HomeMy WebLinkAbout23-05 Renewal 01/2009 }F}>n.}:y4C49KA0{-0�.4Cai-9.}4�.M:K+OC44YY.J.C✓e4-0740�}4+:K4h64.:+.*:Y.4.YJ4M.pp.7-0�.n04CP0904444CQMY:/r;4b9C34}044c4rW?4C40b6ti^?:-04K}0.4�YX'KiC9PXP0900'�tF}04+eM046-hbK'*M-09+0�.!�ww:wi4C�A*�34.Y`aq.vf
Permit Class Permit Number
RENEWAL 23-05 #
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources }
and
x Coastal Resources Commission
P
for APR 13 Z009
X Major Development in an Area of EnvironmentaMorAead
onc
pursuant to NCGS 113A-118 City DGIO
X Excavation and/or filling pursuant to NCGS 113-229
Issued to River Bend Marina, c/o Berit Peck, 226 Shoreside Drive, Cape Carteret, NC 28584
,i
.t
Authorizing development in Craven County at adj. to Plantation Canal, off of the Trent
River,Town of River Bend , as requested in the permittee's letter dated 12/8/08
This permit, issued on January 2. 2009 , is subject to compliance with the application(where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to the original of Permit No. 23-05, which was issued on 2/14/05, as well
as all subsequent modifications, and copies of all documents shall be readily available on site when
Division personnel inspect the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit shall be accessible on-site to Department
personnel when the project is inspected for compliance.
Jam . Gregson, Director
Any maintenance work or project modification not covered Division of Coastal Management
hereunder requires further Division approval.
All work shall cease when the permit expires on This permit and its conditions are hereby accepted.
December 31, 2010
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program. Signature of Permittee
40
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley,Governor James H. Gregson, Director William G. Ross Jr., Secretary
January 6, 2009
River Bend Marina
c/o Berit Peck
226 Shoreside Drive
Cape Carteret NC 28584
Dear Ms. Peck:
The enclosed permit constitutes authorization under the Coastal Area Management Act, and where
applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. Please sign both the
original (buff-colored form) and the Xerox stamped "Copy". Return the copy to this office in the enclosed
envelope. Signing the permit and proceeding means you have waived your right of appeal described below. Please
retain the original (buff-colored form), as it must be available on site when the project is inspected for
compliance.
If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A-
121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office
of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty
(20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid
objection to the issuance of this permit within twenty(20)days, the matter must be resolved prior to work initiation.
The Coastal Resources Commission makes the final decision on any appeal.
The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be
carried out in accordance with your application. Modifications, time extensions, and future maintenance require
additional approval. Please read your permit carefully prior to starting work and review all project plans, as
approved. If you are having the work done by a contractor, it is to your benefit to be sure that he fully understands
all permit requirements.
From time to time, Department personnel will visit the project site. However, if questions arise concerning
permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time
for assistance. By working in accordance with the permit, you will be helping to protect our vitally important
coastal resources.
Sincerely,
r•
Douglas V. Huggett
Major Permits and Consistency Manager
Enclosure
400 Commerce Avenue, Morehead City, NC 28557
Phone: 252-808-2808\FAX: 252-247-3330\ Internet: www.nccoastalmanagement.net
An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper
DCM Coordinator: Permit#: J oS
MAILING DISTRIBtiTION SHEET
Permitee: .,u-e4— denim way"" C'
Agents:
DCM Field Offices
Elizabeth (with revised work plan drawings)
orehead Cit
Washington
Wilmington
US ACOE Offices:
Washington: Raleigh Bland
Tr eeler
Wi estcott(NC DOT)
Bill Biddlecome(NC DOT)
Wilmington: Dave Timpy
Cultural Resources: Renee Gledhill-Early
Public Water Supply: Debra Benoy(WIRO)
Joey White(WARD)
Marine Fisheries: Anne Deaton
NC DOT: Ken Pace
Shellfish Sanitation: Patti Fowler
State Property: June Michaux
Water Quality: Cyndi Karoly(Raleigh)
John Hennessy(NC DOT)
Washington: Vivian Christy
AI
;=
Wilmington: Joanne Steenhuis—401
Kelly Johnson- Stormwater
Wildlife Resources: Maria Dunn(WARD)
Molly Ellwood (WIRO)
LPO:
Fax Distribution: Permitee#:
Agent#:
A•;A W
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F.Easley,Governor James H. Gregson, Director William G. Ross Jr.,Secretary
MEMORANDUM
DATE: December 16, 2008
TO: Doug Huggett
THRU: Tere Barrett f "
FROM: Brad Connell $
SUBJECT: River Bend Marina, State Permit #23-05
Please find enclosed a letter from Mrs. Berit Peck, of the River Bend Marina& Cafe, requesting
a permit extension. State Permit#23-05 was issued on February 14, 2005 for marina construction
with 102 boat slips,boat ramp, shoreline stabilization, and upland development on Plantation
Canal, off of the Trent River, in Craven County. The permit is set to expire on December 31,
2008.
The applicant is requesting to extend the permit expiration date. The applicant is unable to
complete the construction of the proposed development by the end of this year and is requesting
a renewal in order to finish the substantial development that has already begun. This request is
in accordance with 15A NCAC 07J .0404(b).
I would recommend issuing a two-year extension to State Permit#23-05. A check in the amount
of$100 has been received to process the request.
Cc: Ted Tyndall, DCM
Tracey Wheeler, USACE
Maria Dunn, WRC
Kyle Barnes, DWQ
Enclosure
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-2808\FAX: 252-247-3330\Internet: www.nccoastalmanagement.net
An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper
A�
NCDENR
North Carolina Department of Environment and Natural Resources
Division of Coastal Management
Michael F. Easley,Governor James H. Gregson, Director William G. Ross Jr.,Secretary
MEMORANDUM
DATE: December 12, 2008
TO: Doug Huggett
THRU: Tere Barrett
FROM: Brad Connell
SUBJECT: River Bend Marina, State Permit #23-05
Please find enclosed a letter fro Mr. B t Peck, of the River Bend Marina& Cafe, requesting a
permit extension. State Permit#2 - was issued on February 14, 2005 for marina construction
with 102 boat slips, boat ramp, shoreline stabilization, and upland development on Plantation
Canal, off of the Trent River, in Craven County. The permit is set to expire on December 31,
2008.
The applicant is requesting to extend the permit expiration date. The applicant is unable to
complete the construction of the proposed development by the end of this year and is requesting
a renewal in order to finish the substantial development that has already begun. This request is
in accordance with 15A NCAC 07J .0404(b).
I would recommend issuing a two-year extension to State Permit#23-05. A check in the amount
of$100 has been received to process the request.
Cc: Ted Tyndall, DCM
Tracey Wheeler, USACE
Maria Dunn, WRC
Kyle Barnes, DWQ
Enclosure
400 Commerce Avenue, Morehead City, North Carolina 28557
Phone: 252-808-2808\FAX: 252-247-3330\Internet: www.nccoastalmanagement.net
An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper
River Bend Marina
&Cafe
1 Marina Rd.
New Bern NC 28562
c � 12 DEC 9 2008
Morehead City DCM
Gc� /7'-d m r In P9-Y ge N C.r!5-R/I/
Cx ��/✓'i � � v i' �n y �E/�rr�iT /�.2
/Y