Loading...
HomeMy WebLinkAbout23-05 Renewal 01/2009 }F}>n.}:y4C49KA0{-0�.4Cai-9.}4�.M:K+OC44YY.J.C✓e4-0740�}4+:K4h64.:+.*:Y.4.YJ4M.pp.7-0�.n04CP0904444CQMY:/r;4b9C34}044c4rW?4C40b6ti^?:-04K}0.4�YX'KiC9PXP0900'�tF}04+eM046-hbK'*M-09+0�.!�ww:wi4C�A*�34.Y`aq.vf Permit Class Permit Number RENEWAL 23-05 # STATE OF NORTH CAROLINA Department of Environment and Natural Resources } and x Coastal Resources Commission P for APR 13 Z009 X Major Development in an Area of EnvironmentaMorAead onc pursuant to NCGS 113A-118 City DGIO X Excavation and/or filling pursuant to NCGS 113-229 Issued to River Bend Marina, c/o Berit Peck, 226 Shoreside Drive, Cape Carteret, NC 28584 ,i .t Authorizing development in Craven County at adj. to Plantation Canal, off of the Trent River,Town of River Bend , as requested in the permittee's letter dated 12/8/08 This permit, issued on January 2. 2009 , is subject to compliance with the application(where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal shall be attached to the original of Permit No. 23-05, which was issued on 2/14/05, as well as all subsequent modifications, and copies of all documents shall be readily available on site when Division personnel inspect the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit shall be accessible on-site to Department personnel when the project is inspected for compliance. Jam . Gregson, Director Any maintenance work or project modification not covered Division of Coastal Management hereunder requires further Division approval. All work shall cease when the permit expires on This permit and its conditions are hereby accepted. December 31, 2010 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee 40 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley,Governor James H. Gregson, Director William G. Ross Jr., Secretary January 6, 2009 River Bend Marina c/o Berit Peck 226 Shoreside Drive Cape Carteret NC 28584 Dear Ms. Peck: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. Please sign both the original (buff-colored form) and the Xerox stamped "Copy". Return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. Please retain the original (buff-colored form), as it must be available on site when the project is inspected for compliance. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A- 121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty(20)days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it is to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Sincerely, r• Douglas V. Huggett Major Permits and Consistency Manager Enclosure 400 Commerce Avenue, Morehead City, NC 28557 Phone: 252-808-2808\FAX: 252-247-3330\ Internet: www.nccoastalmanagement.net An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper DCM Coordinator: Permit#: J oS MAILING DISTRIBtiTION SHEET Permitee: .,u-e4— denim way"" C' Agents: DCM Field Offices Elizabeth (with revised work plan drawings) orehead Cit Washington Wilmington US ACOE Offices: Washington: Raleigh Bland Tr eeler Wi estcott(NC DOT) Bill Biddlecome(NC DOT) Wilmington: Dave Timpy Cultural Resources: Renee Gledhill-Early Public Water Supply: Debra Benoy(WIRO) Joey White(WARD) Marine Fisheries: Anne Deaton NC DOT: Ken Pace Shellfish Sanitation: Patti Fowler State Property: June Michaux Water Quality: Cyndi Karoly(Raleigh) John Hennessy(NC DOT) Washington: Vivian Christy AI ;= Wilmington: Joanne Steenhuis—401 Kelly Johnson- Stormwater Wildlife Resources: Maria Dunn(WARD) Molly Ellwood (WIRO) LPO: Fax Distribution: Permitee#: Agent#: A•;A W NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F.Easley,Governor James H. Gregson, Director William G. Ross Jr.,Secretary MEMORANDUM DATE: December 16, 2008 TO: Doug Huggett THRU: Tere Barrett f " FROM: Brad Connell $ SUBJECT: River Bend Marina, State Permit #23-05 Please find enclosed a letter from Mrs. Berit Peck, of the River Bend Marina& Cafe, requesting a permit extension. State Permit#23-05 was issued on February 14, 2005 for marina construction with 102 boat slips,boat ramp, shoreline stabilization, and upland development on Plantation Canal, off of the Trent River, in Craven County. The permit is set to expire on December 31, 2008. The applicant is requesting to extend the permit expiration date. The applicant is unable to complete the construction of the proposed development by the end of this year and is requesting a renewal in order to finish the substantial development that has already begun. This request is in accordance with 15A NCAC 07J .0404(b). I would recommend issuing a two-year extension to State Permit#23-05. A check in the amount of$100 has been received to process the request. Cc: Ted Tyndall, DCM Tracey Wheeler, USACE Maria Dunn, WRC Kyle Barnes, DWQ Enclosure 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808\FAX: 252-247-3330\Internet: www.nccoastalmanagement.net An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper A� NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley,Governor James H. Gregson, Director William G. Ross Jr.,Secretary MEMORANDUM DATE: December 12, 2008 TO: Doug Huggett THRU: Tere Barrett FROM: Brad Connell SUBJECT: River Bend Marina, State Permit #23-05 Please find enclosed a letter fro Mr. B t Peck, of the River Bend Marina& Cafe, requesting a permit extension. State Permit#2 - was issued on February 14, 2005 for marina construction with 102 boat slips, boat ramp, shoreline stabilization, and upland development on Plantation Canal, off of the Trent River, in Craven County. The permit is set to expire on December 31, 2008. The applicant is requesting to extend the permit expiration date. The applicant is unable to complete the construction of the proposed development by the end of this year and is requesting a renewal in order to finish the substantial development that has already begun. This request is in accordance with 15A NCAC 07J .0404(b). I would recommend issuing a two-year extension to State Permit#23-05. A check in the amount of$100 has been received to process the request. Cc: Ted Tyndall, DCM Tracey Wheeler, USACE Maria Dunn, WRC Kyle Barnes, DWQ Enclosure 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-2808\FAX: 252-247-3330\Internet: www.nccoastalmanagement.net An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper River Bend Marina &Cafe 1 Marina Rd. New Bern NC 28562 c � 12 DEC 9 2008 Morehead City DCM Gc� /7'-d m r In P9-Y ge N C.r!5-R/I/ Cx ��/✓'i � � v i' �n y �E/�rr�iT /�.2 /Y