HomeMy WebLinkAboutEX #12-2024 - Williford, CharlesPlanning and Development
Department
February 6, 2024
Charles Williford
PO Box 754
Nags Head, NC 27959
REC-
__ ED
FEB 0 6 2024
ivai 6
CM -EC
Town of Nags Head
Post Office Box 99 Telephone 252-441-7016
Nags Head, North Carolina 27959 FAX 252-441-4290
www.naasheadnc nov
Exemption Number—12-2024
RE: EXEMPTED PROJECT— REDISTRIBUTION OF SAND CONSISTENT WITH CURRENT RULES
[15A NCAC 07K .0103(c)]
PROJECT ADDRESS — 2811 S Virginia Dare TRL
AREA OF ENVIRONMENTAL CONCERN • OH AEC
Dear property owner:
I have reviewed the information submitted to this office concerning the filing of an application for a minor development
permit under the Coastal Area Management Act, After making a site inspection on 415/2023,1 have determined that the
activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site
drawing. , and meets the conditions specified below. If your plans should change and your project will no longer meet
these conditions, please contact me before proceeding.
MAINTENANCE AND REPAIR— [15A NCAC 7K .0103(c)]: Redistribution of sand that results from storm over wash
or aeolian transport around buildings, pools, roads, parking areas and associated structures is considered maintenance
so long as the sand remains within the Ocean Hazard AEC.
1. The project consists of removing excess sand from (location of sand is encroaching on the structure and
accumulating between the adjacent property and beach accessway.)
2. Take 6 foot around any harden structure;
3. No lowering of dune;
4. This exemption allows for relocated sand to be used in the repair of storm damaged dunes;
5. Existing primary and frontal dunes shall not be broadened or extended in an oceanward direction beyond
pre -storm dimensions;
6. Redistribution of sand shall be accomplished in such a manner that damage to existing vegetation is
minimized;
7. Accumulated sand containing storm debris shall be sifted or have all debris removed prior to redistribution
within an Area of Environmental Concern;
8. The activity shall not exceed the lateral bounds of applicant's property unless permission is obtained from
adjoining owners; (07h.0308(a)(4)(B))
9. In order to minimize adverse impacts to nesting sea turtles, any work occurring within the period of May 1
through November 15 shall require review from the US Fish & Wildlife Service and North Carolina Wildlife
Resource Commission 919-515-5019;[GS 113A-1201
10. Please call me for a final inspection to set up your inspection before April 301h 252.449-6047
If your plans should change and your project will no longer meet these conditions, please contact me before
proceeding. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other
State, Federal or Local authorization. This exemption expires 90 days from the date of the letter.
Sincerely,
Conner Twiddy, LPO
Town of Nags Head
5401 S. Croatan Hwy/ PO Box 99
Nags Head, NC 27959
Cc: Yvonne Carver, DCM Field Rep /Elizabeth City Field Office
FEB 0 6 2024
DCM-EC