HomeMy WebLinkAboutEX #14-2024 - EMOCEAN LLCPlanning and Development
Department
February 8, 2024
EMOCEAN LLC
788 Washington Road
Pittsburg PA, 15228
zur,
i
Town of Nags Head
Post Office Box 99
Nags Head, North Carolina 27959
www.naesheadnc,gov
RECEIVED
FER
5`�PC'�2 r,Nc
®CM -EC
Telephone 252-441-7016
FAX 252-441-4290
Exemption # 14-2024
RE: EXEMPTED PROJECT (Statutory Exclusion) - MAINTENANCE AND REPAIR OF EXISTING STRUCTURES
- [G.S. 113-103(5)(B)(5) and [15A NCAC 7K.0103(a)]
PROJECT ADDRESS —9415 S Old Oregon Inlet
AREA OF ENVIRONMENTAL CONCERN — Ocean Hazard (OH) AEC
Dear Property Owner:
I have reviewed the information submitted to this office in your inquiry concerning the necessary filing of an
application for a minor development permit under the Coastal Area Management Act. After making a site
inspection on February 8, 2024 , I have determined that the activity you propose is exempt from needing a minor
development permit as long as it remains consistent and meets the conditions specified below. if your plans
should change and your project will no longer meet these conditions, please contact me before proceeding.
MAINTENANCE AND REPAIR — [G.S. 113-103(5)(B)(5) and 15A NCAC 7K.0303(a)]
- Maintenance and repairs (excluding replacement) necessary to repair damage to strictures caused by the
elements are specifically excluded from the definition of development under the conditions and in the
circumstances set out in G.S. 113A 103(5)(b)(5). Individuals required to take such measures within an AEC shall
contact the local CAMA representative for consultation and advice before beginning work.
Structures may be repaired in a similar manner, size and location as the original structure. No expansions or
additions are permissible. The repairs are limited to 50%of the market value of the existing structure and the
following specific conditions.
1 The project consist of replacing pilings and deck boards in the same footprint .All work to be within the
existing footprint with dune walkover less than 6 feet wide.
This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State,
Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the
letter.
Sincerely,
Christopher Trembly, CAMA LPO
Town of Nags Head
Cct DCM Elizabeth City, Yvonne Carver Division of Coastal Management