Loading...
HomeMy WebLinkAbout27-05 Nichols, J. & Chesshire, R. & Lomicka, M. & Buxton, J., c/o Coastal Marketing & Development Permit Class Permit Number NEW 27-05 STATE OF V`ORT11 CAROLINA Department of Environment and Natural Resources and 3 Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 Excavation and/or filling pursuant to NCGS 113-229 Issued t0 J.Nichols,R.Chesshire,M.Lomicka&J.Buxton,c/o Coastal Marketing&Development,309 Middle St.,New Bern,NC 28560 Authorizing development in Pamlico County at Dawson Creek, at 142 Sunshine Dr., Shine Landing S/D, Arapahoe , as requested in the permittee's application dated 8/10/04. including the attached workplan drawing.dated 5/10/04 This permit, issued on February 24, 2005 , is subject to compliance with the application(where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines im risonment or civil action; or may cause the permit to be null and void. Docking Facility 1) No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 2) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee shall not be relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. f This permit must be accessible on-site to Department ), personnel when the project is inspected for compliance. Ch es S. Jones,Director Any maintenance work or project modification not covered hereunder requires further Division approval. Division of Coastal Management All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31, 2008 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee t Nichols, et. al. Permit#27-05 Page 2 of 3 ADDITIONAL CONDITIONS 3) This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. 4) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee shall not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 5) The authorized structures and associated activity shall not cause an unacceptable interference with navigation. 6) The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor. The line of division of riparian access shall be established by drawing a line parallel to the channel, then drawing a line p perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. 7) In order to ensure consistency with Condition No. 6 of this permit, the permittee shall conduct an as- built survey depicting the docking facility, property lines and riparian corridor lines. The survey shall be submitted to the Division of Coastal Management within 60 days of completion of the permitted project. 8) The permittee shall install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors shall be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 9) It is possible that the authorized structure may be damaged by wave wash from passing vessels. The issuance of this permit does not relieve the permittee from taking all proper steps to ensure the integrity of the permitted structure and the safety of moored boats. 10) Any portion of the permitted access pier built over coastal wetlands shall not exceed six feet in width and shall be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. Erosion and Sedimentation Control 11) In order to protect water quality, runoff from construction must not visibly increase the amount of suspended sediments in adjacent waters. x 12) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). t Nichols, et. al. Permit#27-05 Page 3 of 3 ADDITIONAL CONDITIONS 13) All disturbed areas shall be provided a ground cover sufficient to restrain erosion within 30 calendar days of project completion. 3 6 General 14) No vegetated wetlands or open water areas shall be excavated or filled, even temporarily. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 808-2808 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 50 feet of the normal water level. NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley,Governor Charles S. Jones, Director William G. Ross Jr., Secretary February 28, 2005 Coastal Marketing&Development 309 Middle Street New Bern,NC 28560 Dear Sir: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. Please sign both the original (buff- colored form) and the copy. Return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below.Please retain the original(buff-colored form),as it must be available on site when the project is inspected for compliance. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A- 121.1 or 113-229.Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty(20)days,the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it is to your benefit to be sure that he fully understands all permit requirements. From time to time,Department personnel will visit the project site.To facilitate this review,we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Sincerely, R^I& V, /I V Douglas V.Huggett Major Permits and Consistency Manager Enclosure 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293\FAX: 919-733-1495\Internet: http://dcm2.enr.state.nc.us An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Jerry Nichols, Robert Chesshire, Mark Lomicka, James Buxton Joint applicants with 25% undivided interest in the property. 2. LOCATION OF PROJECT SITE: 142 Sunshine Drive in Shine Landing Subdivision off SR1302 and adjacent to Dawson Creek near Arapahoe, Pamlico County Photo Index - 2000:216-900, R-21 1995: 79-863, Q-22 State Plane Coordinates - X: 2670100 Y: 463400 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - September 1, 2004 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received Complete: September 27, 2004 Office - Morehead City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Pamlico County Land Classification From LUP - Rural/Conservation (B) AEC(s) Involved: CW, EW,PTA (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: Existing - None Planned - None (F) Type of Structures: Existing - None Planned - Pier, finger piers, tie pilings (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands 2424 sq. ft. shaded (B) Public Trust Areas and Estuarine 2898 sq. ft. usurped, Waters of Dawson Creek of which 1271 sq. ft. is shaded (C) High Ground 360 sq.ft. 300 sq.ft. shaded graveled (D) Total Area Disturbed: 5982 (E) Primary Nursery Area: No (F) Water Classification: SC; NSW Open: No 8. PROJECT SUMMARY: The applicant proposes to construct a 6' X 60' gravel walkway to a 6' X 50' access over high ground to a 6' X 404' access over wetlands, to a 6' X 203'pier with two 1.5' X 15' finger piers and 8 tie pilings for four boatslips. 1 FIELD INVESTIGATION REPORT: Nichols, Chesshire, Lomicka, and Buxton PAGE #2 9. Nt;RRATIVE DESCRIPTION: ProjecL, Setting The site is located approximately 4 miles southeast of the Town of Arapahoe at 142 Sunshine Drive (Lot 40 in the Shine Landing subdivision), on Dawson Creek, in Pamlico County. The joint applicants each owns 25% undivided interest in the non-residential lot. The lot slopes from the Normal Water Level at the northern property boundary to approximately 11' above the Normal Water Level at the property's southern boundary. The majority of the lot is composed of freshwater and coastal wetlands. SSpartina alterniflora, Spartina ap tens, S6mus sue.,and Cladium jamaicense can be found in the coastal wetlands on the property with multiple freshwater wetland species found over 420' from the property's boundary with Dawson Creek. The property is 80 feet in length along the shoreline. The property rises quickly once beyond the wetland areas to a flat upland area adjacent to Sunshine Drive. Dawson Creek is classified SC; NSW by the EMC in the area of the proposed construction and is less than 1000' from where Dawson Creek is classified SA; HQW NSW. Dawson Creek is classified by the Division of Marine Fisheries as a secondary nursery area but closed to shell fishing. Water depths in the area of the proposed boat slips range from -3.4' to -4.2' below the NWL. Currently there are no structures adjacent to the property, however, residential houses and piers have been constructed on other lots within the subdivision. The developers of Shine Landing Subdivision have installed a community dock for other off waterfront lot owners downstream from the proposed project location. Project Proposal The applicants propose to construct a 6' X 60' marl/gravel walkway from Sunshine Drive to a 6' X 50' wooden access over high ground to a 6' X 404'wooden access over wetlands, to a 6' X 203'wooden pier with two 1.5' X 15' wooden finger piers and 8 wooden tie pilings to create four 15' X 30' boat slips. The access would be elevated 3 feet above the substrate where it crosses over wetlands. The pier would be located 15' from the adjacent riparian property line to the East and 20' from the adjacent riparian property line to the West. There are currently no piers on the properties adjacent to the proposed project. The proposed pier location is within a cove and would project out into the creek 203 feet beyond the Normal Water Level. Dawson Creek is approximately 900 feet wide in the vicinity of the proposed pier. Anticipated Impacts As proposed the project would impact 660 sq. ft. over high ground, of which 360 sq. ft. would be impervious surface in the area of the gravel walkway. The access over wetlands would shade 2424 sq. ft. of wetlands. Construction of the access is expected to produce minor and temporary impacts on the vegetation and grade/elevation of the wetlands from foot traffic and the movement of construction equipment. The pier and associated boat slips would usurp 2898 sq. ft. of Estuarine Waters and Public Trust Areas of Dawson Creek and would FIELD INVESTIGATION REPORT: 1 Nichols, Chesshire, Lomicka, and Buxton PAGE #3 --------------------------- create 1271 sq. ft. of shading of shallow water habitat as proposed. Localized turbidity impacts are expected during pier construction. The pier would extend out from the NWL 203 feet, approximately twice the length of the typical residential pier in Dawson Creek. Submitted by: Stephen Lane -Morehead City District - October 18, 2004 i Form DCNI-W-1 PP AT LI C IO A _ �. ;Erg 22 (To be completed by all applicants) 2004 yb. City, town, con munity or land'mar e t,v S Ski►��t Su Vt.)i orL 1. APPLICANT c. Street address or secondar road number 1q0 Srfhshine, rives a. Landowner: � -��a`�e� d. is proposed work within city limits or planning S. Name A L 5 t jurisdiction? _ X — Yes No Address e. Name of body of water nearest project (e.g. river, creek, sound, bay) 'aw,50 Creek. City State Zip Day Phone 3. DF.SCRIP"TION AND PLANNED USE Fax OF PROPOSED PROJECT b. Authorized Agent:� —�;.- o a,Sfiot a. List all development activities you propose (e.g. Name building a home, motel, marina, bulkhead, pier, and I —}— excavation and/or filling activities. Address � /vl i of of t?- -5-Tre e_ 1 Co�S�yu 0. />4Cr lc�i`1�� S�iDS 'Te h ,) City /% P iA) 13e rR State �C- a,.,�Pr`vu� Stib�ivisian� `I c�`��d ?SZ-633�-6o ql b. is the proposed activity maintenance of an existing Zip "t Day Phone p l'o project, new work, or both? 11(!u) Fax.5A __�'33- lea c. Will the project be for public, private or commercial I use? _ 12Vi✓uC. Project name (if any) d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach NOTE: Pcnrot will 6c irfued in name oJlmidowner(f), gndlor additional pages. nu�rQoss_t.t-1^ c'a�s�'�� project nante. Q LueAI K j-A i5 •r r.e d7 Q2o3 fe•"I'�u,_�f _ 2. LOCATION OF PROPOSED boatsl►pf.-th� s 1-- ' �� bL �'- d 4 PROJECT o wa��r ,0►^�� r '� Qwvte,rs �Y ��aWSt'tl,c�iot Pa i Grp be- dd h e, Wilk wn�x o a. County Y�dr�l-YP31 t_�TIQ L.o-rvsP,d To ck ccro q `--slips p r ffO ci l (Yl q ct r�e5' a Yl oc�e- v..r ., nto� fJ1 if be. � ' / f-`, cr`.'i_ l.of 417,0, Form DCM-N11`-1 in. Describe existing wastewater treatment,facilities. P1oh 4. LAND AND WATER CIiARACTERISTICS ' ,� ,� c rt5 n.. Describe location and type of discharge s to waters o� of the state. (For example, surface runoff, sanitary arY a. Siie of entire tract L-T #4 t ,a wastewater, industrial/commercial effluent, 1.16 cL c- down' and residential discharges.) b. Size of individual lot(s) u G Nkus,o f� c. Approximate elevation of tract al>ov��Q��tA� NWL GG O G o. Describe existing drinking water supply source. d. Soil type(s) and texture(s) of tract PgeaL 1!0 1�o -rir r L,i vte t � e. Vegetation on tract r'�1 r� c am_ l this L7" is L°CAC4 S. ADDITIONAL INFORMATION f, Man-made features now on tract �.I FxAJe�{ 1 e, ✓CfIC�CyII d1 SLAbGlIi�1S1DN J roeAds e,�v'( �►^cACrliv"►tivvo(` "f"cV �/hey V G.IeG n�•e Plan land application form. the In addition to the completed g. What is the CAMA Land Us following items must be submitted: classification of the site? (Co-11 the lOO°t L nd""per'.) Transitional • A copy or (lie deed (with state application only) or Conservation Community Developed other instrument under which the applicant claims title _ Rural W15-evuices ether to the affected properties. f the applicant claiming to be the owner of said property, then It. How is the Tract zoned by local government? forward a copy of the deed or other instrument under ri 1 -40 Ke which the owner claims title, plus written permission from the owner to carry out the project. i. Is die proposed project consistent with thNappAlicable let including plan view Yes 7� • An accurate, dated work p ( zoning. ltaable) (Attach Zoning ro,,,P►ia„�e «' � if�'Pp and cross-sectional drawings) drawn to scale Riefer black to Ink on an 8 ll2' by 11" white paper. j. Has a professional archaeological aX s Mont been Coastal Resources Commission Rule 71.0203 for a done for the tract? — Yes detailed description.) If yes, by whom? National Registered please vole that original drawings are preferred an k, Is the project located in a N only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an historic District eligible�rope�tyolve a National adequate number of quality copies are provided by Register listed orCorps of Yes = No applicant. (Contact the U.S. Army Engineers regarding that agency's use of larger No drawings.) A site or location map is a part of plat X - 1, Are there wetland n t Other �` Coastal (marsh) requirements and it must be sufficiently detailed to If yr, has a delineation been conducted? _Z9.1— guide agency personnel unfamiliar with the area to the (,4(tach documvwarion, if available) h f 2 2 2004 Form DCM1I-NIP-1 Morehead City DCM site. Include highway or secondary road (SR) 6. CERTIFICATION AND PERNUSSION numbers, landmarks, and the like. TO ENTER ON LAND • A Storrnwater Certification, if one is necessary. I understand that any permit issued in response to t})is • A list of the names and complete addresses of the application will allow only the development described in adjacent waterfront (riparian) landowners and the application. The project will be subject to conditions signed return receipts as proof that such owners and restrictions contained ii the permit. have received a copy of the application and plats by certified mail. Such landowners must be advised I certify that to the best of my knowledge, the proposed that they have 30 days in which to submit comments activity—complies with the State of North Carolina's on the proposed project to the Division of Coastal approved Coastal Management Program and will be Management. Upon signing this form, the applicant conducted in a manner consistent with such program. further certifies that such noticehas been provided. "r�eddoYp� Door � � 5 I certify that I am authorized- to grant, and do in fact, Name �nyc pam�N g,qod�grant permission to representatives of state and federal Address y 34 hP� a�9 q —_ review agencies to enter on the aforementioned lands in n_. �07. Phone sot �o, connection with evaluating information related to this Name permit application and follow-up monitoring of the Address KP 1 ,__T_ _ ay? project. Phone I further certify that the information provided in this Name application is truthful to the best of my knowledge. Address Phone Y This is the 'Id day of �vd7 • A list of previous state or federal permits issued for --D L4 N e 0 4- H'Ir v-t So vX - ��-•t� work on the project tract. Include permit numbers, Print Name [� permittee, and issuing dates. Signature yt B K e- Lz do..ner or Awhori;ed Agew Please indicate attachments pertaining to your proposed • A check made payable to the i)epnrtment of project. Environment, health, and Natural Resources (DEHNR) to cover the costs of processing the !/A DCM MP-2 Excavation and Fill Information application. � DCM MP-3 Upland Development ✓ DCM MP4 Structures Information • A signed AEC hazard notice for projects in N/A DCM MP-5 Bridges and Culverts oceanfront and inlet areas. N� DCM NIP-6 Marina Development • A statement of compliance Aith the N.C. NOTE; Please sign and date each attaclvnent in the (N.C.G.S. 113A - 1 to space provided at the bottom of each forni. Environmental Policy Act 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Form DCM-'vfP4 �n STRUCTUI[ZES SEP 2 2 2004 (Construction within Public Trust Areas) Morehead City DCM Attach this form to Joint Application for CAMA Major e. Mooring buoys W)A Permit, Form DCM-MP-1. Be sure to complete all (1) _ Commercial _Community _ Private other sections of the Joint Application which relate to (2) Number this proposed project. (3) Des::iption of buoy (Color, inscription, size, anchor, etc.) a. Dock(s) and/or Pier(s) ' (1) — Commercial _Community ,- Private (2) Number O K C w 41 K way (3) Length �.`� F"r. (4) Width of water body (4) Width d- -FT. (5) Dist�-tce buoy(s) to be placed beyond (5) Finger Pie,-s >� Yes No saoreiine (i). Number (i i) Length i��fr7. f. Mooring s«acture (boatlift, mooring pilings, etc.) N�A (iii) Width (1) — Commercial _Community _ Private (6) Platform(s) Yes X _ No (2) Number (i) Number (3) Length (i i) Lenzth (4) «'idt:� (iii) Width (7) Number of slips proposed g. Other (c- <:.:zure de:crpnon) (8) Proximity of stru:::ire to adjacent riparian property lines k3TT• n riaKT' ao�7: o►,L�1" (9) Width of water body 9 dO -1-,e-7 (10) Water depth at ware-ward end of pier at NfLW or IN-VL 14 Fe- --r b. Boathouse (including cover5d lifts) ► )n (1) Commerc:al Private -b vtvkectt'%, t` e4V'r►.5ovL- - (2) Length coc rml Mg r eTl Ka y-'�be✓. Cad. (3) Width Appli of or Project Name c. Groin (e.g. wood, sheetpiie, etc.) JQ 1A, Sigmtm-e (1) Number O lT y (2) Length(s) mete d. Breakwater (e.g. wood, sheetpile, etc.) MIA (1) Lenzdi (2) Average distance from NtHW, NWL or wetlands (3) Maximum distance beyond 1411W, NWL or wetlands Form DC1N-NIP-3 rUPLANDr-� �J S E P 2 d 2004 DEVELOPMENT �P,��raohead City DC111 (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major h. Projects that require a CAMA Major Development Permit, Form DCM-MP-1. Be sure to complete all Permit may also require a Stormwater Certification. other sections of the Joint Application that relate to this Has a site development plan been submitted to the proposed project. Division of Environmental Management for review? ✓ Yes No a. Type and number of buildings, facilities, units or If yes, date submitted 111710A structures proposed 0_LrJ4171_pa-'h fY'ovn nave r oa �o rr�acaPe w t���a� ay �v i. Describe pro mse method of sewage disposal. b. Number of lots or parcels j. Have the facilities described in Item i. above c. Density (give the number of residential units and the received state or local approval? units per acre) O (Attach appropriate documentation) k. Describe location and type of proposed discharges to d. Size of area to be graded, filled or disturbed waters of the state (for example, surface runoff, including roa( s, ditches, etc. 401,X1, for cL sanitary wastewater, industrial/commercial effluent, Mat-j h Frown 12gt)eo{ ret4 T. "wash down" and residential discharges). w oad e n wq l K wiry Su rQtcc-, wlatetr Y 14 K oF�' f'vbwt e. If the proposed project will disturb more than one — ow acre of land, the Division of Land Resources must OrCrI15S receive an erosion and sedimentation control plan at least 30 days before land disturbing activity begins. 1. Describe proposed drinking water supply source If applicable has a sedimentation and erosion e.g. well community, public system etc.) control plan been submitted to the Division of Land omit"co 0-!diX mgmicrDa() 'A C -- =5 l— 9 - Resources? Yes No If yes, date submitted A] m. Will water be impounded? Yes No If yes, how many acres? f. List the materials (such as marl, paver stone, asphalt: or concrete) to he used for paved surfaces. n. If the project is a oceanfront development, when /f1aY1 w► e Nsed �o coN51YN was the lot(s) platted and recorded? _ n art t �c !Ya r v j sue, , lf9-ems(lJ Coatsa r "Kag v. Pa . g. Give the percentage of the tract within 75 feet of Appl' nt or Project Name MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to he covered by SignatRl impervious and/or built-upon surfaces, such as a C pavement, buildings, rooftops, or to be used for pale —' vehicular driveways or parking. O "o _ Revised 03/95 400 copies of this public document were printed at a total cost of$7.00 or$ .02 per copy. April 24, 2004 North Carolina Division of Coastal Management SEP 2 2 2004 11 Morehead Hwy.City 2 District Morehead City DCM Hestron Plaza II Morehead City, NC 238557 Re: Lot 40, Shine Landing Pamlico County, NC Dear Sir or Madam: Please let this letter serve as authorization for Duncan Harrison/Coastal Marketing & Development Co. to submit application for dock construction permitting on our behalf and act as our agent as regards the above property, of which we are one-quarter owner. Thank you for your consideration in this matter and we are available as below should you have any questions or need anything further. cerely, Robert E. and Sharon B. Chesshire 114 Briar Park Dr. Greer, SC 29651 864-676-1144 cc: Duncan Harrison, Coastal Marketing& Dev. Co. DIVISION OF COASTAL MANAGEMENT ip APPLICATION TRANSMITTAL AND PROCESSING RECORD 1) APPLICANT: Jerry Nichols,Robert Chesshire,Mark Lomicka,James Buxton County: Pamlico LOCATION OF PROJECT: 142 Sunshine Drive in Shine Landing Subdivision off SR 1302 and adjacent to Dawson Creek near Arapahoe. DATE APPLICATION RECEIVED COMPLETE BY FIELD: September 27,2004 FIELD RECOMMENDATION: Attached:No To Be Forwarded:Yes CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES FIELD REPRESENTATIVE: Stephen Lane DISTRICT OFFICE: Morehead\ DISTRICT MANAGER REVIEW: B) DATE APPLICATION RECEIVED IN RALEIGH: FEE REC'D: $ Z5-0- PUBLIC NOTICE RECD: 10/b 4,/D END OF NOTICE DATE: /O 12-0/0 ADJ. RIP.PROP NOTICES REC'D: DEED REC'D: APPLICATION ASSIGNED TO: ET-r ON: Jo/Zp A C) 75 DAY DEADLINE: 12-//( I 150 DAY DEADLINE: MAIL OUT DATE: STATE DUE DATE: FEDERAL DUE DATE: FED COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE OBJECTION NOTES COMMENTS S: RETURNED YES NO Coastal Management-Regional Representative Coastal Management-LUP Consistency Division of Community Assistance 0 ulof Land Quality Section 1 V J U ti ` Division of Water Quality 1 2/ 30/0, ' Storm Water Management(DWQ) IVIA State Property Office I(/Z700a Division of Archives&History e"'/oY Division of Environmental Health t V( Z/cX, Division of Highways Wildlife Resources Commission Division.of Water Resources Division of Marine Fisheries Submerged Lands(DMF) Permit# DCM Coordinator: MAILING DISTRIBUTION: DCM Field Offices: Elizabeth City ( Morehead Cityl/I -M &vim �1 j Shepk.� Washington Wilmington US Army Corps of Engineers(USACE): Washington: Mike Bell(NCDOT) Bill Biddlecome(N OT) Raleigh Blan Wilmington: Dave Timpy(NCDOT) Henry Wicker Others: Cultural Resources: R ee edhi11-Early Environmental Health: Terry Pierce,/ Marine Fisheries: Mike Street NCDOT: Ken Pact,,," / Shellfish Sanitation: Patty Fowle✓ State Property Office: Joseph Hendersoi✓ Water Quality: Cyndi Karoly(for non-DOT John Hennessy(NCDOT) Water Resources: John Sutfilerlan Wildlife Resources: Maria Trip Bennett Wynne David Cox(NCDOT) Travis Wilson(NCDOT). LPO: FAXING DISTRIBUTION: Permitee at Agent at DCM Field Offices: Elizabeth City(252/264-3723) Morehead City(252/247-3330) Washington(252/948-0478) Wilmington(910/350-2004) US Army Corps of Engineers(USACE): Washington: Mike Bell(NCDOT) Bill Biddlecome(NCDOT) Raleigh Bland(252/975-1399) Wilmington: Dave Timpy(NCDOT) Henry Wicker(910/251-4025) CANLA Major Permit Process Manual Page 70 of 70 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary MEMORANDUM TO: Doug Huggett FROM: Stephen Lane SUBJECT: Comments & Recommendations - CAMA Major Permit - Jerry Nichols, Robert Chesshire, Mark Lomicka, James Buxton, Pamlico County DATE: February 14, 2005 The following are my comments and recommendations regarding the above mentioned proposal. The request is to construct a 6' X 60' gravel walkway to a 6' X 50' access over high ground to a 6' X 404' access over wetlands, to a 6' X 203'pier with two 1.5' X 15' finger piers and 8 tie pilings for four boatslips. Based upon my review I have no objection to the issuance of this permit but offer the following conditions: 1 No sewage, whether treated or untreated, shall be discharged at any time from any boats using the docking facility. Any sewage discharge at the docking facility shall be considered a violation of this permit for which the permittee is responsible. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 2 This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, may become a permanent part of this marina/docking facility without permit modification. No non-water dependent uses of structures may be conducted on, in, or over public trust waters without permit modification. 3 The pier/boathouse and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. 151-B Hwy. 24, Hestron Plaza II, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper a- r d Any portion of the permitted access pier and docking facilities built over coastal wetlands must not Mood six feet in width and must be elevated a minimum of three feet over the wetland substrate as measured from the bottom of the decking. 5 All development within 50 feet of the normal water level must be consistent with 1?nvironmental Management Commission (EMC) Neuse River buffer regulations in place at the time of such Development. 6 No ,atte;rnpt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 7 The authorized structure and associated activity must not cause an unacceptable interference with iiavigation. 8 This permit authorizes a.maximum of 4 boat slips. At no time shall more than 4 vessels be moored or docked at the facility. The restriction of the number of vessels shall apply to all marine vessel types, including but not limited to motorboats, sailing vessels and Personal watercraft. NO N"F,_ It is strongly recommended that the permittee exercise all available precautions in the day-to-day operation of the facility to prevent facility waste from entering the adjaccia waters. Such discharge, either directly or indirectly, to adjacent waters COLIM contravene state water quality standards, thereby violating state law. cc: Tcd Tyndall, Assistant Director, DCM Terc Barrett, MHC District Manager, DCM Raleigh Bland, USACE, Washington N NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary MEMORANDUM To: Doug Huggett, Major Permits Processing Coordinator From: Maureen Meehan, DCM Morehead City District Planner Date: November 10, 2004 Subject: Major Permit Application, Requested by Jerry Nichols, Robert Chesshire, Mark Lomicka, and James Buxton to construct a gravel driveway,pier with two finger piers, and 8 tie pilings for four(4)boatslips, on property located at 142 Sunshine Drive in Sunshine Landing Subdivision, adjacent to Dawson Creek near Arapahoe, Pamlico County,North Carolina. LUP Consistency Determination: The proposal is Consistent With&Not in Conflict with the 1992 Pamlico County Land Use Plan certified by the CRC on July 24, 1992,provided that all applicable local, state, and federal development guidelines are met. Overview: Areas of Environmental Concern (AEC) impacted by the proposal include Estuarine Waters (EW) and Public Trust Area (PTA), and Coastal Wetland (CW). The Waters at the project site are classified as SC; NSW and are closed to the harvesting of shellfish. The area is not a Primary Nursery Area. The Pamlico County Land Classification Map designates the subject property AECs as "Conservation". Development within the designated AECs is limited by CAMA regulations and development guidelines. Applicable or related policy includes the following: "Except for the requirements established in Policy 10, which exceed the 1 SA NCAC 7H minimum use standards, Pamlico County will permit those uses which conform to the general use standards of the North Carolina Administrative Code (1 SA NCAC 7H)for development within the 15A NCAC 7H as defined Areas of Environmental Concern identified in this plan as Conservation areas I, III, and IV. The Conservation IV classification includes estuarine and public trust waters. " (Residential, Commercial, and Industrial Development Impacts on Resources, Policy 11,pg. IV-14) "Pamlico County supports the use standards for estuarine and public trust waters as specifies in 1 SA NCAC 7H.0207. " (Marine Resource Areas, Policy 1,pg. IV-14) Cc: Tere Barrett, Morehead City District Manager 151-B Hwy. 24, Hestron Plaza II, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%a Post Consumer Paper �aSTN[o STATE OF NORTH CAROLINA DEPARTMENT OF TkANSPORTATION MxHAEL F.EASLEY DIVISION OF HIGHWAYS LYNDO TIPPETT GovERNOR November 4, 2004 SECRETARY Mr. Doug Huggett, Major Permits Processing Coordinator North Carolina Department of Environment and Natural Resources Division of Coastal Management 1638 Mail Service Center Raleigh, North Carolina 28699-1638 Subject: CAMA Permit Application—Construct a Walkway, A 6'X 203' Pier Including 2 Finger Piers and 8 Tie Pilings in Pamlico County Mr. Doug Huggett, The permit application was submitted to this office for review. Find attached the completed form as requested. This agency has no comment for the project. It occurs a distance well off the highway right of way of a non system street in Pamlico County. Should you have any questions or need additional information, please advise. My number in the New Bern district office is (252) 514-4716. Sincerely, e�0 7 Aaron C. Everett District Engineer RECEIVED NOV 12 2004 AV.OF COASTAL MANAGEMENT RALEIGH ACE/rrf attachment Copy: Roberto Canales, P.E., Chief Engineer's Office- w/attachments Judy Slywka, Roadside Environmental Unit- w/attachments Division Two 9 District Two•209 S. Glenburnie Road-New Bern,N.C. 28560•Phone(252)514-4716 A AGA NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal--Manager�,ent Michael F.Easley, Governor Charle ;S. Jones, Director William G Ross Jr., Secretary October 19, 2004OCT 2 7 2004 RECEIVEDMEMORANDUM: MOt'@h TO: Ruth Leggett ead Qty DCM OCT 2 6 2004 Division of Community Assistance DIV.OF COASTAL MANAGEMENT RALEIGH FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE &FILL Permit Application Review Applicant: Jerry Nichols, Robert Chesshire, Mark Lomicka, James Buxton Project Location: Pamlico County, 142 Sunshine Drive in Shine Landing Subdivision, off Sr 1302 and adjacent to Dawson Creek near the community of Arapahoe. Proposed Project: Proposes to construct a 6' X 60' gravel walkway to a 6' X 50' access over high ground to a 6' X 404' access over wetland, to a 6' X 203' pier with two 1.5' X 15' finger piers and 8 tie pilings for four boatslips. Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 8, 2004. If you have any questions regarding the proposed project, please contact Stephen Lane at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. _LZ"This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED l/� DATE /o — -2 '�t- —d 151-B Hwy. 24, Hestron Plaza II, Morehead City, North Carolina 28557 „-- --- I— � -. ., — " , �nnn � ......... ------ .................,.... ..,. r } NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr.,Secretary October 19, 2004 MEMORANDUM: TO: Maureen Meehan District Planner Division of Coastal Management FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE &FILL Permit Application Review Applicant: Jerry Nichols, Robert Chesshire, Mark Lomicka, James Buxton Project Location: Pamlico County, 142 Sunshine Drive in Shine Landing Subdivision, off Sr 1302 and adjacent to Dawson Creek near the community of Arapahoe. Proposed Project: Proposes to construct a 6' X 60' gravel walkway to a 6' X 50' access over high ground to a 6' X 404' access over wetland, to a 6' X 203' pier with two 1.5' X 15' finger piers and 8 tie pilings for four boatslips. Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 8, 2004. If you have any questions regarding the proposed project, please contact Stephen Lane at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: e This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE /` aLo 151-B Hwy. 24, Hesfron Plaza II, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G Ross Jr.,Secretary October 19, 2004 MEMORANDUM: :rf TO: Dan Sams NOV 0 1 2004 For James Simmons Division of Land Resources Morehead City DCM FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE &FILL Permit Application Review Applicant: Jerry Nichols, Robert Chesshire, Mark Lomicka, James Buxton Project Location: Pamlico County, 142 Sunshine Drive in Shine Landing Subdivision, off Sr 1302 and adjacent to Dawson Creek near the community of Arapahoe. Proposed Project: Proposes to construct a 6' X 60' gravel walkway to a 6' X 50' access over high ground to a 6' X 404' access over wetland,to a 6' X 203' pier with two 1.5' X 15' finger piers and 8 tie pilings for four boatslips. Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 8, 2004. If you have any questions regarding the proposed project,please contact Stephen Lane at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE dcr Z7, zoo 151-B Hwy. 24, Hestron Plaza II, Morehead City, North Carolina 28557 ... -.-- --- I- r. .i -11 111 Innn/ -1. ......... -.---..------ NCDENR NOV 1 2 2004 North Carolina Department of Environment and Natural Resources Division of Coastal Management Morehead P,,ity DCM Michael F. Easley, Governor Charles S. Jones, Director William G Ross Jr., rry October 19, 2004 MEMORANDUM: u L, TO: Patty Fowler ! OCT Z 0 NCDENR-Division of Environmental Health Q Shellfish Sanitation Section FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE &FILL Permit Application Review Applicant: Jerry Nichols, Robert Chesshire, Mark Lomicka, James Buxton Project Location: Pamlico County, 142 Sunshine Drive in Shine Landing Subdivision, off Sr 1302 and adjacent to Dawson Creek near the community of Arapahoe. Proposed Project: Proposes to construct a 6' X 60' gravel walkway to a 6' X 50' access over high ground to a 6' X 404' access over wetland,to a 6' X 203' pier with two 1.5' X 15' finger piers and 8 tie pilings for four boatslips. Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 8, 2004. If you have any questions regarding the proposed project, please contact Stephen Lane at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED. r DATE ��• b 151-B Hwy. 24, Hesfron Plaza II, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330\ Internet: www.nccoastalmanagement.net P, NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G Ross Jr., Secretary October 19, 2004 MEMORANDUM: TO: Ken Pace NCDOT OCT 2 7 State Construction/Materials Branch FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE &FILL Permit Application Review Applicant: Jerry Nichols, Robert Chesshire, Mark Lomicka, James Buxton Project Location: Pamlico County, 142 Sunshine Drive in Shine Landing Subdivision, off Sr 1302 and adjacent to Dawson Creek near the community of Arapahoe. Proposed Project: Proposes to construct a 6' X 60' gravel walkway to a 6' X 50' access over high ground to a 6' X 404' access over wetland,to a 6' X 203' pier with two 1.5' X 15' finger piers and 8 tie pilings for four boatslips. Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 8, 2004. If you have any questions regarding the proposed project, please contact Stephen Lane at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE A,z O 151-B Hwy. 24, Hestron Plaza II, Morehead City, North Carolina 28557 Phone: 252-808-2808 \ FAX: 252-247-3330\ Internet. www.nccoastalmanagemen1.net NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G Ross Jr.,Secretary October 19, 2004 MEMORANDUM: N O V 2 2 2004 p E C E 0 W E TO: Joe Henderson nr lead City DCM OCT ? 2 2004 NC Dept. of A i i a ion State Property Office DOA STATE PROPERTY OFFICE FROM: Doug Huggett 'Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE &FILL Permit Application Review Applicant: Jerry Nichols,Robert Chesshire, Mark Lomicka, James Buxton Project Location: Pamlico County, 142 Sunshine Drive in Shine Landing Subdivision, off Sr 1362 and adjacent to Dawson Creek near the community of Arapahoe. Proposed Project: Proposes to construct a 6' X 60' gravel walkway to a 6' X 50' access over high ground to a 6' X 404' access over wetland,to a 6' X 203'pier with two 1.5' X 15' finger piers and 8 tie pilings for four boatslips. Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 8, 2004. If you have any questions regarding the proposed project,please contact Stephen Lane at(252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: l.� This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED �� DATE I 151-B Hwy. 24, Hestron Plaza II, k1orehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net RECFiVED MWR — � NO V 1 6 2004 IIV.OF COASTAL kWGEMENT A RAWGH NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F.Easley, Governor Charles S. Jones, Director William G Ross Jr.,Secretary October 19, 2004 MEMORANDUM: �� TO: Renee Gledhill-Early NOV 1 6 2004 OCT '2 2004 NC Dept. of Cultural Resources Archives &History fyorehead City DCMN4S" ic%cSERVAT1)h OFFICE FROM: Doug Huggett P , 2 8 Major Permits Processing Coordinator (/ SUBJECT: CAMA/DREDGE&FILL Permit Application Review Applicant: Jerry Nichols, Robert Chesshire, Mark Lomicka, James Buxton Project Location: Pamlico County, 142 Sunshine Drive in Shine Landing Subdivision, off Sr 1302 and adjacent to Dawson Creek near the community of Arapahoe. Proposed Project: Proposes to construct a 6' X 60' gravel walkway to a 6' X 50' access over high ground to a 6' X 404' access over wetland,to a 6' X 203'pier with two 1.5' X 15' finger piers and 8 tie pilings for four boatslips. Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 8, 2004. If you have any questions regarding the proposed project,please contact Stephen Lane at(252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE 151-B Hwy. 24, Hestron Plaza II, Morehead City, North Carolina 28557 NOV 0 1 2004 Phone: 252-808-28081 FAX. 252-247-33301 Internet: www.nccoastalmanagemenl.net RECEIVED , Y' DEC 3 0 2004 NCDENR DIV.C�COAST�R�IGH�hGEMEN7 North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G Ross Jr.,Secretary October 19, 2004 MEMORANDUM: 041797 U � F @1gfl�j L5 Lg D Environmental Bio o ical Supervisor D C T 2 2 g P 2004 Division of Water Quality DENR ►�n�wnsa�roATER sQUAU �J Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: Jerry Nichols, Robert Chesshire, Mark Lomicka, James Buxton Project Location: Pamlico County, 142 Sunshine Drive in Shine Landing Subdivision, off Sr 1302 and adjacent to Dawson Creek near the community of Arapahoe. Proposed Project: Proposes to construct a 6' X 60' gravel walkway to a 6' X 50' access over high ground to a 6' X 404' access over wetland,to a 6' X 203' pier with two 1.5' X 15' finger piers and 8 tie pilings for four boatslips. Please indicate below your agency's position or viewpoint on the proposed project and return this form by November 8, 2004. If you have any questions regarding the proposed project, please contact Stephen Lane at (252) 808-2808. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. I ;�-6 3� SIGNED DATE 151-B Hwy. 24, Hestron Plaza 11, Nlorehead City, North Carolina 28557 Phone: 252-808-28081 FAX. 252-247-33301 Internet: www.nccoasta!management.net NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary September 27, 2004 Pamlico News Inc. Legal Advertisement Section P.O Box 510 Oriental, NC 28571 Re: Public Notice— Shine Landing S/D - Lot 40 Dear Sir: Please publish the attached Notice in the Wednesday October 6, 2004 issue of the Painlico News. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Jaye Poole, NC Division of Coastal Management, 1638 Mail Service Center, Raleigh, North Carolina 27699-1638, Telephone (919) 733-2293. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Morehead City office. Sincerely, Stephen Lane Coastal Management Representative Enclosure cc:Doug Huggett, Major Permits Coordinator Ted Tyndall, Assistant Director Tere Berrett, Morehead City District Manager 151-B Hwy. 24, Hestron Plaza Il, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received on September 22, 2004. According to said application, Jerry Nichols, Robert Chesshire, Mark Lomicka, and James Buxton , propose to construct an access over the marsh for a distance of 454 feet, and construct a pier 203 feet in length with 4 boat slips at Shine Landing S/D Lot # 40, adjacent to Dawson Creek in Arapahoe, Pamlico County. A copy of the entire application may be examined or copied at the office of Stephen Lane, NC Division of Coastal Management, located at 151-B Hwy. 24, Hestron Plaza II, Morehead City,NC, (252) 808-2808 during normal business hours. Comments mailed to Charles S. Jones, Director, Division of Coastal Management, 151-B Hwy 24 Hestron Plaza II, Morehead City, NC 28557, prior to October 26, 2004 will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PUBLISHED ON: Wednesday, October 6, 2004 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary September 27, 2004 Mr. Duncan Harrison Coastal Marketing and Development Co. 309 Middle Street New Bern, NC 28560 Dear Mr. Harrison: The NC Division of Coastal Management hereby acknowledges receipt of your application submitted to this office by you on behalf of your clients for State approval for development within Estuarine Waters, Public Trust Area, and Estuarine Shoreline located at Shine Landing S/D Lot 40, adjacent to Dawson Creek, Pamlico County. It was received on September 22, 2004, and appears to be adequate for processing at this time. The projected deadline for making a decision is December 6, 2004. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from September 22, 2004, you may request a meeting with the Director of the Division ofCoastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road rightof- way fronting your property, or at a point along the road righfof-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. 151-B Hwy. 24, Hestron Plaza Il, Morehead City, North Carolina 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%a Post Consumer Paper An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if youhave any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, Stephen Lane Coastal Management Representative sdl Enclosure cc:Doug Huggett,Major Permits Coordinator Tere Barrett, District Manager r i wl � 4 AMA PE MIT APPLIED R I'll re. "iefil c a.,+ k , o r► l IA ILf" G h C c ccl� PROJECT: QVt r wNwrl 1�br a d1J4",,"c.t n, hft G.hltlact ;�• �03 fctt- ., + Gr«k. COMMENTS ACCEPTED THROUGH Srr r�� p� k.l r, 4�eeII CAe_'�b00 -- FORM E DETAILS CONTACT APPLICANT: Mark !'o'",;k"� TAIACr AIAWh,, THE L AL PETC; MIT OFFICER BELOW: �C/tit - /►1o✓� e.. .� c.10 Co p.ff,/ 1"I ft.kcdl,y cl� Aws l y^--t c to 4`.- (,r, e. — I, 3yq ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIER/MOORING PILINGSIBOATLIFT/BOATHOUSE) I hereby certify that I own property adjacent to �5ee- citaGhtA is 4l'yR2 S"n5hime-3riVe. (Name of Property Owner)�C Parce property located at L ofi -'qo i vt shine �.aMd ivt q 5u.lJo[I ✓I s t 0n) -f pO (Lot, Block, Road, etc.) n on �a�sovt Cree,K , in 7`�V•a(po( Aee 1"aWt�iGo , N.C. (Waterbody) (Town and/or County) He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. I do not wish to waive the setback requirement. EP 2 2 2004 I -clu wish to waive that setback requirement. More-head City DCM ------------------------------------------------------------------------------------------------------------------ DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (To be filled in by individual proposing development) ----------------------------------------------------------------------------------------------------------- Signatu (' Print or Type Name $G6-- qqs-a(PsO Telephone Number Date: 1 {// 0-4 ADJACENT RIPARIAN PROPERTY OWNER STATEMENT (FOR A PIER/MOORING PILINGSIBOATLIFT/BOATHOUSE) I hereby certify that I own property adjacent to See- OLitae4tA is /ya S'k n.sh i tle 3 rive (Name of Property Owner)- T x f a►rce� property located at Lot -#q0 in .Sh i r12. �,a.4I A q 5t c,�o[p I"V t S)ova., 4 /10 g2_1010 (Lot, Block, Road, etc.) // on DctWsovL CrecK , in Are(Po( bide.f )9aw tw , N.C. (Waterbody) (Town and/or County) He has described to me, as shown below, the development he is proposing at that location, and, I have no objections to his proposal. I understand that a pier/mooring pilings/boatlift/boathouse must be set back a minimum distance of fifteen feet (15') from my area of riparian access unless waived by me. - - I do not wish to waive the setback requirement. SEP 2 2 2004 I do wish to waive that setback requirement. Morehead City DC ------------------------------------------------------------------------------------------------------------------ DESCRIPTION AND/OR DRAWING OF PROPOSED DEVELOPMENT: (To be filled in by ii:dividual proposing development) c_ Signature THW hOPE, RCOPM Print or Type Name Telephone Number Date: 512 5 ,Zoe Ioouor Aug 19 2003 FILED In PAMLICO County. NC on Aug 10 2003 at 02.'38 01 PH i MOO r by: SUE K WiITFORO state •t PAMLICO REGISTER OF DEEDS North Carolina County BOOK 106 PAGE Real Est at• Excise Tax NORTH CAROLI NA S E P 2 2 2004 WARRANTY DEED PAMLICO COUNTY THIS DEED, made and entered into this the l/I .� da ff P-0.�;03,, by � '. and between COASTAL MARKETING & DEVELOPMENT COMPANY, a North Carolina General Partnership of Craven County, North Carolina, hereinafter referred to as Grantor and JERRY M. NICHOLLS and wife KATHLEEN M. NICHOLLS of Greer, South Carolina, whose address is 112 Briar Park Drive, Greer, SC 29651 hereinafter referred to as Grantees; W I T N E S S E T H: That the Grantor, for a valuable consideration paid by the Grantees, the receipt of which is hereby acknowledged, has and by these presents does grant, bargain, sell and convey unto the Grantees, their heirs and assigns, in fee simple, all that certain lot or parcel of land situated in Number Five Township, Pamlico County, North Carolina and more particularly described as follows: SEE ATTACHED EXHIBIT "A" TO HAVE AND TO HOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantees in fee simple . And the Grantor covenants with the Grantee, that Grantor is seized of the premises in fee simple, has the right to convey the same in fee simple, that title is marketable and free and clear of all encumbrances, except all RETURNED TO--HENDERSON, BAXTER, TAYLOR & GATCHEL, P.A. 28743 DATE RETURNED PO DRAWER U, NEW BERN, NC 28563 ` Rj r ICJ S E P 2 2 2004 B= 4W PACE !_ Ly ericumLcaiiCt:u Of reuLricLions mentioned above, and Lhat: Grantor will warrant and defend the title against the lawful claims of all persons whatsoever. The designation Grantor and Grantee as used herein shall include all parties, their heirs, successors, and assigns, and shall include singular, plural, masculine, feminine or neuter as required by context . IN WITNESS WHEREOF, the Grantor has hereunto set their hands and adopted as their seals the typewritten word "SEAL" appearing after their signatures hereinbelow this the day and year first above written. COASTAL MARKETING & DEVELOPMENT COMPANY, a North Carolina General Partnership (Seal) (SEAL) DUNCAN HARRISON, Gener Partner (SEAL) -it MICHAEL SANDERS, General Partner NORTH CAROLINA CRAVEN COUNTY I, 1/ t s a Notary Public of the County and State aforesaid, certify that DUNC HARRISON and J. Michael Sanders, General Partners of Coastal Marketing & Development Company, a North Carolina General Partnership, personally appeared before me this day and acknowledged the due execution of the foregoing document . WITNESS my hand and notarial seal this th day of August, 2003 . Not y Public My Commission Exp des : 1/1- ��c�-�1C1 S • 28743 8001C 1W PAGE 4W SEP 2 2 2004 NORTH C"OLINA Forehead City DUVI PAMLICO COUNTY The foregoing certificate of ie certified to be correct . This instrument was present for reg' tration thiE day and hour, and duly recorded in th Ffice of the Register of Deeds of Pamlico County, North Carolina, in Book , at Page /�. This the day of J-p go. 2003, at clock M. Y: REGIST R OF DEEDS DEPUTY REGISTER OF DEEDS 28743 BOOK P 906 PAGE 951 ',RAF S E P 2 2 2004 Morehead City DCM EXHIBIT "A" All that certain lot or parcel of land lying and being situate in Number Five Township, Pamlico County, North Carolina, and being more particularly described as follows: Being all of Lot No. Forty-five (45) , as the same is shown and delineated on a Map of "Final Plan of SHINE LANDING" , said Map being recorded in Plat Cabinet A, Slides 133-7 through 133-12, Pamlico County Registry, reference to said Map being hereby made for a more perfect description of said property. THIS CONVEYANCE IS MADE SUBJECT to those certain restrictive and protective covenants recorded in Book 392, Page 517, Pamlico County Registry. Also conveyed is Boat Slip #1 as shown on the map entitled "Proposed 4 Slip Marina of Lot 40" recorded in Plat Cabinet A, Slide 135-6, Pamlico County Registry. TOGETHER WITH an undivided one-fourth (1/4) interest in Lot Number 40, as shown on the map entitled "Proposed 4 Slip Marina of Lot 40" as shown on that map of record in Plat Cabinet A, Slide 135-6, Pamlico County Registry. Lot 40, Shine Landing, is subject to the following covenants that run with the land: There is to be built on Lot 40 a pier to provide four (4) boatslips, the owner of each slip to have the exclusive use of said slip. The use each owner makes of the pier shall be such that it does not interfere with the use of any other owner of the pier. All owners shall be equally responsible for the maintenance, use, upkeep and replacement of said pier and any owner can enforce this obligation against any other in any court of competent jurisdiction in Pamlico County, North Carolina . If any owner, owner' s agent, servant, employee, tenant, or relative causes damage to the pier, such damage shall be the sole responsibility of that owner who shall be responsible for all necessary repairs or replacement . This obligation shall likewise be enforceable by any other owner in any court of competent jurisdiction in Pamlico County, North Carolina. Any improvements constructed on Lot 40 must conform to the restrictive covenants on Shine Landing Subdivision. The ownership of the fractional interest in Lot 40 may not be further reduced and the taxes on said lot shall be paid on a prorata basis and when due . This obligation may be enforced in t same manner as earlier provided for maintenance and damage repairs . _.- The fractional ownership interest in Lot 40 and the boatslip is an appurtenance to ownership of a lot in Shine Landing and may be sold and transferred only to a lot owner in Shine Landing. In the event a fractional owner of Lot 40 and boatslip sells, conveys or transfers owner' s lot in The Shine Landing, owner must first or contemporaneously transfer the boatslip and fractional interest in Lot 40 to another owner in Shine Landing or the transferee of owner' s lot . Failure to so specifically convey said fractional interest and boatslip shall result in the same being deemed conveyed, sold and transferred as an appurtenance of owner' s lot . 28575