Loading...
HomeMy WebLinkAbout165-05 Renewal/Maintenance 10/2015 Permit Class Permit Number RENEWAL 165-05 MAINTENANCE-5 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ernnit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued to Perdue Farms Incorporated, PO Box 10, Pantego, NC 27860 Authorizing development in Beaufort County at Pantego Creek, 429 West Main Street, in Belhaven as requested in the permittee's application dated letter dated 10/14/15, This permit, issued on October 23,2015 , is subject to compliance with the application(where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. 1) This renewal shall be attached to the original of Permit No. 165-05, which was issued on 11/21/05, Y and copies of all documents shall be readily available on site when a Division representative inspects yv the project for compliance. 2) All conditions and stipulations of the active permit remain in force under this renewal period. t (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. l r Any maintenance work or project modification not covered Braxton C. Davis, Director Division of Coastal Management $ hereunder requires further Division approval. , 4 All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31,2018 Y In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee FPerdue rms Incorporated Permit No. 165-05 Page 2 of 2 ADDITIONAL CONDITIONS Maintenance Clause 3) The Division of Coastal Management shall be notified in writing at least two (2)weeks in advance of any maintenance work authorized by this permit, and such notification shall include: A. The number of the original permit. B. A statement that no dimensional changes are proposed. C. A copy of the original permit plans with cross-hatching indicating the area to be maintained,the area to be used for spoil disposal, and the estimated amount of material to be removed. The location, design and holding capacity of the spoil disposal site shall be approved by a representative of the Division prior to the initiation of any maintenance dredging activities. D. The date of map revision and the permittee's signature shown anew on the original plan. NOTE: A permit renewal application processing fee of$100 was received by DCM for this project. North Carolina Department of Environmental Quality Pat McCrory Donald R. van der Vaart Governor Secretary October 26, 2015 Perdue Farms,Inc. P.O. Box 10 Pantego,N.C. 27860 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable,the State Dredge and Fill Law,for you to proceed with your project proposal. The original(buff- colored form)is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or 113-229.Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center,Raleigh,NC 27611-6714, (919)733- 2698 within twenty(20)days of this decision on your permit.You should also be aware that another qualified party may submit an objection to the issuance of this permit within twenty(20)days. The project plan is subject to those conditions appearing on the permit form. Otherwise,all work must be carried out in accordance with your application. Modifications,time extensions, and future maintenance requires additional approval. Please read your permit carefully prior to starting work and review all project plans,as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time,Department personnel will visit the project site. To facilitate this review,we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions,environmental safeguards,or problem areas,you may contact Department personnel at any time for assistance.By working in accordance with the permit,you will be helping to protect our vitally important coastal resources. Sincerely, 0& Douglas V.Huggett Major Permits and Consistency Manager N.C.Division of Coastal Management Enclosure 400 Commerce Ave.,Morehead City,NC 28557 Phone:252-808-28081 FAX:252-247-3330 Internet:www.nccoastaimanagement.net An Equal Opportunity 1 Affirmative Action Employer-Made in part by recycled paper DCM Coordinator: S ,YS Permit#: ((¢s 0 MAILING DISTRIBUTION SHEET �! Permitee: P•e tAt FG(ymE In Agents: DCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City Washington Wilmington US ACOE Offices: Washington: Raleigh Bland William Westcott(NC DOT) Bill Biddlecome (NC DOT) Wilmington: Tyler Crumbley Liz Hare Cultural Resources: Renee Gledhill-Early Public Water Supply: Diane Williams (WIRO) Joey White (WARD) DCM/ Shane Staples Fisheries Specialist Gregg Bodnar NC DOT: Ken Pace DMF/ Patti Fowler Shellfish Sanitation: Shannon Jenkins State Property: Tim Walton Water Resources: Karen Higgins (Raleigh) John Hennessy(NC DOT) Washington: Anthony Scarbraugh-401 Wilmington: Joanne Steenhuis —401 Chad Coburn- 401 DEMLR Washington: Scott Vinson-Stormwater Wilmington: Georgette Scott- Stormwater Wildlife Resources: Maria Dunn LPO: Fax Distribution: Permitee#: Agent#: MEMRANDUM To: Courtney Spears From: Steve Trowel Through: Jonathan Howell J� Date: 18 October 2018 Subject: Renewal of Major CAMA Permit no. 165-05 Perdue Agribusiness LLC is requesting for the second time,to renew Major CAMA permit no. 165-05 originally issued on 21 November 2005 for maintenance excavation of the barge slip at their grain facility located in the Town of Belhaven adjacent Pantego Creek in Beaufort County, North Carolina. Perdue staff reports that the Alligator/Pungo river cut of the Intercoastal Waterway (ICW) has ongoing shoaling issues, therefore barges are unable to travel the cut fully loaded. Purdue staff reports that the US Army Corps may undertake some dredging work in the ICW cut this dredging cycle due to increased tonnage, mainly barges traveling to Nucor, and can now justify the dredging work. Perdue staff want to be prepared if the shoaling is cleared. This is the second 5 year maintenance request by Perdue since the original issuance of the permit. Washington staff has no objection to the renewal of this permit. The $100 check has been deposited. RECEIVED OCT 21 2015 DCM- MHD CITY PERDUE AGRIBUSINESS U.0 PERIAT'..AGR113USINF.SS ENVIRO NMEN"1Al. P.O. Bov 460 • LexN kton N('27849-0460 s 0111ce: 2i2-348-4326 October 14, 2015 HAND DELIVERED N.C. Division of Coastal Management Attn: Mr. Steve Trowell NCDEQ 943 Washington Square Mall Washington,North Carolina 27889 Subject: Perdue Farms Incorporated Belhaven Grain Facility/Belhaven,N.C. Barge Slip Maintenance Project Permit# 165-05 Dear Mr. Trowell: Perdue AgriBusiness, LLC is requesting an extension for the maintenance permit from the N.C. Division of Coastal Management. This permit was obtained to perform necessary maintenance to our barge slip, located at our grain facility in Belhaven. The project entailed excavation of our current barge slip to accommodate the draft required for fully loaded barges, in addition to shoreline stabilization. There has been no work performed under this permit because an area of the current shipping lane through the inter-coastal waterway near the Alligator River and the current channel within the breakwater at Belhaven will not accommodate the draft of fully loaded barges as alluded to in my 2013 letter. Although the issue within Pantego Creek in Belhaven has corrected itself, there are still issues near the Alligator River. It would not prove beneficial to undertake the project until this area of barge travel have been dredged to allow uninhibited passage. We have been made aware of the possibility that due to tonnage shipped on the aforementioned waterway, the Corp of Engineers is considering to undertake dredging of this channel;therefore we respectfully request this extension to allow us the opportunity to perform said work at such time the shipping lane's depth is restored to reflect previous conditions. Please find enclosed the required fee. We hope this meets with your approval and if you should have any questions regarding this permit extension request, please contact me at 252-348-4326. Sincerely, Wayne Black,REM,REPA,CCA RECEIVED Director, Perdue Agri-Business Environmental Enclosures/: Check Payment# 3919 OCT 21 2015 DCM- MHD CITY