Loading...
HomeMy WebLinkAbout51-05 Renewal 03/2015 F�2�n!'R�ENEWAL s Permit Number 51-05 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission erint"t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Christopher Piner,PO Box 25,Williston,NC 28589 Authorizing development in Carteret County at adjacent to Core Sound, off Hwy. 70, South Harbor Road, Davis as requested in the permittee's letter dated received in MUD City on 12/16/14 This permit, issued on March 3, 2015 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. A. 1S. ` p Y x 1) This renewal shall be attached to the original of Permit No. 51-05, which was issued on 5/16/05, as well as all subsequent renewals, and copies of all documents shall be readily available on site when Division personnel inspect the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: A permit renewal application processing fee of$100 was received by DCM for this project. h y f This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. : date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit shall be accessible on-site to Department personnel when the project is inspected for compliance. Braxton C. Davis, Director Any maintenance work or project modification not covered hereunder requires further Division approval. D1v1S10n of Coastal Management x All work shall cease when the permit expires on This permit and its conditions are hereby accepted. December 31,2016 r In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee '�}MSC-CCK44S}-0C+)K3-066KK^Yi400PP044C-0^X-0arXK•YiP49{.C+'<.}h`:vJLvh`X N�SZ'wh`Ji4Jtibat�C-0AkW?^:ti+a^:-h:`,�.:wh`iKKW^:-44`fiC^Y!K'^Si-:wi^SK?tsA+,f°L°0•�:-'.{^tiKKK/»N.ititiKK��?{N�i°F _�A ERR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary March 3, 2015 Christopher Piner P.O.Box 25 Williston,N.C. 28589 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable,the State Dredge and Fill Law,for you to proceed with your project proposal.The original(buff- colored form)is retained by you and it must be available on site when the project is inspected for compliance.Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or 113-229.Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center,Raleigh,NC 27611-6714,(919)733- 2698 within twenty(20)days of this decision on your permit.You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty(20)days. The project plan is subject to those conditions appearing on the permit form. Otherwise,all work must be carried out in accordance with your application.Modifications,time extensions, and future maintenance requires additional approval.Please read your permit carefully prior to starting work and review all project plans,as approved.If you are having the work done by a contractor,it would be to your benefit to be sure that he fully understands all permit requirements. From time to time,Department personnel will visit the project site.To facilitate this review,we request that you complete and mail the enclosed Notice Card just prior to work initiation.However,if questions arise concerning permit conditions,environmental safeguards,or problem areas,you may contact Department personnel at any time for assistance.By working in accordance with the permit,you will be helping to protect our vitally important coastal resources. Sincerely, Douglas V.Huggett Major Permits and Consistency Manager Enclosure 400 Commerce Avenue,Morehead City,North Carolina 28557 Phone:252-808-28081 FAX 252-247-33301 Internet:www.ncooastalmanagement.net An Equal Opportunity/Affirmative Action Employer DCM Coordinator: /J- C�Egli-�� Permit MAILING DISTRIBUTION SHEET Permitee• le� Agents: DCM Field Offices Elizabeth City / (with revised work plan drawings) Morehead City Washington Wilmington US ACOE Offices: Washington: Raleigh Bland Tracey Wheeler William Westcott (NC DOT) Bill Biddlecome (NC DOT) Wilmington: Tyler Crumbly Cultural Resources: Renee Gledhill-Early Public Water Supply: Diane Williams (WIRO) Joey White (WARD) Marine Fisheries: Shane Staples Jessi Baker S NC DOT: Ken Pace Shellfish Sanitation: Patti Fowler State Property: Tim Walton / Water Quality: Karen Higgins (Raleigh) John Hennessy (NC DOT) Washington: Anthony Scarbraugh-401 Scott Vinson-Stormwater / Wilmington: Joanne Steenhuis—401 Chad Coburn - 401 Linda Lewis - Stormwater Wildlife Resources: Maria Dunn (WARO) Vacant(WIRO) LPO: Fax Distribution: Permitee #: Agent#: NCDENR North Carolina Department of Environment and Natural Resources Pat McCrory Donald R. van der Vaart Governor Secretary Memorandum 1/23/15 To: Daniel Govoni From: Ryan Davenport Re: Renewal Request— e Permit#51-05, Christopher Piner Please find enclosed a request from Chris Piner requesting to renew State Permit#51-05. This permit was issued on 12/31/08 and renewed on 1/22/13 for a docking facility. There has been continuous work on the docking facility throughout the life of the permit. The permit will expire on 12/31/14. The applicant is requesting a renewal so that the remaining work can be completed. Enclosed is a$100 check #2151. Therefore, I recommend this request be authorized and that the permit be renewed for another 2 years. Cc: Roy Brownlow 1601 Mail Service Center,Raleigh,North Carolina 27699-1601 Phone:919-707-8600\Internet:www.ncdenr.gov An Equal Opportunity\Affirmative Action Employer-Made in part by recycled paper 017� V Chris D. Piner P.O. Box 725 353 Highway 70 E. Williston, North Carolina 28589 Ryan Davenport Division of Coastal Management 400 Commerce Avenue Morehead City, North Carolina 28557 Dear Mr. Davenport: I would like to request an extension on my major development permit. The permit is issued to Chris Piner and the project is located at 130 South Harbor Drive in Davis, North Carolina. Permit number is 51-05. Enclosed is a check in the amount of$100.00 for the extension fee. If I need to provide any further information please contact me at 252-241-2477 or 252-225-7491. My email is chris.piner@usmc.mil. Sincerely, Chris Piner m f (30, RECEIVEF DEC 1 R RECEIVED DCM-n, DEC 181014 DCM-MIHD CITY 6w�� Chris D Piner Po Box 725 353 Highway 70 East Williston, N.C.28589 Ryan Davenport Division of Coastal Management 400 Commerce Avenue Morehead City, N.C. 28557 Dear Mr Davenport am requesting an extension on my major development permit. Permit number is 51-05 located at 130 South Harbor Drive Davis, N.C. As per our phone conversation on Friday January 23rd I am including a list of work completed to date, and work to be done. All of the canal has been dredged out except 3O0ft at the sound entrance the excavated area needs widening out to the permitted dimension. Due to the limitations of available machinery and the presence of an existing bulkhead I was only able to dig the canal fourteen feet wide rather than the twenty foot allowed by the permit. The boat basin has been excavated and the boat ramp has been installed graded and rocked. All of the 767ft of bulkhead has been installed and tie backs are in place. This includes the bulkhead in the new basin. All bulkheading has been backfilled all affected areas have been graded and grass reestablished. A second existing boat ramp has been enlarged, graded, and concrete slab installed. Work yet to be done. Construct finger piers in the new boat basin. Install two boat lifts between finger piers in new boat basin. Install boat lift in existing boat slip at the Eric Groves lot adjacent to the new boat basin. Construct boat house over the boat lifts in the new basin. Widen the dredged channel of the outer 3OOft of the access canal to 20ft wide by 5ft deep. Thanks Chris Piner RECEIVED FEB 0 4 2015 Pll?Ah=IMr+r�xw*