HomeMy WebLinkAbout08-24CB - Minor Permit (Signed)Town of Carolina Beach
Local Government CAMA
MINOR DEVELOPMENT
PERMIT
as authorized by the State of North Carolina, Department of Environment,
and Natural Resources and the Coastal Resources Commission for development
in an area of environment concern pursuant to Section 113A-118 of the
General Statutes, "Coastal Area Management"
Issued to Winds at Carolina Beach H VI, authorizing development in the Ocean Hazard (AEC) at 418 Carolina
Beach Ave N., in Carolina Beach, NC 28428, as requested in the permittee’s application, dated 6/24/2024. This
permit, issued on 6/24/2024, is subject to compliance with the application and site drawing (where consistent with the
permit), all applicable regulations and special conditions and notes set forth below. Any violation of these terms may
subject permittee to a fine, imprisonment or civil action, or may cause the permit to be null and void.
This permit authorizes: The installation of 6 gravel filled drainage trenches in rear parking area and removing 20 yards material
and grading.
(1) All proposed development and associated construction must be done in accordance with the permitted work plat
drawings(s) dated received on 6/18/2024. [GS 113A-120]
(2) Any change or changes in the plans for development, construction, or land use activities will require a re-evaluation and
modification of this permit.[GS 113A-120]
(3) A copy of this permit shall be posted or available on site. Contact this office at 910-707-2042 for a final inspection at
completion of work.[GS 113A-120]
(4) The structure must set back a minimum of 60 feet from the first line of stable natural vegetation, nor extend farther
seaward than the CB Development Line, as determined by the DCM, the LPO, or other assigned agent of the DCM.
[07H .0306(a)(1)]
(Additional Permit Conditions on Page 2)
This permit action may be appealed by the permittee or other qualified persons
within twenty (20) days of the issuing date. From the date of an appeal, any
work conducted under this permit must cease until the appeal is resolved. This
permit must be on the project site and accessible to the permit officer when the
project is inspected for compliance. Any maintenance work or project
modification not covered under this permit, require further written permit
approval. All work must cease when this permit expires on:
DECEMBER 31, 2027
In issuing this permit it is agreed that this project is consistent with the local Land
Use Plan and all applicable ordinances. This permit may not be transferred to
another party without the written approval of the Division of Coastal
Management.
_____________________________________
Haley Moccia
CAMA LOCAL PERMIT OFFICIAL
1121 N. Lake Park Blvd.
Carolina Beach, NC 28428
______________________________________
PERMITTEE
(Signature required if conditions above apply to permit)
08-24CBPermit Number
Name: Winds at Carolina Beach H VI
Minor Permit # 08-24CB
Date: 6/24/2024
Page 2
(5) The permittee is required to contact the Local Permit Officer 910-707-2042, shortly before he plans to begin
construction to arrange a setback measurement that will be effective for sixty (60) days barring a major shoreline
change. Construction must begin within sixty (60) days of the determination or the measurement is void and must
be redone.[07H .0306]
(6) All buildings constructed within the ocean hazard area shall comply with the NC Building Code, including the
Coastal and Flood Plain Construction Standards of the N. C. Building Code, and the Local Flood Damage
Prevention Ordinance as required by the National Flood Insurance Program. If any provisions of the building code
or a flood damage prevention ordinance are inconsistent with any of the following AEC standards, the more
restrictive provision shall control.[GS 113A-120]
(7) All unconsolidated material resulting from associated grading and landscaping shall be retained on site by effective
sedimentation and erosion control measures. Disturbed areas shall be vegetatatively stabilized (planted and
mulched) within 14 days of construction completion.[GS 113A-120]
(8) Any structure authorized by this permit shall be relocated or dismantled when it becomes imminently threatened by
changes in shoreline configuration. The structure(s) shall be relocated or dismantled within two years of the time
when it becomes imminently threatened, and in any case upon its collapse or subsidence. However, if natural
shoreline recovery or beach renourishment takes place within two years of the time the structure becomes
imminently threatened, so that the structure is no longer imminently threatened, then it need not be relocated or
dismantled at that time. This condition shall not affect the permit holder's right to seek authorization of temporary
protective measures allowed under CRC rules.[07H .0306(g)]
SIGNATURE:
PERMITTEE JoAnna Binsack
DATE: 6.24.24