPS SHALL BE CONSTRUCTED OVER PIPE ALONG THE PIPELINE ROUTE AT EACH BEACH ACCESS. IN NO CASE SHALL DISTANCE BETWEEN RAMPS EXCEED 400 FEET. CONTRACTOR MAY BE REQUIRED TO BURY PIPE AT HANDICAPPED RAMPS OR VEHICULAR BEACH ACCESS POINTS. 2. TILLING OF THE BEACH FILL SHALL BE PERFORMED IN ACCORDANCE WITH CONTRACT SPECIFICATION SECTION 01 57 19 AS DIRECTED BY THE CONTRACTING OFFICER REPRESENTATIVE. LEGEND 3. HORIZONTAL CONTROL IN FEET, N.C. STATE PLANE COORDINATES NAD 83. VERTICAL CONTROL IN FEET NAVD 88. 4. IMAGERY DATE: JANUARY 2021. 5. PIPELINE ROUTE ON THE OCEAN ISLE BEACH PORTION OF THE PROJECT SHALL BE COORDINATED WITH THE TOWN OF OCEAN ISLE BEACH AND RESOURCE AGENCIES AND BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO CONSTRUCTION. POINT OF CONTACT WITH THE TOWN OF OCEAN ISLE BEACH IS MS. DAISEY IVEY, TOWN ADMINISTRATOR PHONE No. 910-579-2166. THE CONTRACTOR IS REQUIRED TO GIVE CONTRACTING OFFICER 15 DAY ADVANCE NOTICE OF NEED OF PIPELINE DELINEATION. 6. ALL CONTRACTOR OPERATIONS SHALL BE PERFORMED IN A MANNER THAT AVOIDS DAMAGE TO EXISTING SANDBAGS, STRUCTURES AND ROADS. SANDBAGS, STRUCTURES AND ROADS DAMAGED BY CONTRACTOR OPERATIONS SHALL BE REPAIRED TO THE SATISFACTION OF THE CONTRACTING OFFICER OR HIS/HER DESIGNATED REPRESENTATIVE AT NO COST TO GOVERNMENT OR THE OWNERS OF THE DAMAGED PROPERTY. IN ORDER TO MINIMIZE THE RISK OF DAMAGE, WHEELED OR TRACKED EARTH MOVING EQUIPMENT SHALL NOT WORK CLOSER THAN 10 FEET FROM SANDBAGS AND STRUCTURES DURING ALL WORK INCLUDING DISTRIBUTION AND MOVEMENT OF BEACH FILL MATERIAL. IN AREAS WHERE IT IS NOT POSSIBLE TO TIE INTO THE 6-FOOT CONTOUR, THE CONTRACTOR SHALL CONSTRUCT THE BACKSLOPE AT 5 HORIZONTAL TO 1 VERTICAL. 7. PAST STORMS IN THE NORTH CAROLINA AREA SINCE THE CONTRACT SURVEYS WERE TAKEN 0 MAY HAVE ERODED PORTIONS OF THE PROJECT AREA AND PIPELINE ROUTE. ALL CONTRACTORS ARE ENCOURAGED TO VISIT THE SITE PRIOR TO SUBMITTING A BID TO INVESTIGATE POTENTIAL PIPELINE ROUTES. ALL PIPELINE ROUTES MUST BE APPROVED PRIOR TO ANY PLACEMENT OF MATERIAL ON THE BEACH. SHALLOTTE INLET BORROW AREA EXISTING BASELINE PROPOSED PIPELINE ROUTE APPROXIMATE SLOPE INTERCEPT BEACH FILL (NEW WORK) BORROW AREA I:/_1V9]LMAN IaIVF_1I OPTION ITEM 1 AREA 1000 2000 Feet I I US Army Corps of Engineers° 0 ZCD o .. w w om° oN Q N Q N U O 0 CD Q z CDw N U N > O Z J J� z0 Q� Ln °� 0 05 w Q z co} In J } of 0 w z w w M w w Z H Z� Y 0 z - U Q Q U J g Q M w U 2 U S D N N 0 -), 0 w —), n c�1 M O 0' Coll), w w Q Z U =) z Z W U) QLL Q 0 ZU C/)oO� ouzo UZ� � :E 2i 0 0 Q�co z D J_ Q z z w w � U U QQ� U � �w0 w Q Ymz m2�i Z �n� w0 �Z� H 0<0 z Q P- w U Q U Q0v O O Q z 0 U [Y m SHEET ID I G- 102-01 D U Z O Q O LL z 0 W LL W U) Q J U Z D 0 W J O z O U C U I RTA M O 0' Coll), w w Q Z U =) z Z W U) QLL Q 0 ZU C/)oO� ouzo UZ� � :E 2i 0 0 Q�co z D J_ Q z z w w � U U QQ� U � �w0 w Q Ymz m2�i Z �n� w0 �Z� H 0<0 z Q P- w U Q U Q0v O O Q z 0 U [Y m SHEET ID I G- 102-01 D U Z O Q O LL z 0 W LL W U) Q J U Z D 0 W J O z O U C U I RTA SHEET ID I G- 102-01 D U Z O Q O LL z 0 W LL W U) Q J U Z D 0 W J O z O U C U I RTA CU I G F V ❑c C 11, 0 2 O O LU 1 W w = LIMITS OF U) BEACH PLACEMENT w F00 24+00 23+00 + U) O + Lid z STA: 20+00.90 N: 54109.35 E: 2182898.44 3 1 4 1 5 C� r O U) iL 3RD ST PROJECT BASELINE APPROXIMATE END OF SANDBAGS` STA. 19+50 (TO BE FIELD VERFIED) 10 • 21+00 2(�+00- 19+00 18+00 17+00 >K+00 15+00 14+00 13+00 12+00 rt- 0 E :-MH\IV D S --"" - - _ - ` CONSTRUCTION BERM J = ELEVATION +6.0' (NAND 88) - ----- New H Q N: 53849.5 E: 2183236.7 STA: 9+99.99 N:54241.72-\ E. 2183890.55 6 7 8 9 10 J D J U)"- m = , w m i I- r p SANDBAGS I J SANDBAGS m Q 2 3RD ST swk w ok i _ ' / I STA:0+00.76 4�i N: 54373.76 E:2184881.02 W -z- __ 1 +00 9+00 8+00 7+00 6+00 5+00 4+00 3+00 2+00 1 +00 0+01 + 0 '--I +- ----i--+--4 +-----j----- r-----I-----+------'--- --4-- OPTION ITEM 1 CONSTRUCTION BERM N:54149.3 E2183902.9 ELEVATION +6.0' (NAVD 88) : N: 53951.3 E: 2183463.0 - N: 54068.3 N: 53974.4 E: 2184418.1 E:2183926.2 10 > cn ;um n Cn p iz D oD O � O 700' TRANSITION SECTION START STA. 17+00 END STA. 10+00 NOTES: 1. THE WIDTH OF THE CONSTRUCTION BERM IS DEPENDENT UPON THE PROPORTIONAL QUANTITY OF SAND TO BE PLACED AT THE TIME OF CONSTRUCTION. THE WIDTH OF THE CONSTRUCTION BERM MAY BE ADJUSTED DURING CONSTRUCTION BASED ON THE CONTRACT BEACH PROFILE SURVEY AND THE SLOPE OF THE MATERIAL DURING PLACEMENT. 2. THE CONSTRUCTION BERM SLOPE IS DEPENDENT UPON MATERIAL PROPERTIES AND WAVE ENVIRONMENT DURING PLACEMENT. 3. EXISTING BEACH SURVEY CONDUCTED IN MAY 2021. HORIZONTAL DATUM IS IN FEET, NAD 83 AND VERTICAL DATUM IS IN FEET, NAVD 88 4. THE CONTRACTOR SHALL CONSTRUCT SAND RAMPS OVER PIPE ALONG THE BEACH PIPELINE ROUTE. SAND RAMPS SHALL BE PLACED AT EACH BEACH ACCESS AS A MINIMUM, BUT IN NO CASE SHALL DISTANCE BETWEEN RAMPS EXCEED 400 FEET. THE SAND RAMPS SHALL BE REPAIRED IF ERODED BY WEATHER OR BEACH TRAFFIC. 5. EXISTING DUNES AND BEACH GRASS SHALL BE PROTECTED FROM DAMAGE DUE TO CONSTRUCTION. THE CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES ON THE BEACH, INCLUDING ACCESS RAMPS, SIGNAGE, FENCES, ETC. FROM DAMAGE DUE TO CONSTRUCTION. 6. THE CONTRACTOR SHALL CONDUCT DAILY OPERATIONS TO CLEAN UP TRASH AND DEBRIS PUMPED ON TO THE BEACH BY DREDGING OPERATIONS AND/OR FOUND ON THE BEACH WITHIN THE LIMITS OF CONSTRUCTION. DEBRIS AND WASTE SHALL BE PROPERLY SECURED AND DISPOSED OF ON A WEEKLY BASIS. 7. THE CONTRACTOR SHALL BE REQUIRED TO PERFORM SAFETY PATROL TO MINIMIZE PEDESTRIAN TRAFFIC THRU THE LIMITS OF CONSTRUCTION AT LEAST 500' AHEAD AND BEHIND THE POINT OF DISCHARGE. MEASURES TO INCLUDE MOVEABLE SAFETY FENCE AT THESE LMITS TO EXTEND FROM DUNE TO THE WATERS EDGE, CLOSURE OF ANY PEDESTRIAN ACCESS RAMPS WITHIN THE DIRECT VICINITY OF THE DREDGING OPERATIONS, AND WARNING SIGNS AT ALL PEDESTRIAN RAMPS AND PUBLIC ACCESS WAYS. NOTES CONTINUED- 8. NO BEACH FILL MATERIAL SHALL BE PLACED LANDWARD OF THE TEMPORARY CONSTRUCTION EASEMENT LINE, OR WITHIN 10 FEET OF OR UNDERNEATH ANY RESIDENTIAL BUILDINGS. THE CONTRACTOR SHALL BE REQUIRED TO SLOPE (5H:1V) THE LANDWARD SIDE OF THE BERM WHERE NECESSARY TO AVOID PLACING BEACH FILL MATERIAL LANDWARD OF THE TEMPORARY CONSTRUCTION EASEMENT LINE, OR WITHIN 10 FEET OF OR UNDERNEATH ANY RESIDENTIAL BUILDINGS. 9. THE CONTRACTOR SHALL EXTEND 6.0' NAVD BERM CREST HORIZONTALLY LANDWARD, WHERE POSSIBLE TO THE POINT OF INTERSECTION WITH THE EXISTING GROUND OR DUNE EXCEPT AT LOCATIONS AS NOTED BY THE TYPICAL SECTIONS AND/OR AS DIRECTED BY THE CONTRACTING OFFICER. 10. SANDBAGS HAVE BEEN PLACED ALONG THE BEACH AND IN FRONT OF EXISTING STRUCTURES BETWEEN THE PROJECT START AND DURHAM ST. THE CONTRACTOR SHALL NOT DIRECTLY PLACE SAND EITHER HYDRAULICALLY OR MECHANICALLY, ON ANY EXPOSED SANDBAGS, PRIOR TO BEGINNING WORK ON OCEAN ISLE BEACH, THE CONTRACTOR SHALL CONDUCT AN ONSITE MEETING WITH THE CONTRACTING -VIHW OFFICER OR HIS/HER REPRESENTATIVE AND A REPRESENTATIVE FROM THE NC DIVISION OF COASTAL MANAGEMENT TO IDENTIFY AND DISCUSS NECESSARY MEASURES TO BE TAKEN REGARDING WORK AROUND THE SAND BAGS. V N8�5_33.58"E TERMINAL GROIN 170 (TO BE CONSTRUCTED BY OTHERS) LEGEND EXISTING BASELINE EXISTING INDEX CONTOURS EXISTING INTERMEDIATE CONTOURS EXISTING MEAN HIGH WATER LINE (APPROX.) APPROXIMATE SLOPE INTERCEPT BEACH FILL (NEW WORK) 1 STA.-1+66.30 N: 54395.08 E: 2185046.71 50H:lV SLOPE TO TERMINAL GROIN CONTRACT OPTION WORK AREA 0 100 200 Feet PUBLIC BEACH ACCESS (STAR) IF VEHICLE ACCESS (V) US Army Corps of Engineers° 0 o w z .. 0 w omo Q N Q N U Q ( O Zo Do w N �� U N F > CD J ��°�°�oo J� zo Q� w Q z co} m Lu J o } coLw z LL - w w ZHZF-Y0L 00 w w w� U Q� Q U J g Q W U -)=§ D N x 0 0 L) U) Fn N M O co W w Q Z 5 U z J wU)Q° OLL EszU a-0O� 0�--z0 c) }�Qz 2J00 Q�cooO z 2 D >J_ Q z Z = w 0 2 w Q O U o + QQ� U N Z �w0 Lu J Ymz m w cn EJ> wJO � Z= � w cM owo Q z o Y 0 U w (-) 0 Q Q z ~ U m SHEET ID IC-101-01 U z O Q O U- z 0 W c/ ) co Q J U z W J O I- z O U CU I RTA CU I G F 1 2 3 4 5 40. ' r *F-R E 2ND ST M4 14� _t- 0 > n o _ m^ PROJECT BASELINE W _ 10 STA: 39+92.97 ` u J O N: 53555.88 0 = T _ E:2181010.08 39 - N - 4000 STA:50+34.10 0 4 42+00 41+00uj - N: 53338.72 43+00 - + E: 2179991.84 46+00 45+00 _ 10�+00 + J- 4900 +- _ I- _ - 48+00 47+00 - + - -+ - - I - - _ l �,, 10 -i---1---+--I--i ma`s �-� W 51 +00 50 �0- 52+00 Lu Op _ I- _ 4- 10 - -10 - - 10 O _ -� 10 10 E + - - - r MHW ` co L0 ------------ V J -_-s 0 N: 53254.0 E:2181067.3 N: 53127.7 E: 2180763.1 :0- Ic C 11, 0 N: 53006.5 E: 2180426.1 N: 52818.9 ,E: 2179818.4 NOTES: 1. THE WIDTH OF THE CONSTRUCTION BERM IS DEPENDENT UPON THE PROPORTIONAL QUANTITY OF SAND TO BE PLACED AT THE TIME OF CONSTRUCTION. THE WIDTH OF THE CONSTRUCTION BERM MAY BE ADJUSTED DURING CONSTRUCTION BASED ON THE CONTRACT BEACH PROFILE SURVEY AND THE SLOPE OF THE MATERIAL DURING PLACEMENT. 2. THE CONSTRUCTION BERM SLOPE IS DEPENDENT UPON MATERIAL PROPERTIES AND WAVE ENVIRONMENT DURING PLACEMENT. 3. EXISTING BEACH SURVEY CONDUCTED IN MAY 2021. HORIZONTAL DATUM IS IN FEET, NAD 83 AND VERTICAL DATUM IS IN FEET, NAVD 88. 4. THE CONTRACTOR SHALL CONSTRUCT SAND RAMPS OVER PIPE ALONG THE BEACH PIPELINE ROUTE. SAND RAMPS SHALL BE PLACED AT EACH BEACH ACCESS AS A MINIMUM, BUT IN NO CASE SHALL DISTANCE BETWEEN RAMPS EXCEED 400 FEET. THE SAND RAMPS SHALL BE REPAIRED IF ERODED BY WEATHER OR BEACH TRAFFIC. 5. EXISTING DUNES AND BEACH GRASS SHALL BE PROTECTED FROM DAMAGE DUE TO CONSTRUCTION. THE CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES ON THE BEACH, INCLUDING ACCESS RAMPS, SIGNAGE, FENCES, ETC. FROM DAMAGE DUE TO CONSTRUCTION. 6. THE CONTRACTOR SHALL CONDUCT DAILY OPERATIONS TO CLEAN UP TRASH AND DEBRIS PUMPED ON TO THE BEACH BY DREDGING OPERATIONS AND/OR FOUND ON THE BEACH WITHIN THE LIMITS OF CONSTRUCTION. DEBRIS AND WASTE SHALL BE PROPERLY SECURED AND DISPOSED OF ON A WEEKLY BASIS. 7. THE CONTRACTOR SHALL BE REQUIRED TO PERFORM SAFETY PATROL TO MINIMIZE PEDESTRIAN TRAFFIC THRU THE LIMITS OF CONSTRUCTION AT LEAST 500' AHEAD AND BEHIND THE POINT OF DISCHARGE. MEASURES TO INCLUDE MOVEABLE SAFETY FENCE AT THESE LMITS TO EXTEND FROM DUNE TO THE WATERS EDGE, CLOSURE OF ANY PEDESTRIAN ACCESS RAMPS WITHIN THE DIRECT VICINITY OF THE DREDGING OPERATIONS, AND WARNING SIGNS AT ALL PEDESTRIAN RAMPS AND PUBLIC ACCESS WAYS. 6 1 7 LIMITS OF BEACH PLACEMENT ti 3 ` -A E FIRST ST 10 CON-STRUCTION BERM ELEVATION +6.0' (NAVD 88) E fts TYPICAL BEACH SECTION CHANGE OVER LOCATION t STA. 27+00 STA: 30+20.99 N: 53974.49 -0 IMFi E: 2181887.30 1 10+00- _22+90 J 2 �1k00 - I - -_ F- _1�- - -i - - A- _ _ 10 -.gyp- 1 lot P% z =- - -'-,-� MHW cf) cf) 0Cz n rn � 0 NOTES CONTINUED: 8. NO BEACH FILL MATERIAL SHALL BE PLACED LANDWARD OF THE TEMPORARY CONSTRUCTION EASEMENT LINE, OR WITHIN 10 FEET OF OR UNDERNEATH ANY RESIDENTIAL BUILDINGS. THE CONTRACTOR SHALL BE REQUIRED TO SLOPE (5H:1V) THE LANDWARD SIDE OF THE BERM WHERE NECESSARY TO AVOID PLACING BEACH FILL MATERIAL LANDWARD OF THE TEMPORARY CONSTRUCTION EASEMENT LINE, OR WITHIN 10 FEET OF OR UNDERNEATH ANY RESIDENTIAL BUILDINGS. 9. THE CONTRACTOR SHALL EXTEND 6.0' NAVD BERM CREST HORIZONTALLY LANDWARD, WHERE POSSIBLE TO THE POINT OF INTERSECTION WITH THE EXISTING GROUND OR DUNE EXCEPT AT LOCATIONS AS NOTED BY THE TYPICAL SECTIONS AND/OR AS DIRECTED BY THE CONTRACTING OFFICER. 10 SANDBAGS HAVE BEEN PLACED ALONG THE BEACH AND IN FRONT OF EXISTING STRUCTURES BETWEEN THE PROJECT START AND DURHAM ST. THE CONTRACTOR SHALL NOT DIRECTLY PLACE SAND EITHER HYDRAULICALLY OR MECHANICALLY, ON ANY EXPOSED SANDBAGS, PRIOR TO BEGINNING WORK ON OCEAN ISLE BEACH, THE CONTRACTOR SHALL CONDUCT AN ONSITE MEETING WITH THE CONTRACTING OFFICER OR HIS/HER REPRESENTATIVE AND A REPRESENTATIVE FROM THE NC DIVISION OF COASTAL MANAGEMENT TO IDENTIFY AND DISCUSS NECESSARY MEASURES TO BE TAKEN REGARDING WORK AROUND THE SAND BAGS. R1 -10 --M H W SON E: 2182105.7 LEGEND EXISTING BASELINE a - ftk 00 26+00 --I--I---4-- c K 00 -mom� N: 53582.5 E: 2182226.6 EXISTING INDEX CONTOURS EXISTING INTERMEDIATE CONTOURS EXISTING MEAN HIGH WATER LINE (APPROX.) APPROXIMATE SLOPE INTERCEPT BEACH FILL (NEW WORK) PUBLIC BEACH ACCESS (STAR) IF VEHICLE ACCESS (V) 10 10 0 o i U Lu Lu U) Lu w U) 0 Ln N Q U) Lu z J U CQ G 0 100 200 Feet I I US Army Corps of Engineers° O z - ui Um_ z ON ¢N QN co U �O Do �� Q Zo w N N F U > O � J J Q �Z� °� °� 00 w Q z Lu co} m J o LL � } coLw z w w 00 w w� zF-ZF_w0F_ U Q< Q U J 2 Q M wC)0 = D�Niv 0 -), c U 2 cn cnN M co � N w wQ Z U 5 J z wU)< O0ZU 0 -Z UZly- }:EQz �J00 co z u D >J_ a z Z w O w a U U o QQ� U Z Ln Lu a w _j zU) LLJ m0- z Q O 2E U) pw0 F- U Z z o a LL] + U U U () O N O Q Q z c0 o m SHEET ID I C- 102-01 D U Z 0 L.L 0 LL Z 0 Lu LL r����� VJ U z D 0 Lu J 0^' I r I- Z 0 U C U I RTA G 1 2 3 a E2NDST G) "ko-via O , STA: 80+42.34 N : 52467.62 cn t E 2177112 75 00 O Or ^ ' - 00 80+00 79+00 78+00 77+00 76+00 75+00 74+00 73+00 F -- - — " -- E I C 11, 0 N: 52125.2 E: 2177263.7 1 4 5 CU I 6 7 8 9 ! f E2NDST o n , , ti• = t —I PROJECT BASELINE ►'� O . •� STA: 70+47.24 a _ ow STA: 59+70.37 N: 52763.85 �, N: 53084.41 E:2178062.72 /� ..w up-- E:2179090.78 zVOL � ` IL _ cn OP cn +00[71+00/0�+ 69+00 68+00 67+00 ---� 66+00 65+00 64+00 63+00 62+00 61+00 _ �0±0D /_59+�00 58+00 57+00 56+00 ---I--+-4----I--+--4----I--+-�---- +------ -�--I- ---+--I--+--{---i--1- E FIRST ST --- _ L 10 10 10 9 z z O i ""I t 55+00 54+00 E FIRST ST 10 N O LIMITS OF � _ BEACH PLACEMENT U 10 -- — ----- -_.-- — 10 —_--- 10-------------------- 10------- — _-- _ — —_-- —----------------------- — — — — — — — — — ------------------------------ ------ ---------------- -------------------- ---- -- MHW ----MHW ----------------- ° - — 0 _ — � N:52536.5 z > E: 2178916.3 U)m >O 0 z C c) 0 �J 1 1700' TRANSITION SECTION START STA. 63+00 END STA. 80+00 -10 NOTES: 1. THE WIDTH OF THE CONSTRUCTION BERM IS DEPENDENT UPON THE PROPORTIONAL QUANTITY OF SAND TO BE PLACED AT THE TIME OF CONSTRUCTION. THE WIDTH OF THE CONSTRUCTION BERM MAY BE ADJUSTED DURING CONSTRUCTION BASED ON THE CONTRACT BEACH PROFILE SURVEY AND THE SLOPE OF THE MATERIAL DURING PLACEMENT. 2. THE CONSTRUCTION BERM SLOPE IS DEPENDENT UPON MATERIAL PROPERTIES AND WAVE ENVIRONMENT DURING PLACEMENT. 3. EXISTING BEACH SURVEY CONDUCTED IN MAY 2021. HORIZONTAL DATUM IS IN FEET, NAD 83 AND VERTICAL DATUM IS IN FEET, NAVD 88. 4. THE CONTRACTOR SHALL CONSTRUCT SAND RAMPS OVER PIPE ALONG THE BEACH PIPELINE ROUTE. SAND RAMPS SHALL BE PLACED AT EACH BEACH ACCESS AS A MINIMUM, BUT IN NO CASE SHALL DISTANCE BETWEEN RAMPS EXCEED 400 FEET. THE SAND RAMPS SHALL BE REPAIRED IF ERODED BY WEATHER OR BEACH TRAFFIC. 5. EXISTING DUNES AND BEACH GRASS SHALL BE PROTECTED FROM DAMAGE DUE TO CONSTRUCTION. THE CONTRACTOR SHALL PROTECT ALL EXISTING STRUCTURES ON THE BEACH, INCLUDING ACCESS RAMPS, SIGNAGE, FENCES, ETC. FROM DAMAGE DUE TO CONSTRUCTION. 6. THE CONTRACTOR SHALL CONDUCT DAILY OPERATIONS TO CLEAN UP TRASH AND DEBRIS PUMPED ON TO THE BEACH BY DREDGING OPERATIONS AND/OR FOUND ON THE BEACH WITHIN THE LIMITS OF CONSTRUCTION. DEBRIS AND WASTE SHALL BE PROPERLY SECURED AND DISPOSED OF ON A WEEKLY BASIS. 7. THE CONTRACTOR SHALL BE REQUIRED TO PERFORM SAFETY PATROL TO MINIMIZE PEDESTRIAN TRAFFIC THRU THE LIMITS OF CONSTRUCTION AT LEAST 500' AHEAD AND BEHIND THE POINT OF DISCHARGE. MEASURES TO INCLUDE MOVEABLE SAFETY FENCE AT THESE LMITS TO EXTEND FROM DUNE TO THE WATERS EDGE, CLOSURE OF ANY PEDESTRIAN ACCESS RAMPS WITHIN THE DIRECT VICINITY OF THE DREDGING OPERATIONS, AND WARNING SIGNS AT ALL PEDESTRIAN RAMPS AND PUBLIC ACCESS WAYS. -10 10 10— Lij ------ ----------- ----- __,.�_---------------- --------- ---____ _ W ----—--_10.-- _--- - 2 U) ---------------------- W W MHW CONSTRUCTION BERM_ _ o _ O — -° ELEVATION +6.0' (NAVD 88) co V J cn vJ r � �_ W 0 C z M < J U NOTES CONTINUED: 8. NO BEACH FILL MATERIAL SHALL BE PLACED LANDWARD OF THE TEMPORARY CONSTRUCTION EASEMENT LINE, OR WITHIN 10 FEET OF OR UNDERNEATH ANY RESIDENTIAL BUILDINGS. THE CONTRACTOR SHALL BE REQUIRED TO SLOPE (5H:1V) THE LANDWARD SIDE OF THE BERM WHERE NECESSARY TO AVOID PLACING BEACH FILL MATERIAL LANDWARD OF THE TEMPORARY CONSTRUCTION EASEMENT LINE, OR WITHIN 10 FEET OF OR UNDERNEATH ANY RESIDENTIAL BUILDINGS. 9. THE CONTRACTOR SHALL EXTEND 6.0' NAVD BERM CREST HORIZONTALLY LANDWARD, WHERE POSSIBLE TO THE POINT OF INTERSECTION WITH THE EXISTING GROUND OR DUNE EXCEPT AT LOCATIONS AS NOTED BY THE TYPICAL SECTIONS AND/OR AS DIRECTED BY THE CONTRACTING OFFICER. 10. SANDBAGS HAVE BEEN PLACED ALONG THE BEACH AND IN FRONT OF EXISTING STRUCTURES BETWEEN THE PROJECT START AND DURHAM ST. THE CONTRACTOR SHALL NOT DIRECTLY PLACE SAND EITHER HYDRAULICALLY OR MECHANICALLY, ON ANY EXPOSED SANDBAGS, PRIOR TO BEGINNING WORK ON OCEAN ISLE BEACH, THE CONTRACTOR SHALL CONDUCT AN ONSITE MEETING WITH THE CONTRACTING OFFICER OR HIS/HER REPRESENTATIVE AND A REPRESENTATIVE FROM THE NC DIVISION OF COASTAL MANAGEMENT TO IDENTIFY AND DISCUSS NECESSARY MEASURES TO BE TAKEN REGARDING WORK AROUND THE SAND BAGS. —VI H W EXISTING BASELINE EXISTING INDEX CONTOURS EXISTING INTERMEDIATE CONTOURS EXISTING MEAN HIGH WATER LINE (APPROX.) APPROXIMATE SLOPE INTERCEPT BEACH FILL (NEW WORK) PUBLIC BEACH ACCESS (STAR) IF VEHICLE ACCESS (V) 0 100 200 Feet I I US Army Corps of Engineers° O zo .. w ui zm zz ON Q N Q N 0 O O 0 0 F__ co Q Z CD UN� >O cn D J Jz Q Q �� Oo� 00E- 00 ui Q z Lu co} 00 J co 0z LL W W 00 W 0 W F- zF zF_ OF U < J g QQ�Q0 w00= Dz - M NN 0-i0�U=wn ).ncv co O co I- 0' CO W LLJ Q Z U 5 J Z W WO CO Q Q OOZU 0�z0 Uzi }:�iQZ g�p0 < (Do Z u Q z Z w O w Q O U o QQ� + U 00 Ym0 z a wJH zCo LLJ m Q O ��z cj Ow0 P— U z z o Q + OU U0Ln O Q Q z O cl) U m SHEET ID I C- 103-01 D U z O CQ G O LL z 0 W LL ��/ �/ ) J U z D 0 W J O z O U C U I RTA 1 5 CU I E 10 G F C Ic C 0 20 15 10 w 5 w w Z z 0 0 Q > w -5 J W 10 15 20 15 10 w Lu z z 0 0 Q > w w -5 10 15 i 2 I 3 DISTANCE VARIES - SEE SHEET C-103-0 i \ CONSTRUCTION \\ BERM WIDTH \ PLUS VARIES \ -.T OLERANCE ASSUMED _ SLOPE DURING APPROXIMATE +6.0' CONSTRUCTION EXISTING BEACH SEE NOTE 1 PROFILE MINUS \ TOLERANCE \ MHW (+1.79' NAVD 88) SLOPE CORPS OF ENGINEERS INTERCEPT BASELINE -50 0 50 100 150 200 250 300 350 400 450 500 550 DISTANCE IN FEET FROM BASELINE TYPICAL BEACH TRANSITION SECTION SOUTH END STA. 63+00 TO STA. 80+00 DISTANCE VARIES - SEE SHEET C-101-0 I -50 0 CORPS OF ENGINEERS BASELINE 50 100 PLUS ASSUMED SAND BAGS TOLERANCE SLOPE DURING SEE NOTE 2 CONSTRUCTION +6.0' SEE NOTE 1 MINUS \ TOLERANCE \ \ MHW (+1.79' NAVD 88) SLOPE 1�1 \ INTERCEPT APPROXIMATE OPTIONAL EXISTING BEACH ITEM 1 a PROFILE 150 200 250 300 350 DISTANCE IN FEET FROM BASELINE TYPICAL OPTIONAL BEACH BERM SECTION STA. -1 +66.3 TO STA. 10+00 400 450 500 550 20 15 10 w 5 w w z O 0 w - J 5 W 10 15 20 15 10 w Lu z z 0 0 w w -5 10 15 20 15 10 w LL 5 z z 0 0 Q > w w -5 10 15 -50 7 I 8 DISTANCE VARIES - SEE SHEETS C-102-0 AND C-103-0 0 PLUS — ASSUMED TOLERANCE SLOPE DURING CONSTRUCTION `— +6.0' SEE NOTE 1 MINUS \\ \ \ \ TOLERANCE MHW (+1.79' NAVD 88) APPROXIMATE EXISTING BEACH \ \\ PROFILE ��----�� --- --- \\ CORPS OF ENGINEERS ---�� Z/ BASELINE — SLOPE INTERCEPT 50 100 150 200 250 300 350 400 450 500 550 DISTANCE IN FEET FROM BASELINE TYPICAL BEACH BERM SECTION STA. 27+00 TO STA. 63+00 DISTANCE VARIES DISTANCE VARIES IiVIVJ 1 f1VV I IVIV BERM ASSUMED / PLUS SLOPE DURING \ TOLERANCE CONSTRUCTION \ \ SEE NOTE 1 \— +6.0' MINUS \\ \ APPROXIMATE TOLERANCE \ \ \ MHW (+1.79' NAVD 88) EXISTING BEACH \ \ \ PROFILE CORPS OF ENGINEERS CORPS OF ENGINEERS BASELINE EASEMENT LINE -50 0 50 100 150 200 250 300 350 DISTANCE IN FEET FROM BASELINE TYPICAL BEACH BERM SECTION STA. 19+50 TO STA. 27+00 DISTANCE VARIES - SEE SHEET C-101-0 CORPS OF ENGINEERS BASELINE -50 0 50 100 NOTES: 1. THE WIDTH OF THE CONSTRUCTION BERM IS DEPENDENT UPON THE PROPORTIONAL QUANTITY OF SAND TO BE PLACED AT THE TIME OF CONSTRUCTION. THE BASIS FOR DETERMINING THE WIDTH OF 6. THE CONTRACTOR SHALL NOT REMOVE OR RELOCATE ANY EXISTING BEACH MATERIAL THAT IS ABOVE THE CONSTRUCTION BERM WILL BE THE GOVERNMENT'S INTERPRETATION OF THE BORROW AREA THE BEACH FILL PROFILE PRIOR TO CONSTRUCTION. AND BEACH PROFILE SURVEY, AND THE SLOPE OF THE MATERIAL DURING PLACEMENT. 2. THERE SHALL BE NO CONSTRUCTION OR BEACH FILL PLACED BEYOND THE LANDWARD SIDE OF THE SANDBAGS. 7. AS AN OPTION TO THE CONTRACT AND AT THE DIRECTION OF THE CONTRACTING OFFICER, THE CONTRACTOR SANDBAG LIMITS SHOWN ARE APPROXIMATE AND SHALL BE FIELD VERIFIED BY THE CONTRACTOR. SHALL TILL ANY FILL AREAS IDENTIFIED BY THE CONTRACTING OFFICER. BEACH TILLING LIMITS SHALL BE ALONG THE ENTIRE LENGTH OF THE BEACH FILL AREA FROM THE SEAWARD TOE OF THE STORM BERM TO MEAN HIGH 3. THE CONSTRUCTION BERM SLOPE IS DEPENDENT UPON MATERIAL PROPERTIES AND WAVE ENVIRONMENT WATER (ELEV. +1.79' NAVD88) DURING PLACEMENT. THE 15HAV SEAWARD SLOPE IS THE INITIAL ASSUMED SLOPE FOR PAYMENT AND 8. A VERTICAL TOLERANCE OF +/- 0.5' ABOVE AND BELOW THE PRESCRIBED BERM AND DUNE GRADE AND SLOPES QUANTITY PURPOSES. LINE SHALL BE PERMITTED IN THE FINISHED SURFACE. BELOW THE MEAN HIGH WATER LINE (+/-1.79' NAVD88) THE 4. EXISTING BEACH SURVEY COMPLETED IS MAY 2021. HORIZONTAL DATUM IS IN FEET, NAD 83 AND VERTICAL FILL MATERIAL WILL BE ALLOWED TO ASSUME ITS NATURAL SLOPE RESULTING FROM THE EFFECTS OF WAVE AND DATUM IS IN FEET, NAVD 88. WATER LEVEL CONDITIONS. FOR PAYMENT PURPOSES, THE TOLERANCE LINE SHALL EXTEND THE ENTIRE BERM AND SLOPES (LANDWARD, INTERMEDIATE, AND ASSUMED SEAWARD SLOPE) TO THE 5. TYPICAL BEACH SECTION STATION LIMITS ARE APPROXIMATE AND ARE SUBJECT TO CHANGE BASED ON INTERSECTION OF THE LANDWARD AND ASSUMED SEAWARD SLOPE AND PRE -CONSTRUCTION SURVEYED EXISTING BEACH CONDITIONS. CONDITION, SEE SPECIFICATION SECTION 35 20 23 FOR MEASUREMENT AND PAYMENT AND ALLOWABLE TOLERANCE. CU I 400 450 500 SAND BAGS SEE NOTE 2 PLUS ASSUMED TOLERANCE SLOPE DURING OPTIONAL CONSTRUCTION ITEM 1 SEE NOTE 1 +6.0' \\ MHW (+1.79 NAVD 88) MINUS \\ TOLERANCE \ \ APPROXIMATE — EXISTING BEACH PROFILE 150 200 250 300 350 400 450 500 DISTANCE IN FEET FROM BASELINE TYPICAL BEACH BERM SECTION STA. 10+00 TO STA. 19+50 SLOPE INTERCEPT 550 SLOPE INTERCEPT 550 VERT. 10 0 10 20 30 HORZ. 50 0 50 100 150 SCALE IN FEET US Army Corps of Engineers° 1 1 l O Lu zO -• O 0 ui Um_ ON QN QN U Q 0co 0 zo O Do ui �2 CD U) J UD J z UU� 0 Q m 00 O U U) ui 2 Q z co} m m 0 C:) w J LL UJ wmwow�z (Z`3� Z� Y_j Hz - x (�¢ U QQ U W> m¢ � w N= 0� 0� U= . U) C/)N M O l' N ui W w Q Z � U Z J W�>Q 02ZU U)o�� ��z0 UZ-j }�QZ �J00 Q3:cooO z D J_ z Z J W O O U U U) Z Q== W zw� m Y0OZ U W W ��z � U) Z =) — z J oU0 U_ QOU W U) C/) QO 0 U � m SHEET ID C-301-0 RTA BCOES REVIEW BCOES REVIEW BCOES REVIEW BCOES REVIEW BCOES REVIEW