HomeMy WebLinkAbout68-05 Renewal 02/2017 Permit Class Permit Number
RENEWAL 68-05
STATE OF NORTH CAROLINA
Department of Environmental Quality -
and
Coastal Resources Commission
r
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS I I3A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Ronald A. Pettit, P.O. Box 499, Salve,NC 27972
Authorizing development in Dare County at Pamlico Sound, 27130 NC 12, Salvo
as requested in the permittee's application daW letter dated
12/24/16.
This permit, issued on February 9,2017 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to Permit No. 68-05, which was issued to the permittee on 5/6/05, as
well as all subsequent renewals, refinements, and modifications, and copies of all documents shall be
readily available on site when a Division representative inspects the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
NOTE: A permit renewal application processing fee of$100 was received by DCM for this project.
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date.
This permit must be accessible on-site to Department
personnel when the project is inspected for compliance.
BraxtoA 6. Davis, Director
Any maintenance work or project modification not covered Division of Coastal Management
hereunder requires further Division approval.
All work must cease when the permit expires on This permit and its conditions are hereby accepted.
December 31,2018
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program. Signature of Permittee
ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
Coastal Management BRAXTON C. DAVIS
ENVIRONMENTAL QUALITY Director
February 13,2017
Ronald A.Pettit
P.O. Box 499
Salvo,N.C. 27972
Dear Sir or Madam:
The enclosed permit constitutes authorization under the Coastal Area Management Act,and
where applicable,the State Dredge and Fill Law,for you to proceed with your project proposal. The
original(buff-colored form) is retained by you and it must be available on site when the project is
inspected for compliance. Please sign both the original and the copy and return the copy to this office in
the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal
described below.
If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS
I I3A-121.1 or 113-229.Your petition for a hearing must be filed in accordance with NCGS Chapter
150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,NC 27611-6714,
(919)733-2698 within twenty(20)days of this decision on your permit.You should also be aware that
another qualified party may submit an objection to the issuance of this permit within twenty(20)days.
The project plan is subject to those conditions appearing on the permit form. Otherwise,all work
must be carried out in accordance with your application. Modifications,time extensions,and future
maintenance requires additional approval. Please read your permit carefully prior to starting work and
review all project plans,as approved. If you are having the work done by a contractor, it would be to your
benefit to be sure that he fully understands all permit requirements.
From time to time,Department personnel will visit the project site. To facilitate this review,we
request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if
questions arise concerning permit conditions, environmental safeguards, or problem areas,you may
contact Department personnel at any time for assistance. By working in accordance with the permit,you
will be helping to protect our vitally important coastal resources.
Sincerely,
II
Do glas V. Huggett
Major Permits Manager
N.C. Division of Coastal Management
Enclosure
State of North Carolina I Environmental Quality I Coastal Management
Morehead City Office 1 400 Commerce Avenue I Morehead City,NC 28557
252 808 2808
DCM Coordinator: 3.,J&Q Permit#: �� Y
MAILING DISTRIBUTION SHEET �@
Permitee: 20,,61� ?� IVJ AC 2Ig7Z
Agents: �arJ $D 27916-
DCM Field Offices
Elizabeth City (with revised work plan drawings)
Morehead City
Washington
Wilmington
US ACOE Offices:
Washington: Raleigh Bland
Josh Pelletier
William Westcott(NC DOT)
Bill Biddlecome (NC DOT)
Wilmington: Tyler Crumbley
Liz Hair
Cultural Resources: Renee Gledhill-Early or (environmental.review@ncdcr.gov)
Public Water Supply: Heidi Cox (WIRO)
Joey White (WARO)
Marine Fisheries: Shane Staples
NC DOT: Ben Hughes
Shellfish Sanitation: Shannon Jenkins
State Property: Tim Walton
Water Quality: Karen Higgins (Raleigh)
John Hennessy (NC DOT)
Washington: Anthony Scarbraugh—401
Wilmington: Robb Mairs—401
Chad Coburn- 401
DEMLR:
Washington: Scott Vinson- Stormwater
Wilmington: Georgette Scott - Stormwater
Wildlife Resources: Maria Dunn
LPO:
Fax Distribution: Permitee#:
Agent#:
ROY COOPER
Gm
WILLIAM G. ROSS, JR.
Interim Sr.,( t.ry
Coastal Management
ENVIRONMENTAL.OUALITY BRAXTON DAVIS
t)u er.tnr
MEMORANDUM
TO: Doug Huggett, Major Permits Coordinator
Division of Coastal Management, Morehead City
FROM: Cynthia Rountree, Field Representative <A
THROUGH: Frank Jennings, District Manager AF
Northeastern District,Division of Coast Management
DATE: January 4, 2017
SUBJECT: Major Permit#68-05 issued to Roald A. Pettit for the construction of riprap,
bulkhead,boat ramp, docking facility and finger pier adjacent to the Pamlico
Sound in Salvo, Dare County; request for extension.
REFERENCE: (a)Letter from Ronald A. Pettit dated December 24, 2016,rec'd December 30,
2016 and check# 6492 in the amount of$100 rec'd December 30, 2016
(b) 15A NCAC 07J.0404(b) Development Period Extension
1. The request for extension of this major permit has been reviewed pursuant to the
provisions of reference(b). Reference(a)provided the required signed and dated
attestations.
2. This office concurs that substantial development has begun, and is continuing.
3. Changes in Coastal Resources Commission's rules and development standards since the
date of issuance of this permit are not considered relevant to the permitted development,
and do not raise concern for denial or modification of this permit.
4. It is recommended that a two-year extension of this permit be granted.
5. Also enclosed is a copy of the subject permit, and the Extension request letter.
RECEIVED
JAN 17 2017
-.^-^Nothing Compares .. D C M- M H D CITY
State of North Carolina I Environmental Quality I Coastal Management
Address 1 I Address 2 1 City,State ZIP
000 000 0000 T
Ronald A Pettit December 24,2016
27130 Hwy 12
Salvo,Nc 27972 Received
252-987-2306
permit#68-05 utC 3 0 7016
NCDENR
CM-EC
1367 U.S. 17 South
Elizabeth City, NC 27909
252-264-3901 ext 233
Fax: 252-264-3723
attn: Kelly Russell
Dear Kelly ,
I would like to apply for a permit extension for permit#68-05 which is expiring the end
of December 2016. I was not able to complete the 15'freestanding bulkhead, 2'x10'
finger pier and the riprap on the point was not completed. Enclosed is my check for
$100.00.
If you have any questions please call 252489-8211
'Z est ards,
Ronald A Pettit
RECEIVED
JAN 17 2017
DCM- MHD CITY
NC Division of Coastal Management �,B C D
Cashier's Official Receipt
Date: "3 20
ZLP
yl ,
Received From: wo "J k LD $
Permit No.:
Check No.:
n r
Applicant's Name: o t4 4 L r—> /" �� County: cx(-
1 D
Project Address: e �lZ G`
Please retain receipt for your records as proof of payment for permit issued.
Signature of Agent or Applicant:
2 c..� crJ r Date:
Signature of Field Representative: Date: IZ13
Permit Number
�- rm it Class
1..
2"d RENEWAL 68-OS
- --
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources -_
and i
Coastal Resources Commission F E 0 1 9 2015
v
ermtt _i
for
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Ronald A. Pettit P.O. Box 499 Salvo NC 27972
Authorizing development in Dare County at Pamlico Sound 27130 NC 12,
Salvo as requested in the permittee's letter dated 12/31/14
This permit, issued on February 16 2015 , is subject to compliance with the application(where consistent
with the permit), all applicable regulations, special conditions and notes set forth below.Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to the original of Permit No. 68-05,which was issued on 5/6/05, as well as
all subsequent renewals, refinements, and modifications, and copies of all documents shall be readily
available on site when Division personnel inspect the project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
RECEIVED
JAN 1 7 2017
ACM- MHD CITY
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date.
This permit shall be accessible on-site to Department �.; �m
personnel when the project is inspected for compliance.
Any maintenance work or project modification not covered „; Braxton C. Davis, Director
hereunder requires further Division approval. Division of Coastal Management
All work shall cease when the permit expires on
This permit and its conditions are hereby accepted.
December 31,2016
t In issuing this permit, the State of North Carolina agrees
Lthat your project is consistent with the North Carolina Coastal
anagement Program. Signature of Permittee
./rt`G'9'C'Yr;.-06'1PY?NNKi')Ki4:-:.ii1. x'0-0�+'.'�JY.-0-Y
rermit Class Permit Number
RENEWAL 68-05
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and
Coastal Resources Commission
e r m it
for
X Major Development in an Area of EnvironmentaL_Concern ,
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Ronald A. Pettit,P.O. Box 499, Salvo, NC 27972
Authorizing development in Dare County at Pamlico Sound, 27130 NC 12, Salvo
, as requested in the permittee's letter dated 12/12/12
This permit, issued on FP—hr n 15, 2013 , is subject to compliance with the application (where consistent
with the permit),all applicable regulations, special conditions and notes set forth below. Any violation of these terms may
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
1) This renewal shall be attached to the original of Permit No. 68-05, which was issued on 5/6/05, and
copies of both documents shall be readily available on site when Division personnel inspect the
project for compliance.
2) All conditions and stipulations of the active permit remain in force under this renewal.
RECEIVED
JAN 17 2017
DCM- MHD CITY
This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission.
date. An appeal requires resolution prior to work initiation or
continuance as the case may be.
This permit shall be accessible on-site to Department
personnel when the project is inspected for compliance. L �
Any maintenance work or project modification not covered Braxton C. Davis, Director
Division of Coastal Management
hereunder requires further Division approval. g
All work shall cease when the permit expires on This permit and its conditions are hereby accepted.
a
December 31, 2014
In issuing this permit, the State of North Carolina agrees
that your project is consistent with the North Carolina Coastal
Management Program. Signature of Permittee
Permit Class Permit Number
W 68-05
STATE OF NORTH CAROLINA
Department of Environment and Natural Resources
and ..,
Coastal Resources Commission M
AY
�rrrYit � LU�S
for �L.<..,:-,� .,,�• -
X Major Development in an Area of Environmental Concern
pursuant to NCGS 113A-118
X Excavation and/or filling pursuant to NCGS 113-229
Issued to Ronald A. Pettit,P.O.Box 499,Salvo,NC 27972
Authorizing development in Dare County at Pamlico Sound. 27130 NC 12. Salvo f
S , as requested in the permittee's application dated 6/21/04, including the
attached workplan drawing (1), dated "revised" 2/9/05.
This permit, issued on May 6,2005 , is subject to compliance with the application (where consistent
with the permit), all applicable regulations, special conditions and notes set forth below.Any violation of these terms may r
be subject to fines, imprisonment or civil action; or may cause the permit to be null and void.
r1
J
r
Rip rap f
r1) The riprap shall not extend waterward more than 5 feet from the edge of the adjacent coastal wetlands at f
any point along its alignment at the time of construction. j
j
2) The riprap material shall be free from loose dirt or any pollutant. It shall be of a size sufficient to
prevent its movement from the site by wave or current action.
'• J
r3) The riprap material shall consist of clean rock or masonry materials such as but not limited to granite, f
marl, or broken concrete. RE f
CEIVEp
r
(See attached sheets for Additional Conditions) BAN 2011
This permit action may be appealed b the ermittee or Signed b the authority r DEIvR and the
P Y PP Y P Y Y ��i��
other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Co �yIT Y
date. An appeal requires resolution prior to work initiation or
fcontinuance as the case may be.
This permit shall be accessible on-site to Department
personnel when the project is inspected for compliance.
f Charles S. Jones, Director
Any maintenance work or project modification not covered
hereunder requires further Division approval. Division of Coastal Management
I
All work shall cease when the permit expires on This permit and its conditions are hereby accepted. f
J
X, December 31,2008
f
In issuing this permit, the State of North Carolina agrees i
that your project is consistent with the North Carolina Coastal
i Management Program. Signature of Permittee r
4
jrr..>ax.o-:-•,-:o-»o-rs}o-o-»aa.,ac-.�,s.}c..v.oc,s.o-a�ooaw+..,... ,....��.._......,t�;.hytiyy2�,tdYriv,...L;l.._,.•_,...•::�...•:..:::..r.�....:_.ti....... ............
Ronald A.Pettit Permit#68-%,_
Page 2 of 4
ADDITIONAL CONDITIONS
4) The riprap shall not extend more than 12 inches above the height of the adjacent wetland substrate.
Bulkhead
5) The bulkhead shall be constructed prior to any backfilling activities.
6) The bulkhead shall be structurally, tight so as to prevent seepage of backfill materials through the
structure.
t
7) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other
suitable materials approved by department personnel. No excavation is permitted except for that which
may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc.
s
r 8) The fill material shall be clean and free of any pollutants except in trace quantities.
1 f
9) All backfill material shall be obtained from a high ground source and confined behind the permitted f
bulkhead. f
f
f 10) No backfill material is to be placed within 30 feet of the normal high water line, except that which shall
be used to backfill the area behind the permitted bulkhead. r
f11) The "freestanding" bulkhead shall not extend more than an average of 6 inches above the height of the
adjacent wetland substrate. No backfilling of the freestanding bulkhead is permitted. f
I
f12) The "freestanding" bulkhead shall be located waterward of any area of coastal wetlands.
y
r13) The alignment of the "freestanding" bulkhead shall be staked by a representative of the Division of
rCoastal Management within a maximum of 30 days prior to the start of any construction. Failure to
t initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions shall f
frequire the alignment to be re-staked by DCM within a maximum of 30 days prior to the new expected If
X start of construction.
:r J
' I
Boat Ramp
f J
r 14) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or
poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact f
f waters of the State or waters that will enter waters of the State.
ECEIVEpJ
J
y Docking Facility
JAN 17 2017 J
XfXXY
15) This permit authorizes only the docks, piers, and other structures and uses located in or over the a
15city
r that are expressly and specifically set forth in the permit application. No other structUQUeth@
floating or stationary, shall become a permanent part of this docking facility without permit f
modification. No non-water dependent uses of structures shall be conducted on, in or over public trust
waters without permit modification. X/
s
f
f
- J
Jrm:-:.:o w-�•r.4o.o-w�oa-�o-o-�eo-o-}u.��;aat-�o-�xo-no.awao-tNwc-..va�.a�,a.�xa.�r�-aa�-x>o-ac1.,}tvr.r.caw,w.-:w:->ti�:-�t.`�:-ram}o-.�co;.•rr.t•���:bo-r.=:-rrrrxrrf rx rrrrrrr.rrir.�rr�:rir�
J�
,.;ald A.Pettit Permit#68-05
Page 3 of 4
ADDITIONAL CONDITIONS
16) No attempt shall be made by the permittee to prevent the full and free use by the public of all navigable
waters at or adjacent to the authorized work.
17) The authorized structure and associated activity shall not cause an unacceptable interference with
navigation.
18) The permittee shall maintain the authorized work in good condition and in conformance with the terms ,
and conditions of this permit. The permittee is not relieved of this requirement if he abandons the
permitted activity without having it transferred to a third party. .
P
19) This permit does not authorize the interference with any existing or proposed Federal project, and the
permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury
which may be caused from existing or future operations undertaken by the United States in the public
interest.
20) Permanent reflectors shall be attached to the structure in order to make it more visible during hours of
darkness or inclement weather.
21) This permit authorizes a maximum of 9 boat slips designed as personal watercraft docks. At no time
shall more than 9 vessels be moored or docked at the facility. The restriction of the number of vessels
shall apply to all marine vessel types, including but not limited to motorboats, sailing vessels and
personal watercraft. Any modification/reconfiguration of this facility shall require permit modification.
NOTE: Any proposal to add two or more additional boat slips to the authorized 9-slip facility shall
require that the docking facility be classified as a marina, and shall therefore require a review
under the N.C. Environmental Policy Act (NCEPA).
NOTE: It is strongly recommended that the permittee exercise all available precautions in the day-to-day
operation of the facility to prevent facility waste from entering the adjacent waters. Such
discharge, either directly or indirectly, to adjacent waters could contravene state water quality
standards, thereby violating state law.
Sedimentation and Erosion Control
22) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to
ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence,
diversion swales, or berms, etc.). At a minimum, silt fences shall be properly installed immediately
landward of the bulkead caps immediately following completion of backfilling activities, and remain
until as such time the area has become stabilized in accordance with condition number 20 below.
23) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion
within thirty days of project completion. RECEIVED
JAN 17 2017
DCM- MHD CITY S¢C
.�� .�aco.,roa•axaw,�r..•rconve-:.+.tiwrrr.-:�.ro-rrrrr.-r:•:-:ao-�•rr•^:-r.-�.ti�•rrr.=wrrirrrrrrrrT
Ronald A. Pettit Permit# 68-05
Page 4 of 4
ADDITIONAL CONDITIONS
General
24) The permittee understands and agrees that, if future operations by the United States requires the
removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the
opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause
unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required,
upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or
obstructions caused thereby, without expense to the United States or the state of North Carolina. No
claim shall be made against the United States or the state of North Carolina on account of any such
removal or alteration.
25) No vegetated wetlands shall be excavated or filled. $
f
26) At no time shall any construction equipment cross coastal wetlands or adjacent private properties
without proper approval and/or permit modification.
27) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not f
authorized. y
f 28) Dredging in any manner, including "kicking" with boat propellers, is not authorized. This prohibition 3
shall be applied and enforced throughout the entire existence of the permitted structure. r
f
NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits,
f approvals or authorizations that may be required.
r
J
NOTE: Future development of the permittee's property may require a modification of this permit.
tContact a representative of the Division at (252) 264-3901 prior to the commencement of any f
such activity for this determination. The permittee is further advised that many non-water
dependent activities are not authorized within 30 feet of the normal water level. r
f
f
NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water
Quality Certification No. 3490 (DWQ Project No. 05-0421), which was issued on 4/19/05. i
f 1
NOTE: The U.S. Army Corps of Engineers authorized the proposed project under General Permit No.
198200277 (COE Action Id. No. 200510623), which was issued on 3/16/05. r
f
XX
f
r
I
r
f
f
X RECEIVED
f
f
r f
JAN 17 2017
f
DCM-
MHD CITY
f
f
f
f
fia.oxo-;�r�taw.���:ao- �:t-rv�»�tc:trot-�+r�.ow..Cacao-»�o-coavouaaatoaoo-r�x,x�:.taw.r»aN-���va-;-�o-wo:-..�.tivaoati>.taa:.v-�.+,�!.r�>wrrr.a:,:ri,�.rf,�rr,�r.:-:•r>•rr.�.o-s-ter:�.+.�f�rrrrl
ADJACENT PROPERTY C
(JULIANN F. BLEVINS)
60 0 60 120 180
Q --Note: Rip rap to be transported by watercraft
JZ from adjacent highland to work site. (see bulkhead section
'COASTAL WETLANDS for materials)
�Q (DETERMINATION MADE 05/04/04
BY PROPOSED FREE STANDING
0 �Oo -k BULKHEAD-15'(NO BACKFILL)
C� a '1Z PROPOSED
BULKHEAD
O _
PROPOSED � NWL . . �— . • AC�ILL
Q /BULKHEAD- 12' PROPOSED 2'x to
FINGER PIER—ate.
"�� EXISTING BULKHEAD PROPOSED CONC.
BOAT RAMP 12'X 20'
IT
NA
kPV
EXISTING EXISTUNG
IN
-2.0' BOAT RAMP BUILDING
A
R
PILE(YP)< P(O O OSFO
9-PROPOSED gT�NcJAN�i/�/� TOWERG
MANUFACTURED ZJ qCC �'�q qNf
WATERCRAFT DOCKS C v/
(4.92'X 12.58'each) Fss�� FORFO
EXISTING
RESIDENC
BOAT RAMP SECTION VIEW WF7147'gk
i
PROPOSED RETURNWALL
ADJACENT PROPERTY OWNER:
N EXISTING (GRAND HARBOR, LLC)
GROUND
�\EXISTING Note:Access and watercraft docks i
BOTTOM installed per manufactures
recommendations.