Loading...
HomeMy WebLinkAboutEX #30-2024 - Gina Camp S V Family Limited Partnershipn RECEIVED 101 MAR 2 2 2624 1961 1�'yt ��{\/J�� pt�'' {/�� DC1'i1m k..,.avi Town of Nags Head Planning and Development Post Office Box 99 Telephone 252-441-7016 Department Nags Head, North Carolina 27959 FAX 252-441-4290 w v.naesheadnc.aov March 22, 2024 Exemplion Number — 30-2024 Gina Camp of S V Camp Family Limited Partnership 15600 Chesdin Landing Ter Chesterfield, VA 23838 RE: EXEMPTED PROJECT— REDISTRIBUTION OF SAND CONSISTENT WITH CURRENT RULES [15A NCAC 07K .0103(c)] PROJECT ADDRESS — 2101 S Virginia Dare TRL AREA OF ENVIRONMENTAL CONCERN - OH AEC Dear property owner: I have reviewed the Information submitted to this office concerning the filing of an application for a minor development permit under the Coastal Area Management Act. After making a site inspection on 41512023,1 have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing. , and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. MAINTENANCE AND REPAIR— [15A NCAC 7K.0103(c)]: Redistribution of sand that results from storm over wash or aeolian transport around buildings, pools, roads, parking areas and associated structures is considered maintenance so long as the sand remains within the Ocean Hazard AEC. 1. The project consists of removing excess sand from (location of sand is encroaching on the structure and accumulating between the adjacent property and beach accessway.); 2. This exemption allows for relocated sand to be used in the repair of storm damaged dunes; 3. This allows sand to be removed 6 foot around structures and a foot below bottom of walk way 4. Existing primary and frontal dunes shall not be broadened or extended in an oceanward direction beyond pre -storm dimensions; 5. Redistribution of sand shall be accomplished in such a manner that damage to existing vegetation is minimized; 6. Accumulated sand containing storm debris shall be sifted or have all debris removed prior to redistribution within an Area of Environmental Concern; 7. The activity shall not exceed the lateral bounds of applicant's properly unless permission is obtained from adjoining owners; [07h.0308(a)(4)(B)] 8. In order to minimize adverse Impacts to nesting sea turtles, any work occurring within the period of May 1 through November 15 shall require review from the US Fish & Wildlife Service and North Carolina Wildlife Resource Commission 919-515-6019;Ios 113A-120] 9. Please call me for a final inspection before April 1501 to set up your inspection before April 301" 252-449- 6047 If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization. This exemption expires 90 days from the date of the letter, Sincerely, pniric4 ` raid* Conner Twiddy, , LPO Town of Nags Head 5401 S. Croatan Hwyl PO Box 99 Nags Head, NC 27959 Cc: Yvonne Carver, DCM Field Rep /Elizabeth City Field Office MAR 2 2 2024 DCM - C