Loading...
HomeMy WebLinkAbout160-05 Renewal 02/2018 Permit Class Permit Number RENEWAL/ 160-05 MAINTENANCE-5 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Permit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Inlet Point Harbor BOA c/o Ann Bowman, 1025-A N.Lake Park Blvd.,Carolina Beach,NC 28428 Authorizing development in New Hanover County at adj.to the AIWW, and Myrtle Grove Sound, Federal Point Township , as requested in the permittee's application dated letter dated 12/20/17. This permit, issued on_ February 5,2018 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action;or may cause the permit to be null and void. 1) This Renewal shall be attached to the original of Permit No. 160-05, which was issued to the permittee on 10/21/05, as well as all subsequent modifications,refinements, and renewals, and copies of all documents shall be readily available on site when a Division representative inspects the project for compliance. 2) In order to protect colonial nesting water birds and juvenile shrimp and finfish populations, no excavation or filling shall be permitted between April 1 and August 31 of any year without the prior approval of the Division of Coastal Management, in consultation with appropriate resource agencies. (See attached sheet for additional conditions.) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DEQ and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. This permit must be accessible on-site to Department � 4 personnel when the project is inspected for compliance. Any maintenance work or project modification not covered Braxt Davis, Director hereunder requires further Division approval. Division Of Coastal Management All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31,2022 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee Inlet Point Harbor BOA Permit No.;1;60Z-05 Page 2 of 2 ADDITIONAL CONDITIONS 3) The authorized project is located within a primary nursery area(PNA). Therefore, in accordance with NCAC 15A:07H.0208 of the Rules of the Coastal Resources Commission, no new dredging or excavation within the PNA shall be permitted. Dredging in any manner, including "kicking" with boat propellers, is not authorized. This prohibition shall be applied and enforced throughout the entire existence of the permitted structure. 4) All conditions and stipulations of the active permit remain in force under this Renewal. Maintenance Clause 5) The Division of Coastal Management shall be notified in writing at least two (2) weeks in advance of any maintenance work authorized by this permit, and such notification shall include: A. The number of the original permit. B. A statement that no dimensional changes are proposed. C. A copy of the original permit plans with cross-hatching indicating the area to be maintained, the area to be used for spoil disposal, and the estimated amount of material to be removed. The location, design and holding capacity of the spoil disposal site shall be approved by a representative of the Division prior to the initiation of any maintenance dredging activities. D. The date of map revision and the permittee's signature shown anew on the original plan. NOTE: The N.C. Division of Water Resources has assigned the proposed project DWR Project No. 05- 1610. NOTE: The U.S. Army Corp of Engineers has assigned the proposed project COE Action Id.No. SAW- 2005-01155. NOTE: A permit renewal application processing fee of$100 was received by DCM for this project. DCM Coordinator: Permit#: '..r: MAKING DISTRIBUTION SHEI!iT- Permitee: �o��T C� 1�- �1 ✓r ' o � Agents. IV MAIV4. COA DCM Field Offices Elizabeth City (with revised work plan drawings) Morehead City Washington Wilmington 5F7 US ACOE Offices: Washington: Raleigh Bland(Beaufort,Camden; Chowan,Craven,Hertford,Hyde,Perquimans, Tyrrell) Josh Peletier(Bertie,Currituck,Dare,Gates,Pamlico,Pasquotank,Washington) Tom Steffaus(NC DOT-Beaufort,Carteret,Craven,Pamlico) Bill Biddlecome(NC DOT-Remainder ECitylWashington District) Wilmington: Tyler Crumbley(Brunswick,New Hanover) Liz Hair(Carteret,Onslow,Pender). Brad Shaver(NCDOT-Brunswick,New Hanover,Onslow,Pender) Cultural Resources: Renee Gledhill-Earley .Public Water Supply: Heidi Cox(WIRO) Clif Whitfield(WARD) Marine Fisheries: Shane Staples Curt Weychert NC DOT: David Harris Shellfish Sanitation: Shannon Jenkins State Property: Tim Walton DEMLRIDWR: Karen Higgins Kristy Lynn Carpenter(NC DOT-All Projects) Washington: Anthony Scarbraugh-401 Roger Thorpe-Stormwater Garcy Ward-(NCDOT-Beaufort,Bertie,Camden,Carteret,Chowan,Craven,Currituck, Dare;Gates,Hertford,Hyde,Pamlico,Pasquotank,Perquimans,Tyrrell,Washington) Wilmington: Robb Mairs—401 (Carteret,Onslow,Pender,New Hanover) Chad Coburn—401 (Brunswick) Georgette Scott-Stormwater Joanne Steenhuis-401 (NCDOT-Brunswick,New Hanover,Onslow,Pender) Wildlife Resources: Maria Dunn(WARO) LPO: Fax Distribution: Permittee#: Agent# ROY COOPER Governor r.rn MICHAEL S. REGAN Secretm'v BRAXTON DAVIS Coastal Management Director ENVIRONMENTAL QUALITY MEMORANDUM TO: Gregg Bodnar Major Permits Coordinator-MHC FROM: Sean Farrell 4 Field Representative,Wilmington THRU: Debbie Wilson 0 District Manager,Wilmington DATE: January 8,2018 SUBJECT: Request for Renewal of State Permit No. 160-05 Inlet Point Harbor BOA,1025-A N.Lake Park Blvd.,Carolina Beach,NC 28428,New Hanover County Ms. Kelly McMahon, acting as agent for Inlet Point Harbor BOA, is requesting renewal of State Permit No. 160-05 for maintenance dredging of the existing community boat basin and access channel. State Permit No. 160-05 was originally issued to Inlet Point Harbor BOA c/o Ann Bowman on October 21, 2005 for maintenance excavation of an existing community boat basin and access channel, adjacent to the AIWW, Myrtle Grove Sound, in New Hanover County.Following Hurricane Ophelia in 2005, State Permit No. 160- 05 was modified on June 28, 2006 for the replacement of the existing deteriorated timber bulkhead located within the Inlet Point Harbor BOA basin and access channel. Approximately 2,800 linear feet of new composite bulkhead was installed at an average of approximately 2 feet to 5 feet waterward of the existing wooden bulkhead. State Permit No. 160-05 was modified on January 23,2012 and again on March 12, 2013 to remove/cut the filter cloth at the location of the weep holes of the new composite bulkhead. State Permit No. 160-05 was modified again on March 23, 2015 authorizing the construction of an additional approximately 78 linear ft. of new composite bulkhead. State Permit No. 160-05 was last renewed on March 12, 2013 to maintain the Maintenance 5 Clause, which was due to expire on December 31, 2017. The applicant acknowledges the permit conditions set forth in State Permit No. 160-05 and requests no other modifications at this time. This Office has no objection to a 5-Year Maintenance Renewal of State Permit No. 160-05. The applicant has included a check(No.002391)for the$100.00 renewal fee. cc: WiRO file Tyler Crumbley,USACE RECEIVED Robb Mairs, DWR JAN 1. 7 2018 DCAh- MHD CITY State of North Carolina I Environmental Quality I Coastal Management 127 Cardinal Drive Ext,Wilmington,NC 28405 919 796 7215 iGOPROPERTY MANAGEMENT better association management December 20, 2017 Subject: Inlet Point Harbor BOA—CAMA Permit Renewal To Whom It May Concern, We would like to renew the CAMA permit for Inlet Point Harbor BOA, permit number 160-05 which expires December 31, 2017. Work is on-going and there are no proposed changes in footprint/dimensions, soil disposal or any other conditions. Included is the $100.00 permit renewal fee. The mailing address should be updated as follows: Inlet Point Harbor BOA C/O GOProperty Management 1908 Eastwood Road Suite 321 Wilmington, NC 28403 If you have any questions, please feel free to contact GOProperty Management at 910-509- 7281. Sincerely, Inlet Point Harbor BOA RECEIVED C/O GOProperty Management; by, JAN � 7 2018 /tell /�c/�a/coK Kelly McMahon CM- MHD CITY RECEIVED DCM WILMINGTON, NC F 2 8 2017 GOProperty Mgt. Ph 910.509.7281 Fax 910.681.1361 E-mail Kelly.mcmahon@gopropertymgt.com ��r.Itowwaaxwao-o-xe�rao-Y>�n.�aoa•)r:,vxs+-:•savfix�ao-:,YYraw.�tw>,ti:.�).•o-skMco•.so<etiww:�war..:•w,+r:-:ouat-t�arcvw,rK r.vx-,wo-o-ac w. Permit Mass Permit Number MODIFICATION/MINOR 160-05 t STATE OF NORTH CAROLINA Department of Environment and Natural Resources K 7 and Coastal Resources Commission z ikrmtt for k X Major Development in an Area of Environmental Concern pursuant to NCGS I I3A-118 � X Excavation and/or filling pursuant to NCGS 113-229 t Issued to Inlet Point Harbor BOA c/o Ann Bowman, 1025-A N.Lake Park Blvd.,Carolina Beach,NC 28428 a Authorizing development in New Hanover County at adj.to the AIWW,and Myrtle Ground Sound, Federal Point Townshil2 , as requested in the permittee's letter dated 1/13/15, including the f x attached workplan drawing(1) dated 115115 f , This permit, issued on March 2-1 201 S- , is subject to compliance with the application(where consistent with the permit), all applicable regulations, special conditions and notes set forth below.Any violation of these terms may sbe subject to fines,imprisonment or civil action;or may cause the permit to be null and void. 1) Unless.specifically altered herein,this minor modification authorizes the construction of approximately 78 linear feet of bulkhead, all as expressly and specifically set forth in the attached } workplan drawing. Any additional land disturbing activities and/or construction may require a A modification of this permit. Contact a Division of Coastal Management representative at(910) 796- 11 7215 for this determination. 3 s Bulkhead V i 2) The bulkhead shall be constructed in the same alignment as depicted on the attached workplan x drawings. 3) No backfill material shall be placed within 30 feet of the normal high water line, except that which will be used to backfill the area behind the permitted bulkhead. (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the t other qualified persons within twenty(20) days of the issuing Chairman of the Coastal Resources Commission. { 4 date. X ♦ } 2 y This permit must be accessible on-site to Department ,� �� a ,,�,�• personnel when the project is inspected for compliance. Any maintenance work or project modification not covered i :..__.Braxton C. Davis, Director ;t hereunder requires further Division approval. Division of Coastal Management } All work must cease when the permit expires on A This permit and its conditions are hereby accepted. b r December 31,2017 Y X l In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal R F`j.,F!"�V E D Management Program. JAN 17 2018 Signature of Permittee :.Y:.K.(.:.?'rYw'rJ•Y::��•X:.:J?i. t.h,.%nI•)d+rviSi.nN✓.v!N?62^Y0.`?h}4{.(�iYr:KJMWCi:S(K.r:y.`[.;.i+/lq+/..Y.::.):•:•N..ii.:..i.!..,;.w:.yp<.irY:...\Y){ Y..:Y�.:..i+..'�vK.:::K�:.r.v,�r;.i{•'iG:.X^:i�^):.•�v%J/..•YF}.iGiK•r'A DCW M.HD CITY .'•Y.V:•.ti�J}:K4}PPC'Y.•:v:•tiK.hv>40�.`4:PN•X•Vit.00J'}:\N^'rif-`ti-.XtiK.::!•C•4•:'.•S•t`•:-:K.;•::K:\}C•'>h'•h:•.Y•,K'!K¢}."^M.K�M••v ti:KKK•;•:-;K-•...:•P}:K'irl.•'r}i4(•!•%•aYC•lvmrr.......-..... ,�, Permit#160-05 Inlet Point Harbor BOA c/o Ann Bowman page 2 of 2 3 ADDITIONAL CONDITIONS p 4) The temporary placement or double handling of fill materials within waters or vegetated wetlands is not authorized. ¢ f F ed prior to any backfilling activities. 5) The bulkhead shall be construct ,£ 6) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the t r ti• structure. y, r r 7 The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal or vinyl sheet piles, } or other suitable materials approved by Division personnel. x 8) All backfill material shall be clean and free of any pollutants except in trace quantities. r Y f Sedimentation and Erosion Control f. 9) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 10) Aground cover sufficient to restrain erosion shall be provided within 30 calendar days of completion of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed f ning wall immediately following completion of backfilling immediately landward of the top of the retai activities. x y; is General } t 11 This minor modification shall be attached to the original of Permit No. 164-05, which was issued on 10/21/05, the minor modifications issued on 6/28/06, 1/23/12 and 3/12/13, and copies of all documents shall be readily available on site when Division personnel inspect the project for compliance. 12) All conditions and stipulations of the active permit remain in force under this minor modification unless specifically altered herein. s NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. f ssing fee of$100 was received by DCM for this project. NOTE: A minor modification application proce Y 1. i Il } ¢ k r i A �.i.`t^M•P\Khh�Y••3!WO}OK�WL•h4•.»N'rt•.ti'S•i+.K.WCK-0K•t•:•MV�`00•i:K•P'J:'•C•'•N4'}9+':•O•}N•N.KKtiOP}:?.w•:''r/.K•L'Y:Nn�Y'N:K-W X•:•:i.K:'�i•:i•}iW hGK•L40^'•'><Mh