Loading...
HomeMy WebLinkAbout160-05 Minor Mod 06/2006 Permit Class Permit Number MODIFICATIONAT HNOR 160-05 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Inlet PointfHarbor'BOA c/o Ann Bowman, 1025-A N.Lake Park Blvd.,Carolina Beach,NC,28428 Authorizing development in New Hanover County at adj. to AIWW, Myrtle Grove Sound, Federal Point Township , as requested in the permittee's letter dated 6/16/06. including the attached workplan drawings (2), "received" 6/19/06. This permit, issued on June 28,2006 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below.Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization 1) Unless specifically altered herein; this modification authorizes the replacement/repair of approximately 2,800 LF of bulkhead located within the Inlet Point Harbor BOA basin and access channel, all as expressly and specifically set forth in the attached workplan drawings. 2) The alignment of the bulkhead shall follow the alignment of the existing bulkhead to the maximum extend possible, and shall not extend waterward of the existing bulkhead more than an average of 2 feet with a maximum of 5 feet. ti t f :i (See attached sheet for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit shall be accessible on-site to Department personnel when the project is inspected for compliance. Charles S. Jones, Director Any maintenance work or project modification not covered ivision of Coastal Management hereunder requires further Division approval. All work shall cease when the permit expires on This permit and its conditions are hereby accepted. December 31, 2008 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee xro-cato-a+hwo-�:•aaaaao-aa•axb•co-o-asao-»rt- aco-�ro-awo-ra:c-w �o-x+om sar.+.;..� Inlet Point Harbor BOA Permit# 160-05 Page 2 of 2 x ADDITIONAL CONDITIONS 3) The bulkhead shall be constructed prior to any backfilling activities. 4) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 5) The bulkhead shall be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation or other land disturbing activities is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. 6) The backfill material shall be clean and free of any pollutants except in trace quantities. 7) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. Sedimentation and Erosion Control 8) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, etc.). At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities: 9) All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion within thirty days of project completion. General 10) No vegetated wetlands shall be excavated or filled, even temporarily.y 11) This minor modification shall be attached to the original of Permit No. 160-05, which was issued on 10/21/05, and copies of all documents shall be readily available on site when Division personnel inspect the project for compliance. 12) All conditions and stipulations of the active permit remain in force under this minor modification. NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F.Easley,Governor Charles S. Jones, Director William G.Ross Jr.,Secretary June 28, 2006 Inlet Point Harbor BOA c/o Ms. Ann Bowman 1025-A North Lake Park Blvd Carolina Beach, NC 28428 Dear Ms. Bowman: The enclosed pen-nit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. Please sign both the original (buff- colored form) and the Xerox stamped "Copy". Return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. Please retain the original (buff-colored form),as it must be available on site when the project is inspected for compliance. If you object to the permit or any of the conditions, you may request a hearing pursuant to NCGS 113A- 121.1 or 113-229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 276 1 1-67 14, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the pen-nit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it is to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning pen-nit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit, you will be helping to protect our vitally important coastal resources. Sincerely, 49^7& V Douglas V. Huggett Major Permits and Consistency Manager Enclosure 400 Commerce Avenue, Morehead City, NC 28557 Phone: 252-808-28081 FAX: 252-247-33301 Internet: www.nccoastaimanagement.net An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper Permit# &0- 0!( DCM Coordinator: [LING DISTRIBUTION: p Permitee: ,� �C POi`A'� 1WA /. G I o 60WOA t tan'� �� ��- (41� NJ,r Agent: Cp,/lJ �n t� 1 ! L 2E�t2� DCM Field Offices: El' abeth City Mor—r&6id it ilmingto US Army orps of ngineers(USAGE): ° Washington: Mike Bell(NCDOT) Bill Biddlecome(NC T) Raleigh Bland mingtori:. Dave i Others: Cultural Resources: Renee Gledhill-Early Public Water Supply: Debra Benoy(WIRO) Fred Hill(WARD) Marine Fisheries: Mike Street NCDOT: Ken Pace Shellfish Sanitation: Patty Fowler State Property Office: Tommy Cline Water Quality: Cyndi Karoly(for non-DOT) John Hennessy(NCDOT) Wildlife Resources: Maria Tripp Steve Everhart Travis Wilson(NCDOT) LPO: FAXING DISTRIBUTION: Permitee at Agent a o .ri Ct9c� DCM Field Offices: Elizabeth City(252-264-3723) Morehead City(252-247-3330) Washington(252-948-0478) Wilmington(910-350-2004) US Army Corps of Engineers(USAGE): Washington: Mike Bell(NCDOT) Bill Biddlecome(NCDOT) Raleigh Bland(252-975-1399) Wilmington: Dave Timpy(910-2514025) CAMA Major Permit Process Manual Page 70 of 76 � s We(t NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Charles S.Jones,Director William G. Ross Jr., Secretary MEMORANDUM TO: Doug Huggett FJUN Permits Sect' nFROM: Robb Mairs 2 2OQ6 Field Repres ntative, Wilmington CM THRU: Jim Gregson, M®�®I�� d ' � p District Manager, Wilmington DATE: June 19, 2006 SUBJECT: Permit Modification Request CAMA Major Permit No. 160-05 Inlet Point Harbor BOA c/o Ann Bowman New Hanover County Mr. H. Stanley Rudd,acting agent for Inlet Point Harbor BOA, is requesting a minor modification of State Permit No. 160-05. State Permit No. 160-05 was issued to Inlet Point Harbor BOA c/o Ann Bowman on October 21,2005 for maintenance excavation of an existing boat basin and access channel,adjacent to the AIWW,Myrtle Grove Sound, in New Hanover County. State Permit No. 160-05 is due to expire on December 31,2008. Mr. Rudd is requesting that the permit be modified to allow for the replacement of the existing,deteriorating bulkhead located within the Inlet Point Harbor BOA basin and access channel. Mr.Rudd states that approximately 2,800 linear feet would be installed throughout the boat basin and indicated sections along the access channel,which would be installed an average of 2' no further than 5' waterward of existing bulkhead. The agent has submitted a check(ck. #044723) in the amount of$100.00 for the modification request. This Office has no objection to the permit modification request. Enclosures cc: Wilmington Files Fritz Rohde,DMF Dave Timpy,COE Noelle Lutheran,DWQ 127 Cardinal Drive Extension,Wilmington, North Carolina 28405-3845 Phone:910-796-7215\Fax:910-395-3964\Internet:http://www.nccoastalmanagement.net An Equal Opportunity\Affirmative Action Employer-50%Recycled\10%Post Consumer Paper Intercoastal Diving, Inc. June 16, 2006 Robb Mairs NCDENR 127 Cardinal Drive Ext. Wilmington, N.0 28405 Dear Robb, Intercoastal Diving, Inc., on behalf of Inlet Point HOA, requests a minor modification to Coastal Resources Commission Permit # 160-05 to allow bulkhead construction waterward of the existing structure. Said construction will result in the installation of +/- 2800 LF of new bulkhead necessary for soil retention. The existing system is at the end of its useful life and areas of failure are occurring. We would request your approval (perhaps conditional) to start remedial repairs and ultimately new construction as soon as possible. We feel it in the best interest of all parties to mitigate the negative impacts that this situation is causing. I have enclosed the site plan and bulkhead details for your review. Please give me a call if I can assist in any way. Thanking you in advance for your attention in this matter. Yours truly, INTERCOASTAL DIVING, INC. OS—L 7k4 H. Stanley Rudd President HSR/jdb Enc: Sht S1&S2 RECEIVEL) DCM WILMINGTON, NC .JUN 1 9 2006 DC N F��fNERAI���` 6710 Market Street • Wilmington, NC 28405 (910) 395-5211 FAX (910) 395-4837 ASSO H WMBER Intercoastal Diving, Inc. June 19, 2006 Robb Mairs NCDENR 127 Cardinal Drive Ext. Wilmington, N.0 28405 RE: Inlet Point HOA Project Dear Robb, This is to clarify distance waterward of the existing bulkhead for the above referenced project: Proposed as follows: Will average 2' and will not exceed 5' Should you have any questions please contact me. Sincerely, INTERCOASTAL DIVING, INC. a H. Stanley Rudd President HSR/pp DCM WILMINGTCN. NC JUN I S 2006 ABC � c f��fNfR��G��� 6710 Market Street • Wilmington, NC 28405 (910) 395-5211 FAX (910) 395-4837 ASSOCIATE MEYAEA