Loading...
HomeMy WebLinkAbout51-05 Renewal 12/2008 <.+,o-:-.+'«..�'° .a�.•;.ti-o+to-ocaaa•..rc.c••aacno-ro-x¢wo•aa•o-oa•aoow•.:<-c•ou:c:�o-:•acoa.•ran•o•ro-oa-: k r±•a•aab•�.r-:-•»„wcw:+r.jw:oao-ta�•u•r�K,•• .�n•��.w•rr,w,-.•r..y Permit Class Permit Number RENEWAL 51-05 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission t 0 for r Development in an Area of Environmental C . X Major p . pursuant to NCGS 113A-118 DEC 3 (y 2008 X Excavation and/or filling pursuant to NCGS 113-"orehea� Issued to Christopher Piner, PO Box 25,Williston, NC, 28589 city j)(; Authorizing development in Carteret County at adjacent Core Sound off Hwy. 70, South F Harbor Road Davis , as requested in the permittee's letter dated 10/28/08 This permit, issued on December 5.2008 , is subject to compliance with the application(where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action;or may cause the permit to be null and void. 1) This renewal shall be attached to the original of Permit No. 51-05, which was issued on 5/16/05, and copies of both documents shall be readily available on site when Division personnel inspect the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit shall be accessible on-site to Department personnel when the project is inspected for compliance. James H. i-egson, Director Any maintenance work or project modification not covered Division of Coastal Management hereunder requires further Division approval. This permit and its conditions are hereby accepted. All work shall cease when the permit expires on December 31, 2010 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Signature of Perm Management Program. i'ttee A� NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley,Governor James H. Gregson, Director William G. Ross Jr.,Secretary December 5, 2008 Mr. Christopher Piner PO Box 25 Williston NC 28589 Dear Mr. Piner: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. Please sign both the original (buff-colored form) and the Xerox stamped "Copy". Return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. Please retain the original (buff-colored form), as it must be available on site when the project is inspected for compliance. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A- 121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty(20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it is to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Sincerely, x � Douglas V. Huggett Major Permits and Consistency Manager Enclosure 400 Commerce Avenue, Morehead City, NC 28557 Phone: 252-808-2808\ FAX: 252-247-3330\ Internet:www.nccoastalmanagement.net An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper DCM Coordinator: Flcwe_I\ MAILING DISTRIBUTION SHEET Permitee: Agents: DCM Field Offices Eliza (with revised work plan drawings) as ngton Wilmington US ACOE Offices: Washington: Raleigh Bland Tracey Wheeler William Westcott(NC DOT) Bill Biddlecome(NC DOT) Wilmington: =Timpy Cultural Resources: Renee Gledhill-Early Public Water Supply: Debra Benoy(WIRO) Joey White(WARO) Marine Fisheries: Anne Deaton NC DOT: Ken Pace Shellfish Sanitation: Patti Fowler State Property: June Michaux Water Quality: Cyndi Karoly(Raleigh) John Hennessy(NC DOT) Washington: Vivian Christy Al Hodge Kyle Barnes Wilmington: Joanne Steenhuis Wildlife Resources: Maria Dunn(WARD) Molly Ellwood (WIRO) LPO: Fax Distribution: Permitee#: Agent#: ' , 1 DEPARTMENT OF THE ARMY I7� WILMINGTON DISTRICT,CORPS OF ENGINEERS 69 DARLINGTON AVENUE WILMINGTON,NORTH CAROLINA 28403-1343 REPLY TO ATTENTION OF: December 17, 2008 Regulatory Division Action ID No. 200500376 and State Permit No. 51-05 C EVE - kJ Christopher Piner DEC 2 3 2008 Post Office Box 25 Williston,North Carolina 28589 Morehead City DGM Dear Mr. Piner: Through coordination with the North Carolina Division of Coastal Management, we have learned of your request to renew your Department of the Army(DA)permit issued on June 22, 2005 and modified on October 11, 2005, which authorized the maintenance excavation on a 1500' x 20' section of an existing man made canal, excavation of an 80' x 45' upland boat basin with three boat slips covered by a 30' x 60' roof, construction of a 19' x 15' boat ramp, bulkhead three separate areas totaling 767', construction of four boat lifts in a man made canal adjacent to Core Sound and 163 feet of bulkhead, on South Harbor Road, in Davis, Carteret County,North Carolina. Your proposal continues to be consistent with the provisions and objectives of General Permit No. 198000291. The permit is hereby renewed. It is understood that all other conditions of your permit remain applicable and that the expiration date is December 31, 2010. If you have any questions or comments you may call me at(910) 251-4634. Sincerely, Dave Timpy, Project Manager Wilmington Regulatory Field Office 2 Copies Furnished: Chief, Source Data Unit NOAA/National Ocean Survey ATTN: Sharon Tear N/CS261 1315 East-West Hwy., Rm. 7316 Silver Spring, MD 20910-3282 Mr. Doug Huggett � ;" Division of Coastal Man/gement North Carolina Department of DEC 2 3 ZOUt3 Environment and Natural Resources 400 Commerce Avenue �A®rehead Ci1� ��� Morehead City,North Carolina 28557-3421 Tere Barrett, District Manager Morehead City, Wilmington Regional Office North Carolina Division of Coastal Management 400 Commerce Avenue Morehead City,North Carolina 28557 A`7�i"A`A NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley,Governor James H. Gregson, Director William G. Ross Jr., Secretary MEMORANDUM: TO: DOUG HUGGETT 'fl Thru: TERE BARRET M FROM: HEATHER STYRON SUBJECT: RENEWAL REQUEST - CAMA MAJOR PERMIT — 51-05- CHRIS PINER, CARTERET COUNTY DATE: November 12, 2008 Please find enclosed a request to renew State Permit #51-05 from Mr. Chris Piner. This permit was issued on May 16, 2005 for the construction of a bulkhead, excavation of a basin and existing canal not to exceed —5' NLW, boat ramp, and a docking facility with boatlifts and two boathouses at South Harbor Road, Davis. The permit is set to expire on December 31 , 2008. The applicant has excavated the basin, installed the bulkhead, partially completed the excavation within the canal and partially completed the boat ramp with the exception of the placement of the concrete slab. The remaining work consists of the installation of the finger piers, installation of the three boatlifts, installation of the boathouses over two of the lifts, finishing the canal excavation and placing the concrete slab for the boat ramp. There has been no change in the proposal or in property ownership. The applicant would like to renew the permit for a period of two years as allowed in T15A .07J .0404. A check in the amount of $100.00 accompanies this request. I recommend the renewal be granted as requested. Cc: Ted Tyndall, Assistant Director, DCM Tere Barret, District Manager Dave Timpy, COE 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808\ FAX: 252-247-3330\ Internet: www.nccoastalmanagement.net An Equal opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper October 28, 2008 0 C T 3 0 2008 Major Permit Extension Morehead City DCM Heather Styron 400 Commerce Avenue Morehead City,NC 28557 Dear Heather: As per our phone conversation on September 5, 2008, I am sending this letter to formally request an extension of my major permit#51-05 expiration date December 31,2008. The project site is 130 South Harbor Drive, Davis,NC. As of today,the new basin has been excavated, all bulk heading is complete, most of the dredging of the existing canal has been done. The boat ramp is in but I do not have the concrete slab on it yet. The remaining work consists of finger piers in the new basin, three boat lifts, boat house over the two boat lifts in the new basin, some more rock and concrete slab on the boat ramp and finish the dredging of the existing canal. I may have some of this work done by the expiration date but I don't know how much. Please let me know if you need any further information or if you want to meet me at the worksite. Th you ,�" /,U�, Chris Piner P.O. Box 725 Williston,NC 28589 Home: 252-729-0171 Cell: 252-241-2477