Loading...
HomeMy WebLinkAbout156-05 Renewal 05/2013 Permit Class Permit Number RENEWAL 156-05 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission ikrmit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Marjorie M. N. Tyler and William Powell, 446 Batchelor Bay Dr., Windsor, NC 27983 Authorizing development in Bertie County at Albemarle Sound, Batchelor Bay Dr., Merry Hill , as requested in the permittee's letter dated 4/25/13 This permit, issued on MaT, 7013 , is subject to compliance with the application (where consistent with the permit),all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action;or may cause the permit to be null and void. 1) This renewal shall be attached to the original of Permit No. 156-05, which was issued on 10/26/05, and copies of both documents shall be readily available on site when Division personnel inspect the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: The expiration date of this permit has been extended in accordance with Session Law 2009- 406, and amended by Session Law 2010-177. This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty(20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit shall be accessible on-site to Department personnel when the project is inspected for compliance. Braxton . Davis, Director Any maintenance work or project modification not covered / bivision of Coastal Management hereunder requires further Division approval. All work shall cease when the permit expires on This permit and its conditions are hereby accepted. December 31,2014 ' In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee 4 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C. Davis John E. Skvarla, III Governor Director Secretary May 16, 2013 Marjorie Tyler William Powell 446 Batchelor Bay Dr. Windsor,N.C. 27983 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable,the State Dredge and Fill Law, for you to proceed with your project proposal.The original (buff-colored form)is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,NC 27611-6714, (919) 733-2698 within twenty(20)days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty(20)days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications,time extensions,and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review,we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions,environmental safeguards, or problem areas,you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Sincerely, P V. /1*,V=- Douglas V. Huggett Major Permits and Consistency Manager Enclosure 400 Commerce Ave.,Morehead City,NC 28557 Phone:252-808-28081 FAX:252-247-3330 Internet:www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer DCM Coordinator: �Ck,,S L- �-� Permit#: 6 0 S MAILING DISTRIBUTION SHEET Permitee: c o�—. Agents: DCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City ashin on V-t Wilmin on US ACOE Offices: Washington: Raleigh—Bland ace r William Westcott(NC DOT) Bill Biddlecome(NC DOT) Wilmington: Dave Timpy Cultural Resources: Renee Gledhill-Early or(environmental.review@ncdcr.gov) Public Water Supply: Debra Benoy(WIRO) Joey White(WARD) Marine Fisheries: Anne Deaton Jeanne Hardy NC DOT: Ken Pace Shellfish Sanitation: Patti Fowler State Property: Tim Walton Water Quality: Karen Higgins(Raleigh) John Hennessy(NC DOT) Washington: Wilmington: Joanne Steenhuis—401 Chad Coburn-401 Linda Lewis- Stormwater Wildlife Resources: Maria Dunn(WARO) LPO: Fax Distribution: Permitee#: Agent#: NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Pat McCrory Braxton C. Davis John E. Skvarla, III Governor Director Secretary 16 May 2013 RECEWED Reid Clarke 442 Batchelor Bay Drive fj MAY 2 0 2013 Windsor, NC 27983-7011 Dear Mr. Clarke: DCMMDcffy This letter of refinement is in reference to your 25 April 2013 correspondence(attached), as agent, requesting a renewal and modification of Major CAMA Permit No. 156-05. This permit was issued to Marjorie M.N. Tyler and William Powell on 26 October 2005 for the addition of 3 single pile personal watercraft lifts to an existing, shared L-head pier structure with an existing boathouse and sailboat lift, for a docking facility of five boats. The shared pier structure is located at 446 Batchelor Bay Drive(off NC Hwy 45), in Batchelor Bay Subdivision, on Batchelor Bay of Albemarle Sound, near the Town of Windsor in Bertie County, North Carolina. This is the first letter of refinement for the permit, and the renewal was issued on 15 May 2013 with an expiration date of 31 December 2014. The applicants installed the 3 personal watercraft lifts as authorized, removed the existing sailboat lift, and have recently removed one of the personal watercraft lifts. Therefore, they currently have a docking facility for 3 boats. Your request to amend the permit to allow for the construction of two side by side, 20' long by 15' wide, uncovered boat lifts separated by a 42' long by 3'wide L- shaped catwalk for access off the main pier structure, as shown on your attached plats (2) dated 25 April 2013, is hereby authorized. This will be accomplished by removal of another personal watercraft lift, resulting in a docking facility for a total of 4 boats on the shared pier structure. Total shoreline length for both properties is 182', and this modification will result in an increase of 126 ft2 shaded impact(from 565 ft2 to 691 ft2) due to the addition of the L-shaped catwalk. All permit conditions including the 31 December 2014 expiration date still apply and remain unchanged. Your plan view and cross-sectional drawings, both dated 25 April 2013, will become a permanent part of the file. Thank you for your time and cooperation in this matter. If you have any questions about this or related matters, please don't hesitate to contact me at(252)948-3852 or Kimberly Hedrick at(252)948-3936 in the Washington Regional Office. Sincerely, David W. Moye District Manager Washington Regional Office cc: Doug Huggett—Major Permit Coordinator, DCM Kimberly Hedrick—Compliance&Enforcement Representative, DCM Marjorie M.N. Tyler—446 Batchelor Bay Drive,Windsor, NC 27983 William L. Powell—448 Batchelor Bay Drive, Windsor, NC 27983 Anthony Scarbraugh—NCDENR, Division of Water Quality,Washington Regional Office Raleigh Bland—USACE,Washington Regulatory Field Office 943 Washington Square Mall,Washington,NC 27889 Phone:252-946-6481 1 FAX:252-948-0478 Internet:www,nccoastalmanagement.net An Equal Opportunity\.Affirmative Action Employer RECEIVED NCDENR North Carolina Department of Environment and Natural Resou"$ 0 7 2013 Division of Coastal Management Pat McCrory Braxton C. Davis D� r�WSkvarla, III Governor Director 'f'� r Secretary S' /`f�/ MEMORANDUM TO: Doug Huggett, Major Permits Coordinator, Morehead City Headquarters, Division of Coastal Management (DCM) ;w lr THROUGH: David Moye, District Manager, Washington Regional Office, DCM FROM: Kimberly Hedrick, Compliance and Enforcement Representative, Washington Regional Office, DCM DATE: 3 May 2013 SUBJECT: Renewal of Major CAMA Permit No. 156-05 issued to Marjorie M.N. Tyler and William Powell Major CAMA Permit No. 156-05 was issued to Marjorie M.N. Tyler and William Powell on 26 October 2005 for the addition of 3 single pile personal watercraft lifts to an existing, shared L-head pier structure with an existing boathouse and sailboat lift, for a total mooring of five boats. The shared pier structure is located at 446 Batchelor Bay Drive (off NC Hwy 45), in Batchelor Bay Subdivision, on Batchelor Bay of Albemarle Sound, near the Town of Windsor in Bertie County, North Carolina. This is the first renewal request for the permit, and the expiration date of 31 December 2008 had been changed to 31 December 2012 due to Session Law 2010-177. The applicants installed the 3 personal watercraft lifts as authorized, removed the existing sailboat lift, and have recently removed one of the personal watercraft lifts. Therefore, they currently have mooring for 3 boats. The attached cover letter for the project is also a request for a modification. Based upon your conversation with David Moye, it was agreed that a Letter of Refinement will be issued for the proposed modification following the renewal of the permit. The $100 check covering the cost of the requested renewal was received and has been deposited in the Department's account. Staff recommends renewal of the $100 permit as requested. Please call me at (252)948-3936 if you have any questions. ATTACHMENT 943 Washington Square Mall,Washington,NC 27889 Phone:252-946-6481 1 FAX:252-948-0478 Internet:www.nccoastalmanagement.net An Equal Opportunity t Affirmative Action Employer DCM APR 302013 April 25, 2013 W ARO Ms. Kimberly Hedrick BECENED NCDENR Compliance & Enforcement Representation MAY 0 7 2013 943 Washington Square Mall Washington, NC 27889 DCM MO Cn y Re: Request for permit extension (renewal) of CAMA Permit 156-05 issued to Marjorie M.N. Tyler and And William Powell located at 446 Batchelor Bay Dr., Windsor, NC 27983. (Bertie Co.). Expiration date December 31, 2008 changed to December 31, 2012 Due to Session Law 2010-177 Dear Ms. Hedrick: My name is W. Reid Clarke, agent of property owners. (See attached "Authorized Agent Agreement"). We are requesting a renewal and minor modification of Permit #156-05 that was issued for the construction of 3 single pile jet ski lifts to an existing pier structure with existing boathouse and sail boat lift, for an authorized total of 5 boats. Under this permit, one covered boat lift and three jet ski lifts were built to pier structure. As of today one jet ski lift has been removed leaving 3 lifts on pier. If permit is renewed with minor modifications, we will keep one covered boat lift, one jet ski lift, remove and replace one jet ski lift with two side by side uncovered 4 pile lifts (Numbers 3 and 4) with a L-shaped catwalk in between them, both lifts being adjacent to the L-shaped platform on the opposite side of the existing covered boat lift. This proposal will result in a total of 4 boat lifts for the shared pier structure, which is one less than originally permitted. Total shoreline on both properties is f 91' each, for a total of 182'. This minor modification will result in a 126 S.F. increase in shaded impact by the addition of the proposed L-shaped cat walk for access to the two new lifts. Current shaded impact of 565 S.F. in platforms and covered boat lift will increase to 691 S.F. for this project. Page 2 Thank you in advance for your consideration of this request. If further information is needed, please contact me at: Phone: 252/287-8533; Cell: 252/287- 7828; Email: wallacerclarke(a),gmaii.com. Please find enclosed: 1. Authorized Agent Consent Agreement 2. Adjacent Riparian Property Owner Statement 3. Plan View and Cross Sectional Drawings Sincerely, U) &J OdIL W. Reid Clarke Agent of Property Owners WRC/pw Enclosures -� 12.00 --� SriE Rio i� �12.'x •3'� - 3 00 EXISTING COVERED ppl+ t 45E D I 12,00' /'r- BOAT LIFT ( Z 0 4 5.F GAT I X►sTtNG C 1-1x t(o ) u - _.------_-- PLAT fi:O RM �A/)TS-,. P E R.5 0 LA ® I 1�'.OQ XISTtt�;C, TET Sk-1 L I F T REPLAC.Er 13Y i i9.00' _iF�' 1 i PERGOLA E X.i-T;N C3 G'_ NEW EnOA7' ►-TFTS f utiscavER LIFT ON 8 x $' DECKING POST X1ST1��G .JS ". JOIST SK t L1 FT / BEAM-,, POST i I PIER POST STRUCTURAL DETAIL 11-4 64 � 6" x 6" POST AT $' OC, 5' SPAN j' 2" x 6" BEAMS SANDWICH POSTS 3 BOLTS PER JOINT �I 2" x 6" JOISTS AT 20" 6C. { x 6" BECK BOARDS SECURED WITH SCREWS tiyt r�tjSnT{ ti.C.. t lb3 My i$ p 7 l ln/• 1�¢1�1 C�qr �� f w 5.00' 9.00• _�- NFL, 1.00' RECEIVED 7.50' MAY 2 0 2013 I GRAPHIC SCALE 20 0 10 20 40 DCAf-MUD CrIl' gp p /L 7-YLE R' Pi,0P)F- :TY ( IN FEET ) i inch = 20 ft. PEh?MIT# I5(0 - o5 MARTO'i t E 1"`f L-C F" W����AM Pow'ELL f W pox L4 Avm POLE _ e, I { 9 { tit/ Rid C1�rk�. A GE NT 4 - Z5 3