Loading...
HomeMy WebLinkAboutCorrespondence - As-Built surveys for OIB Beach Fill 10/12/2022From: Brad Rosov To: Coats. Heather; Adam Priest Subject: [External] RE: As -built surveys for OIB beach fill Date: Wednesday, October 12, 2022 2:57:39 PM Attachments: imaae001.ma imaae002.jpg Final Post Con Surveys-C101.odf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to Report Spam. Heather, We did get the as -built survey for the accretion fillet from the USACE back in late June (see attached). We had passed it along to Mickey but neglected to forward them along to you as well (sorry?). Volume quantities provided by the USACE indicated that 272,936 cy of fill were placed within the footprint of the accretion fillet and an additional 484,211 cy of fill were placed to construct the CSRM project. Here is a figure that depicts the length of the entire CSRM project along with the accretion fillet. Hope this helps! Terminal Gro n LJ1_ = 1. - •�_ ._-i I- - T- — .. _�._4�_ •' � � � LACcrctlo n Fillet 4 Federal CS RM Project From: Coats, Heather <heather.coats@ncdenr.gov> Sent: Wednesday, October 12, 2022 11:10 AM To: Adam Priest<apriest@coastaIprotection eng.com>; Brad Rosov <brosov@coastalprotectioneng.com> Subject: As -built surveys for OIB beach fill Hi guys, Did you ever get copies of the as -built surveys from the ACE for the Ocean Isle Beach nourishment? I may be overlooking them, but don't recall seeing them and I'm also trying to track down the final fill length and volume for the project. Thanks in advance if you can provide this info! If not, I'll check with the ACE. if Heather Coats Beach & Inlet Management Project Coordinator Division of Coastal Management North Carolina Department of Environmental Quality 910 796 7302 office heather. coats(2ncdenr.gov 127 Cardinal Drive Extension Wilmington, INC 28405 0