Loading...
HomeMy WebLinkAbout50-24 Sharp, Tucker Exemption Number – EX 50-24 June 18, 2024 Tucker Sharp (St. Moritz Homeowner’s Association, Inc.) c/o Prime South of the Carolinas 1163 Sagamore Avenue, Unit 65 Portsmouth, NH 28460 RE: EXEMPTED PROJECT – STRUCTURAL BEACH ACCESSWAY [15A NCAC 7H.0308(c) and 15A NCAC 7K.0207] PROJECT ADDRESS – 4110 New River Inlet Road, North Topsail Beach NC AREA OF ENVIRONMENTAL CONCERN – Ocean Hazard AEC Dear Mr. Sharp, I have reviewed your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. After making a site inspection on June 3, 2024, I have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing submitted on May 23, 2024 and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please co ntact me before proceeding. CONDITIONS FOR CONSTRUCTION OF STRUCTURAL ACCESSWAY OVER FRONTAL DUNE 1. The entire accessway shall consist of a post-and-rope pathway which follows the following design: a. Posts must not be greater than 4x4 inches, should extend no deeper than 5 feet below ground, and should maintain spacing of at least 7 feet between posts; b. Posts should be installed by hand without the use of heavy equipment; c. Only rope railings – no wooden or other railing systems will be allowed; d. Rope railings should be at least 3 feet above ground in order to avoid sea turtle interactions; and e. Paths should be shore-perpendicular, should not extend more than 6 feet waterward of planted vegetation, and should not obstruct recreation, access, or emergency vehicles. 2. The accessway shall be constructed so as to make no alterations to the frontal dune that are not necessary to construct the accessway. In no case shall the dune be altered so as to diminish its capacity as a protective barrier against flooding by reducing the volume of the dune. a. The accessway shall be exclusively for pedestrian use. b. The accessway shall be a maximum of six feet in width. c. Any areas of vegetation that are disturbed during construction shall be revegetated as soon as feasible. 3. The accessway shall conform with any applicable local or State building code standards. 4. Damaged, non-functioning, or portions of accessways that become non -compliant with the previous conditions shall be removed by the property owner. 5. The Permittee and/or the Permittee’s Authorized Agent shall be responsible for obtaining all necessary authorizations, approvals, or zoning and building permits from the local government having jurisdiction (Town of North Topsail Beach and/or Onslow County) prior to commencing work. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter. Sincerely, Jonathan Lucas NC Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Cc: Kate Winzler, Town of North Topsail Beach Encl: Site drawing GARAGE LEVEL ELEVELEV ELEV STAIRSSTAIRS STAIRS ST. MORITZ SITE PLAN Scale: 1/32" = 1'-0"1 PROPOSED TEMPORARY BEACH ACCESS EXISTING BEACH ACCESS TEMPORARILY CLOSED X X