Loading...
HomeMy WebLinkAbout08-05 Renewal/Maintenance 03/2016 Permit Class Permit Number RENEWAL/ 8-05 MAINTENANCE-5 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ikrmit COPY for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Pine Island Property Owners Association, Inc., PO Box 2285, Kitty Hawk,NC 27949 Authorizing development in Currituck County at Atlantic Ocean and ocean beach, within limits of Pine Island S/D , as requested in the permittee's application dated letter dated 2/29/16. This permit, issued on March 10,2016 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal shall be attached to the original of Permit No. 8-05, which was issued to the permittee on 1/20/05, as well as all subsequent modifications and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal. NOTE: A permit renewal application processing fee of$100 was received by DCM for this project. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 05-0004. RE G�E I V E D APR 082016 This permit action may be appealed by the permittee or Signed by the aut of the SeCAQV6EQ and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. This permit must be accessible on-site to Department / personnel when the project is inspected for compliance. Any maintenance work or project modification not covered y Brd7�t n C. Davis, Director hereunder requires further Division approval. Aivision of Coastal Management All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31,2021 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary Coastal Management ENVIRONMENTAL QUALITY BRAXTON DAVIS Director March 14, 2016 Pine Island POA, Inc. P.O.Box 2285 Kitty Hawk,N.C. 27949 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable,the State Dredge and Fill Law, for you to proceed with your project proposal.The original(buff-colored form)is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or 113-229.Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center,Raleigh,NC 27611-6714, (919)733-2698 within twenty(20)days of this decision on your permit.You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty(20)days. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications,time extensions,and future maintenance requires additional approval.Please read your permit carefully prior to starting work and review all project plans,as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time,Department personnel will visit the project site.To facilitate this review,we request that you complete and mail the enclosed Notice Card just prior to work initiation.However, if questions arise concerning permit conditions,environmental safeguards,or problem areas,you may contact Department personnel at any time for assistance.By working in accordance with the permit,you will be helping to protect our vitally important coastal resources. Sincerely, � A uglas V. Hugge Major Permits Manager N.C. Division of Coastal Management Enclosure Nothing Compares!�- � State of North Carolina I Environmental Quality I Coastal Management 400 Commerce Avenue I Morehead City,NC 28557 252-808-2808 T DCM Coordinator: 5ff—", Permit#: MAILING DISTRIBUTION SHEET �iwPermitee• p Agents: DCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City Washington Wilmington US ACOE Offices: Washington: Raleigh Bland William Westcott(NC DOT) Bill Biddlecome (NC DOT) Wilmington: Tyler Crumbley Liz Hare Cultural Resources: Renee Gledhill-Early Public Water Supply: Heide Cox (WIRO) Joey White(WARD) DCM/ Shane Staples Fisheries Specialist Gregg Bodnar NC DOT: Ben Hughes DMF/ Shellfish Sanitation: Shannon Jenkins State Property: Tim Walton Water Resources: Karen Higgins (Raleigh) John Hennessy (NC DOT) Washington: Anthony Scarbraugh-401 Wilmington: Joanne Steenhuis —401 Chad Coburn- 401 DEMLR Washington: Scott Vinson-Stormwater Wilmington: Georgette Scott- Stormwater Wildlife Resources: Maria Dunn LPO: Fax Distribution: Permitee#: Agent#: , PAT MCCRORY DONALD R. VAN DER V AART BRAXTON DAVIS Coastal Management Dovrwr ENYIRONMCNTA1,OVAL.ITY MEMORANDUM TO: Courtney Spears, Major Permits Coordinator Division of Coastal Management, Morehead City Office FROM: Ron Renaldi, Coastal Management Representative, NE District, DCM 1�•R•�, THROUGH: Frank Jennings, District Manager, NE District,DCM DATE: March 7, 2016 SUBJECT: Major Permit#8-05 issued to Pine Island POA, Inc. for Primary Dune Maintenance in the Pine Island Subdivision,Corolla,Currituck County; request for Extension REFERENCE: (a) Letter from Jeff Shields to Ron Renaldi, dated February 29, 2016, rec'd. March 3, 2016 (b) 15A NCAC 07J .0404(b)Development Period Extension 1. The request for extension of this major permit has been reviewed pursuant to the provisions of reference(b). Reference(a)provided the required signed and dated attestations. 2. This office has determined that the original development authorized by MP#8-05 has been completed and Pine Island POA, Inc. now wishes to renew the permit in order to have a permitting vehicle available to repair dunes in response to a storm event. 3. Changes in Coastal Resources Commission's rules and development standards since the date of issuance of this permit are not considered relevant to the permitted development, and do not raise concern for denial or modification of this permit. 4. It is recommended that a five-year extension of this permit be granted. 5. The required fee of$100, paid by check#1395, was received on March 3, 2016. 6. Also attached is a copy of the subject permit, and the Extension request letter. FJ/rar RECEIVFD Attachment MAR 0 9 2016 -!' "Nothing Compares,_,_,,, DCM- M H U CITY State of North Carolina I Environmental Quality I Coastal Management 1367 US Hwy 17 South I Elizabeth City,NC 27909 252-264-39011252-264-3723[fax] ceea Tine Isfand POA Inc. PO Bo.�1465 OCIWI C Kitty Hawk, NC 27949 Memorandum: To: Ron Renaldi From: Jeff Shields, Agent for P/POA Date: February, 29t", 2016 Ref 5 year renewal request for permit #8-05 Ron, Good speaking with you... Please see $100 check enclosed as well as a copy of our CAMA Major Permit. We are requesting a 5 year renewal to the existing permit as it expires on December 31, 2016.. Thanks for your cooperation in this matter. RECEIVED MAR 0 9 2016 DCM- MHD CITY NC Division of Coastal Management 13 3 , —N B C D Cashier's Official Receipt Date: 3/320 Received From: f S Is, Ps,A , -L�/a C $ Permit No.: M-�• � Check No.: 13 9 S Applicant's Name: �� e� �s/���► ��o �L` ��tl County: r 3 _ Project Address: �i A Q— S A Z ace /� 7 c`n 4 Please retain receipt for your records as proof of payment for permit issued. Signature of Agent or Applicant: 'c-c-4 Date: J 3A' Signature of Field Representative- C// � / Date: 31,3 Permit Class Permit Number MODIFICATION/MINOR 8-05 STATE OF NORTH CAROLINA Received Department of Environment and Natural Resources and Coastal Resources Commission Vermft DMEC for X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Pine Island Property Owners Association, Inc., PO Box 2285, Kitty Hawk,NC 27949 Authorizing development in Currituck County at Atlantic Ocean and ocean beach,within limits of Pine Island S/D , as requested in the permittee's application email dated 11/21/13 including attached workplan drawing(1) dated received in the Morehead City office on 12/16/13 This permit, issued on January 14,2014 , is subject to compliance with the application(where consistent with the permit),all applicable regulations, special conditions and notes set forth below.Any violation of these terms may be subject to fines,imprisonment or civil action;or may cause the permit to be null and void. 1) Unless specifically altered herein,this minor modification authorizes the rehabilitation of the dune at Lot 23, Lots 86-133 and lots 210, 212, 256,257,259 and 260, all as expressly and specifically set forth in the attached work plan drawing. 2) All work on the authorized project shall be conducted entirely landward of the normal high water line. 3) This minor modification shall be attached to the original of Permit No. 8-05, which was issued on 1/20/05, the modification issued on 2/22/05, the modification/renewal issued on 7/7/08 and copies of all documents shall be readily available on site when a Division representative insBe s IPj� or compliance. tt �� (See attached sheet for Additional Conditions) MAR 0 9 2016 This permit action may be appealed by the permittee or Signed by the authority of thU 64by WORGiThY other qualified persons within twenty(20) days of the issuing Chairman of the Coas`taesources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. t� This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Braxton C. Davis,Director CDecember ' n�e work or project modi t tion not covered Division of Coastal Management utres further ision approval. This permit and its conditions are hereby accepted. ust cease when the permit expires on r 31,2016his permit, the State of North Carolina agrees ect is consistent with the rth Carolina Coastal tgnature of Permittee Program. r ;qpaoa Pine Island Property Owners Association, Inc. Permit#8-05 Page 2 of 2 ADDITIONAL CONDITIONS 4) All conditions and stipulations of the active permit remain in for under this minor modification unless specifically altered herein. NOTE: The expiration date of this permit has been extended in accordance with Session Law 2009-406, and amended by Session Law 2010-177. t s I .f �O Q`� Pao OG OG p�c••>..aaoou•v,,waco-uaw,a«.�ca�ac+.e.•oo.,.>.war�a-;�t cwe�arec-«.aa,,.aow o,�:.c�eao.o-o.:.,..>,:.. �•o,• ,<.W.,++.:n�c..wouro-uc�.�we.+.:,.ao.;aoo.,ao.xv.�>.cro..„aa.wa0000e.:s..:.,;,o-+.��.>...a.:.,.; Perri,it Class Permit Number MODIFICATION/MINOR 8-05 STATE OF NORTH CAROLINA �RENEWAL/MAINTENANCE 5Clyi3�g � _ _,)artment of Environment and Natural Resources _. and Coastal Resources Commission ft ermt for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Pine Island Property Owners Association,Inc.,PO Box 2285,Kitty Hawk,NC 27949 Authorizing development in Currituck County at Atlantic Ocean and ocean beach, within limits of Pine Island S/D , as requested in the permittee's application letter dated 6/17/08 including :. attached workglan drawings (5) all dated received 6/18/08 f This permit,issued on July 7,2008 , is subject to compliance with the application(where consistent with the permit), all applicable regulations,special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) Unless specifically altered herein, this minor modification/renewal authorizes an extension of the previously authorized project limits, as depicted on the attached workplan drawings, 2) Each request to carry out additional dune rehabilitation activities shall require a modification of this permit. 3) This renewal/minor modification shall be attached to the original of Permit No. 8-05, which was issued on 1/20/05,as well as the modification of 1/22/07, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 1 t � 4) All conditions and stipulations of the active permit remain in for under this re96 dification 6VE unless specifically altered herein. D This permit action may be appealed by the permittee or Signed by the authority of the Secretary oeBNR and the other qualified persons within twenty(20) days of the issuing Chairman of the Coastal ReWulces Commission. date. An appeal requires resolution prior to work initiation or DC M- M H D CITY a continuance as the case may be. (t ` This permit must be accessible on-site to Department personnel when the project is inspected for compliance. 2- James H. Gregs irector Division of Coastal Management Any maintenance work or project modification not covered hereunder requires further Division approval. This permit and its conditions are hereby accepted. All work must cease when the permit expires on December 31, 2013 62 ;L 5 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Signature of Permittee Management Program. Pc in't Class Permit Number MOD IFICATION/NflNOR 8-05 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and JAPE 2 4 2007 Coastal Resources Commission rmtt com � EIlzp6et EU&J for X Major Development in an Area of Environmental Concern. pursuant to NCGS 113A-118 X Excavation and/.or filling pursuant to NCGS 113-229 Issued to Pine Island Property Owners Association,Inc:,PO Box 2285,Kitty Hawk,NC 27949 Authorizing development in Currituck County at Atlantic Ocean and ocean beach, within limits of Pine Island SID , as requested in the permittee's application letter dated 10/31/06 including attached workvlan drawings(2) 1 dated"received Elizabeth City 11/3/06" and 1 dated 10/31/06. This permit, issued on January 22,2007 , is subject to compliance with the application(where consistent with the permit), all applicable regulations, special conditions and notes set forth below.Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permittto be null and void. 1) As depicted on the attached workplan drawings, this minor modification authorizes an extension in the restoration area to include lots 241 through 250. 2) All work on the authorized project shall be conducted entirely landward of the normal high water line. Y P J Y g 3) This minor modification shall be attached to. the original of Permit No. 8-05, which was issued on 1/20/05, and modified on 2/22/05, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 4) All conditions and stipulations of the active permit remain in for under this minor modification unless specifically altered herein. This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department (/-/ personnel when the project is inspected for compliance. C arllep�TtCiJ�es S. Jones ii Director Any maintenance work or project modification not covered Division of G� VWt hereunder requires further Division approval. This permit and its conditions are herebyMARPO 2016 All work must cease when the permit expires on December 31, 2008 DC M-- M H D CITY ti In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Signature of Permittee LManagement Program. V�tiviL.i2-Yn4^:�1'A`xi.•h 1-0�4`titit�\-?•.\ti�WKti-}ph\`•l.ki•Wtti�hv`CKCO# h`•7+`\\\�:41.h�:-h.V�V\\\�h\-.�\�4 titii1V�4:w�TM`h'�'v.\ti.i�\`ti\tiv{.}.\'�'ti1`M\\i1�4ti�.rhti ti`..�N. JOb MON 02:43 PM NO DIV OF COASTAL MGMNT FAX NO. 4 Pi 02 • ♦,+�•:.:i)@'.•�•LC 90[•:1�'1'111'Ii.04i7•.I.A•{.11d.1)LOC-:.442'J•E./i'TCC�1�diY:GG09�570Vi+JaV•:�ZT:•w5• r:•r:m-•.�-........................ Permit Number • . �.,Irlss ,.,�rrl�rc'���rinw/1II�lc>l� 8-05 �. STATE OF)'FORTH CAROLINA Depwi,nient of Environment anti Natural Resources and C,oistal Rcsourmei Coininission Perm ft fur REC. iiv- . x X.- Major Develol unit in an Area of Environmental Concern MAR 0 9 2016 pursuant to NCC}S .l 13A-118 Exemition and/or filling pursuant to NCGS 113-229 ACM- MHD C lsstu--d to_Pirw Island I�i,-�prl•ty,n�vnery Associaligi- ric.tPO Box 2285.Kitt Hawk,awk,NC 27949 Authorizing tlavc'lopriicut in„_C.tirriltick -,,,Cotanty at Atlantic nccan acid accan hcaell,�,witl i 1 J�I>tU L'.Piil�._C4i x�s�. lX•L ....._ , as rquested in the peat-tittec's application Ietter datoU1 4LEialvdiill,_ 61t�:tot►etcl„� rk,plmslrar_viln it"teel 90/05. _ .. �•. - --... 1'hifi perntii, i+suetl on__i bwary 2?,DUS is sultject to compliance with the application(where consistent with litc permit),all nplilicahle regulations,special conditions and notes set forth below, Any violation of these teens may be t,ijbject it)tines, inqu isonmcnt or civil action;or in1ycause Lite per rlit to be null and void. M I,) As ticpicted oil the attached wvckplan drawing, this minor modification authorizes the repair of 0scarprnonts on tho occ,tnward most vertical dune face. 2) All work on the authorized project shall be conducted entirely landward of the normal high water line. t 3) 1Ilis ininor modification shall be nttachcd to the original of Permit No. 8-05, which was issued on 1/20/05, and eopias of both docturlents sbail bo readily available on site when a Division representative hvt lwcis the prcijcet for compliance. 4) All conditions and stipulations of the active perInil remain Ili for- tinder this minor modification unless spo.cifically allured heroin. •I111K penult 1101ion may he appealed by the: permittve or Signed by the authority of the Secretary of DFNR and the diliet riurll:rWd hcr4oni within twenty (20) days of the issuing Chairtraw of the Coastal Resources Commission. chtic. An appeil rk;quires 11ZO atoll prior to wort:initiation or Cotitinttspec m,the case may hc. f il1S ltUIRil t iml, be accessible o11-sfte to Depirtnteat p:'isur)n:l wlivn tfic project iS iltxllected for coinpliancc• Marics S. Jones,Director Any waintruancea work or laroik:0 1110dificuU011 not covered Division of Coastal Management Lott under il'l'llllres ftn thor oivitiiou approval. This Pcnrut sad it.5 conditions are hereby act:eptcd. All vivik mu%t coast;when the permit expires on 1Derember 31,200$ lti i;:atulg this portrait, ilia Stale of North Carolina agreag that ye,tlt•projovt is coitSiUnit wish the North Caroltim Coaslnl Signature of Ilentlittee 4 I4tap (;1'11tt 111 Program. �,i i•:i:C N:0 r;M 5 i 1 A"I.YTHAC•.K.[;0 iW:•r 4:v SP.)6bo•C441 @?G:ACY.%WC4i9M1 S90 J6tfPFYlcL:e,J00:rovA'.i1'•7rro4;i-M::N:iP:C�rP:`i8k�!•h04'fd9909G+%•??INbLW4'•4^0`-4H4s•FFFOIC.[4t9d•MG{�'1Ji 09 Y i'e• it Class Permit Number V2VE W 8-05 STATE OF NORTH CAROLINA Department of Environment and Natural Resources 3 `�� and a> Coastal Resources Commission JAB 2 03 20 for _2L Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Pine Island Property Owners Association, Inc., PO Box 2285, Kitty Hawk, NC 27949 Authorizing development in Currituck . County at Atlantic Ocean and ocean beach within limits of Pine Island /D , as requested in the permittee's application dated /7/o4.incl. attached drawin 1-9 of 9 dtd.rcd. in Elizabeth City 11-2-04, 1-4 of 4,dtd. 10/8/04,photos 1-5 of 5 dtd. 9/2/04,&AEC Hazard Notice dtd. 12/12/04. This permit, issued on January 20, 2005 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Dune Rehabilitation Activities 1) Prior to the initiation of any dune rehabilitation activities on any individual lot, easements or similar legal instruments shall be obtained from all affected property owners. 2) All dune rehabilitation activities shall be carried out on the west side of the existing dune crest. 3) Only beach quality sand shall be used for dune rehabilitation purposes. Prior approval from the Division of Coastal Management shall be required for any material that is to be brought in from off site borrow areas. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. l This permit must be accessible on-site to Department personnel when the project is inspected for compliance. arees S. Jones, Director Any maintenance work or project modification not covered Division of Coastal Management hereunder requires further Division approval. This permit and its conditions are hereby accepted. All work must cease when the permit expires on ., RECEIVED December 31, 2008 _ - MAR 0 9 2016 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal F a , ,ITY Signature of Permittee LM anagement Program. ,q r) �` 000-»oaa Pine Island P.O.A. Permit 48-05 Page 2 of 3 ADDITIONAL CONDITIONS s a 4) This permit authorizes dune rehabilitation activities to be carried out one (1) time along the entire reach of the requested project area. Any request to carry out additional activities within an area where dune rehabilitation activities have been completed will require a modification of this permit. 5) All material must have a minimum sand content of 90%. 6) All dune rehabilitation material shall be clean*and free of pollutants and highly erodible finer material, except in trace quantities. 7) All dunes created by the authorized project shall be stabilized with appropriate vegetation as soon as possible after project completion. 8) Should the work result in any damage to existing beach access areas, the accesses must be restored to pre-project conditions immediately upon project completion in that specific area. 9) All disturbed dune areas must be restored and revegetated immediately following project completion in that specific area. 10) All work shall be accomplished.in such a manner that damage to existing vegetation is minimized. 11.) Should the permittee wish to carry out work waterward of the crest of dune, a modification to this permit shall be required prior to undertaking any such activity. Sand Fence Installation p 12) Sand fencing shall not impede existing public access to the beach, recreational use of the beach, or emergency access. Sand fencing shall not be installed in a manner that impedes or restricts established common law and statutory public access and use of public trust lands and waters. 13) Sand fencing shall not be installed in a manner that impedes, traps or otherwise endangers sea turtles, or sea turtle hatchlings. 14) Non-functioning, damaged, or unsecured sand fencing shall be immediately removed by permittee. 15) Sand fencing shall not be placed on the wet sand beach area. R1�CG1v�� a A{� � MAR �g 2016 General Cl 16) No vegetated wetlands may be excavated or filled. DCM• M H� 17) This permit does not authorize any permanent or long-term interference with the public's right of access and/or usage of all State lands and waters. Pine Island P.O.A. Permit#8-05 A 4'64a0.Od0.4iJp one Island P.O.A. Permit #8-05 Page 2 of 3 ADDITIONAL CONDITIONS f a 4) This permit authorizes dune rehabilitation activities to be carried out one (1) time along the entire reach of the requested project area. Any request to carry out additional activities within an area where dune rehabilitation activities have been completed will require a modification of this permit. 5) All material must have a minimum sand content of 90%. 61) All dune rehabilitation material shall be clean and free of pollutants and highly erodible finer material, except in trace quantities. 7) All dunes created by the authorized project shall be stabilized with appropriate vegetation as soon as possible after project completion. 8) Should the work result in any damage to existing beach access areas, the accesses must be restored to pre-project conditions immediately upon project completion in that specific area. 9) All disturbed dune areas must be restored and revegetated immediately following project completion in that specific area. 10) All work shall be accomplished in such a manner that damage to existing vegetation is minimized. 11) Should the permittee wish to carry out work waterward of the crest of dune, a modification to this permit shill be required prior to undertaking any such activity. Sand Fence Installation p 12) Sand fencing shall not impede existing public access to the beach, recreational use of the beach, or emergency access. Sand fencing shall not be installed in a manner that impedes or restricts established common law and statutory public access and use of public trust lands and waters. 13) Sand fencing shall not be installed in a manner that impedes, traps or otherwise endangers sea turtles, or sea turtle hatchlings. 14) Non-functioning, damaged, or unsecured sand fencing shall be immediately removed by permittee. 15) Sand fencing shall not be placed on the wet sand beach area. RECEIVED MAR 0 9 2016 General DCM- MHD CITY 16) No vegetated wetlands may be excavated or filled. 17) This permit does not authorize any permanent or long-term interference with the public's right of access and/or usage of all State lands and waters. Pine Island P.O.A. Permit #8-05 ADDITIONAL CONDITIONS 18) This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required, including any required for the borrow proposed .areas. NOTE: The permittee should make every effort possible to minimize any negative impacts of trucks and construction equipment on roadway and pedestrian traffic. The permittee should also ensure that the ability of individuals to access and enjoy the beach is not impeded outside of the construction limits. f NOTE: The Division of Land Resources Approved an Erosion and Sedimentation Control Plan (Permit No. Curri-2004-035) for this project on 5/26/04. s RECEIVED MAR 0 9 2016 DCM- MILD CITY