Loading...
HomeMy WebLinkAbout116-05 Paul, Victoria E. A s Permit Class Permit Number NEW 116-OS STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission IVA "t for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 ` r Issued to Victoria E.Paul,590 Candy Field Road,Pantego,NC 27860 Authorizing development in Beaufort County at adj. Pungo River, SR 1722 Belhaven , as requested in the permittee's application dated 3/10/05, including the attached workplan drawing (1) dated 1/26/05 This permit, issued on Jnl� 15. 2005 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below.Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Docking Facility 1) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 2) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this .} permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. ff Any maintenance work or project modification not covered Charles S. 7os, Director hereunder requires further Division approval. Division of Coastal Management v All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31,2008 In issuing this permit, the State of North Carolina agrees ' that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee �J Victoria E.Paul Permit#116-05 Page 2 of 3 ADDITIONAL CONllITIONS 3) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 4) The authorized structure and associated activity shall not cause an unacceptable interference with navigation. 5) The permittee shall maintain the authorized work in good condition and in conformance with the terms And conditions of this permit. The permittee is not.relieved of this requirement if he/she abandons the permitted activity without having it transferred to a third party. 6) This permit shall not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 7) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. Shoreline Stabilization 8) The bulkhead alignment shall be constructed along a straight line form the existing corners on the east and west side of the project property. 9) The bulkhead shall be constructed prior to any backfilling activities. 10) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 11) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation or other land disturbing activities is permitted except for that which may be required for the construction of the bulkhead wall, riprap, headmen cables, etc. This pe,:rit does not authorize any excavation %vater yard of the approved alignment. 12) The backfill material shall be clean and free of any pollutants except in trace quantities. 13) The riprap shall not extend waterward more than 10 feet from the authorized bulkhead alignment at any point along its alignment at the time of construction. 14) The riprap material shall be free from loose dirt or any pollutant. It shall be of a size sufficient to prevent its movement from the site by wave or current action. 15) The riprap material shall consist of clean rock or masonry materials such as but not limited to granite, marl, or broken concrete. x�oaa�.a.o-o•o-ac•o-o-raao-o-oao-x x .:.�cao-to-o-a�ac.„o-�.<�r -0.�o-a.o-oro-• N` t. rVictoriaE. Paul Permit#116-05 Page 3 of 3 Sedimentation and Erosion Control ppropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.) 17) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion within thirty days of project completion. General 18) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 19) All highground grading and construction shall be done in accordance with the attached workplan drawings. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that the rules of the Environmental Management Commission prohibit many non-water dependent activities within 50 feet of the normal water level. NOTE: The permittee and/or his contractor is urged to meet with a representative of the Division prior to project initiation. NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3490 (DWQ Project No. 050575), which was issued on 515105. NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. h 200510785. AU �' NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G.Ross Jr.,Secretary July 18, 2005 Victoria E. Paul 590 Candy Field Road Pantego,NC 27860 Dear Ms. Paul: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. Please sign both the original (buff- colored form) and the copy. Return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. Please retain the original(buff-colored form),as it must be available on site when the project is inspected for compliance. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A- 121.1 or 113-229.Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty(20)days,the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it is to your benefit to be sure that he fully understands all permit requirements. From time to time,Department personnel will visit the project site.To facilitate this review,we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas,you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Sincerely, RI& V. IiAN Douglas V. Huggett Major Permits and Consistency Manager Enclosure 400 Commerce Avenue, Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NANIE: Victoria E. Paul 2. LOCATION OF PROJECT SITE: Off SR 1722, on the west side of the Pungo River,below Belhaven, at the residential subdivision locally referred to as Ellis Cove, in Beaufort County,North Carolina Photo Index—2000: 108-1266; H-10 1995: 108-1145; G-7; 1989: 2-96-5; Q-12 State Plane Coordinates -X: 2,709,400 Y: 641,000 Pamlico Beach Quad. (upper left corner) 3. INVESTIGATION TYPE: CAMA and D/F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit—3/23/05 Was Applicant Present-No 5. PROCESSING PROCEDURE: Application Received - 3/23/05 Office -Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan-Beaufort County Land Classification From LUP—Limited Transition (uplands) (B) AEC(s) Involved: EW,PTA, ES, PTS (D) Water Dependent: YES (D) Intended Use: Private (E) Wastewater Treatment: Existing-None Planned -None at this time (F) Type of Structures:Existing—Undeveloped lot Planned -Bulkhead, riprap, and pier (G) Estimated Annual Rate of Erosion: Unknown 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands (B)Non-Vegetated Wetlands 3,000 ft2 1,544 ft2 (shaded) Pun go River bottom (C) Other Uplands (D) Total Area Disturbed: 0.1 acre or 4,544 ft2 (E) Primary Nursery Area:No (F) Water Classification: SB NSW Open: Yes 8. PROJECT SUMMARY:The applicant proposes to construct a bulkhead and place riprap on the waterward side of the bulkhead. The bulkhead will be constructed from the corners of existing bulkheads on neighboring properties, in a straight line,with an average alignment±25'waterward of the normal water level(NWL). The proposed riprap will be placed with a 2:1 slope with the waterward toe averaging 10'from the proposed bulkhead. Applicant also proposes to construct a 6'x 200'pier with a 16'x 20'platform and a Tx 36'finger pier around a 16'x 16'boat lift. Victoria E. Paul Pungo River Beaufort County Project Setting The project site is located off SR 1722 on the west side of the Pungo River below Belhaven at the residential subdivision locally referred to as Ellis Cove in Beaufort County,North Carolina. The project site is a wooded undeveloped 0.39 -acre residential lot with±120' of natural shoreline with no man made shoreline stabilization i.e. bulkhead or rip rap. The lot is vegetated primarily with various large oaks,loblolly pines and red maple trees. The under story consist of various vines and shrubs. There is a±5' high erosion escarpment that transitions to a sandy estuarine beach at the normal water level (NWL). Both adjacent waterfront properties are developed with single-family residences. The developed property downstream of the project site has a ±150' long pier. The shorelines on adjacent properties are stabilized with bulkheads. The bulkhead return wall on the downstream side is 30' long while the bulkhead return wall on the upstream side is 20' long. Water depths offshore are shallow with a sandy bottom substrate. Water depths are approximately 2.5' 200' offshore the NWL and 8"to 12"between the bulkheads on adjoining lots. The presence of submerged aquatic vegetation (SAV) was not observed at or near the project area although this observation was made recently during a dormant period for SAVgrowth. The Pungo River at this location is designated as SB NSW by the Environmental Commission, Coastal Waters by the Division of Marine fisheries and is open to shell fishing. Project Description The applicant proposes to construct a bulkhead from the corners of existing bulkheads on neighboring properties,in a straight line,with an average alignment±25'waterward of the NWL. The maximum distance between the proposed bulkhead and the NWL is ±30'. The proposed bulkhead will be backfilled to the±5'high erosion escarpment. The proposed riprap will be placed with a 2:1 slope with the waterward toe averaging 10' from the proposed bulkhead. The applicant also proposes to construct a 6' x 200' pier with a 16' x 20' T-head platform, and a 4' x 36' finger pier around a 16' x 16' boat lift. Project Impacts The project as proposed will result in the filling of±3,000 ft2of shallow water habitat in the Pungo River. The There will be some short-term localized turbidity associated with the construction activities. Steve Trowell - Washington Regional Office - 23 March 2005 Form DCM-MP-1 APPLICATION (To be completed by all applicants) b. City, town, community or landmark hl�.iJ��► 1. APPLICANT C. Street address or secondary road number a. Landowner: �—' — 1-77 Z. Name i+ G.62r Gl. L, Q.(,a d. Is proposed work within city 1' is or planning jurisdiction? Yes No Address 6-qo (,: nciN e. Name of body of water nearest roject (e.g. river, City �" State of C, creek, sound, bay) ?u V 10 O 'fs;Li V ' V' Zip 2 r7W& Q Day Phone �S 5:' Fax 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT b. Authorized Agent: Name aJ-P. Yb a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and 5 r7 2 Q � excavation and/or fill*- activities. Address o� i , +l.u & 'd y � city be I ho.Uan State OV c: rcr�t-o c�i^ ZipDa Phone Z 52 -060 y -y 17 Y b. Is the proposed activity maintenance of an existing project, new work, or both? N P.t_.y WOC k Fax Z S-? — q U LHP (p c. Will the pro' be for public,private or commercial use? _ r�'' U in 4(-2L C. Project name (if any) �/1 n,+0- r CL b 1 Pao d. Give a brief description of purpose,use, methods of construction and daily operations of proposed project. If more space is needed, please attach NOTE: Permit wiU be issued in name of Imidowner(s), and/or additional pages. Yl 4 j'(,C �• �. project name. � Y i 2. LOCATION OF PROPOSED PROJECT a. County Uf-%l�..P.t `�✓� Revised 03/95 Form DCM-MP-1 m. Describe existing wastewater treatment facilities. 4. LAND AND WATER 11r) '?La- CHARACTERISTICS a. Size of entire tract r �� a na n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary b. Size of individual lot(s) �� �.d f wastewater, industrial/commercial effluent, "wash down" and residential discharges.) c. Approximate elevation of tract above MW or '� Y,-C''1, H �- d. Soil type(s) and,texture(s) of tract o. Describe existing drinking water supply source. e. Vegetation on tract ! Y-�et� ►'1e S Qom' s, hr�b5- f. Man-made features now on tract NO A)El 5. ADDITIONAL INFORMATION g. What is the CAMA Land Use Plan land In addition to the completed application form, the classification of the site? (Consult the local land use plan.) following items must be submitted: Conservation Transitional Developed - Community 0 A copy of the deed (with state application only) or Rural ether other instrument under which the applicant claims title to the affected properties. If the applicant is not h. How is the tract zoned by local government? claiming to be the owner of said property, then f -2 C) n e forward a copy of the deed or other instrument under which the owner claims title, plus written permission i. Is the proposed project consistent with the applicable from the owner to carry out the project. zoning? Yes No (Attach zoning compliance certificate, if applicable) An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black j. Has a professional archaeological assessment been ink on an 8 112" by I white paper. (Refer to done for the tract? Yes ✓No Coastal Resources Commission Rule 7J.0203 for a If yes, by whom? detailed description.) k. Is the project located in a National Registered Please note that original drawings are preferred and Historic District or does it involve a National only high quality copies will be accepted. Blue-line Register listed or el! ' le property? prints or other larger plats are acceptable only if an Yes No adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of 1. Are there wetlands on the site? Yes ✓ No Engineers regarding that agency's use of larger Coastal (marsh) Other drawings.) A site or location map is a part of plat If yes, has a delineation been conducted? requirements and it must be sufficiently detailed to (Attach documentation, if available) guide agency personnel unfamiliar with the area to the Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND • A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the I understand that any permit issued in response to this adjacent waterfront (riparian) landowners and application will allow only the development described in signed return receipts as proof that such owners the application. The project will be subject to conditions have received a copy of the application and plats and restrictions contained in the permit. by certified mail. Such landowners must be advised that they have 30 days.in which to submit comments I certify that to the best of my knowledge, the proposed on the proposed project to the Division of Coastal activity complies with the State of North Carolina's Management. Upon signing this form, the applicant approved Coastal Management Program and will be further certifies that such notice has been provided. conducted in a manner consistent with such program. Name �� /� rC� l't v1 EI LL)a Y-d 5 I certify that I am authorized to grant, and do in fact, Address PO c n N .A7yY`i grant permission to representatives of state and federal Phone 25z-- ` 6, 5 4 5 q review agencies to enter on the aforementioned lands in connection with evaluating information related to this Name T h o 2y S C , E2- l( W LC c= permit application and follow-up monitoring of the Address 1 ()(o e n e. 5� Tri r hn rc� /U�� 78 'b project. --T Phone 2 5 — 9-;t 3 ;�J(3 I further certify that the information provided in this Name application is truthful to the best of my knowledge. Address Phone This is the l0 day of AWoj? ,-19"-ems • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, Print Name permittee, and issuing dates. Signature weer or Authorized Agent • A check for$250 made payable to the Department of Please indicate attachments pertaining to your proposed Environment, Health, and Natural Resources project. (DEHNR) to cover the costs of processing the ✓ DCM MP-2 Excavation and Fill Information application. DCM MP-3 Upland Development • A signed AEC hazard notice for projects in DCM MP-4 Structures Information DCM MP-5 Bridges and Culverts oceanfront and inlet areas. DCM MP-6 Marina Development • A statement of compliance with the N.C. NOTE: Please sign and date each attachment in the Environmental Policy Act (N.C.G.S. 113A - 1 to space provided at the bottom of each form. 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. ID—A—i nzioc Form DCM-MP-2 EXCAVATION AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all 1. EXCAVATION N/A- other sections of the Joint Application that relate to this proposed project. a. Amount of material to be excavated from below Describe below the purpose of proposed excavation or MHW or NWL in cubic yards No n e_ fill activities. All values to be given in feet. b. Type of material to be excavated bon eJ Average Final Existing Project c. Does the area to be excavated include coastal Length Width Depth Depth wetlands (marsh), submerged aquatic v% mtion Access (SAVs) or other wetlands? Yes ✓ No channel (MLW) or(NWL) d. Highground excavation in cubic yards I�C�YI Canal 2. DISPOSAL OF EXCAVATED Boat MATERIAL N/ r- basin a. Location of disposal area �Za Boat ramp b. Dimensions of disposal area N/ A Rock <:> z groin : ;. c. Do you claim title to disposal area? ) Yes No If no attach a letter granting Rock «� �y_: ��> ��'�:�;;� gr g Permission from the M, owner. breakwater �`'�'��.�:€:><>� %%�.�>-�F< l,,`'- d. Will a disposal area be available for future Other (Excluding maintenance? Yes No NIA shoreline � If yes, where. stabilization) Revised 03/95 Form DCM-MP-2 e. Does the-disposal area include any coastal wetlands If yes; (marsh), SAVs or other wetlands? (1) Amount of material to be placed in the Yes No water IVIA NIA- (2) Dimensions of filf area f. Does the disposal include any area in the water? (3) Purpose of fill Yes No b. Will fill material be placed in coastal wetlands 3. SHORELINE STABILIZATION (marsh), SAVs or other wetlands? Yes No N`,A If yes, A///* a. Type of shoreline stabiliza)tion (1) Dimensions of fill area Bulkhead ✓ Riprap (2) Purpose of fill b. Length l a c. Average distance waterward of MHW or NWL a5� 5. GENERAL d. Maximum distance waterward of MHW or NWL �r / a. How will excavated or fill material be kept on site e. Shoreline erosion during preceding 12 months and erosion co �trolled? ; d h r, d -!A-n k no 4.,u v, d0 .,rri✓ i 1 I 's -Q1 (7 SIB (Source of information) toinCty a < nj:7e" aru , f. T e of bulkhead or riprap material ldood /-A n.,,f:* r"i b. What type of construction equipment will be used / (for example, dragline, backhoe, or hydraulic g. Amount of fill in cubic yards to be placed below dredge)'7 water level 0 zE ice'. l�i.t m p 1/u (1) Riprap e�81 C1 � 0r' Urt�✓' (2) Bulkhead backfill I I l c.. Will wetlands be crassed in transpgMng equipment h. Type of fill material 30 nit /(J 6?1.4 to project site? Yes ,/ No If yes, explain steps that will be taken to lessen environmental impacts. i. Source pf fill material LQLaL--2hrai4-f,ftJ 4. OTHER FILL ACTIVITIES AppU'Wr6FPra1ed Name (Excluding Shoreline Stabilization) N S' a. Will fill material be brought to site? Yes No Date 400 copies of this public document were printed at a total cost of$11.00 or $ .03 per copy. Revised 03/95 Form DCM-MP4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major e. Mooring buoys /" IA Permit, Form DCM-MP-I. Be sure to complete all (1) _ Commercial _Community_Private other sections of the Joint Application which relate to (2) Number this proposed project. (3) Description of buoy a. Dock(s) and/o<P:ier:( (Color, inscription, size, anchor, etc.) s) (1) _ Commercial _Community _Private (2) Number 1 (3) Length (4) Width of water body (4) Width Co ' (5) Distance buoy(s) to be placed beyond (5) Finger Piers L,� Yes No shoreline (i) Number i (ii) Length :3�' f. Mooring structure oatlift ooring pilings, a .) (iii) Width 4f / (1) _ Commercial _Community= rivate (6) Platform(s) Yes No (2) Number f (i) Number 1 (3) Length 1.3 ' (ii) Length i(a (4) Width 13 (iii) Width o D ' (7) Number of slips proposed g. Other (Give complete description) N lA (8) Proximity of structure to adjacent riparian property lines 3 d (9) Width of water body vZ "hL,l e 5 (10) Water depth at waterward end of pier at MLW or NWL ';? , sS b. Boathouse (including covered lifts) (1) Commercial Private (2) Length (3) Width Appli r Project e c. Groin (e.g. wood, sheetpile, etc.) A r� S• � 1 Number (2) Length(s) Date d. Breakwater (e.g. wood, sheetpile, etc.) IV%14 (1) Length (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands Reviged (11/4; DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD A) APPLICANT: Victoria E. Paul, by Jerol Selby, Agent County: Beaufort LOCATION OF PROJECT: Off SR 1722, on the west side of the Pungo River, below Belhaven, at the residential subdivision locally referred to as Ellis Cove in Beaufort County, North Carolina DATE APPLICATION RECEIVED COMPLETE BY FIELD: 23 M ch 2005 '�nj FIELD RECOMMENDATION: ATTACHED ANF� 6 CONSISTENCY DETERMINATION: U 20�5 FIELD REPRESENTATIVE: Steven J. Trowell DISTRICT 0 Fe*d fy DCM DISTRICT MANAGER REVIEW: , _ `��' ����ll B) DATE APPLICATION RECEIVED IN RALEIGH: D D& p' FEE REC'D: $400 IWI/0 PUBLIC NOTICE REC'D: 5 END OF NOTICE DATE: /0 ADJ. RIP. PROP NOTICES REC'D: DEED REC'D: APPLICATION ASSIGNED TO: I-�b,,,,,� l ON: C) 75 DAY DEADLINE: 150 DAY DEADLINE: Ogkz� MAIL OUT DATE: _ STATE DUE DATE: d` FEDERAL DUE DATE: 6 bs FED COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE OBJECTIONS: NOTES COMMENTS YES NO RETURNED Coastal Management - Regional representative Coastal Management - LUP Consistency Determination Division of Community Assistance Land Quality Section -3-aS Division of Water Quality Storm Water Management (DWQ) State Property Office 11-05 Division of Archives & History y.uj'©5 Division of Environmental Health H-��-0 5 ✓ Division of Highways L1- 13-05 Wildlife Resources Commission Ll ZS_0S Division. of Water Resources Division of Marine Fisheries Submerged Lands (DMF) Permit DCM Coordinator: Row6k MAILING DISTRIBUTION: Permitee: cL Qa s__ Agent: DCM iorehea ld Offices: zabeth City i on Wilmington US Army Corps of Engineers(USACE):. Washington: Mike Bell(NCDOT) Bill e(NCDOT) alei h Blan Wilmington: Dave Timpy(NCDOT) Henry Wicker Others: Cultural Resources: ja Kemessy Environmental Health: Marine Fisheries: NCDOT: Shellfish Sanitation:State Property Office Water Quality: on-DOT . JohnOT) Water Resources: John Sutherland \�( Wildlife Resources: aria Tri ennett Wynne David Cox(NCDOT) Travis Wilson(NCDOT) LPO: FAXING DISTRIBUTION: Permitee at Agent at DCNI Field Offices: Elizabeth City(252/264-3723) Morehead City(252/247-3330) Washington(252/948-0478) Wilmington(910/350-2004) US Army Corps of Engineers(USACE): Washington: Mike Bell(NCDOT) Bill Biddlecome(NCDOT) Raleigh Bland(252/975-1399) - Wilmington: Dave Timpy(NCDOT) Henry Wicker(910/251-4025) CAMA Major Permit Process Manual Page 70 of 70 MEMORANDUM TO: Doug Huggett THROUGH: Terry Moore a FROM: Steve Trowel!57' DATE: 7/25/02 SUBJECT: Victoria E. Paul Major CAMA/Dredge and Fill Permit Application Enclosed is an application received from Jerol Selby,agent for Victoria E.Paul,for bulkhead, riprap and pier construction onsite her property located on the west side of the Pungo River below Belhaven at the residential subdivision locally referred to as Ellis Cove in Beaufort County,North Carolina. The applicant is applying for a bulkhead alignment that averages±25' offshore the NWL. The bulkhead is to be constructed from corner to corner, in a straight line, from bulkheads on adjoining properties on the east and west side. The subject property is a natural shoreline with no man made shoreline stabilization i.e. bulkhead or riprap. I have reviewed the proposed shoreline stabilization work in regards to the use standards in NCAC 71-1, specifically.0208(7)(D)(ii)and have determined that the applicant's proposal is consistent with those standards. I have also determined the proposed pier work to be consistent with the use standards in NCAC 7H. Absent of any strong objections from the commenting agencies,I recommend that the permit be issued and along with the standard conditions for bulkhead, riprap and pier work, I recommend the following condition: (1) The proposed bulkhead is to be constructed per the application drawings dated 1/26/05. The bulkhead alignment is to be accomplished in a straight line from the existing corners on the east and west side of the project property. AN7`i NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley,Governor Charles S. Jones, Director William G. Ross Jr.,Secretary MEMORANDUM To: Doug Huggett, Major Permits Processing Coordinator From: Fred Landa, DCM Washington District Planner Date: July 8, 2005 Subject: Major Permit Application,Requested by Victoria Paul. The applicant proposes to construct a bulkhead, place riprap on the waterward side of the bulkhead, and construct a pier and finger pier around a boat lift. The project site is located in a residential subdivision off SR 1722 in Bath on the west side of the Pungo River below Belhaven in Beaufort County, North Carolina. LUP Consistency Determination: The proposal is Consistent With &Not In Conflict with the Beaufort County, NC 1997 Land Use Plan certified by the CRC on November 20, 1998. Overview: The project area is located in a subdivision off SR 1722 in Bath on the west side of the Pungo River below Belhaven in Beaufort County. The site is undeveloped with no existing man-made shoreline stabilization devices. A 5'-high erosion escarpment transitions to a sandy estuarine beach at the normal water level. Both adjacent waterfront properties are developed with single- family residences. The shorelines at the adjacent properties are stabilized with bulkheads. The applicant proposes to construct a bulkhead from the corners of existing bulkheads on the neighboring properties. The proposed bulkhead would be backfilled to the 5'-high erosion escarpment. The proposed riprap would be placed on the waterward side of the bulkhead on a 2:1 slope. The applicant also proposes to construct a 6' x 200' pier with a 16' x 20' T-head platform, and a 4' x 36',finger pier around a 16' x 16' boat lift. Anticipated impacts: The project as proposed would result in the filling of 3000 ft2 of shallow habitat in the Pungo River. 400 Commerce Avenue Morehead City, North Carolina 28557 Phone: 252-808-2808\FAX: 252-247-3330\Internet: www.nccoastalmanagement.net An Equal opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper Areas of Environmental Concern (AEC): AECs impacted by the proposal include Public Trust Area, Public Trust Shoreline, Estuarine Water and Estuarine Shoreline. The water classification is SB-NSW and is open to the harvesting of shellfish. The area is not a Primary Nursery Area. The Beaufort County Land Classification Map designates the subject property as `Limited Transition' and the AECs as "Conservation". Development within the designated AECs is limited by CAMA regulations and development guidelines. Applicable or related policy includes the following: "Beaufort County supports the construction of bulkheads which fulfill the use standards set forth in 1 SA NCAC 7H" (Bulkhead Construction,pg. IV-10) "Beaufort County supports the use standards for estuarine waters and public trust areas as specified in 15A NCAC 7H.0207" (Marine Resource Areas (a), pg. IV-18) Cc: John Thayer, Manager of Planning and Grants 2 Instructions to Word Processing_ This is a card letter 31. June 24, 2005 Regulatory Division Action ID No. 200510785 Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 400 Commerce Avenue Morehead City, North Carolina 28557-3421 Dear Mr. Huggett: Reference the application of Victoria Paul for a Department of the Army permit to construct a bulkhead and a pier, and place riprap material waterward of the bulkhead, on property located off State Road 1722, adjacent to the Pungo River,near Belhaven, in Beaufort County, North Carolina. The Federal agencies have completed review of the proposal as presented by the application and your field investigation report. We recommend that the following conditions be included in the State authorization: 1. All work authorized by this permit must be performed in strict compliance with the attached plans, which are a part of this permit. Any modification to these plans must be approved by the US Army Corps of Engineers (USACE)prior to implementation. 2. The permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the U.S. Army Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal, relocation, or alteration. The permittee shall notify NOAA/NATIONAL OCEAN SERVICE Chief Source Data Unit N CS261, 1315 E West HWY- RM 7316, Silver Spring, MD 20910- 3282 at least two weeks prior to beginning work and upon completion of work. 3. Except as authorized by this permit or any USACE approved modification to this permit, no excavation, fill or mechanized land-clearing activities shall take place at any time in the construction or maintenance of this project, within waters or wetlands. This permit does not authorize temporary placement or double handling of excavated or fill material within waters or wetlands outside the permitted area. This prohibition applies to all borrow and fill activities connected with this project. 4. Unless otherwise authorized by this permit, all fill material placed in waters or wetlands shall be generated from an upland source and will be clean and free of any pollutants except in trace quantities. Metal products, organic materials (including debris from land clearing activities), or unsightly debris will not be used. Questions or comments may be addressed to Mr. Raleigh Bland, Washington Field Office, Regulatory Division, telephone(252) 975-1616, extension 23. Sincerely, Raleigh Bland,P.W.S. Regulatory Project Manager Copies Furnished: Ms. Cyndi Karoly Division of Water Quality North Carolina Department of Environment and Natural Resources 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Mr. Pete Benjamin U.S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 Mr. Ron Sechler National Marine Fisheries Service Habitat Conservation Service Pivers Island Beaufort, North Carolina 28516 Mr. David Rackley NMFS, Habitat Conservation Division 219 Fort Johnson Road Charleston, South Carolina 29412-9110 Mr. Ronald J. Mikulak, Chief Wetlands Regulatory Section Water Management Division U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303 Mr. Terry Moore, District Manager Washington Regional Office North Carolina Division of Coastal Management 943 Washington Square Mall Washington, North Carolina 27889 A� NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr.,Secretary May 16, 2005 Victoria E. Paul 590 Candy Field Road Pantego, NC 27860 Dear Mr. Paul: This letter is with reference to your application for a Coastal Area Management Act Major Development permit to construct a bulkhead, a 6' x 200' pier, a 16' x 20' platform, a 4' x 36' finger pier around a 16' x 16' boatlift, and place rip rap in Beaufort County adjacent to the Pungo River within the Ellis Cove S/D off SR 1722, Belhaven, NC. Although processing of the application is nearing completion, additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S. 113A-122(c) which would make August 20, 2005 the new deadline for reaching a decision on your request. However, we expect to take action prior to that time and will do so as soon as possible. In the interim, if you have any question on the status of your application, do not hesitate to contact me by phone (252-808-2808) or e-mail (doug.huggett@ncmail.net). Very sincerely, e. v k.� t Major Permits & Consistency Coordinator cc: DCM, Morehead City DCM, Washington 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net WATC,- Y Michael F.Easley,Governor d� Q aG William G.Ross Jr.,Secretary Cq r North Carolina Department of Environment and Natural Resources Alan W.Klimek,P.E.Director Division of Water Quality L:R'"CER/1 ' MAY 1 0 200�"ay 5, 2005 DWQ Project#05�0575 DIV.OF CO1*'TF-t�f���t'AC-'y9':'T Beaufort County RALEIGH ( Ms.Victoria E.Paul / O�`�p 590 Candy Field Road Pantego,NC,27860 / Subject Property: Off SR1722 on the west side of the Pungo River �s Approval of 401 Water Quality Certification(GC3490)with Additional Conditions Dear Ms. Paul: You have our approval, in accordance with the attached conditions,to dredge,place fill material within or otherwise impact by shading 0.10 acres of waters and/or wetlands to construct a bulkhead with riprap, pier and boatlift as described in your application received by the Division of Water Quality(DWQ) Wetlands/401 Unit on April 6, 2005. After reviewing your application,we have determined that the Division of Water Quality(DWQ)General Water Quality Certification Number 3490 covers these water impacts. This Certification allows you to General Permit No. 198000291 when issued by the US Army Corps of Engineers(USACE). In addition,you should get or otherwise comply with any other federal, state and local requirements before you go ahead with your project including(but not limited to) erosion and sediment control regulations and CAMA. Also,this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project,you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project(now or in the future) exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 21-1 .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification(or Isolated Wetland Permit) are met. No other impacts are approved including incidental impacts: Amount Approved Plan Location or Reference (Units) 404/CAMA Wetlands 0.10 (acres) DCIM Field Investigation Report N�o thCarolina 401 Wetlands Certification Unit Naturally 1650 Mail Service Center,Raleigh,North Carolina 27699-1650 2321 Crabtree Boulevard,Suite 250,Raleigh,North Carolina 27604 Phone: 919-733-1786/FAX 919-733-6893/Internet:htti)://h2o.enr.staie.nc.us/ncwetlands Victoria E. Paul Page 2 of 2 May 5,2005 2. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401/Wetlands Unit,North Carolina Division of Water Quality, 1650 Mail Service Center,Raleigh,NC, 27699-1650. 3. Water Quality Certification The proposed project must comply with all of the conditions of General Water Quality Certification(GC)3490. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depleted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification(associated with the approved water impacts),you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition,which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions,please telephone Cyndi Karoly in the Central Office in Raleigh at 919- 733-9721 or Tom Steffens in the DWQ Washington Regional Office at 252-946-648 1. Sincerely, f14 /� Alan W. Klimek, P.E. AWK/cbk Enclosures: GC 3490 Certification of Completion cc: Doug Huggett,DCM USACE Washington Regulatory Field Office DWQ Washington Regional Office File Copy Central Files Jerol Selby, 5724 Sidney Road, Belhaven,NC, 27810 Filename: 050575Paul(Beaufort)401 W A TFR Michael F.Easley,Governor � pG William G.Ross Jr.,Secretary Cq;( 7� North Carolina Department of Environment and Natural Resources ?W5 Alan W.Klimek,P.E.Director Division of Water Quality April 21, 2005 Ms.Victoria E. Paul 590 Candy Field Road Pantego, NC 27860 Subject: CAMA/Stormwater Review SW7050403 Bulkhead and Pier Project Beaufort County Dear Ms.: Paul The Washington Regional Office received a copy of your CAMA application for a proposed bulkhead and pier project at lots 5 &6 Woodstock Point Subdivision on April 4, 2005. Staff review of the plans and specifications has determined that the project, as proposed, consists of activities that will not pose surface water quality threats from stormwater runoff since no significant new impervious area is proposed. The Director has determined that projects that are reviewed and approved by the Division as not posing water quality threats from stormwater runoff should not be subject to the stormwater management permitting requirements of 15A NCAC 2H.1000. For this reason, we are informing you by way of this letter that your project will not require a stormwater management permit. Please keep in mind that this determination does not affect your legal requirements to obtain other permits which may be required by the Division of Water Quality, the Division of Land Resources, Coastal Area Management Act or any other Federal, State or Local Government. In addition, any future modifications to the project will require additional review from this office to assure that stormwater impacts are not an issue. If you have any questions or need additional information concerning this matter, please contact me at (252) 948-3923. Sincerely, Roger K. Thorpe Environmental Engineer Washington Regional Office cc: -/'Doug Huggett, DCM Washington Regional Office Central Files o e N hCarl ;VattlCC North Carolina Division of Water Quality Washington Regional Office Phone(252)946-6481 FAX(252)946-9215 Customer Service Internet: h2o.enr.state.nc.us 943 Washington Square Mall,Washington,NC 27889 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer—50%Recycled110%Post Consumer Paper c DEPARTMENT OF THE ARMY /�, WILMINGTON DISTRICT, CORPS OF ENGINEERS P.O.Box 1890 Wilmington,North Carolina 28402-1890 IN REPLY REFER TO 100 Mire Regulatory Division head City CCM � p Action ID: Zoo S i `��- j Applicant: Waterway: CIVVI' County:"Work Type: V& 6-iAll y,it) �1 Mr. Ron Sechler Mr. Doug Huggbtt National Marine Fisheries Svc, NOAA Division of Coastal Management Pivers Island NC Department of Environment, Health Beaufort, NC 28516 and Natural Resources 400 Commerce Avenue Mr. Pete Benjamin Morehead City, NC 28557-3421 Fish and Wildlife Enhancement U.S. Fish and Wildlife Service Post Office Box 33726 " MUM, Raleigh, North Carolina 27636-3726 Regional Office Division of Coastal Management Mr. Ronald J. Mikaluk, Chief NC Department of Environment, Health Wetlands Section —Region IV and Natur Res urces Water Management Division w *ye U.S. Environmental Protection Agency w `n 61 Forsyth Street, SW Atlanta, Georgia 30303 Gentlemen: Pursuant to Action ID No. 198000291, the CAMA-Corps Programmatic Permit agreement, a State Field Investigation Report is enclosed Your comments a /or recommendations would be appreciated on or before (n Op Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, telephone (252)975-1616, extension 23. Sincerely, a W" Raleigh W. Bland, P.W.S. Regulatory Project Manager Enclosure ILaptCOASTq41 z North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary MEMORANDUM TO: Maria Tripp NC Wildlife Resources Commission 1 � 3456 FROM: Doug Huggett �� , `'� '� �19 Major Permits Processing Coordinator APR RECEIVED w DATE: 4 April 2005 C Habitat •ConservationPro SUBJECT: CAMA and Dredge & Fill Application Review APPLICANT: Victoria E. Paul By Jerol Selby, Agent 5724 Sidney Road Belhaven,NC 27810 PROJECT LOCATION: Beaufort County PROPOSED PROJECT: Applicant proposes to construct a bulkhead and place riprap on the waterward side of the bulkhead. The bulkhead will be constructed from the corners of existing bulkheads on neighboring properties, in a straight line, with an average alignment±25' waterward of the normal water level (NWL). The proposed riprap will be placed with a 2:1 slope with the waterward toe averaging 10' from the proposed bulkhead. Applicant also proposes to construct a 6' x 200' pier with a 16' x 20'platform and a 4' x 36' finger pier around a 16' x 16' boat lift. Please indicate below your position or viewpoint on the proposed project and return this form by 25 April 2005. Please contact David W. Moye, at 252-948-3952, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. � This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed Date 02 7 ( zoo S One NoAhCarolina 943 Washington Square Mall,Washington,North Carolina 27889 Naturally Phone:252-946-6481 1 FAX:252-948-0478 1 Internet:www.nccoastalmanagement.nev An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper _ 1*oF a � � North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary MEMORANDUM TO: Joe Henderson NC Department of Administration State Property Office FROM: Doug Huggett Major Permits Processing Coordinator - DATE: 4 April 2005 SUBJECT: CAMA and Dredge & Fill Application Review APPLICANT: Victoria E. Paul �_ By Jerol Selby, Agent 5724 Sidney Road Belhaven,NC 27810 PROJECT LOCATION: Beaufort County PROPOSED PROJECT: Applicant proposes to construct a bulkhead and place riprap on the waterward side of the bulkhead. The bulkhead will be constructed from the corners of existing bulkheads on neighboring properties, in a straight line, with an average alignment±25' waterward of the normal water level (NWL). The proposed riprap will be placed with a 2:1 slope with the waterward toe averaging 10' from the proposed bulkhead. Applicant also proposes to construct a 6' x 200' pier with a 16' x 20'platform and a 4' x 36' finger pier around a 16' x 16' boat lift. Please indicate below your position or viewpoint on the proposed project and return this form by 25 April 2005. Please contact David W. Moye, at 252-948-3952, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. a Signed L.S Date _ One NoAhCarolina 943 Washington Square Mall,Washington,North Carolina 27889 Naturally Phone:252-946-6481 1 FAX:252-948-0478 1 Internet:www.nccoastalmanagement.nev f An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper 1 APR-14-2005 THU 12:54 PM COASTAL MANAGEMENT FAX N0, 12529480478 P. 01 PdCi 01' W,U 2 IIIST F;x: ,62-946-?431 Apr 14 '05 9.45 P,01i01 « p sur-It`Fox Note 7671 u6WL4 w y T C ./w c co, V, NOril1 � rca�itl, 13c�'►'a.:Thent of Eno � `i'( X 61-4-don of Goan Iu4ic° tt c,i F. E',isfoy.Qae.lor Cl 60,18 S.Jones. Director William G. Ross,Jr,,Secretory WIVIORAII UM � I v ZUtJS TO: Dean pu c. 1 �rr•Y 1t:?'i" I;tatc Cr Morehead City DCM I'' 1� )~ylejor Pi►i+''fs p4C1CCssing Cou inatar 1� Yy ra"t l 14 4•April 4 19 SUBJW1': CA NIA a:?t:1 Dredge 8t:pill App ication Review Icy 1vt'�tl 5';•'.1•,y,Agent � i sT ys ,5724 Sfc tY; DWI t i�slhl rye,27810 • i i 1'At),11iCI 1.0-Cr1,11IOT : County I I ITZ.0P08S0 PX0JIQC"t's A1,A.11;:cwit proposes to construct a bulkhead and place riprap on the v--4."Qr Wikr4 53do of cqc c bulkhead will W constntcted from the comers of existing t-►49JI+:adA oat prop'-I tk,s, itt a straight litre,with an avemage alignment t25'wstcrward of tlke llorht;tl Water Iewel'('NWI.). the proposed riprai will be placed with a 2:1 slope with the Wilt:i'r5'El{l taS�VCia,".".,�• �"l'CCit►tier, p(UrioS�d tlillCl1ca�1, Applicant also proposes to construct a 6'x 2W p4;r Naitl, a 16'1t 20'pittt ow-j 3e1tl a 4'x 30 fingclr PI r around a 16'x 16'boat lift. Pl:a 1 r a+� it?r3d�7t+� i+el�tia yCit;:is.mitinrt or vit;rvp>7 nt an the proposed project and return this i'+ar,a tap 2 Ape i 30P�;, P1C-1 4 e,ontact 1*4d 'W, Moye, at 252-948-3952, if you have any que,;•tion."meaI4411,4&tile'pcoposcA p4 ojwct. W]ttrl apprl prWo,in depth comments with supporting RFix'x,'t' l"`w , , 'flais fJ4c... has no olljec;Son the project as proposed, I .. .-v-.. ; 7hi;►o:a`i.,,.bas iav cot.7 meat the proposed project. Thji t�ptrt'ove:; of the roposed project only if the recommended ct'r�;tfYc tart.{nQorporated. St: attached. This nlsl•:,1 objo is to the pnlposed project for reasons described in the :1 ig;tc��3 r. �,. .�� ,o���A�-, y�,,� .F e�•'.r.�?`7." 17isrt;c a 1 r- dS .,ww � i"M'?� • r._.ram-�,�......... - COO OIL lluraentt. '...u.s•N.,-an.,„1.M•wn-.fr•v wnJ..,...,,.,,w.....nT.__n_,r....r.....--_.� CndO,�!� `J'19 ai tA;I pion;JryWM WL WnahkpbA,Nom car*o 2389 ll �fJ '�.M.:i„-046'. .< t FAlS:252.9rtb•Oti81 tnto�www.nCM%*WApwmntnW CW*A,ni'.p l A:vi*"A-.Wn Po*yw-50`4 tiwyiAW 110%Pog Cmwvw Paqr i L COATIq� 4F a North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary MEMORANDU TO: Mr. William McNeil Director Division of Community Assistance 4PR FROM: Doug Huggett 'v/�r�fj O ����5 Major Permits Processing Coordinat9c7cin. y0 DATE: 4 April 2005 SUBJECT: CAMA and Dredge & Fill Application Review APPLICANT: Victoria E. Paul By Jerol Selby, Agent 5724 Sidney Road Belhaven,NC 27810 PROJECT LOCATION: Beaufort County PROPOSED PROJECT: Applicant proposes to construct a bulkhead and place riprap on the waterward side of the bulkhead. The bulkhead will be constructed from the corners of existing bulkheads on neighboring properties, in a straight line, with an average alignment±25' waterward of the normal water level (NWL). The proposed riprap will be placed with a 2:1 slope with the waterward toe averaging 10' from the proposed bulkhead. Applicant also proposes to construct a 6' x 200' pier with a 16' x 20'platform and a 4' x 36' finger pier around a 16'x 16' boat lift. Please indicate below your position or viewpoint on the proposed project and return this form by 25 April 2005. Please contact David W. Moye, at 252-948-3952, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed��?�� � �1/� Date S"cis' NorthCarolina 943 Washington Square Mall,Washington,North Carolina 27889 Natzmally Phone:252-946-6481 1 FAX:252-948-0478 1 Internet:www.nccoastalmanagement.neV An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper oaf COASiq� n/` z North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary MEMORANDUM TO: Mr. Jim D. Simons, P.G., P.E. State Geologist& Director MAY n 3 2005 Division of Land Resources FROM: Doug Huggett Morehead City DCM Major Permits Processing Coordinato DATE: 4 April 2005 _� SUBJECT: CAMA and Dredge & Fill Application Review APPLICANT: Victoria E. Paul By Jerol Selby, Agent 5724 Sidney Road Belhaven,NC 27810 PROJECT LOCATION: Beaufort County PROPOSED PROJECT: Applicant proposes to construct a bulkhead and place riprap on the waterward side of the bulkhead. The bulkhead will be constructed from the corners of existing bulkheads on neighboring properties, in a straight line, with an average alignment±25' waterward of the normal water level (NWL). The proposed riprap will be placed with a 2:1 .slope with the waterward toe averaging 10' from the proposed bulkhead. Applicant also proposes to construct a 6' x 200' pier with a 16'x 20'platform and a 4' x 36' finger pier around a 16' x 16' boat lift. Please indicate below your position or viewpoint on the proposed project and return this form by 25 April 2005. Please contact David W. Moye, at 252-948-3952, if-you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed Date One NorthCarolina Naturally 943 Washington Square Mall,Washington,North Carolina 27889 Phone:252-946-6481 1 FAX:252-948-0478 1 Internet:www.nccoastalmanagement.nev An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper �pF COISIq�� �� a z North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary MEMORANDUM TO: Patty Fowler NCDENR Division of Environmental Health APR FROM: Doug Huggett Major Permits Processing Coordinator " H SANlTgTlO.N DATE: 4 April 2005 SUBJECT: CAMA and Dredge & Fill Application Review APPLICANT: Victoria E. Paul By Jerol Selby, Agent 5724 Sidney Road Belhaven,NC 27810 PROJECT LOCATION: Beaufort County PROPOSED PROJECT: Applicant proposes to construct a bulkhead and place riprap on the waterward side of the bulkhead. The bulkhead will be constructed from the corners of existing bulkheads on neighboring properties, in a straight line, with an average alignment ±25' waterward of the normal water level (NWL). The proposed riprap will be placed with a 2:1 slope with the waterward toe averaging 10' from the proposed bulkhead. Applicant also proposes to construct a 6' x 200'pier with a 16' x 20'platform and a 4' x 36' finger pier around a 16'x 16' boat lift. Please indicate below your position or viewpoint on the proposed project and return this form by 25 April 2005. Please contact David W. Moye, at 252-948-3952, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed WAft 1-4 vwlei Date One North Carolina 943 Washington Square Mall,Washington,North Carolina 27889 Naturally Phone:252-946-6481 1 FAX:252-948-0478 1 Internet:www.nccoastalmanagement.nev An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper a APR 5 2005 North Carolina Department of Environment and Natural Resources Division of Coastal Management WTOW rREsEWAVA Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary MEMORANDUM TO: Renee Gledhill-Early eg-- 05_ o 74 9 NC Department of Cultural Resources Archives & History Building �� iM FROM: Doug Huggett a Major Permits Processing Coordinator _A } DATE: 4 April 2005 SUBJECT: CAMA and Dredge & Fill Application Review APPLICANT: Victoria E.Paul By Jerol Selby, Agent 5724 Sidney Road Belhaven,NC 27810 !a R 2 Z0.65 PROJECT LOCATION: Beaufort County Morehead City DCM PROPOSED PROJECT: Applicant proposes to construct a bulkhead and place riprap on the waterward side of the bulkhead. The bulkhead will be constructed from the corners of existing bulkheads on neighboring properties, in a straight line, with an average alignment±25' waterward of the normal water level (NWL). The proposed riprap will be placed with a 2:1 slope with the waterward toe averaging 10' from the proposed bulkhead. Applicant also proposes to construct a 6' x 200' pier with a 16' x 20'platform and a 4' x 36' finger pier around a 16' x 16' boat lift. Please indicate below your position or viewpoint on the proposed project and return this form by 25 April 2005. Please contact David W. Moye, at 252-948-3952, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the 4 attached comments. Signed LI� Date NorthCarolina 943 Washington 6de Mall,Washington,North Carolina 27889 Naturally Phone:252-946-6481 1 FAX:252-948-0478 1 Internet:www.nccoastalmanagement.neV An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper 0 6 2005 �COAST.q� Z North Carolina Department of Environment and Natural Resources ✓ Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary MEMORANDUM TO: Mr. Preston P. Pate, Jr. Director Division of Marine Fisheries FROM: Doug Huggett Major Permits Processing Coordinator DATE: 4 April 2005 SUBJECT: CAMA and Dredge & Fill Application Review APPLICANT: Victoria E. Paul D 0 By Jerol Selby, Agent 5724 Sidney Road JUN 2 8 2005 ! Belhaven,NC 27810 PROJECT LOCATION: Beaufort County D M F K A B I T AT PROPOSED PROJECT: Applicant proposes to construct a bulkhead and place riprap on the waterward side of the bulkhead. The bulkhead will be constructed from the corners of existing bulkheads on neighboring properties, in a straight line, with an average alignment ±25' waterward of the normal water level (NWL). The proposed riprap will be placed with a 2:1 slope with the waterward toe averaging 10' from the proposed bulkhead. Applicant also proposes to construct a 6' x 200'pier with a 16'x 20'platform and a 4'x 36' finger pier around a 16'x 16' boat lift. Please indicate below your position or viewpoint on the proposed project and return this form by 25 April 2005. Please contact David W. Moye, at 252-948-3952, if you have any questions regarding the proposed project. When appropriate, in depth comments with supporting data are requested. /' REPLY L' This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed �1�-��� / �� Date North Carolina 943 Washington Square Mall,Washington,North Carolina 27889 Naturally Phone:252-946-6481 1 FAX:252-948-0478 1 Internet:www.nccoastalmanagement.netl An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper I SELBY LAND CONCEPTS 5724 Sidney Road Belhaven,NC 27810 252-964-4171 /FAX 252-964-4686 March 11, 2005 N. C. Dept. of Environment and Natural Resources 943 Washington Square Mall Washington,NC 27889 Attention: Steve Trowell Reference: Victoria E. Paul Woodstock Pt. Sub-Division Dear Mr. Trowell: Enclosed is a Major CAMA Dredge and Fill Permit Application for the construction of a wooden bulkhead and rip rap on site on an undeveloped residential lot owed by Victoria E. Paul located off SR 1722 at Woodstock Pt. Sub-Division on the Pungo River near Belhaven in Beaufort County,North Carolina. The bulkhead project will be to construct the proposed bulkhead in a straight line from the corners of bulkhead on adjoining properties. The bulkhead alignment will average + - 25 ft. waterward of the normal water level. Dragline mats will be used to facilitate the movement of a trac hoe while driving the bulkhead sheets. The rip rap is to be placed once the bulkhead is constructed. Rip rap is proposed to be placed at a 2'/1' slope with an average alignment of 10 ft. waterward of proposed bulkhead. The area landward of the proposed bulkhead will be backfilled to the +- 5 ft. high erosion escarpement. The area will then be planted with typical yard grass such as Centipede and or St. Augustine. Also proposed is a 6 ft. x 200 ft. pier with a 20 ft. x 16 ft. T-Head platform, 4 ft. x 36 ft. finger pier around a 13 ft. x 13 ft. boat lift. The application package has been sent certified mail return receipt requested to the adjacent landowners. The required signed green cards will be submitted to your office when received by me. Sincerely, F Jerol Selby a r.r `as�t SAND•ROCK•BULKHEAD STONE•EXCAVATING•SITE PREPARATION•DEMOLITION March 11, 2005 Edward Ray Edwards PO Box 1647 Washington,NC 27889 Dear Mr. Edwards: Please find enclosed an application for a Major CAMA Dredge and Fill Permit for the construction of a wooden bulkhead and placement of rip rap rock on property owned by Victoria E. Paul located at Woodstock Point in Belhaven,North Carolina. If you have no objections please send a letter stating so. Enclosed is a stamped envelope for your convenience. If you have any questions concerning this matter please direct them to: NCDENR Attention: Steve Trowell 943 Washington Square Mall Washington,NC 27889 Thank you, Jerol Selby enclosures March 15 , 2005 I have no objection to have the work done on the property next to me . 5724 Sidney Road•Belhaven,North Carolina 27810 PHONE 2,4�964-4171 •FAX Q11-964-4686 3-7- Developmen!Type FEE DCM% DWQ% 143001601 4351000931625 6253 (24300 l6D2 4351 DD095 2341) ' L Private.non-conuran:W development that does not involve $250 1 DO%(S250) the filling or excavation of any D%(SO) wetlands or open water areas 11. Public or commercial development that does not involve the Ming or 1 OD% excavation of any wetands or open 5400 ADO) O%(SO) water areas: Ill. For development that involves the _ fling and/or excavation of up to 1 acre of wetlands and/or open water areas,determine N A,B,C.or D Maw applies: Il,'(A� For Private,noncommercial development,If General water Quality S250 100%($250) O%(SO) Certification No.3301(see attached) can be applied 111(13k For public or commercial development,if General water Quality S400 100°k(5400) 0%(SO)Certification No01(see attached).33 can be applied: Ill(C� If General Water Quality Certification Na 3301(see attached) could be applied,but DCM staff determined that additional review and S40D 60%(S240) 40%(S160) written DWQ concurrence is needed because of concerns related to water quality or aquatic fife_ lll(D) If General Water Quality Certification No.33D7(see attached) 5400 6C°:°(5240) 40%(5160) can not be applied: M For development that involves the filling and/or excavation of more 5475 60%(S2E5) 4D°ro(S190) than one acre of wetlands and/or open water areas: ■ Complet liverx item 4 if.. .., ,,. ,r ■ Print your name and address on the reverse so that we can return the card to you. C. Signature ■ Attach this card to the back of the mailpiece, X EJ Agent or on the front if space permits. ��-- y`"" ❑Addressee D. s delivery address different from item 1? El Yes 1. Article Addressed to: If YES,enter delivery address below: ❑ No 7-ho ma s C' //t��re 3. Service Type ❑Certified Mail ❑ Express Mail �.G lst!/ ✓ / ] 7&?(� ❑ Registered ❑ Return Receipt for Merchandise tJ` ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery?(Extra Fee) ❑Yes 2. Article Number 7003 2260 0004 8233 0794 (Transfer from service label) PS Form 3811,March 2001 Domestic Return Receipt 102595-01-M-1424 COMPLETE •N COMPLETE THIS SECTIONON DELIVERY ■ Complete items 1,2,and 3.Also complete A. Received by(Please Print Clearly) B. D e of elivery item 4 if Restricted Delivery is desired. s ■ Print your name and address on the reverse so that we can return the card to you. C. Signatu ■ Attach this card to the back of the mailpiece, X 1',, �, ❑Agent or on the front if space permits. ❑Addressee D. Is delivery address different fro item 1? ❑Yes 1. Article Addressed to: If YES,enter delivery address below: ❑ No Edward Eat.a-eds pa fax tO V7 3. Service Type �,� El Certified Mail El Express Mail 1 ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑C.O.D. 4. Restricted Delivery?(Extra Fee) ❑Yes 2. Article Number 7003 2260 0004 8233 0787 (Transfer from service label) PS Form 3811, March 2001 Domestic Return Receipt 102595-01-M-1424 f/0 CAA w'r a' x North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary 4 April 2005 WASHINGTON DAILY NEWS Post Office Box 1788 Washington, NC 27889 Attention: Legal Advertising Department Please include the enclosed Notice of Filing in the Public Notice section of the 7 April 2005 edition of your newspaper. If it will not be possible to include this notice in that edition, or if you should have any questions about this notice, please call me as soon as possible at 948-3812. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notices, and an original invoice to: JAYE POOLE NCDENR COASTAL MANAGEMENT DIVISION 1638 MAIL SERVICE CENTER RALEIGH, NC 27699-1638 Thank you. Sincerely, Sandra Gordon Secretary, Division of Coastal Management c: Doug Huggett Original Emailed: Original mailed: `f-- No e hCarolina 943 Washington square Mall,Washington,North Carolina 27889 NaNurally Phone:252-946-6481 1 FAX:252-948-0478 1 Internet:www.nccoastalmanagement.ney An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by N.C.G.S. 113A-119(b)that an application for a development permit in an Area of Environmental Concern as designated under the CAMA was received on 23 March 2005. According to the said application,Victoria E. Paul, Applicant, by Jerol Selby, Selby Land Concepts, proposes to construct a bulkhead and place riprap on the waterward side of the bulkhead. The bulkhead will be constructed from the corners of existing bulkheads on neighboring properties, in a straight line,with an average alignment±25'waterward of the normal water level(NWL). The proposed riprap will be placed with a 2:1 slope with the waterward toe averaging 10' from the proposed bulkhead. Applicant also proposes to construct a 6'x 200'pier with a 16'x 20'platform and a 4'x 36'finger pier around a 16'x 16' boat lift, at property located off SR 1722,on the west side of the Pungo River, below Belhaven, at the residential subdivision locally referred to as Ellis Cove, in Beaufort County,North Carolina. A copy of the entire application maybe examined or copied at the office of Terry Moore, 943 Washington Square Mall, Washington, NC during normal business hours. Comments mailed to CHARLES JONES, DIRECTOR, COASTAL MANAGEMENT DIVISION, NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES, 400 COMMERCE AVENUE, MOREHEAD CITY, NC 28557 prior to 2 May 2005 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. Please publish on 7 April 2005 in the Washington Daily News for the NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES., COASTAL MANAGEMENT DIVISION. apF COASl4(,T� a y North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross, Jr., Secretary 4 April 2005 Mr. Jerol Selby,Authorized Agent For: Ms.Victoria Paul 5724 Sidney Road Belhaven,NC 27810 Dear Mr. Selby: The Division of Coastal Management hereby acknowledges receipt of an application for State approval for development of the property of Victoria E. Paul, located off SR 1722, on the west side of the Pungo River, below Belhaven, at the residential subdivision, locally referred to as Ellis Cove, in Beaufort County, North Carolina. It was received on 23 March 2005 and appears to be adequate for processing at this time. The projected deadline for making a decision is 6 June 2005. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will also serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. Should there be any questions on this procedural change, do not hesitate to contact me. If this agency does not render a permit decision within 70 days from 23 March 2005, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. N.C.G.S. 113A-119(b) requires that notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along the property where it can be observed from a public road. Some examples would be: nailing the notice card to a telephone pole or tree along the road right-of-way fronting the property, or at a point along the road right-of-way where a private road would lead one into the property. Failure to post this notice could result in an incomplete application. An onsite inspection will be made and if additional information is required,you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincfrf ly, Steven J.Trowell, Field Representative Division of Coastal Management Washington Regional Office ENCLOSURE c: Doug Huggett Noce hCarolina 943 Washington Square Mall,Washington,North Carolina 27889 Naturally Phone:252-946-6481 1 FAX:252-948-0478 1 Internet:www.nccoastalmanagement.netl An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper AMA E MIT APPLIED FOR r I i of se AIWI- . 2APPLICANT: FOR MORE DETAILS CONTACT .4 C •FFICER BELOW: i I � 'r 9 50R. NORTH CAROLINA BEAUFORT COUNTY THIS DEED Made and executed this the 17th day of July, t 1961, by and between Beth Sloan and husband, Thomas H. Sloan, of North Carolina Beaufort County, hereinafter designated as parties of the first part, and ry J. W. Paul and wife, Mary W. Paul, of said State and County, hereinafter desig- ' noted as parties of the second part; W I T N E S S E T H. ','•;t"�"vZ That the parties of the first part, in consideration of the sum of Ten Dollars ($10.00) and other valuable considerations to them paid by l a; the parties of the second part, the receipt of which is hereby acknowledged, ={ have bargained and sold, and by these presents do hereby bargain, sell, and r ? convey unto the parties of the second part, their heirs and assigns, all that certain lot or parcel of land in North Carolina, Beaufort County, Bath Township, described as follows! Bounded on the North by Pungo River, on the South by Stephe Be Sparrow and wife, on the West by Stephen 0. Sparrow and wife and on the East by Howard Smith land, beginning at an iron stake in the East sideline of the lands of Stephen Be Sparrow and wife as described in deed of record in Book 463 at Page 367, and on map in Map Book 6 at Page 96, all in Beaufort County Regis- try, said iron stake being located in their line 5475 feet on a course of North 42+ East from the Southeast corner of said tract and being also 300 feet from the South edge of Pungo River, and running from said beginning point North 53° 451 West 550 feet to another iron stake; thence North 42° East: 300 feet to Pungo River; thence down said river in a Southeastwordly direction 550 feet to the (line of Howard Smith land; thence with the Smith line South 42° West 300 feet Ito an iron stake, the point of beginnings There is also hereby conveyed a right of way from the Loop Road as shown on map in Map Book 6 at Page 96, to the land herein conveyed and above described. Said right of way shall be 20 feet in width odjoining the line shown on the map herein referred to as adjoining the land of J- T. Smith and being South 42° West 5775 feet and being the same right of way reserved by E. mraccn n'rronncr.n�.l.nw W�.^.n IIlGTON,n011i II CAIIOLIIIA I (Leon R. Sparrow and wife, Dorothy L. Sparrow in deed to Stephen D. Sparrow and wife dated Mpy 18, 19569 of record in Beaufort County Registry Book 463 at Page 367. The property hereby conveyed being the some conveyed to Beth Sloan by deed dated December 16, 1960, by Roy C. Anderson and wife, Beau- fort County Registry Book 516 at Page 441. TO HAVE AND TO HOLD the above described lot or parcel of land, together with all privileges and appurtenances thereunto belonging, for in anywise appertaining unto them, the said parties of the second part, (their heirs and assigns, in fee simple. i And the parties of the first part covenant that they are seized in fee of said property and that they have the perfect right to convey the same in fee simple; that the same is free and clear of all liens and en- d ' (cumbrances and that they do hereby forever warrant and will forever defend the �titlo to the said land against the lawful claims of all persons, whomsoever. \��•r .-1 F. 6 i" IN WITNESS WHEREOF, the parties of the first part have �i o � (hereunto set their hands and seals, the day and year first above written. 0 Beth Sloan F.AL) t r. Thomas H. Sloan N m NORTH CAROLINA u q BEAUFORT COUNTY R �. / LW a Notary Public of the r 0?•r41-1 td A a aforesaid State and County, do hereby certify that this day personally appeared F. cm o ci before me Beth Sloan and husband, Thomas H. Sloan, and acknowledged the clue I of s. m a m execution of the foregoing instrument for the purposes therein expressed. o U. m o e. Witness my hand and notarial seal, this the 1' day of 1961. 1 A)� Notary Public '6, •...,•• ply'tommission expires ') 10 rI V L.E. MEPCEP Fi.1ed December 13, 1961 at /+ 00 P.M. ATTORNCT.AT•LAW V n. C. Duke, Register of Deeds NAS11MG—J.NOON(L.1nOLINA