Loading...
HomeMy WebLinkAbout145-05 NC Seafood Industrial Park Authority � Permit Class Permit Number NEW 145-05 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission COPY 4 for �M! 02, 2005 X Major Development in an Area of EnvironniLeLital Concern r pursuant to NCGS 113A-118 MOrehC ... I City DC X Excavation and/or filling pursuant to NCGS 113-229 3: Issued to NC Seafood Industrial Park Authority,P.O. Box 549,Wanchese,NC 27981 Authorizing development in Dare County at Wanchese Harbor, Harbor Rd. (SR 1140) Wanchese , as requested in the permittee's application dated 6/29/05. including the attached workylan drawings (15), all dated 6/28/05. This permit, issued on October 19,2005 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below.Any violation of these terms shall be subject to fines, imprisonment or civil action; or shall cause the permit to be null and void. Upland Development 1) Unless specifically altered herein, this permit authorizes only the grading and other land disturbing activities associated with the redevelopment of the property owned by the applicant located on Harbor Rd (SR 1140) adjacent to Wanchese Harbor, Mill Landing Creek basin, including the grading necessary for the construction of the approved boat ramp, removal of the existing concrete slab, the steel sheet pile wall, and the removal of the existing riprap, all as expressly and specifically set forth in the attached permit application forms and drawings. Any additional land disturbing activities and/or construction shall require a modification of this permit. Contact a Division of Coastal Management representative at(252) 264-3901 for this determination. ' (See attached sheets for Additional Conditions) This permit action shall be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case shall be. This permit shall be accessible on-site to Department personnel when the project is inspected for compliance. V Charl Any maintenance work or project modification not covered S. Jones, Director hereunder requires further Division approval. Division of Coastal Management All work shall cease when the permit expires on This permit and its conditions are hereby accepted. December 31, 2008 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee dc,�.taaaoocoaaaoax-�-�c�eaa ..ao-:-:�.-r.srrr,-;c-wa'oh+.taa--xoo.o-cou-o-:.}asbaaoo���:-r}o-r o-o-a�:-aao->aaarr ;--:ao-}o.o-r.a:yc-}o+ao->:-o-�. w �i6bYr.K_X=:9C4ti{-N-0-Y._'-}}t Y?3 Si��:.-rti}6}.::✓..�G:MYQKtiYT-0v}JK-tiy:Ni^ti:`Ka'-i}.ti�.W}CtiWXK.pL40-:-0+A-004-W-%44 .4C- +'%-04PO�Ch' K-0C4}yy'}p{•M7?ti.;} NC Seafood Industrial Park Authority Permit# 145-05 Page 2 of 4 ADDITIONAL CONDITIONS Excavation 2 ROsOnot exceed -12 feet below the normal water level in front of lots 29 and 29A and excavation shall not exceed -7 feet below the normal water level in front of lots 28A and 24. In no case shall the depth of excavation exceed the depth of connecting waters. 3) No excavation shall take place outside the areas indicated on the attached workplan drawings. Spoil Disposal 4) All excavated materials shall be confined to the area designated on the attached workplan drawing 2 of 15, dated 6/28/05. Any proposal to relocate the location of the spoil disposal site shall require permit modification. 5) All excavated materials shall be confined above mean high water and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of solids into any marsh or surrounding waters. Shoreline Stabilization 6) The proposed alignment of the permitted bulkhead and riprap shall be staked by the applicant and approved by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of any construction. 7) The alignment of the approved bulkhead shall be in accordance with the attached workplan drawings. 8) The bulkhead shall be constructed prior to any backfilling activities. 9) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 10) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation or other land disturbing activities, other than those approved under this permit, are permitted except for that which shall be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. Yyy 'f 11) The riprap material shall be free from loose dirt or any pollutant. It shall be of a size sufficient to prevent its movement from the approved alignment by wave or current action. 12) The riprap material shall consist of clean rock or masonry materials such as but not limited to granite, marl, or broken concrete. 13) The backfill material shall be clean and free of any pollutants except in trace quantities. w+,iwco->,}a+��at!:rwK-»o-ct-a�:�o-�»o-aao-a+� nn�ro-o-:,tro-aaaa��A+ro-o-ao-r.at�axaxtrwaaaaaaa�+,aoo-o-ewo-wro-}acrt>at,-:Ks.o;+.vrruo-c-.�o-.�r:-.}r..rr::aoa<.;.a�rx NC Seafood Industrial Park Authority Permit# 145-05 Page 3 of 4 ADDITIONAL CONDITIONS 14) No backfill material is to be placed within 30 feet of the normal water line, except that which shall be used to backfill the area behind the permitted bulkhead. Boat Ramp 15) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State.' Docking Facilities 16) This permit authorizes the removal of the docks, piers, and other structures:and uses located in or over the water that are expressly and specifically set forth in the permit application and attached workplan drawings. This permit authorizes the reinstallation of the docking facility located in front of lots 29 and 30 to its original dimensions and configuration (86.5 ft. x 10 ft. with two finger piers, 12 ft. x 3 ft.), and the instillation of the two bollards, all as expressly and specifically set forth in the permit application and attached workplan drawings. No other structure, whether floating or stationary, shall become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures shall be conducted on, in or over public trust waters without permit modification. Sedimentation and Erosion Control 17) .Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. 18) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion within thirty days of project completion. Concrete Wharf/Apron 19) This permit authorizes the 15 ft. x 70 ft. long concrete apron with a 15 ft. "dog leg" located on lot 24, and the 20 ft. x 25 ft. concrete apron located on lot 28A, all as expressly and specifically set forth in the permit application and attached workplan drawings. The permittee shall take every precaution to ensure that live concrete shall not contact waters of the State or waters that will enter waters of the State. General 20) This permit authorizes the removal of the four 2-inch pvc outfall pipes and their replacement with the 6- { inch outfall pipe, all as expressly and specifically set forth in the permit application and attached workplan drawings. F} iPP:O-r.:Yr.W.-M4++`7dp4-0-0L<?}}}}{'}p-:�j.p'4h'�Yh}'.4}:.CY::CvC4}}P}}.X 0-00040G4'}}C9K-0S!`-0h0i 4}164C'P' '47{N+7iMdi0!�?d4p40443•S NC Seafood Industrial Park Authority Permit# 145-05 Page 4 of 4 ADDITIONAL CONDITIONS 21) The. permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee shall be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such . removal or alteration. 22) No vegetated wetlands shall be excavated or filled without permit modification. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that shall be required, including but not limited to a modified Stormwater permit from the Division of Water Quality. NOTE: Future development of the permittee s property shall require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal water level. L NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water 4 Quality Certification No. 3400 DW Project No. 20051572 10/7/05. :< Q Y ( Q J ) NOTE: The U.S. Army Corps of Engineers has assigned the proposed project COE Action Id. No. x 200511758. v �S !7 �Y. 'xr 7 .f .}ppp.ppp�pgp.}(j.} :•}4.' ,-:-}i-ti.1%-04}7•Q-}6J]Ca}}}}.Yfn`CaGi�.Wt�4GC{+iNM•:W..MWP}OXh`4X-}F406-0ti'Ota\`�-W}.}:y-.r}X}:.0-`.a+•}i✓✓fi.Pe,-h`hG- A'ri!A WCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G.Ross Jr.,Secretary October 19, 2005 NC Seafood Industrial Park Authority ATTN: Mr.Bob Peele P.O.Box 549 Wanchese,NC 27981 Dear Mr. Peele: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. Please sign both the original (buff- colored form) and the Xerox stamped "Copy". Return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. Please retain the original (buff-colored form),as it must be available on site when the project is inspected for compliance. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A- 121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty(20)days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it is to your benefit to be sure that he fully understands all permit requirements. From time to time,Department personnel will visit the project site.To facilitate this review,we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Sincerely, P^7&6- V, Douglas V. Huggett Major Permits and Consistency Manager Enclosure 400 Commerce Avenue, Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: NC Seafood Industrial Park 2. LOCATION OF PROJECT SITE: End of Harbor Road (SR 1140) Wanchese, Dare County, Mill Landing Creek off Roanoke Sound Photo Index - 2000:183-2132 (I-J,3) 1995: 183-1892 (J-L,3) 1989: 152-15 (152-15 (K-M,14) 1984: 140-506 (V-W,17) State Plane Coordinates - X: 3000300 Y: 779600 Oregon Inlet, UL 3. INVESTIGATION TYPE: CAMA / D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 07/14/05 Was Applicant Present - No 5. PROCESSING PROCEDURE: Application Received Complete - 06/30/05 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Dare County Land Classification From LUP - Conservation (B) AEC(s) Involved: EW, ES & PTA (C) Water Dependent: Yes (D) Intended Use: Commercial (E) Wastewater Treatment: Existing - On-site septic drain fields for each tenant Planned - None (F) Type of Structures: Existing - Concrete bulkhead, riprap, docks, boat moorings, and commercial buildings Planned - Steel sheet pile bulkhead (G) Estimated Annual Rate of Erosion: N/A Source - N/A 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Public Trust Area, Estuarine 5,750 sf 900 sf- ramp Waters 340 sf- ramp rock 1,120 sf- bulkhead (B) Estuarine Shoreline 5,330 sf- wharf 5,770 sf- backfill 1,075 sf 1,500 sf- ramp excavated (C) Total Area Disturbed: 20,710 (0.48 acres) (D) Primary Nursery Area: No (E) Water Classification: SC Open: No 8. PROJECT SUMMARY: The applicant proposes to construct a bulkhead along the shoreline of the Seafood Industrial Park, to construct a concrete wharf and to dredge areas of the basin. FIELD INVESTIGATION REPORT: NC SEAFOOD INDUSTRIAL PARK Page 2 of 2 PROJECT SETTING The NC Seafood Industrial Park is located on 54 acres adjacent to a man-made basin adjoining Mill (Landing) Creek off Roanoke Sound and at the end of Harbor Road (SR 1140) in Wanchese, Dare County. The Park is proposing further development of lots 24, 28A, 29A, 29 and 30, which have a combined area of 3.6 acres. The lots have a combined shoreline length of approximately 460 feet that is stabilized by concrete bulkheading and riprap. Existing development on the property includes five metal buildings, concrete parking areas, two docks, two piers, and three sport fishing boat rigging slips. Most of the remaining undeveloped area of the property is covered with marl with very little vegetation existing at the site. The property elevation is approximately eight feet above normal water level (NWL). One of the lots was once used as the NCDOT ferry repair facility, which included a marine railway and a transfer table. The old infrastructure for the repair facility has been removed except for the paved areas. Currently the tenants include a sport fishing boat construction business, a marine engine distributor, the NC Division of Marine Fisheries, a commercial seafood business and a marina. Adjacent riparian properties consist of a boat basin and a marsh. The waters of Mill Creek are classified as SC by the Division of Environmental Management and are closed to shellfish taking. The water depths in the basin in this area range from less than one foot in the north corner of the basin to -26 feet. DEVELOPMENT PROPOSAL In order to provide a straight shoreline for lots 29A, 29 and 30, the applicant proposes to construct 250 feet of steel sheet pile bulkheading. The proposed bulkhead alignment will be a maximum of 3f=t waterward of the existing shoreline bulkhead and will average approximately 7 feet waterward of NWL along 110 feet of the alignment. The remainder of the proposed bulkhead alignment will be along the shoreline that has existing riprap. The riprap will be removed and the bulkhead installed. In this section, the applicant proposes to construct a 30-foot wide concrete boat ramp. The boat ramp will be 80 feet long with approximately 30 feet below NWL. The applicant proposes to install riprap stone along the waterward toe and west side of the proposed boat ramp for stability, as well as 50-foot long steel sheet pile sidewalls. Along this section shoreline, the applicant proposes to construct a 15-foot wide concrete shoreline apron or wharf to be located on land, adjacent to the shoreline of the proposed bulkhead. An existing dock will be removed during construction of the bulkhead and replaced when the bulkhead is completed. The applicant proposes to dredge the basin bottom near shore of lots 29 and 29A to a depth of-12 feet below NWL. The proposed dredge area is approximately 140 feet by 15 feet with a 20-foot by 20-foot extended area into the basin. The existing water depths in this area range from -12 feet to -1 foot. The bottom in this area is soft muck. f FIELD INVESTIGATION REPORT: NC SEAFOOD INDUSTRIAL PARK Page 3 of 3 In order to provide a straight shoreline along lot 24 and a portion of lot 28A, the applicant proposes to remove existing shoreline riprap and construct approximately 90 feet of steel sheet pile bulkhead. Approximately 70 feet of bulkhead will be along the shoreline of lot 24 and will have a maximum distance of 5 feet waterward of NWL and will average approximately 3 feet waterward of NWL. Approximately 20 feet of bulkhead will be constructed along the shoreline of lot 28A that will have a maximum distance of 18 feet waterward of NWL and will have an average of 12 feet waterward of NWL. The proposed bulkhead alignment will stabilize a corner area of the Seafood Park basin. The applicant proposes to construct a 25-foot long return wall at lot 28A, a 25-foot long retaining wall at the corner of the basin and a 15-foot long return wall on lot 24. The applicant proposes to construct a 15-foot wide concrete apron or wharf on lot 24, approximately 70 feet along the shoreline with a 15-foot long dog leg at the corner. The applicant proposes to construct a 20-foot by 25-foot concrete apron or wharf on lot 28A. The applicant proposes to install a new six-inch stormwater outfall pipe to replace four existing two-inch pipes and a scour ditch that currently directs stormwater runoff into the basin. The applicant proposes to dredge the basin bottom near shore in the corner at lots 28A and 24 to a depth of -7 feet below NWL. The proposed dredge area is approximately 65 feet by 45 feet with existing water depths that range from -7 feet to -3 feet below NWL. The bottom is soft muck. Spoil material will be deposited behind the proposed bulkhead to facilitate settling. The applicant proposes to install temporary sheeting to contain the spoil material. The material will be deposited approximately six feet above ground elevation and remain in place for a minimum of 60 days. Once bulkhead backfill settling has abated, the spoil material will be removed to lot 2 at the park. The applicant indicates that approximately 450 cubic yards of bottom material will be excavated for the project. An existing 17-foot by 140-foot commercial grade dock will be rehabilitated during this project. No new docks are proposed. The existing dock for lot 30 that will be relocated was authorized by CAMA permit #29-03. ANTICIPATED IMPACTS The development proposal will result in the following impacts: 1. The proposed bulkhead will result in 1,120 square feet of Public Trust Area (PTA) and Estuarine Waters (EW) Areas of Environmental Concern (AECs) being filled with approximately 415 cubic yards of backfill material placed below NWL. 2. The proposed boat ramp will result in approximately 900 square feet of PTA and EW being filled and 1,500 square feet of Estuarine Shoreline (ES) AEC being paved. The rock to stabilize the ramp will result in 340 square feet of PTA and EW being filled with approximately 71 cubic yards of material. FIELD INVESTIGATION REPORT: NC SEAFOOD INDUSTRIAL PARK Page 4 of 4 3. The removal of approximately 230 feet of existing riprap to facilitate the construction of the proposed bulkhead will result in the loss of 1,075 square feet of ES AEC, changing to PTA and EW AECs. 4. The deposition of spoil material behind the bulkhead to mitigate for future settling will result in the filling of 5,770 square feet of ES AEC. 5. The construction of the concrete wharf will result in the filling of 5,330 square feet of ES AEC with impervious surface. 6. The proposed dredging will result in the disturbance of approximately 5,750 square feet of PTA and EW AECs. Approximately 450 cubic yards of bottom material will be removed. 7. Temporary water turbidity will occur during construction. Submitted by: Frank A. Jennings, III Date: 08/11/05 Form DCM-MP-1 J1 M 0 2005 TIO1 \ b"C'rCa APPLICA � : ..o. ,1, (To be completed by all applicants) b. City, town, community or landmark Wanchese 1. APPLICANT c. Street address or secondary road number _Harbor Road (SR 1140) a. Landowner: Name NC Seafood Industrial Park Authority d. Is proposed work within city limits or planning — jurisdiction? Yes X No Address P.O. Box 549 e, Name of body of water nearest project (e.g. river, City Wanchese State NC creek, sound, bay) Wanchese Harbor (Mill Landing Creek Basin) Zip 27981 Day Phone 252-473-5867 3. DESCRIPTION AND PLANNED USE Fax 252-473-6139 OF PROPOSED PROJECT b. Authorized Agent: Name Bob Peele, Director a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead,pier,and excavation and/or filling activities. Address Same Steel Sheet Pile Bulkhead and Concrete Slab, Bulkhead Backfill, Concrete Boat Ramp, State Two Timber Docks, City Basin Maintenance Excavation Zip Day Phone b. Is the proposed activity maintenance of an existing project, new work, or both? Both Fax c. Will the project be for public,private or commercial use? Commercial c. Project name (if any) Wanchese Seafood Industrial Park Shoreline ImT)rovements d. Give a brief description of purpose,use, methods of construction and daily operations of proposed project. If more space is needed, please attach NOTE: Permit will be issued in name ojlandoxner(s), ondior additional pages. (See Attached) project name. 2. LOCATION OF PROPOSED PROJECT a. County Dare Revised 03/95 Form DCAi-MP-1 m. Describe existing wastewater treatment facilities. 4. LAND AND WATER Each lot contains a septic tank and septic field CHARACTERISTICS permitted by Dare Co. Department of Health. a. Size of entire tract 54 Acres n.. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary b. Size of individual lot(s) 3.605 Acres wastewater, industrial/commercial effluent, "wash down" and residential discharges.) C. Approximate elevation of tract above MHW or Surface Runoff NWL 5 feet above MHW d. Soil type(s) and texture(s) of tract o. Describe existing drinking water supply source. sand, peat, clay Public Water Supply e. Vegetation on tract fescue and rye grass f. Man-made features now on tract 5. ADDITIONAL INFORMATION Seafood Industrial Park with infrastructure g. What is the CAMA Land Use Plan land In addition to the completed application form, the classification of the site? (Consulr the local land use plan.) following items must be submitted: X Conservation X Transitional Developed Community • A Dopy of the deed (with state application only) or Rural Other other instrument under which the applicant claims tide to the affected properties. If the applicant is not h. How is the tract zoned by local government? claiming to be the owner of said property, then Not Zoned forward a copy of the deed or other instrument under which the owner claims title, plus written permission i. Is the proposed project consistent with the applicable from the owner to carry out the project. zoning? NA Yes No (Arrach Zoning compliance ccrtificarc, if applicably) • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black j. Has a professional archaeological assessment been ink on an 8 1/2" by 11" white paper. (Refer to done for the tract? X Yes No Coastal Resources Commission Rule 7J.0203 for a If yes, by whom? East Carolina Universitv detailed description.) k. Is the project located in a National Registered Please note that original drawings are preferred and Historic District or does it involve a National only high quality copies will be accepted. Blue-line Register listed or eligible property? prints or other larger plats are acceptable only if an Yes X No adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of 1. Are there wetlands on the site? Yes X No Engineers regarding that agency's use of larger Coastal (marsh) Other drawings.) A site or location map is a part of plat If yes, has a delineation been conducted? requirements and it must be sufficiently detailed to (Anoch docunwntafion, if Q„ailabL-) guide agency personnel unfamiliar with the area to the Revised 03/95 Form DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. 6. CERTIFICATION AND PERMISSION TO ENTER ON LAND • A Stormwater Certification, if one is necessary. • A list of the names and complete addresses of the I understand that any permit issued in response to this application will allow only the development described in adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners the application. The project will be subject to conditions p and restrictions contained in the permit. have received a copy of the application and plats by certified mail. Such landowners must be advised I certify that to the best of my knowledge, the proposed that they have 30 days in which to submit comments activity complies with the State of North Carolina's on the proposed project to the Division of Coastal proved Coastal Management Program and will be Management. Upon signing this form, the applicant conducted in a manner consistent with such program. further certifies that such notice has been provided. Name Willie Daniels, Jr. I certify that I am authorized to grant, and do in fact, Address 3652 Mill Landing Rd Wanchese grant permission to representatives of state and federal Phone 3652 ill La review agencies to enter on the aforementioned lands in connection with evaluating information related to this Name Willie Etheridge, Jr. permit application and follow-up monitoring of the Address P.O. Box 77. Wanchese project. Phone 252-473-2806 I further certify that the information provided in this Name application is truthful to the best of my knowledge. Address Phone This is the a q day of Jgk(k , 40 aOQS. • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, Print Named permittee, and issuing dates. Signature See Attached � Q— Zxmdawner or Authorized.lgrnJ • A check for S250 made payable to the Department of Please indfcate attachments pertaining to your proposed project. Environment, Health, and Natural Resources (DEHNR) to cover the costs of processing the X DCM MP-2 Excavation and Fill Information application. DCM MP-3 Upland Development X DCM MP-4 Structures Information • A signed AEC hazard notice for projects in DCM MP-5 Bridges and Culverts oceanfront and inlet areas. DCM MP-6 Marina Development • A statement of compliance with the N.C. NOTE. Please sign and date each attachment in the Environmental Policy Act (N.C.G.S. 113A - 1 to space provided at the bottom of each form. 10) If tle project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. Revised 03/95 Wanchese Seafood Industrial Park Shoreline Improvements PREVIOUS PERMITS ~ D & F 2-77 CAMA 139-80 ISSUED 12/9/80 TO NCSIPA CAMA 175-84 ISSUED 8/24/84 TO EASTERN FUELS, INC. CAMA 120-80 ISSUED 2/15/85 TO NCSIPA CAMA 63-88 ISSUED 4/5/88 TO NCSIPA CAMA 124-94 ISSUED 10/14/94 TO NCSIPA CAMA 124-94 MODIFIED 2/21/96 TO NCSIPA CAMA 50-98 ISSUED 4/15/98 TO NCSIPA CAMA 91-98 ISSUED 10/20/98 TO NCSIPA CAMA 23-99 ISSUED 2/22/99 TO NCSIPA CAMA 64-99 ISSUED 7/11/99 TO NCSIPA CAMA 100-99 ISSUED 10/19/99 TO NCSIPA CAMA 147-00 ISSUED 9/26/00 TO NCSIPA CAMA 68-01 USSYED 6/13/01 TO NCSIPA CAMA 90-02 ISSUED 8/6/02 TO NCSIPA CAMA MINOR 98-043 ISSUED 6/19/98 TO NCSIPA SAWCO77-N-028-003-0010 ISSUED 7/12/77 TO NCSIPA CAWCO81-N-028-000029 ISSUED 3/16/81 TO NCSIPA NPDES NC0057738 ISSUED 1/24/84 TO ST. ELMO'S CRAB CO. NPDES NC0059676 ISSUED 11/23/84 TO EASTERN FUELS, INC. NPDES NC0041386 RENEWED 2/8/88 TO N.C. DEPARTMENT OF COMMERCE NPDES NC0041386 RENEWED 2/l/94 TO NC. DEPARTMENT OF COMMERCE NPDES NC0041386 RENEWED 10/1/98 TO N.C. DEPARTMENT OF COMMMERCE PA5472Termitting\Previous Pemiits.doc Form DCM-MP-2 EXCAVATION AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all 1. EXCAVATION other sections of the Joint Application that relate to this proposed project. a. Amount of material to be excavated from below Describe below the purpose of proposed excavation or MHW or NWL in cubic yards 450 fill activities. All values to be given in feet. b. Type of material to be excavated _ sand, peat Average Flag Existing Project c. Does the area to be excavated include coastal Length Width Depth Depth wetlands (marsh), submerged aquatic vegetation Access (SAVs) or other wetlands? Yes X No channel (MLW) or(NWL) d. Highground excavation in cubic yards 575 Canal 2. DISPOSAL OF EXCAVATED Boat 70 42.5 - 9 - /2 MATERIAL basin 61.8 45 -S, $'' - 7 a. Location of disposal area Lot 2 Boat ramp 78 30 +3.6 -.13 b. Dimensions of disposal area 165ft x 84ft Rock As ;Z ,. groin c. Do you claim title to disposal area? X Yes No Rock If no, attach a letter granting permission from the breakwater owner. j d. Will a disposal area be available for future Other maintenance? Yes X No (Excluding If yes, where? shoreline stabilization) Revised 03195 Form DCM-MP-2 e. Does the disposal area include any coastal wetlands If yes, (marsh), SAVs or other wetlands? (1) Amount of material to be placed in the Yes X No water N/A (2) Dimensions of fill area f. Does the disposal include any area in the water? N/A Yes X No (3) Purpose of fill N/A b. Will fill material be placed in coastal wetlands 3. SHORELINE STABILIZATION (marsh), SAVs or other wetlands? Yes X No If yes, a. Type of shoreline stabilization (1) Dimensions of fill area N/A X Bulkhead Riprap (2) Purpose of fill N/A b. Length .3 SO c. Average distance waterward of MHW or N�WL 5. GENERAL d. Maximum distance waterward of MHW or NWL 8.25 feet a. How will excavated or fill material be kept on site e. Shoreline erosion during preceding 12 months and erosion controlled? None, Shoreline Armored Steel Sheet Pile bulkhead and Concrete Slab (Source of information) f. Type of bulkhead or riprap material Steel Sheet Pile b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic g. Amount of fill in cubic yards to be placed below dredge)? water level backhoe dredge (1) Riprap 71 (2) Bulkhead backfill 415 c. Will wetlands be crossed in transporting equipment h. Type of fill material clean, dry fill material to project site? Yes X No If yes, explain steps that will be taken to lessen environmental impacts. i. Source of fill material upland source 4. OTHER FILL ACTIVITIES App ame (Excluding Shoreline Stabilization) ,� Signature _ a. Will fill material be brought to site? Yes X No Date Revised 03/95 Form DCM-MP4 _ T �fUA i3 2005 STRUCURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major e. Mooring buoys N/A Permit, Form DCM-MP-1. Be sure to complete all (1) _ Commercial _Community_Private other sections of the Joint Application which relate to (2) Number this proposed project. (3) Description of buy iy (Color, inscriptioi i, size, anchor, etc.) a. Dock(s) and/or Pier(s) (1) X Commercial _Community_Private (2) Number 1 13i4 t'LISS (3pATwo,e s (3) Length 86.5 feet �4) Width of water body (4) Width 10 feet �� PICR ;OF'P'"r?L-ffl(5) Distance buoy(s) to be placed beyond (5) Finger Piers _X— Yes No # a 9'°3 shoreline (i) Number 2 (ii) Length 12 feet f. Mooring structure (boatlift, mooring pilings, etc.)N/A (iii) Width 3 feet(average) (1) .X Commercial _Community _Private (6) Platform(s) Yes X No (2) Number 2(Behind Proposed Bulkhead) (i) Number (3) Length 7.5 feet go /1 A►e o-$ (ii) Length (4) Width 7.5 feet oN SM�Rr' (iii) Width (7) Number of slips proposed 3 g. Other (Give complete description) N/A (8) Proximity of structure to adjacent riparian property lines 39 feet (9) Width of water body 542 feet (10) Water depth at waterward end of pier at MLW or NWL 20 feet b. Boathouse (including covered lifts) N/A (1) Commercial Private (2) Length lA �tJe"�� sG14 17 Zn�l0t�sfie/1PC 7>mer (3) Width App>zcant o t Name c. Groin (e.g. wood, sheetpile, etc.) N/A signature (1) Number Gt—CR -0 S (2) Length(s) Date d. Breakwater (e.g. wood, sheetpile, etc.) N/A (1) Length (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands Revised 03/95 Statement of Compliance With the N.C. Environmental Policy Act (N.C.G.S. 113A-1 to 10) The NC Seafood Industrial Park Authority's Shoreline Improvements Project does involve the expenditure of public funds and will require multiple agency approvals to construct. However, as discussed in the attached document (CAMA Major Development Application with required documentation attached for the Wanchese Seafood Industrial Park Shoreline Improvements Project), the NC Seafood Industrial Park Authority does not believe that the project will result in significant adverse environmental impacts. AUG-17-2005 WED 11 :07 AM DCM-DMF E. CITY FAX N0, 252 264 3723 P. 02 Wanchese Scorood Industrial Park Shoreline improvements The l:urpose ofthe proposed shorelinc improvements is to provide docking and water access for commercial tenants and stale agencies located in the North Carolina Wanchese Seafood industrial Park. This work includes installation of a new bulkhead, removal and rein Ullotion of a timber clock, construclion of a new timber dock, retrofitting of an existi rig structure, removal and reinstc:tllation of pan outtall, and dredging. 1'hc major construction of the shoreline improvements consists of a new steel sheet pile bulkhead willr.a 15-foot wide slab-on-grade apron behind (sec Section I3-13). This new bulkhead �tnd slab-on-grade apron is to be installed along approximately 350 feet of shoreline. 'hhe new bulkhead will provido stability along the shorel:: i'aciiilating both industrial loading,up to 750 psf, along the waters edge and basin dredging for up to 14 feet of water depth, which is consistent with the existing facilities located in the Seafood Industrial Park. The construction of the new bulkhead along Lots 30 and 29 will require the removal and dispo&al of the exisling rip rap shoreline protection and two lengths of existing steel ,heel pile bulkhead totaling 40 feet. "There is also a 76-loot long existing concrete sheet pile bulkhead that will be left in place and cutoff 4 feet from the top. Minor excavation will be required for the removal of the existing steel sheet pile bulkhead and partial dornolition of the concrete sheet pile bulkhead. This material typically consists of previously placed sand fill. 'There is an existing timber dock 86,5 feet long by 10 feet wide with 2 finger piers 12 feet long by 3 feet wide along the existing conc7ete sheet pile bulkhead that is to he removed, stored, and reinstalled in front of the new steel sheet pile bulkhead, sec Section A-A. The new bulkhead will be installed approximately 6.0 feet waterward of the existing concrete bulkhead. The area of state waters to be filled in front oi'the existing bulkhead is approximately 710 sq ft with an associated volume of 400 eu yds and is to be filled with clean, dry fill material_ The rroposed bulkhead continues along Lot 29 to the edge of Lot 29A where the proposed project entails the installation of a new vessel landing for the N.C. Marine Fisheries resource Enhancement Program. This vessel landing is to provide a 30-foot wide landing extending 52-feet landward of the proposed bulkhead al a 15% slope and is for 1h,- operation of a landing craft type vessel (see Section C-C). Adjacent to the vessel landing and also located on Lot 29A is a proposed 18 11 by 28 ft timber clock that has been previously permitter) under LAMA permit 147-00, see Section D-D. The installation of the proposed bulkhead and landing along Tots 29 &29A results in the removal of material above NWL creating new state waters. The new state waters created by thr construction of this project is 1,075 sq 11. This excavation along with the excawation for the vessel landing is a total of 575 cu yds of highground excavation, Thero is also proposes{dredging in front of the new bulkhead facility to achieve water depth adjacent to the new bulkhead and for the construction of the vessel landing. This proposed dredging in stale waters is 2,910 sq fl with an associated volume of 250 cu yds. Along;Lot 28A,thcro is an existing Limber dock with concrete deck that is structurally inadequate for its current use. As such, this project includes the retrofitting of the timber � bent caps with galvanized steel plates on either side and bolted through to provide the structural capacity required, see Sections E-E and J-J. At the northeast end of the existing dock on Lot 28A, the new bulkhead with slab-on-grade apron continues, extending the existing dock facility another 17.5 feet (see Section F-F) and then turns 90 degrees and extends for another 70 feet to tie into the back edge of the existing concrete platform(see Section H-H). The construction of this segment of bulkhead is associated with the fill of approximately 410 sq ft of state waters with a volume of 15 cu yds. The proposed project also includes dredging in order to provide water depth in front of the new bulkhead. The dredging in this area consists of 2,780 sq ft and a volume of 200 cu yds. The soil stratum of the site includes a layer of highly compressible peat that will result in large settlements of the area over time. As such, the proposed project includes the use of the dredged and excavated material to surcharge the construction area thereby mitigating the concern of future settlements. The areas of proposed surcharging are depicted on Sheet 14 of 15 of the plats incorporated with this application package. In order to surcharge the area temporary sheeting will be installed that will contain the surcharge material. The containment system will be lined with a geotextile filter fabric, see Section K-K for a section of the proposed temporary containment system. This temporary containment and proposed surcharging would be for a minimum period of 60 days. The material would then be transported to Lot 2 on the property where a silt fence and vegetative covering would be used to contain the material and prevent erosion. Along the northeast side of the building on Lot 28A, there are existing drainage problems that are to be addressed in this project. There is an existing scour drainage ditch alongside the building that is undermining the building slab. There are four 2-inch diameter outfall pipes in this scour ditch that discharge on the riprap slope. The proposed project consists of regrading this area to drain to an existing storm water manhole that will be recast with a grated opening and then sod the area. A new closed concrete collection box will be installed for the four drain lines, that will feed into a new 6-inch diameter outfall pipe that will sleeve through the new bulkhead. See Section G-G for the existing scour ditch and outfall pipes and the new proposed regarding and outfall pipe. There are budgetary concerns associated with this project. As such, it is the intent to provide a set of construction documents that include a base bid project for construction purposes along with a series of additive bid items that will be included as funding allows. Two of these additive bid items are presented in this permit application; the first being the vessel landing for the N.C. Marine Fisheries Research Enhancement Program and the second being the previously permitted 18 ft by 28 ft timber dock. If there are insufficient funds for the construction of the vessel landing, the bulkhead and 15 ft wide slab on grade apron will continue uninterrupted to the end of the timber dock with concrete slab on Lot 28A. It is also anticipated that the dredging to a 12 ft water depth would extend to within 35 ft of the end of the bulkhead. This would result in an increase in the dredge area of 1780 sq. ft. and an increase in dredge volume of 225 cu. yds. ....... ...... ..... ::_::.sRiDEECT:: JUN 3 0 2005 CO. T'4! E— NORTH O CAROLINA :':':':PAMLICO:'.'.'.%v ':'::•:':• ..SOUND.'...'...'. .... ......................... ..... GREENVILLE ...... NEW ...Q.......... .*.......... BERN 0 Oa .'.'.'.'..'.'..'...•.':.'..... :':':':ATLAN TIC:..'::::. ...00EAN......... VICINITY MAP Not To Scale 64 .'............. 4_ ::: :: p :::: :4 ROANOKE; SOUND .'.'.'CROATAN SOUND'..' 345 BROA ................. •.•.•:.......................... OUND. ................. ..'�..�.r.......':V. Q .. .•.•.':F{SCR...... :.'....... . ....%*•:•.•.•.•.•.:�..: TE'.:..':.'......•::.':.. WANCHESE LOCATION'•'•'-. '. ................................ .............................. ' .............................................. LOCATION MAP Not To Scale PURPOSE:CONSTRUCT NEW BULKHEAD VICINITY/LOCATION MAPS WANCHESE SEAFOOD FOR DOCKING AND WATER INDUSTRIAL PARK ACCESS FOR TENANTS o 0 o SHORELINE IMPROVEMENTS DATUM: NGVD 1929 NTS AUTHORIZED AGENT:BOB PEELE ADJACENT PROPERTY OWNERS: NC SEAFOOD INDUSTRIAL PARK AUTHORITY DRAWN BY: MOFFATT & NICHOL P.O. BOX 549 WILLIE DANIELS JR. & WILLIE ETHERIDGE JR. WANCHESE, NC 27981 SHEET 1 OF 15 DATE: 6-28-05 F D r 0 D C m D C X 15'-0" y 0 K 0 z z z 2'-0„ m � I?I " 000 MATCH TO EXIST. ;a 0 oxz 00� PROPOSED CONC CAP PROPOSED CONC SLAB EXIST. CONIC m (f) X m 1% SLOPE SLAB 0 Z TOP OF CAP �C m ? CDEL +6.75f . a. . � z zz� I ° m m Z m 0 U)�� 1 \\ \\ \\ \ N m m= _ EL 3.25 A ;u� b� REINSTALL PROPOSED TIMBER PIER GRAVEL BASE m N WL 0.95 o = 1 .�//\�/\\\/// EXIST. GROUND z (A PROPOSED 1 =o o , CONC FASCIA PANEL 1 \ 'T' ` PROPOSED CLEAN, DRY m p o PROPOSED 0 A b Z W30x132 KING PILE FILL MATERIAL, TYP X D ' Z � I I N 41 D ' D PROPOSED cD D PZ-27 SHEET PILE I CUTOFF EXIST. CONIC °D SHEET PILE BULKHEAD o 1 � o .......... ........... ...I............ m = EXIST. MUDLINE VARIES z 0 N `� m N // / :•�. . EL VARIES FROM o rr-o Z I \\/\ \/�\\�\\�\\ —10.0 f TO —19.0 f o 0 m(A-or \\ \\/ /�` m m -;Ln D z K-m �rCA m m Q, 0 ��D Z m m M�0 m8'-6) f z LEGEND _ m m rr i � AREA OF STATE 0 WATERS TO BE FILLED I 0 � D C m D c D m O Z z to m � z f?1 N < n00 Z7 O C)Z7 z � O m cn U)o� 15'-0" m N (nO.X Z7 n C F ;ar G) m Z m D - EL +6.90f = m D o PROPOSED m ;0Z m I CONC SLAB SWALE o z*c N PROPOSED CONC CAP 0 `��= 1% SLOPE SLOPE m m m TOP OF CAP �— _ n EL +6.75f \/1K \ \ll� \ PROPOSED GRAVEL BASE S PROPOSED CLEAN, DRY 'I FILL MATERIAL z NWL 0.95 n :0 m m o A - EXIST. GROUND o '! A z P SED CONC�im x .cn . N D :I ROPOSED W30x99 KING PILE D EXIST. GROUND'.*.,.,.*.,.*.*.,.*.,. ;;;,.*.' 0 O PROPOSED PZ-27 SHEET PILE:: : I ........ : i X c M D --I o o PROPOSED DREDGE :: o � m mZD DEPTH -12.0,: : :,:,:,:* :. D z —m D -0r to D Rp o <D> LEGEND m z -u <�O AREA OF STATE WATERS 0) = m Z ® TO BE DREDGED N, or m ( EXCAVATION OF 00 ESTUARINE SHORELINE I 0 o F_ 0 D C m D C n K O Zm cn z m z < coo ;0 0 n;uz ;u O m cn -0 N0� m N w o;1 ;o n C F OZ� m g mDm 25'-8" 52'-4" m zz� m TJ Dom Vl z�C C) lnD� m m= PROPOSED MOORING BOLLARD �o WITH FOUNDATION o PROPOSED STL SHEET PILE WALL m CAP & FASCIA PANEL EL 7.0f o EL 6.75f ° 0 - - - - - z o EXIST. GROUND , . . . ., , N o N , �+ :: }:f:::::;:f: :f::: 5% SLOP m co _ N WL 0.95 p oxg oZ z x n PROPOSED N > I� PROPOSED GRAVEL BASE CAST—IN—PLACE J x c CONCBOAT RAMP 22 D PROPOSED GRADE BEAM ON—GRADE o EL —5.75f PROPOSED PRECAST EXIST. GROUND ri PROPOSED RIP RAP CONC BOAT RAMP TOE PROTECTION PANEL, TYP _ ;u c m D 2 i Z 0 = J O O m m2D m 0 rpZ O D z(n= D Z K—m 4 * LEGEND co M o Rp o o D AREA OF STATE WATERS m z �o ® TO BE DREDGED = m Z EXCAVATION OF Nm CAESTUARINE SHORELINE °D EXCAVATION ABOVE o ESTUARINE SHORELINE ............ cn oo D c m D C m o n K O zm .. Z m _ Z N -0 < CDjOo �1 nZ7Z m N cci)o x 15-0' 0c c2� 2 —0 ,ice m m zz� D o � �DW PROPOSED MOORING m m= BOLLARD BEYOND c_ ;a D A o PROPOSED CONC CAP o PROPOSED CONC SLAB 0 1% SLOPE SLOPE _ TOP OF CAP m o Ti o EL +6.75f ° o I o a c> z m o g EXIST. GROUND in o „° A o i PROPOSED GRAVEL BASE Z x r- I' Z 0) PROPOSED TIMBER "� ci I PIER, SEE NOTE I PROPOSED BOLLARD o NWL 0.95 p I FOUNDATION BEYOND °° D = PROPOSED CLEAN, DRY FILL MATERIAL o O ... ..... /i,//� PROPOSED CONC FASCIA m D c \\ PROPOSED DREDGE 0 Z � = I PROPOSED W30x99 KING PILE 00 N 0 � I O � m m2D o D = PROPOSED PZ-27 SHEET PILE cn _'n m m�N D Z K—m XrN D m <D� NOTE: LEGEND m Z -0 K�o THE PROPOSED TIMBER PIER HAS BEEN PREVIOUSLY AREA OF STATE WATERS o m Z AUTHORIZED UNDER PERMIT NUMBER 147-00. ® TO BE DREDGED NJ r m c EXCAVATION OF 00 ESTUARINE SHORELINE 0 F D m c- � ; D C 00 K: O zm .. � Z m Z vri -a < 000 M 0 n;1Z m O m cn R. m N c�n0x c�c : �7(-) F OZ-A r x� M � --Am m zz� M M D i m x UI z�c cn> m m m c D � 0 22'-9"f � o PROPOSED CONC CAP D EXIST. BUILDING D 0 PROPOSED CONC SLAB Z (A N 0 . 2 nl �� � — _ TOP OF CAP �P OF CAP %m. m � oo EL +5.25f xT, c Z Z , N 41 D -ri EXIST. MUDLINE I� NWL 0.95 p PROPOSED GRAVEL BASE o D EXIST. GROUND PROPOSED CLEAN, DRY FILL 0 � PROPOSED NEW 6" DRAIN LINE �,,�,�,�i,��i������`��� PROPOSED CONCRETE OUTFALL ENCLOSURE m D � � � PROPOSED DREDGE LINE PROPOSED PZ-27 SHEET PILE m ::E _ I z p 0 = 0Co m -y o r-oZ O D zc2 cn m G-) mom gm cn D Z K-m mD� R. 0a 0-0 m D m <D� LEGEND -+ Z moo r1 M Kxo = m z AREA OF STATE WATERS N or m --I ® TO BE DREDGED w AREA OF STATE o WATERS TO BE FILLED cn EXISTING BUILDING 4 \ 4-2"0 PVC OUTFALL PIPES EXISTING SCOUR DITCH EXISTING CONDITION EXISTING BUILDING REGRADE TO EXISTING MANHOLE AND SOD 0 NEW 6"0 OUTFALL PIPE PROPOSED CONSTRUCTION PURPOSE:CONSTRUCT NEW BULKHEAD SECTION G-G WANCHESE SEAFOOD FOR DOCKING AND WATER INDUSTRIAL PARK ACCESS FOR TENANTS ° SHORELINE IMPROVEMENTS DATUM: NGVD 1929 NTS AUTHORIZED AGENT: BOB PEELE ADJACENT PROPERTY OWNERS: NC SEAFOOD INDUSTRIAL PARK AUTHORITY DRAWN BY: MOFFATT & NICHOL P.O. BOX 549 WILLIE DANIELS JR. & WILLIE ETHERIDGE JR. WANCHESE, NC 27981 SHEET 11 OF 15 DATE: 6-28-05 V) Ir Ld �w Ld Lv < J U) J Q p W 0 W Lm z -1 O ao <m OW O QE Z v~iw� cno 0-> O_ LiJ LLJ Y O O(n Q cy) Ld Ir c w m w w O J O Qx of� Q3 w O C) O>- p Ld w 0 p p Ld m � J O I LdLd Of cn U) U)Lo O 0_U O Z of O O_U O_ U O _J L, Lq O r- + Ld Ld \\/ O� w = \ U � <6-,t N Ld z Ili N o o w o- p Ln o p O � 0' Ul W \ p O z \ L I O_ O O O O_ p m 0 G` p V) X Ld PURPOSE:CONSTRUCT NEW BULKHEAD SECTION H-H WANCHESE SEAFOOD FOR DOCKING AND WATER INDUSTRIAL PARK ACCESS FOR TENANTS o a'-o" is'-o" SHORELINE IMPROVEMENTS DATUM: NGVD 1929 i�a"=� -o AUTHORIZED AGENT: BOB PEELE ADJACENT PROPERTY OWNERS: NC SEAFOOD INDUSTRIAL PARK AUTHORITY DRAWN BY: MOFFATT & NICHOL P.O. BOX 549 WILLIE DANIELS JR. & WILLIE ETHERIDGE JR. WANCHE NC 27981 SHEET 12 OF 15 DATE: 6-28-05 EXIST. CORRUGATED EXIST. 5 1/2 THICK STAY-IN-PLACE FORMS CONC DECK q /4 , d e n Q EXIST. 6"x14" TIMBER STRINGER PROPOSED 3/4"0 BOLT, TYP PROPOSED 1/2" THICK GALV STEEL T, TYP EXIST. 6"x14" EXIST. 12"0 TIMBER PILE TIMBER BENT CAP PURPOSE:CONSTRUCT NEW BULKHEAD SECTION J-J WANCHESE SEAFOOD FOR DOCKING AND WATER INDUSTRIAL PARK ACCESS FOR TENANTS OF �'-4" SHORELINE IMPROVEMENTS DATUM: NGVD 1929 i�2"=� -o.. AUTHORIZED AGENT: BOB PEELE ADJACENT PROPERTY OWNERS: NC SEAFOOD INDUSTRIAL PARK AUTHORITY DRAWN BY: MOFFATT & NICHOL P.O. BOX 549 WILLIE DANIELS JR. & WILLIE ETHERIDGE JR. WANCHESE, NC 27981 SHEET 13OF 15 DATE: 6-28-05 m Oa-w w= cn LJ Of w w Ld \ \ Lj Of D_ LLJ Cf Qf-X �� \� . Z o J a_W Of \ \ om ou 00 N W Q V W O= n +«9-,9 0� a� mm PURPOSE:CONSTRUCT NEW BULKHEAD SECTION K—K WANCHESE SEAFOOD FOR DOCKING AND WATER INDUSTRIAL PARK ACCESS FOR TENANTS o a'—o" 8'-0" SHORELINE IMPROVEMENTS DATUM: NGVD 1929 i�a"=� _°.. AUTHORIZED AGENT: BOB PEELE ADJACENT PROPERTY OWNERS: NC SEAFOOD INDUSTRIAL PARK AUTHORITY DRAWN BY: MOFFATT & NICHOL P.O. BOX 549 WILLIE DANIELS JR. & WILLIE ETHERIDGE JR. WANCHESE, NC 27981 SHEET 15 OF 15 DATE: 6-28-05 DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD A) APPLICANT: NC Seafood Industrial Park County: Dare LOCATION OF PROJECT: End of Harbor Road (SR 1140) Wanchese, Mill Landing Creek off Roanoke Sound DATE APPLICATION RECEIVED COMPLETE BY FIELD REP: 06/30/05 FIELD RECOMMENDATION: Attached: NO To Be Forwarded: YES CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES FIELD REPRESENTATIVE: Frank A. Jennings, III DISTRICT OFFICE• Elizabeth City DISTRICT MANAGER REVIEW: Ted Sampson, - Jet%_ Date B) DATE APPLICATION RECEIVED IN RALEIGH: D /S/ FEE REC'D: $400 b an � PUBLIC NOTICE REC'D: 0$//Vog J END OF NOTICE DATE: 09/07/05 ✓ ADJ. RIP. PROP NOTICES REC'D: ,/ DEED REC'D: APPLICATION ASSIGNED TO: Ir g&ve ,• ON: otho/0,5 C) 75 DAY DEADLINE: 09//3105 .f 150 DAY DEADLINE: 11 lz 7/as"' MAIL OUT DATE: STATE DUE DATE: FEDERAL DUE DATE: FED COMMENTS REC'D: PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE COMMENTS OBJECTIONS: NOTES RETURNED YES NO Coastal Management- Regional Representative Coastal Management- LUP Consistency Division of Community Assistance Land Quality Section I ( J Division of Water Quality ( p 1�(D� ✓ 3{°v oSt oS?ad �n (cal�/D Storm Water Management (DWQ) � 1 2Z��p/5 State Property Office Division of Archives &History (0S Division of Environmental Health $ 2S D Division of Highways Wildlife Resources Commission Division. of Water Resources Division of Marine Fisheries Submerged Lands (DMF) Permit# IL/5- `/5- O DCM Coordinator: ePt�JP� MAILIpNG DISTRIBUTION:,/ 1 Permitee: Nli �201�0� �nr��s���I ���It®�'1" PD Agent: DCMwa Wilmington US Arm r s of Engineers(USACE): Was ington: Mike Bell(NCDOT Bill B' me CDOT) aleigh Blan Wilmington: Dave Timpy(NCDOT) Henry Wicker Cultural Resources: Renee Gledhill arl Environmental Health: Terry Pierc Marine Fisheries: Mike Stree NCDOT: Ken Pace Shellfish Sanitation: Patty Fowle State Property Office: Joseph Henderso Water uali C di Karoly(for non-DO John Hennessy(N T Waterlb \ ildlife Resources: Maria ri \ ynne David Cox(NCDOT) 1 Travis Wilson(NCDOT) LPO: FAXING DISTRIBUTION: Permitee at �f7�1 �PQ(Z Agent at DCM Field Offices: Elizabeth City(252/264-3723) Morehead City(252/247-3330) Washington(252/948-0478) Wilmington(910/350-2004) US Army Corps of Engineers(USACE): Washington: Mike Bell(NCDOT) Bill Biddlecome(NCDOT) Raleigh Bland(252/975-1399) Wilmington: Dave Timpy(NCDOT) Henry Wicker(910/251-4025) CANIA Major Permit Process Manual Page 70 of 70 �OF W A qQ Michael F.Easley,Governor L William G.Ross Jr.,Secretary rNorth Carolina Department of Environment and Natural Resources •� --1 Q ,� Alan W.Klimek,P.E.Director Division of Water Quality October 21, 2005 Mr. Bob Peele, Director Wanchese Seafood Industrial Park 615 Harbor Road Wanchese, NC 27981 Subject: Stormwater Permit No. SW7050832 N.C. Seafood Ind.Park Auth.-Dock & Shorline Improvements General Permit -Bulkhead/Boat Ramp Dare County Dear Mr. Peele: In accordance with your application to be covered under the State Stormwater General Permit for Bulkheads and Boat Ramps, received on August 31 2005, we are forwarding herewith the subject Certificate of Coverage Number SW7050$32 to construct, operate and maintain impervious areas associated with bulkheads and boat ramps, under the subject General Permit. This permit is issued pursuant to the requirements of North Carolina General Statute 143-215.1 and Title 15A NCAC 2H .1000, the stormwater management rules. Please take notice that this Certificate of Coverage is not transferable except after notice to the Division of Water Quality.(DWQ). The DWQ may require modification or revocation and reissuance of the Certificate of Coverage. This permit does not affect the legal requirement to obtain other permits which may be required by the Division of Water Quality the Division of Land Resources, Coastal Area Management Act, or any other Federal, State, or Local agency, law, rule, or ordinance. If you have any questions concerning this permit, or need additional information in this matter, please contact either me or Scott Vinson at (252) 946-6481. Sincerely, Al Hodge Water Quality Regional Supervisor AH/sav: C:\STORMWATER\PERMIT\SW7050832 cc: Brad Woodall, PE — Moffatt & Nichol Dare, County Building Inspections ,�oug Huggett, DCM — Morehead City Washington Regional Office Central Files No°r`thC, Natun North Carolina Division of Water Quality Washington Regional Office Phone(252)946-6481 FAX(252)946-9215 Customer Service Internet: h2o.enrstate,nc.us 943 Washington Square Mall,Washington,NC 27889 1-877-623-6748 An Equal Opportunity/Affirmative Action Employer—50%Recycled110%Post Consumer Paper STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT GENERAL PERMIT NO. SWG020000 CERTIFICATE OF COVERAGE NO. SW7050832 CONSTRUCT, OPERATE AND MAINTAIN IMPERVIOUS AREAS ASSOCIATED WITH A BULKHEAD OR A BOAT RAMP In compliance with the provisions of North Carolina General Statute 143-215.1 , as amended, other lawful standards and regulations promulgated and adopted by the North Carolina Environmental Management Commission, and 15A NCAC 2H.1000, the Stormwater rules, Wanchese Seafood Industrial Park is hereby authorized to construct, operate and maintain impervious areas associated with a bulkhead or boat ramp and the associated stormwater runoff located at N.C. Seafood Industrial Park Authority— Dock & Shoreline Improvements 615 Harbor Road Wanchese Dare County to receiving waters designated as Mill Landing Creek, class SC waters in the Pasquotank River Basin, in accordance with the provisions of the General Permit for Bulkheads and Boat Ramps, No.SWG020000, and the approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit for the subject project. This Certificate of Coverage shall become effective October 21, 2005. ISined thi the 21s' day of October, 2005. l for Aran W. Klimek, P.E., Director Division of Water Quality By Authority of the Environmental Management Commission / State Stormwater Management Systems Permit No. SWG020000 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY GENERAL PERMIT TO CONSTRUCT, OPERATE AND MAINTAIN IMPERVIOUS AREAS ASSOCIATED WITH BULKHEADS AND BOAT RAMPS UNDER 15A NCAC 211 .1000 In compliance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended, and other applicable Laws,Rules and Regulations promulgated and adopted by the North Carolina Environmental Management Commission. All owners or developers of projects where either a CAMA Major Permit or a Sedimentation Erosion Control Plan approval is required, and a bulkhead or a boat ramp is proposed, are hereby authorized to construct, operate and maintain impervious areas in compliance with the General Permit conditions and the provisions of 15A NCAC 211 .1000 (hereafter referred to as the "stormwater rules'), the approved stormwater management plans and specifications, and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this general permit. The General Permit shall become effective on September 1, 2003. Signed this 13`h day of August, 2003. Original signed by Alan W. Klimek, P.E. Alan W. Klimek, P.E., Director Division of Water Quality By the Authority of the Environmental Management Commission State Stormwater Management Systems r Permit No.SWG020000 PERMITTED ACTIVITIES Until this permit is modified or rescinded,permittees are authorized to construct, operate and maintain impervious surfaces associated with a bulkhead or boat ramp,which has met the following standards. All stormwater runoff from these projects shall be in accordance with the attached schedules as follows. Section A—Final Limitation and Controls Section B—Schedule of Compliance Section C—General Conditions STANDARD CONDITION FOR GENERAL PERMITS This General Permit does not relieve the permittee from responsibility for compliance with any other applicable federal, state, or local law,rule, standard, ordinance, order,judgement, or decree. GENERAL PERMIT COVERAGE All persons desiring to be covered by this General Permit must register with the DWQ or appropriate delegated agency by the filing of a Notice of Intent(NOI) and applicable fees. The NOI shall be submitted and a certificate of coverage issued prior to the construction of any impervious surfaces associated with the construction of a boat ramp or bulkhead. Any owner or developer not wishing to be covered or limited by this General Permit may make application for an individual Stormwater Management Permit in accordance with NCAC 2H.1000, stating the reasons supporting the request. Any application for an individual permit should be made at least 90 days prior to the time the permit is needed. This General Permit does not cover activities covered by an individual permit. Any person conducting an activity covered by an individual permit but which could be covered by this General Permit may request that the individual permit be rescinded and coverage under this General Permit be provided. The definition of any word or phrase in this General Permit shall be the same as given in Article 21, Chapter 143 of the General Statutes of North Carolina, as amended. Other words and phrases used in the General Permit are defined in 15A NCAC 2H.1002. State Stormwater Management Systems Permit No.SWG020000 SECTION A: FINAL LIMITATIONS AND CONTROLS During the period beginning on the effective date of the general permit,the Permittee is authorized to construct,operate and maintain impervious surfaces associated with the construction of bulkheads and boat ramps. Stormwater runoff from the permitted impervious surfaces shall be in accordance with the following conditions: 1. A minimum 30' wide vegetated buffer is required to be maintained between all impervious surfaces and the normal high water line. 2. The runoff from boat ramps and other impervious surfaces outside the 30' buffer area must be directed away from surface waters to the extent practicable. 3. Bulkheads and that portion of a boat ramp within 30' of the mean high water line are considered water dependent structures, and are allowed to discharge stormwater runoff from those areas directly into the receiving waters. 4. No impervious surfaces other than a bulkhead,boat ramp and an access road may be constructed. If any other impervious surface, such as a parking area, is proposed, coverage under the General Permit is not applicable, and an individual Stormwater Management Permit or other General Permit is required. 5. The approved Site&Grading Plan and Erosion Control Plan (if required) will be followed. 6. The approved Site &Grading plan shall contain the following items: a. A clear vicinity map showing the direction and distance to the nearest town or city, street name, street number and the nearest intersection of two major roads. b. The receiving waters. C. The site drawn to scale showing all proposed built-upon surfaces. d. All existing and proposed contours and spot elevations. e. A legend of all symbols used on the site plan. f. A delineation of the property lines with bearings and distances. g. A delineation of jurisdictional 401/404 wetlands and coastal wetlands, or a note on the plans stating that none exist. h. A delineation of the 575' AEC area as applicable. i. A delineation of the 30' buffer area. j. A calculation of the proposed amount of built-upon area. 7. No new stormwater piping shall be allowed except that minimum amount necessary to direct runoff beneath an impervious surface such as a road and that minimum amount needed under driveways to provide access. Long runs of pipe, or pipe that discharges directly to surface waters, are prohibited. 8. The amount of built-upon area must be minimized as much as possible. State Stormwater Management Systems Permit No.SWG020000 SECTION B: SCHEDULE OF COMPLIANCE 1. The permittee shall at all times provide adequate stabilization measures in conformance with the approved Site & Grading Plan and Erosion Control Plan. 2. The permittee shall submit all information requested by the Director or his representative within the time frame specified in the written information request. 3. The permittee shall submit to the Director and shall have received approval for revised plans, specifications, and calculations prior to construction, including,but not limited to, the following items: a. Any revision to the approved plans,regardless of size. b. Project name change. C. Transfer of ownership. d. Redesign of, addition to or deletion of the approved amount of built-upon area, regardless of size. e. Further subdivision of the project area. f. Alteration of the proposed drainage. 4. The Director may determine that revisions to the project will require a modification to permit coverage. 5. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the General Permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modif}ring the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been made. State Stormwater Management Systems Permit No.SWG020000 SECTION C: GENERAL CONDITIONS 1. Failure to abide by the conditions and limitations contained in the General Permit is considered a violation of NCAC 2H.1000, and is grounds for enforcement action in accordance with North Carolina General Statutes 143-215.6A to 143-215.6C, or for certificate of coverage termination, revocation and reissuance, or modification in accordance with NCGS 143-215.1. 2. The certificate of coverage is not transferable except after notice to and approval by the Director. In the event of an ownership change, the Director may require a separate NOI and certificate of coverage. The approval of this request will be considered on its merits, and may or may not be approved. The permittee is responsible for compliance with all permit conditions until such time as the Director approves the transfer. 3. The issuance of this general permit does not prohibit the Director from reopening and modifying the general permit,revoking and reissuing the general permit,or terminating the general permit as allowed by the laws, rules, and regulations contained in NCGS 143- 215.1 and 15A NCAC 2H.1000. 4. The certificate of coverage is issued in accordance with this general permit and may be modified, revoked and reissued, or terminated for cause. The notification of planned modifications or non-compliance does not stay any general permit condition. 5. Upon the presentation of proper credentials, and during nonnal business hours,the pennittee shall allow the Director, an authorized representative of the Director, or DENR staff,to enter the property, inspect the project for compliance with the permit, and sample or monitor for water quality. 6. The permittee shall notify the Division of any name, ownership or mailing address changes within 30 days. 7. Any person who knowingly makes any false statement, representation, or certification regarding the project shall be subject to civil or criminal penalties. 8. The General Pen-nit,Notice of Intent, Certificate of Coverage, approved plans and supporting documentation are considered public record and are open for inspection. Ar' NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary MEMORANDUM TO: Doug Huggett, Major Permits Coordinator THROUGH: Ted Sampson, District Manager FROM: Frank A. Jennings, 111, Field Representative DATE: October 13, 2005 SUBJECT: NC Seafood Industrial Park, Major Permit Application Recommendations The applicant proposes to construct a bulkhead waterward of an existing riprap and bulkhead structure along the shoreline of the Wanchese Seafood Industrial Park harbor, to construct a concrete wharf with a boat ramp and to dredge areas of the harbor basin. The development site is located at the end of Harbor Road (SR 1140), Wanchese, Dare County and on the man-made harbor basin off Mill Landing Creek off Roanoke Sound. While the shoreline is not experiencing erosion because of the existing riprap and sheet pile bulkheading, this protected shoreline was developed by the Park from uplands. The rest of the park's shoreline has a heavy-duty sheet pile bulkhead with a straight alignment and on the shore side of the bulkhead, there is a paved wharf with mooring bollards and cleats. The purpose of the development proposal is to finish construction of the wharf and bulkhead along the shoreline consistent with other shoreline within the park. According to 07H.0208, the proposed wharf, boat ramp and bulkhead are water dependent. The proposed boat ramp is larger and more heavy duty than those we generally see. Its purpose is to facilitate the loading of oyster reef material on a NC DMF vessel. The proposed dredging is consistent with 07H.0208; however, the proposed spoil deposition along the shoreline is not water dependent and is inconsistent with 07H.0209. Spoil material must be deposited 30 feet from NWL to be consistent with the Coastal Shoreline rules. The applicant is proposing to use the spoil material as a means to compact back fill material behind the proposed bulkhead and to provide a firm base for the concrete wharf. This particular use of the spoil material appears water dependent as part of the construction of the bulkhead and wharf and should be authorized. 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer-30%Recycled by Fiber Weight Doug Huggett NC Seafood Industrial Park Recommendations October 13, 2005 Page 2 It is recommended that the development proposal be authorized as proposed with the following conditions: 1 . Excavation will not exceed 12 feet below the mean low water level. In no case shall the depth of excavation exceed the depth of connecting waters. 2. No vegetated wetlands/marsh grass will be excavated or filled. 3. The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. 4. All excavated materials will be confined above mean high water and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of solids into any marsh or surrounding waters. 5. The diked disposal area will be constructed a sufficient distance from the mean high water level or any marsh to eliminate the possibility of dike erosion into surrounding wetlands or waters. 6. The disposal area will be properly graded and provided a ground cover sufficient to restrain erosion within 30 working days of project completion. 7. The bulkhead will not extend waterward more than 10 feet from the normal water level at any point along its alignment at the time of construction. 8. The alignment of the authorized bulkhead must be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of construction. 9. The bulkhead must be constructed prior to any backfilling activities. 10. The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 11. The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. Doug Huggett NC Seafood Industrial Park Recommendations October 13, 2005 Page 3 12. The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 13. All fill material to be placed below normal water level will be confined behind the permitted bulkhead. 14. This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, may become a permanent part of this marina/docking facility without permit modification. No non-water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 15. The pier/boathouse and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. 16. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 17. The authorized structure and associated activity must not cause an unacceptable interference with navigation. 18. The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 19. This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 20. The permittee must install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors should be attached to the structure in order to make it more visible during hours of darkness or inclement weather. WA 14 Michael F.Easley,Governor �0 (r William G.Ross Jr.,Secretary c r North Carolina Department of Environment and Natural Resources Alan W.Klimek,P.E.Director Division of Water Quality October 7, 2005 DWQ Project#05-1572 Dare County Mr. Bob Peele, Director NC Seafood Industrial Park Authority pep RIF r P.O. Box 549 �D�D Wanchese,NC 27981 OCT 1 2'2005 Subject Property: 3908 Poor Ridge Road DIV.OF CUMIAL�' Mill Landing Creek [030151, 30-21-8, SC] Approval of 401 Water Quality Certification(GC3400)with Additional Conditions Dear Mr. Peele: You have our approval, in accordance with the attached conditions,to: dredge 0.132 acres of public trust area/estuarine waters on the subject property; and to place fill material within or otherwise impact 0.054of public trust/estuarine waters to construct a concrete wharf; and to place fill material within or otherwise impact 0.289 acres of estuarine shoreline and excavate 0.024 acres of estuarine shoreline to construct a bulkhead on the subject property as described in your application received by the Division of Water Quality(DWQ)401 Oversight/Express Review Permitting Unit on August 16, 2005. After reviewing your application,we have determined that the Division of Water Quality(DWQ) General Water Quality Certification Number 3400 covers these water impacts. This Certification allows you to General Permit No. 198000291 when issued by the US Army Corps of Engineers (USACE). In addition, you should get or otherwise comply with any other federal, state and local requirements before you go ahead with your project including(but not limited to) erosion and sediment control regulations and CAMA. Also,this approval to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application shall expire upon expiration of the 404 or CAMA Permit. This approval is for the purpose and design that you described in your application. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project(now or in the future)exceed one acre of wetland or 150 linear feet of stream, compensatory mitigation may be required as described in 15A NCAC 21-1 .0506 (h). This approval requires you to follow the conditions listed in the attached certification and any additional conditions listed below. The Additional Conditions of the Certification are: 1. Impacts Approved The following impacts are hereby approved as long as all of the other specific and general conditions of this Certification(or Isolated Wetland Permit)are met. No other impacts are approved including incidental impacts: NorthCaropina Q 401 Oversight/Express Permitting Unit A(ra 7y 1650 Mail Service Center,Raleigh,North Carolina 27699-1650 2321 Crabtree Boulevard,Suite 250,Raleigh,North Carolina 27604 Phone: 919-733-1786/FAX 919-733-6893/Internet:hqp://h2o.enr.state,nc.us/ncwetlands An Equal Opportunity/Affirmative Action Employer—50%Recycled/l0%Post Consumer Paper Roy Etheridge-TNT Concrete Page 2 of 2 October 7,2005 Amount Approved Units Plan Location or Reference Public Trust/Estuarine Waters 0.054 (acres) - filled DCM-MP Public Trust/Estuarine Waters 0.132 acres -dred ed DCM-MP Estuarine Shoreline 0.289 acres - filled DCM-MP Estuarine Shoreline 0.024 acres -excavated I DCM-MP 2. Certificate of Completion Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and any subsequent modifications, the applicant is required to return the attached certificate of completion to the 401 Oversight/Express Review Permitting Unit, North Carolina Division of Water Quality, 1650 Mail Service Center,Raleigh,NC, 27699-1650. 3. Water Quality Certification The proposed project must comply with all of the conditions of General Water Quality Certification(GC) 3400. Violations of any condition herein set forth may result in revocation of this Certification and may result in criminal and/or civil penalties. The authorization to proceed with your proposed impacts or to conduct impacts to waters as depicted in your application and as authorized by this Certification, shall expire upon expiration of the 404 or CAMA Permit. If you do not accept any of the conditions of this Certification(associated with the approved water impacts),you may ask for an adjudicatory hearing. You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition,which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh,N.C. 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions,please telephone Cyndi Karoly in the Central Office in Raleigh at 919- 733-9721 or Kyle Bames in the DWQ Washington Regional Office at 252-946-6481. Sincerely, Alan W. Klimek, P.E. AWK/ijm Enclosures: GC 3400 Certification of Completion cc: Doug Huggett, DCM USACE Washington Regulatory Field Office DWQ Washington Regional Office File Copy Central Files Filename: 051572 W ancheseSeafood(Dare)401 CAMA NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary September 21, 2005 NC Seafood Industrial Park P.O. Box 549 Wanchese, NC 27981 Dear Sir or Madam: This letter is with reference to your application for a Coastal Area Management Act Major Development permit to bulkhead along the shoreline of the Seafood Industrial Park, construct a concrete wharf, and to dredge areas of the basin in Dare County adjacent to the Mill Landing Creek at the end of Harbor Road (SR 1140), Wanchese,NC. Although processing of the application is nearing completion, additional time is needed for this office to complete the review and make a decision on your request. Therefore, it is necessary that the standard review time be extended. An additional 75 days is provided by G.S. 113A-122(c) which would make November 27, 2005 the new deadline for reaching a decision on your request. However, we expect to take action prior to that time and will do so as soon as possible. In the interim, if you have any question on the status of your application, do not hesitate to contact me by phone (252-808-2808) or e-mail (doug.huggett@ncmail.net). Very sincerely, Doug0fluggett Major Permits & Consistency Coordinator cc: DCM, Morehead City DCM, Elizabeth City 400 Commerce Avenue, Morehead City, North Carolina 28557 Phone; 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastalmanagement.net Projects Subject: Projects From: 'Bland,Raleigh W SAW" <Raleigh.W.Bland@saw02.usace.army.mil> Date: Mon, 12 Sep 2005 13:35:09 -0400 To: 'Rich Weaver\(E-mail\)" <Rich.Weaver@ncmail.net>, "Jonathan Howell\(E-mail\)" <Jonathan.Howell @ ncmail.net> Sorry for the delays. Sometimes these workloads are not manageable, especially dealing with the OBX. NC Seafood Park AID 200511758 Wanchese GP-291 Issued 12Sep05 Charles Dunn AID 200511609 Albemarle Sound GP-291 Issued 25Aug05 1 of 1 9/12/05 1:38 PM SEP-12-2005 MON 01: 16 PM DCM-DMF E. CITY FAX NO, 252 264 3723 P. 02 AT406�A�_ NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F.Easley,Governor Charles S.Jones, Director Wiliam G.Ross Jr.,Secretary MEMORANDUM TO: Doug Huggett, Major Permits Coordinator THROUGH: Ted Sampson, District Manager FROM: Frank A, Jennings, 111, Field Representative DATE: September 12, 2005 SUBJECT: NC Seafood Industrial Park, Major Permit Application Recommendations The applicant proposes to construct a bulkhead waterward of an existing riprap and bulkhead structure along the shoreline of the Wanchese Seafood Industrial Park harbor, to construct a concrete wharf with a boat ramp and to dredge areas of the harbor basin. The development site is located at the end of Harbor Road (SR 1140), Wanchese, Dare County and on the man-made harbor basin off Mill landing Creek off Roanoke Sound. While the shoreline is not experiencing erosion because of the existing riprap and sheet pile bulkheading, this shoreline was not developed during the initial construction phase of the park. The rest of the park's shoreline has a heavy-duty sheet pile bulkhead with a straight alignment and on the shore side of the bulkhead, there is a paved wharf with mooring bollards and cleats. The purpose of the development proposal is to finish construction of the wharf and bulkhead along the shoreline on all remaining open lots, According to 071-1.0208, the proposed wharf, boat ramp and bulkhead are water dependent. The proposed boat ramp is larger and more heavy duty than those we generally see. its purpose is to facilitate the loading of oyster reef material on a NC DMF vessel. The proposed dredging Is consistent with 07H.0208; however, the proposed spoil deposition along the shoreline is not water dependent and is inconsistent with 071-1.0209. Spoil material must be deposited 30 feet from NWL to be consistent with the Coastal Shoreline rules. The applicant is proposing to use the spoil material as a means to compact back fill material behind the piuposed bulkhead and to provide a firm base for the concrete wharf. This particular use of the spoil material appears water dependent as part of the construction of the bulkhead and wharf and should be authorized. 1367 U.S.17 South,Elizabeth City,North Carolina 27909 Phone: 252.264-3901\FAX. 252.264-3723\Internet: www.nmoastalmanagement.net An Equal opportunity\Affirmative Action Employer—30%Recycled by Fiber Weight SEP-12-2005 MON 01: 16 PM DCM-DMF E. CITY FAX NO. 252 264 3723 P. 03 Doug Huggett NC Seafood Industrial Park recommendations September 12, 2005 Page 2 It is recommended that the development proposal be authorized as proposed with the following conditions 1. Excavation will not exceed 12 feet below the mean low water level. In no case shall the depth of excavation exceed the depth of connecting waters. 2. No vegetated wetlands/marsh grass will be excavated or filled. 3. The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized, 4. All excavated materials will be confined above mean high water and landward of regularly or irregularly flooded marsh behind adequate dikes or other retaining structures to prevent spillover of solids into any marsh or surrounding waters. 5. The diked disposal area will be constructed a sufficient distance from the mean high water level or any marsh to eliminate the possibility of dike erosion into surrounding wetlands or waters. 6. The disposal area will be properly graded and provided a ground cover sufficient to restrain erosion within 30 working days of project completion. 7. The bulkhead will not extend waterward more than 10 feet from the normal water level at any point along its alignment at the time of construction. 8. The alignment of the authorized bulkhead ri,ust be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of construction. 9. The bulkhead must be constructed prior to any backfilling activities. 10. The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 11. The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment, SEP-12-2005 MON 01 : 16 PM DCM-DMF E. CITY FAX NO. 252 264 3723 P. 04 Doug Huggett NC Seafood Industrial Park Recommendations September 12, 2005 Page 3 12. The fill material will be clean and free of any pollutants except in trace quantities. Metal products, organic materials, or unsightly debris will not be used. 13. All fill material to be placed below normal water level will be confined behind the permitted bulkhead. 14. This permit authorizes only the docks, piers, and other structures and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, may become a permanent part of this marina/docking facility without permit modification. No non-water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 15. The pier/boathouse and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. 16. No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 17, The authorized structure and associated activity must not cause an unacceptable interference with navigation. 18. The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons ine permitted activity without having it transferred to a third party. 19. This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 20, The permittee must install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors should be attached to the structure'in order to make it more visible during hours of darkness or inclement weather. AiA /OffirK, NCDENR North Carolina Department of Environment and Natural Pources - 2005 Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary MEMORANDUM TO: Doug Huggett, D Major Permit Coordinator -.uo FROM: Charlan Owen ICP, NE DCM District Planner Through: Ted Sampson, NE DCM District Manager SUBJECT: Major Permit Request by NC Seafood Industrial Park Authority to provide shoreline improvements on Lots 24, 28A, 29, 29A, and 30 that include installation of approximately 410 linear feet of steel sheet pile bulkhead, construction of a 30 foot wide by 80 foot long concrete boat ramp, installation of two (2) concrete aprons totaling approximately 1,550 sq. ft., and the dredging of approximately 5,750 sq. ft. of basin area adjacent to the property at the end of Harbor Road (SR-1440) within the Wanchese Harbor Basin, Mill Landing Creek, in Wanchese, Dare County. DATE: August 31, 2005 Consistency Determination: The request is consistent with/not in conflict with the Dare County 2003 Land Use Plan certified by the CRC on July 24, 2003. Overview: The NC Seafood Industrial Park is located on 54 acres adjacent to the Wanchese Harbor Basin, a manmade basin that adjoins Mill Landing Creek off the Roanoke Sound at the end of Harbor Road (SR 1140). Existing development on the Lots 24, 28A, 29, 29A, and 30 includes five (5) metal buildings and concrete parking areas, with remaining undeveloped areas covered in marl with very little vegetation. The lots have a combined shoreline of approximately 460 linear feet. Existing shoreline improvements including two (2) docks, two (2) piers, and three (3) sport fishing boat rigging slips. Most of the remaining undeveloped area is covered with marl and very little vegetation. Currently the tenants include a sport fishing boat construction business, a marine engine distributor, the NC Division of Marine Fisheries, a commercial seafood business, and a marina. Along the shoreline of lots 29, 29A, and 30, the existing pier will be removed and salvaged, and existing riprap and sheet pile walls will be removed. Approximately 255 linear feet of steel sheet pile bulkhead will be installed, and the salvaged pier will be reinstalled long the new bulkhead. Riprap will be provided along the sheet pile sidewall abutting lot 30. A 30 foot wide concrete boat ramp will be installed along the shoreline of lots 29 and 29A. The boat ramp will be 80 feet long, with approximately 30 feet below Normal Water Level (NWL). Riprap will be provided along the waterward toe and west side of the boat ramp. Fifty foot long steel sheet pile sidewalls will be provided along either side of the boat ramp. The basin bottom near the shore of lots 29 and 29A will be dredged to a depth of —12 feet below NWL. The dredge area is approximately 140 feet by 15 feet with a 20 foot by 20 foot extended area into the basin. 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 \ FAX: 252-264-3723\ Internet: www.nccoastal management,net An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper .. ... .� � � fPtI GIB . .. ., t f... '�..1. �. ,t �..�. '..... ... �., ... �, . r. ...a .. ... .. ,b_ 1 i ,.�. � ".. • ; ,':fir .. .,.,, I t ., .. .,J .. �i�...):t t.. ..t, h. ,. � ...a 11>. .. ,. t ,_. .Iv: .i:.,..>`t;� _ � �.((`ii i ,.��.t,ic�t ..:.f 'ac;i'n ir��ia C:.St..'�,Z�J�,j t..�._ .`�dil .J1ti�•�i ..,. . .. 7. ... North Carolina Department of Environment and Natural Resources MEMORANDUM Division of Coastal Management Page 2 of 2 Along lots 28A and 24, approximately 155 linear feet of steel sheet pile bulkhead will be installed adjacent to the existing timber dock and along the shoreline, including sidewalls. A-.15 foot wide by 70 foot long concrete apron is proposed on along the shoreline of lot 24. A six-inch stormwater outfall pipe will be installed on lot 24. A 20 foot wide by 25 foot long concrete apron is proposed along the shoreline of lot 28A. The basin bottom near the shore corner of lots 28A and 24 will be dredged to a depth of—7 feet below NWL. The dredge area is approximately 65 feet by 45 feet. The waters of Mill Creek are classified as SC and are closed to shellfish taking. The water depth in the basin is in this area range from less than one foot in the north corner of the basin to —26 feet. Anticipated Impacts resulting from this project are expected to include: the dredging of approximately 5,750 sq. ft. of Public Trust Area/Estuarine Waters Areas of Environmental Concern (AEC); the filling of approximately 2,360 sq. ft. of Public Trust Area/Estuarine Waters AEC and 12,600 sq. ft. of Estuarine Shoreline AEC; and the excavation of 1,075 sq. ft. of Estuarine Shoreline AEC. Basis for Determination: The Dare County Land Classification Map identifies the site area as "Community Village". The site is within Areas of Environmental Concern (AECs) therefore the "Conservation" classification also applies. The following are LUP policies that may be applicable to this request: Estuarine Waters/Shoreline: Policy #5, page 56. "Estuarine Shoreline development should continue to be managed to protect and preserve the natural resources of the estuarine waters and the estuarine shoreline. The appropriate tools for this are the existing CAMA permit program and the Areas of Environmental Concerns (AECs) designated under the CAMA program..." Estuarine Waters/Shoreline: Policy#6, page 57. "Dare County supports the installation and maintenance of estuarine bulkheads. Offshore breakwaters, slopes, rip-rap, and voluntary setbacks in excess of CAMA 30-foot buffer rules should be promoted as additional methods for estuarine shoreline management in lieu of estuarine bulkheads along estuarine shorelines where these less invasive techniques would be equally effective in abating a shoreline erosion problem." 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper C ui North Carolina Department of Environment and Natural Resources �. MEMORANDUM Division of Coastal Management isSEP Page 3 of 3 - 6 2005 Public Trust Areas: Policy #8, page 58. Morehead ci "Dare County supports the preservation and protection of the public's right to access and use of the public trust areas and waters." Marinas: Policy #35, page 70. "Dare County supports the development of marinas to provide boating access to the area's water bodies. Marina development should comply with all State and Federal guidelines concerning location and design. The County encourages the dry stack option of boat storage." Industrial Development.: Policy#61, page 82. "Industrial development that is environmentally suited to Dare County and its surrounding water bodies is encouraged. Dare County also supports the traditional industries of commercial fishing, boat building, and construction." cc: John Thayer, Manager, CAMA Local Planning and Access Programs 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastaimanagement.net An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary August 12, 2005 MEMORANDUM: TO: Preston P. Pate, Jr., Director Division of Marine Fisheries �ilG I g FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC Seafood Industrial Park Project Location: End of Harbor Road (SR 1140) Wanchese, Mill Landing Creek I ,()q rQ Co f i� Proposed Project: Bulkhead along shoreline of Park,construct concrete wharf and dredge basin Please indicate below your agency's position or viewpoint on the proposed project and return this form by 09/02/05, to 400 Commerce Avenue, Morehead City, NC 28557. If you have any questions regarding the proposed project, please contact Frank Jennings at(252)264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: `� This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIG DATE d — AO' 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 \FAX: 252-264-3723\Internet: www.nccoastalmanagement.net An Equal Opportunity\Affirmative Action Employer—30%Recycled by Fiber Weight • �_ w � A6 T 1 • NCDENR "T^., North Carolina Department of Environment and Natural Resources ` ��• Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Direct6V _.. ' �;,William G. Ross Jr., Secretary 0 s AUG 2 2 2005 August 12, 2005 Morehead cit r� C C`v C 0 V E MEMORANDUM: �-- y AUG 17 2005 TO: Ken Pace NC DOT, State Construction/Materials Branch FROM: Doug Hu ett DISTRICT OFFICE gg Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC Seafood Industrial Park Project Location: End of Harbor Road (SR 1140) Wanchese, Mill Landing Creek Proposed Project: Bulkhead along shoreline of Park,construct concrete wharf and dredge basin Please indicate below your agency's position or viewpoint on the proposed project and return this form by 09/02/05, to 400 Commerce Avenue, Morehead City, NC 28557. If you have any questions regarding the proposed project, please contact Frank Jennings at(252)264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. SIGNED 6'. DATE /7/0J- 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—30%Recycled by Fiber Weight NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management 0- Michael F. Easley, Governor Charles S. Jones, Director William G. Ross J,, ecret � � Q August 12, 2005 a MEMORANDUM: �- 0 TO: Lee Padrick Division of Community Assistance FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC Seafood Industrial Park Project Location: End of Harbor Road (SR 1140) Wanchese, Mill Landing Creek Proposed Project: Bulkhead along shoreline of Park,construct concrete wharf and dredge basin Please indicate below your agency's position or viewpoint on the proposed project and return this form by 09/02/05, to 400 Commerce Avenue, Morehead City, NC 28557. If you have any questions regarding the proposed project, please contact Frank Jennings at(252)264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. L/ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE as 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer-30%Recycled by Fiber Weight r� { _._._ Ic 7kA_ R§1 NCDENR AUG 1 8 2005 North Carolina Department of Environment and Natural Resources Division of Coastal Management i111 orehead City CCM Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr.,Secretary August 12, 2005 MEMORANDUM: AUG 1 6 2005 TO: Joe Henderson NC Department of Administration FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC Seafood Industrial Park Project Location: End of Harbor Road (SR 1140) Wanchese, Mill Landing Creek Proposed Project: Bulkhead along shoreline of Park,construct concrete wharf and dredge basin Please indicate below your agency's position or viewpoint on the proposed project and return this form by 09/02/05, to 400 Commerce Avenue, Morehead City, NC 28557. If you have any questions regarding the proposed project, please contact Frank Jennings at(252)264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. SIGNED DATE DA 1367 U.S. 17 South, Elizabeth City,North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—30%Recycled by Fiber Weight 4P N CDENR 'AUG 17 2005 North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr.,Secretary August 12, 2005 MEMORANDUM: S E p - 1 2005 TO: Renee Gledhill-Early M A NC Department of Cultural Resog9jehead City DC ca!;3/0f- FROM: Doug Huggett Major Permits Processing Coordinator �05 SUBJECT: /NC �,,rCAMA/DREDGE & FILL Permit Application Review �u-E 9)2 PPA licant: Seafood Industrial Park e" Co. Project Location: End of Harbor Road (SR 1140) Wanchese, Mill Landing Creek Proposed Project: Bulkhead along shoreline of Park,construct concrete wharf and dredge basin Please indicate below your agency's position or viewpoint on the proposed project and return this form by 09/02/05, to 400 Commerce Avenue, Morehead City, NC 28557. If you have any questions regarding the proposed project, please contact Frank Jennings at(252)264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. Q ,— SIGNED E4X DATE 1367 U.S. 17 South,Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastaimanagement.net An Equal Opportunity 1 Affirmative Action Employer—30%Recycled by Fiber Weight 'AUG 2 2 2005 a It ��� �, i_ AUG 2 NCDENR North Carolina Department of Environment and Natural Resourehead Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr.,Secretary August 12, 2005 el;pp MEMORANDUM: I M TO: Patti Fowler OD ��u NC Department of Environmental Health AM r 5 1 Ly FROM: Doug Huggett � Major Permits Processing CoordinatorNdT1pN SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC Seafood Industrial Park Project Location: End of Harbor Road (SR 1140) Wanchese, Mill Landing Creek Proposed Project: Bulkhead along shoreline of Park,construct concrete wharf and dredge basin Please indicate below your agency's position or viewpoint on the proposed project and return this form by 09/02/05, to 400 Commerce Avenue, Morehead City, NC 28557. If you have any questions regarding the proposed project, please contact Frank Jennings at(252)264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. SIGNED DATE 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—30%Recycled by Fiber Weight A� NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr.,Secretary August 12, 2005 MEMORANDUM: TO: Charlan Owens, District Planner Division of Coastal Management FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC Seafood Industrial Park Project Location: End of Harbor Road (SR 1140) Wanchese, Mill Landing Creek Proposed Project: Bulkhead along shoreline of Park,construct concrete wharf and dredge basin Please indicate below your agency's position or viewpoint on the proposed project and return this form by 09/02/05, to 400 Commerce Avenue, Morehead City, NC 28557. If you have any questions regarding the proposed project, please contact Frank Jennings at(252)264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. X s SIGNED DATE 9 — I —oS 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—30%Recycled by Fiber Weight 1. J.6 rl(0 L=Z� 0 NCDENR North Carolina Department of Environmen . r*Re Division of Coastal Man a-6nt -+ � Michael F.Easley, Governor Charles S. Jones, Dire `'� William Secretary AUG 2 2 2005 August 12, 2005 Morehead C ' WEL) MEMORANDUM: AUG 15 2005 TO: Bill Moore �5Csflc-v DWQ-WARD FROM: Doug Huggett Major Permits Processing Coordinator SUBJ pp�i"cation Review Applicant: NC Seafood Industrial Park Project Location: End of Harbor Road (SR 1140) Wanchese, Mill Landing Creek Proposed Project: Bulkhead along shoreline of Park,construct concrete wharf and dredge basin Pleas ,indicate below your agency's position or viewpoint on the proposed proj&tNQ return this f by 09/02/05, to 400 Commerce Avenue, Morehead City, NC 28557. If you ve any uestions regarding the proposed project, please contact Frank Jennings at(252)264-3901. hen a - ing data are requested. REPLY: ✓ This agency has no ,ob'ection to the project as proposed. 5�1 C�c� a! �P.r..; 6l b� i 5 5L% cue- This agency has no comment on the proposed project. 1.5 're-,-t&`Q - This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED DATE ,O S 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—30%Recycled by Fiber Weight NCDENR 11 JA North Carolina Department of Environment and Natural Resources - 2005 Division of Coastal Management P. q/� Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr.,Secretary August 12, 2005 ��1??O"7 MEMORANDUM: 11`�- AUG N 1 RECEIVED TO: Maria Tripp o. Habitat NC Wildlife Resources Commission cmuervroi im FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC Seafood Industrial Park Project Location: End of Harbor Road (SR 1140) Wanchese, Mill Landing Creek Proposed Project: Bulkhead along shoreline of Park,construct concrete wharf and dredge basin Please indicate below your agency's position or viewpoint on the proposed project and return this form by 09/02/05, to 400 Commerce Avenue, Morehead City, NC 28557. If you have any questions regarding the proposed project, please contact Frank Jennings at(252)264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This office has no objection to the project as proposed. Li This office has no comment on the proposed project. This office approves of the project only if the recommended changes are incorporated. See attached. This office objects to the project for reasons described in the attached comments. SIGNED z DATE 1367 U.S. 17 South, Elizabeth City,North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—30%Recycled by Fiber Weight NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary August 12, 2005 �v MEMORANDUM: TO: Pat McClain / James Simmons Division of Land Quality FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC Seafood Industrial Park Project Location: End of Harbor Road (SR 1140) Wanchese, Mill Landing Creek Proposed Project: Bulkhead along shoreline of Park,construct concrete wharf and dredge basin Please indicate below your agency's position or viewpoint on the proposed project and return this form by 09/02/05, to 400 Commerce Avenue, Morehead City, NC 28557. If you have any questions regarding the proposed project, please contact Frank Jennings at(252)264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED G DATE OF 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—30%Recycled by Fiber Weight i NCDENR OCT 2 5 2005 North arol a Department of Environment and Natural Resources Division of Coastal Management Mor ®Michael F. Easley,Governor _ Charles S.Jon hector Willi oss Y,,4eCry ')CM August 12, 2005 OCT 1 9 .2005 2 0 0 5 1 5 7 2 MEMORANDUM: V.OG CWAL� TO: t"(AA;, Cndi Karoly y Environmental Biological Supervisor p V Division of Water Quality O n F M: �� Doug Huggett AUG 1 6 2005 i Major Permits Processing Coordinator DENR-WATER QUALITY WETLM AND STORMWATER BRANCH SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: NC Seafood Industrial Park Project Location: End of Harbor Road(SR 1140) Wanchese, Mill Landing Creek Proposed Project: Bulkhead along shoreline of Park,construct concrete wharf and dredge basin Please indicate below your agency's osition or viewpoint on the proposed roject and return this form by If you have any questions regarding the proposed project, please contact Frank Jennings at(252)264-3901. When appropriate, in-depth comments with supporting data are requested. REPLY: `- This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency jects to the project for reasons described in the attached co e SIGNED DATE 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 \FAX: 252-264-3723\Internet: www.nccoastalmanagement.net An Equal Opportunity\Affirmative Action Employer-30%Recycled by Fiber Weight 01 ry WA NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley,Governor Charles S. Jones, Director William G. Ross Jr., Secretary May 19, 2005 Tuft Bob Peele J Director I `` NC Seafood Industrial Park Authority MAY 2 3 2005 P. O. Box 549 Wanchese,NC 27981 IVierehead Gay ok+ 11/I Re: Wanchese Seafood Industrial Park Shoreline Improvements Project Dear Mr. Peele: The NC Division of Coastal Management hereby acknowledges receipt of your application on May 6, 2005, for State approval for the development of the referenced project. An initial screening of the submittal package has been conducted. This revealed certain deficiencies, which must be corrected before the application package can be accepted as complete. To assist you in expediting the permitting process as much as possible, I am notifying you of these deficiencies immediately so that they can be quickly corrected to facilitate the detailed review by the Field Representative. I am returning the original application package so that the needed changes can be made, but will retain a copy so that the Field Representative can commence the detailed review. Please understand that the subsequent detailed review may reveal additional areas where further information or documentation is required to demonstrate compliance with the rules directly applicable to the proposed development. If this occurs, you will be notified of such issues separately by the Field Representative. Our initial screening has identified the following deficiencies: 1. Not all questions on the application have been answered, or indicated as "not applicable." Please address the following items: Form DCM-MP-4, Item "a.(6) Platforms" should have the "No" box checked if there is no intent to build platforms. Items "b" through "g" have been left blank, and should reflect a"Not Applicable" indication if there is no intent to modify your existing permit to include such items. 2. Adequate Work Plans or Drawings.have not been submitted. Please address the following items: ■ A Plan View must be submitted that: - Distinguishes between existing and proposed features; specifically: 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—30%Recycled by Fiber Weight Bob Peele May 19, 2005 Page 2 • On Sheet 2 of 14: o In the upper right corner near the North Arrow there is a Propane Tank that is not labeled as existing or proposed and is not addressed by the application. o Directly above the widest part of the riprap to right of center on the page there are two structures, one a small square, and one a small rectangle that are not labeled. o Directly above the riprap at the left of the drawing is a rectangular structure that is not labeled. o The direction, "Building & Slab to be removed under separate project," has an arrow pointing to a line that does not seem to represent any building or slab. These structures intended for removal need to be clearly delineated and labeled. o There exist a number of gray circles in the water that are probably existing mooring pilings. These need to be labeled, or keyed to a symbol. o There exist a number of solid and dashed lines of differing style and intensity that are not labeled. These need to be distinguished by some labeling or keyed symbols to identify them. o The scale for this drawing is not properly labeled. It should indicate 1" = 40', and the scale bar should indicate that the dimensions depicted are in feet. • On Sheet 3 of 14: o A number of rectangular structures exist just to the right of Lot 29A, along the Normal Water Line, and just south of the 75' Estuarine Shoreline near the center of the page that are not labeled as existing or proposed. o A number of rectangular structures exist just to the right of the Lot 24 and Lot 25 boundaries that are not labeled as existing or proposed. o There appears to be a long pier extending toward the southeast from the western portion of the large unlabeled grid structure. This should be labeled and identified as a structure to remain or be demolished. o There appears to be some type of drainage structure that diagonally crosses the Lot 24 boundary. This should be labeled and more clearly defined to identify how and where the current flow terminates. o There exist a number of solid and dashed lines of differing style and intensity that are not labeled. These need to be i Bob Peele May 19, 2005 Page 3 distinguished by some labeling or keyed symbols to identify them. o The scale for this drawing is not properly labeled. It should indicate 1" = 40', and the scale bar should indicate that the dimensions depicted are in feet. • On Sheet 4 of 14: o There exist a number of solid and dashed lines of differing style and intensity that are not labeled. These need to be distinguished by some labeling or keyed symbols to identify them. o Just to the right of the Willie Daniels property line there is a new structure that is neither labeled nor keyed to a symbol. It appears to be a symbol for rock or riprap, but does not use the keyed symbol for riprap. o In the upper right corner near the North Arrow there is a Propane Tank that is not labeled as existing or proposed and is not addressed by the application. o To both the left and right of the boatramp, at the water line, there exist two small square structures that are not labeled. o There is a large, solid line depiction, with an arrowed measurement of 86'-6" at the top that is not labeled. Within this semi-enclosed drawing are indications for a concrete surface, but it is not known whether this represents a building with a concrete floor, or just a concrete slab, and it is not known how far towards the top of the page that this "structure" continues. o The boatramp should be labeled as proposed. o Near the boatramp, and below the water level there exists an area that appears to indicate the placement of rock, but the symbol used is neither keyed nor labeled. Some of this area is overlayed by diagonal lines, and there is no indication of the meaning of these diagonal lines. o The scale for this drawing is not properly labeled. It should indicate 1" = 40', and the scale bar should indicate that the dimensions depicted are in feet. • On Sheet 5 of 14: o A number of rectangular structures exist just to the right of Lot 29A, along the Normal Water Line, and just south of the 75' Estuarine Shoreline near the center of the page that are not labeled as existing or proposed. Bob Peele + May 19, 2005 Page 4 o A number of rectangular structures exist just to the right of the Lot 24 and Lot 25 boundaries that are not labeled as existing or proposed. o There appears to be a long pier extending toward the southeast from the western portion of the large unlabeled grid structure. This should be labeled and identified as a structure to remain or be demolished. o There appears to be some type of drainage structure that diagonally crosses the Lot 24 boundary. This should be labeled and more clearly defined to identify how and where the current flow terminates. o There exist a number of solid and dashed lines of differing style and intensity that are not labeled. These need to be distinguished by some labeling or keyed symbols to identify them. o Near the bottom of the drawing and adjacent to the Lot 24 boundary, there exists an area labeled on Lot 24 as gravel. It is not clear to what extent this gravel exists or is proposed on Lot 28A, nor to what extent it exists on Lot 24. o Along the eastern edge of this boat basin, there exists what appears to be a new structure, enclosed by the symbols for the sheet pile bulkhead, and a dashed and solid line. This should be properly labeled. o Just to the north of the above referenced structure, there exist a series of curved, dashed lines, without any labels or indications of what they represent. Please clarify what these represent. o The scale for this drawing is not properly labeled. It should indicate 1" = 40', and the scale bar should indicate that the dimensions depicted are in feet. • On Sheet 6 of 14: o The concrete slab over the backfill should be labeled as proposed, as should the Concrete Cap, the Concrete Fascia Panel, the King Pile, and the Sheet Pile. o The scale for this drawing is not properly labeled. While the indication of = 1'-0" appears to be correct, the scale bar indicates 1' at the 1" mark and 2' at the 2" mark, rather than 4' and 8', respectively. • On Sheet 7 of 14: o The concrete slab over the backfill should be labeled as proposed, as should the Concrete Cap, the Concrete Fascia Panel, the King Pile, and the Sheet Pile. Bob Peele May 19, 2005 Page 5 o The scale for this drawing is not properly labeled. While the indication of = 1'-0" appears to be correct, the scale bar indicates 1' at the 1" mark and 2' at the 2" mark, rather than 4' and 8', respectively. • On Sheet 8 of 14: o The scale for this drawing is not properly labeled. It should indicate 1" = 10', and the scale bar should indicate that the dimensions depicted are in feet. • On Sheet 9 of 14: o The concrete slab over the backfill should be labeled as proposed, as should the Concrete Cap, the Concrete Fascia Panel, the King Pile, and the Sheet Pile. o The Permitted Timber Pier should more properly be labeled as Proposed Timber Pier, in that the pier previously authorized by Permit Number 147-00 does not appear to have ever been built, and the alteration of the shoreline in this location beneath this pier should be reflected on the new permit. o The scale for this drawing is not properly labeled. While the indication of = 1'-0" appears to be correct, the scale bar indicates 1' at the 1" mark and 2' at the 2" mark, rather than 4' and 8', respectively. • On Sheet 10 of 14: o The scale for this drawing is not properly labeled. While the indication of 3/8" = 1'-0" appears to be correct, the scale bar indicates l' at the 1" mark and 2' at the 2" mark, rather than 2'8" and 5'4", respectively. • On Sheet 11 of 14: o The concrete slab, the gravel base, the backfill, the concrete outfall enclosure, the sheet pile, and the concrete cap should all be labeled as proposed. o The scale for this drawing is not properly labeled. While the indication of 1/8" = 1'-0" appears to be correct, the scale bar indicates 1' at the 1" mark and 2' at the 2" mark, rather than 8' and 16', respectively. • On Sheet 13 of 14: o The concrete slab, the gravel base, the backfill, the sheet pile, and the concrete cap should all be labeled as proposed. Bob Peele May 19, 2005 Page 6 o The scale for this drawing is not properly labeled. While the indication of 1/8" = 1'-0" appears to be correct, the scale bar indicates 1' at the 1" mark and 2' at the 2" mark, rather than 8' and 16', respectively. • On Sheet 14 of 14: o The scale for this drawing is not properly labeled. While the indication of 1 1/2" = 1'-0" appears to be correct, the scale bar indicates 1' at the 1" mark and 2' at the 2" mark, rather than 8" and 1' 4", respectively. - Indicates Creeks; a drawing should be submitted that shows the entire layout of the Seafood Industrial Park and its location in relation to, and its connection to Broad Creek. - Indicates Disposal Areas; a drawing depicting the disposal site, referred to as Lot 2 in the Application, should be provided, including indications of how the spoil material will be contained on that site. - Indicates Adjacent Property Owners' Names; on the plats there should be an indication of how far, in what direction, is the Etheridge boundary; if a plat of the entire Seafood Industrial Park is provided and indicates this information, that would suffice. - Indicates the 30 feet buffer area within the Estuarine Shoreline Area of Environmental Concern. ■ It appears that the proposed development will alter the flow of stormwater at this Industrial Facility, and that the existing approved Stormwater Plan will have to be altered. Any alterations to the Stormwater Plan that will be placed within the Estuarine Shoreline Area of Environmental Concern (AEC), or that may be located outside of an AEC that will cause stormwater flows to adversely affect an AEC will need to be depicted on the drawings that have been submitted for this permit. ■ It appears that the proposed alterations to the shoreline, immediately adjacent to the Normal Water Line will increase the flow of stormwater across the 30 feet buffer by sloping the proposed concrete areas toward the water. This is not acceptable under the buffer rule provisions of the Rules of the Coastal Resources Commission for Estuarine Shoreline AECs. 3. Please provide us with a copy of the letter and project description that you provided to the adjacent riparian property owners, along with any comments or response from them that Bob Peele May 19, 2005 Page 7 you received in return. We note that you have provided the "green postcards" from the Post Office that indicate that these owners received what you sent to them. To expedite our response to your permitting request, we will commence the detailed review of your application for a permit pending the receipt of the additional information requested above. However, the statutorily provided 75/150 days allowed for review cannot commence until such time as we have received a complete application package. Once your application has been accepted as complete, you will receive a separate notification letter. If it is not possible to render a permit decision within 70 days of the date when your application is received complete, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. I am also sending a copy of this letter to you by 7mail to try to expedite the review process. Our procedures provide for the processing clock to not be suspended if within 3 working days of the Email, or within 5 working days from the date of this letter, we receive a reply from you that adequately addresses the issues that have been raised. Please do not hesitate to contact me, or the assigned Field Representative, Frank Jennings, at our Elizabeth City office (252 264 3901) if you have any questions regarding this letter or the permitting process. Sincerely, Ted S pson District Manager TS:yc L—ac—Doug Huggett, Major Permits Coordinator,NC Division of Coastal Management, Morehead City MAJOR PERMIT FEE MATRIX Applicant: NC DOC Wanchese Seafood Industrial Park Z3 ti N Q Selection Development Type Fee DCM % DWQ% (14300 1601 435100093 1625 6253) (24300 1602 435100095 2341) I. Private, non-commercial ❑ development that does not $250 100% ($250) 0% ($.0) involve the filling or excavation of any wetlands or open water areas: II. Public or commercial ❑ development that does not $400 100% ($400) 0% ($0) involve the filling or excavation of any wetlands or open water areas: III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas, determine if A, B, C, or D below applies: III(A). For Private non- commercial development, if $250 100% ($250) 0% ($0) General Water Quality Certification No. 3301 (see attached) can be applied: III(B). For public or commercial development, if $400 100% ($400) 0% ($0) General Water Quality Certification No. 3301 (see attached) can be applied: III(C). If General Water Quality Certification No. $400 60% ($240) 40% ($160) 3301 (see attached) could be applied, but DCM staff determined that additional review and written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water ® Quality Certification No. $400 60% ($240) 40% ($160) 3301 (see attached)cannot be applied: IV. For development that involves the filling and/or $475 60% ($285) 40% ($190) excavation of more than one acre of wetlands and/or o en water areas: NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley,Governor Charles S. Jones, Director William G. Ross Jr., Secretary FAX MEMORANDUM TO: The Coastland Times Manteo, NC 27954 FROM: Yvonne Carver<12 Administrative Assistant DATE: August 12, 2005 SUBJECT: Public Notice — NC Seafood Industrial Park Please publish the attached Notice in the Thursday, August 18, 2005 issue of The Coastland Times. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Jaye Poole, NC Division of Coastal Management, 1638 Mail Service Center, Raleigh, NC 27699-1638. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Elizabeth City office. Attachment cc: oug Huggett, Major Permits Coordinator, DCM File 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 \FAX: 252-264-3723\Internet: www.nccoastalmanagement.net An Equal Opportunity\Affirmative Action Employer—30%Recycled by Fiber Weight NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b)that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received on 06/30/05. According to said application, NC Seafood Industrial Park proposes to construct a bulkhead along the shoreline of the Park, and construct a concrete wharf and dredge areas of the basin located at the end of Harbor Road in Wanchese, NC. A copy of the entire application may be examined or copied at the office of Frank Jennings, Field Representative of the Division of Coastal Management, located at 1367 US 17 South, Elizabeth City, NC, 252-264-3901 during normal business hours. Comments mailed to Charles S. Jones, Director, Division of Coastal Management, 400 Commerce Avenue, Morehead City, NC 28557, prior to 09/07/05, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PLEASE PUBLISH ON: Thursday, August 18, 2005 WDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S. Jones, Director William G. Ross Jr., Secretary August 12, 2005 Mr. Bob Peele, Director NC Seafood Industrial Park Authority P.O. Box 549 Wanchese, NC 27981 Dear Mr. Peele: The Division of Coastal Management hereby acknowledges receipt of the application submitted for State approval for development of property located in Wanchese, Dare County. It was received complete on 06/30/05, and appears to be adequate for processing at this time. The projected deadline for making a decision is 09/13/05. When such time is necessary to complete the review, an additional 75-day review period is provided by law. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from the date received, you may request a meeting with the Director of Division of Coastal Management (DCM) and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer, and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: nailing the notice card to a telephone pole or tree along the road right-of- way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastaimanagement.net An Equal Opportunity 1 Affirmative Action Employer—3C% Recycled by Fiber Weight c" 7 Mr. Bob Peele, Director August 12, 2005 Page 2 An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions, and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, '47. Frank A. Jennings, III Coastal Management Representative FAJ/ybc Enclosure cc: Doug Huggett, Major Permits Coordinator, DCM, Raleigh, NC Ted Sampson, District Manager, DCM, Elizabeth City, NC r i 1 -1 o AMA PERMIT APPLIE FOR PROJECT: (2 , •J s r R T_ :5 T,f_r �l _ : Z) � N C Ncpc- z SG.9� b�t � Y. NFffl� ��FCyF-ic ea /J <-- � 1-7 � /�5 / b� M A /A)(�hJ A N C� C K c q V,6 �/ a �l COMMENTS ACCEPTED THROUGH APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: -7 7.3 - S 8Cfl `7 2 SENDER: COMPLETE THIS SECTION I COMPLETE THIS SECTION ON DELIVERY ■ Complete items 1,2,and 3.Also complete A. Si at /f item 4 If Restricted Delivery is desired. �/ ❑Agent ■•Print your name and address on the reverse X` ❑Addressee so that we can return the card to you. B. Received by(Printed Name) C. D to o Det(v ■ Attach this card to the back of the mailpiece, -� f o O or on the front if space permits- /� `-i' 0 D. Is dellv"dress different from item 1? 1.1Artricle Addressed to: If YES enter delivery address below: ❑ No �0ny I. �uu5 �- D• f3o k 7-7 ri " " (A`, 3. Service Type L-- ❑Certified Mail ❑Express Mall ❑Registered ❑ Return Receipt for Merchandise ❑ Insured Mall ❑C.O.D. 4. Restricted Delivery?(Extra Fee) ❑Yes Z Article Number (Transfer from service label) 7004 2510 0002 5824 3335 ' PS Form 3811,February 2004 Domestic Return Receipt 102595-02-M-t540 COMPLETE •N COMPLETE THIS SECTIONON DELIVERY 21 Complete items 1,2,and 3.Also complete A. Signature item 4 if Restricted Delivery is desired. X /� ❑Agent ■ Print your name and address on the reverse / ❑Addressee so that we can return the card to you. B. Received by(Printed ) C. to Delive ■ Attach this card to the back of the mailpiece,., y or on the front if space permits, 1. Article Addressed to: D. Is delivery address differ6ht-fibm item 1? ❑ es If YES,enter delivery address below.'-0 No ' "" (,,h CLI C S <'.� /`v ` 27 1 .3. Service Type ❑Certified Mail ❑ Express Mall ❑Registered ❑Return Receipt for Merchandise ❑Insured Mall ❑C.O.D. 4. Restricted Delivery?(Extra Fee) ❑Yes Article 2: (7?ans rfrom 7004 251,0 0002 5824 3328 (Transfer from service labeQ _�� a Ps Form 3811, February 2004 Domestic Return Receipt 102595-02-M-1540 Statement of Adjacent Property Owners' Responses There were no comments received from the adjacent property owners to the North Carolina Seafood Industrial Park, Mr. Willie Etheridge Jr. and Mr. Willie Daniels Jr., with regard to the proposed dock and shoreline improvements project. Moffatt & Nichol sent an information package to each adjacent property owner on behalf of the property owner. Each information package consisted of a cover letter, a copy of the CAMA permit application, a copy of the project description, and a copy of the permit application plats. This letter requested that they provide comments to this letter within 30 days of the receipt of the letter and its attachments. No response from the adjacent property owners have been received to date. S. Bradley Woodall, E. Project Manager Moffatt & Nichol II Ll i "SO h0U Z I PH 3 56 •-``� ALVA G.WISE I REGISTER OF DEEDS DARE COUNTY. N.C. - •'' STATE OF NORTH CAROLINA D E E D COUNTY OF DARE �` JAN =NT THIS DEED, made this the 30th day of October, 1980 , by the STATE OF NORTH CAROLINA, a body politic and corporate, party of the first part, to the NORTH CAROLINA SEAFOOD INDUSTRIAL PARK AUTHORITY, party of the second part, W I T N E S S E� T H: THAT, WHEREAS , the General Assembly of North . Carolina, 1979 Session Laws C. 459 Sec. 16 provides that the party of the second part will take title to, develop and manage seafood industrial parks ; and WHEREAS ; the Council of State at a meeting held in the City of Raleigh, North Carolina, on the* 7th day of October, 1980 , approved this conveyance and directed execu- tion of this instrument; NOW, THEREFORE, in consideration of the sum of ONE ($1.00) DOLLAR paid to the party of the first part by the party of the second part, (and other good and valuable consideration) the receipt *of which is hereby acknowledged, the party of the first part has bargained and sold and by these presents does hereby bargain, sell and convey unto the said party of the second part, its successors and assigns , all those certain tracts or parcels of land situ- . 14 ate , lying and being in Nags Head Township , Dare County, fu North Carolina , and more parLicularly described as follows : TRACT 1 BEING 10 . 59 •acres more fully described in >'X � .0 A_ja deed from N:irlo Investment Corporation ; a M to the State of North Carolina dated �4 December 31, 1976 , and recorded January En a 0 •,1 26 , 1977 , in Book 241 , Page 3G6 , Dare `' !I, County Registry ; as also described in a VS -2- condemnation action styled "State of n North Carolina for and on behalf of the North Carolina State Ports Authority vs . Mirlo Investment Corporation , et al" filed in Superior Court of Dare County as 76-CVS-187 , and in a Final Order there- in recorded January 21, 1980 , in Book 291, Page 478, Dare County Registry. TRACT 2 BEING 21.25 acres , more fully described in a condemnation action styled "State of North Carolina, for and on behalf of the North Carolina State Ports Authority vs . Wilma. (Wendy) Hayman Herold, et al" filed y in Superior Court of Dare County as 76-CVS- 184 , and a Final order therein which was recorded January 21 , 1980 , in Book 291 , Page 481, Dare County Registry . TRACT 3 BEING 6 .45 acres , more fully described in a condemnation action styled "State of North Carolina , for and on behalf of the North Carolina. State Ports Authority vs . Ethel Tillett, et al" filed in Superior Court of Dare County as 76-CVS-185 , and a Final. Order therein which was recorded January 21 , 1980 , in Book 291, Page 485 , Dare County Registry. TRACT 4 BEING 30 .74 acres in Dare County , more fully described in a condemnation action styled "State of North Carolina, for and on behalf of the North Carolina State Ports Authority . vs , Willie Daniels , et ux, et al" filed in Superior Court of Dare County as 76-CVS-186 and as further described in a Memorandum of Action, recorded December 10 , 1976 , in Book 239 , Page 639 , Dare County Registry.. TOGETHER WITH the entire interest of the party of` the first part in and to the easements or rights of, way more particularly described as follows : TRACT ]. Easement as described in Deed of Easement from George A. Daniels and wife, Etta T. Daniels to the State of North Carolina, dated December 1 , recorded ecorded December 1 , 1976 , n Page 423 , Dare County Registry . TRACT_2_ Easement as described in a Deed of Easement from Clyde Daniels and wife, Louise P . Daniels to the State of North Cana19 dated 76 , nSeptember 3, 1976 , recorded October 14 i 237, Page 620 , Dare County Registry. 1 -3- -rCCh1C . TRACT 3 No Easement as described in Deed of Easement from Rondal K. Tillett and wife, Nelma R. Tillett to the State of North Carolina dated November 1, 1977 , recorded November 16 , 1977 , in Book 253, Page 829, Dare County Registry_ TRACT 4 Easement as described in a condemnation action styled "State of North Carolina, for and on behalf of the North Carolina State Ports Authority vs . Willie Daniels , et ux, et al" filed in the Superior Court of Dare County as 76-CVS-186 and as further described in a Memorandum of Action, recorded December 10 , 1976 , in Book 239 , Page 639 , Dare County Registry . TO HAVE AND TO HOLD the aforesaid tracts or par- cels of land and all privileges and appurtenances thereunto belonging to the said party of the second part, its suc- cessors "and assigns , forever. IN TESTIMONY WHEREOF, the State of North Carolina has caused this instrument to be executed in its name by JAMES B. HUNT, JR. , Governor, attested by THAD SURE, Secretary of State, and the Great Seal of the State of North Carolina hereto affixed, by virtue of the power and authority afore- said. STAT F NOR 'II CA N NSA, By [.� overnor a •}3`�t ATTES •. � w� 1 zY �• . •fin a e t EfiLy ibf; S ate APPROVED A� RUFUS L. EDMISTEN Attorney General Assistant Attornyy General Return to: Mr, Dennis P. Ayers Grantee's Address: State of North Carolina North Carolina Seafood Industrial Department of Justice Park Authority I PO Box 629 430 North Salisbury Street Raleigh, NC 27602 Raleigh, NC 27611 S'C,ATE OF NORTH CAROI.INA COUIdCY OF WAKE I, SHIRLEY S. BARBEE FOWLER, a Notary Public in and for the County and `Fate aforesaid , do hereby certify that JAMES B. 11UNT, JR. , Governor of the State of North Carolina, and TILAD EURE, Secretary of State of North Carolina, personally came before me tl+i® day and bell+b by me duly sworn says each for himself that he knows the Great Seal of the State of 11,, :1 Carolina and that the seal affixed to the fore- going instrument is the Great Seal of the State; that JAMES B. AUNT, JR. . Governor of Maid State, and TRAD EURE, Secretary of State, subscribed their names thereto, all by virtue of a resolution of the Council of State; and that said instrument is the act and deed of the State of North Carolina. IN WITNESS WHEREOF, I have hereunto set my ha.ld and Notarial Seal,- this the O�Q day of 1�11�• Notar Public My Commission Expires: My commission Expires 9.25.84 (�f p1, :tj Z 11UI;T11 CAROL1t'I`. DMF The [c�rct�oigg Ccrtl /et UU I l l l ti I n'.�t r l l l+u_h i1 f1 U L 11 1 ti c v< <-l + Ware curl.1C1c.c1 Lo he carrccL. at the da lc, and 011ie nle and i It the Book and Pagt: sl+o��n on the 1•i rs t P• 1 �i Ctlunty Dccds For r _--- Register of ---- stet of Dccds B DcpuLy/A5sisLanL-Rcg'1 Y c 4 I C , 1 ti•