Loading...
HomeMy WebLinkAbout58-23 Bailey Pointe Subdivision HOA 1 Permit Class Permit Number NEW 58-23 STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission ertnit for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Bailey Pointe Subdivision HOA, 37 Channel Marker Ct., Belhaven, NC 27810 Authorizing development in Beaufort County at adj. to Ross Creek at Lot#40 within Bailey Pointe Subdivision off SR-1725 between Bath and Belhaven, as requested in the permittee's application dated 11/25/23 (MP-1) and 11/22/23 (MP-2) including attached work plan drawings (2), Sheets 1-2 of 2 dated 11/28/22. This permit, issued on May 24, 2023 , is subject to compliance with the application (where consistent with the permit),all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to civil or criminal penalties; or may cause the permit to be null and void. Boat Ramp 1) Unless specifically altered herein, this permit authorizes one concrete boat ramp, as indicated on the attached workplan drawings. 2) The boat ramp shall either be poured at an upland location and pushed into place once hardened, or poured entirely within a watertight containment structure. Live concrete shall not be allowed to contact waters of the State or waters that will enter waters of the State. RECEIVED (See attached sheets for Additional Conditions) lUL 0 7 ZOD V I CITY This permit action may be appealed by the permiuee or other Signed by the authority of the Secretary of DEQ and the Chair qualified persons within twenty(20)days of the issuing date. of the Coastal Resources Commission. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. f Any maintenance work or project modification not covered / hereunder requires further Division approval. For Braxton C. Davis, Director All work must cease when the permit expires on Division of Coastal Management May 24, 2028 This permit and its conditions are hereby accepted. In issuing this permit,the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. !/� Signature of Permittee .r Bailey Pointe Subdivision HOA Permit No. 58-23 Page 2 of 3 ADDITIONAL CONDITIONS 3) Placement of fill materials below normal water level shall be limited to the ramp structure. 4) Excavation and ground disturbing activities, associated with the placement of the boat ramp, above and below the normal water line shall be limited to that absolutely necessary to establish adequate ramp slope and provide a ramp no greater in size than specified in the attached permit application and workplan drawings. Upland Development 5) Unless specifically altered herein, this permit authorizes the grading and other land disturbing activities associated with the development of the above referenced property, including the boat ramp approach, all as expressly and specifically set forth in the attached permit application and workplan drawings. Stormwater Management 6) The Division Energy, Mineral and Land Resources (DEMLR) approval of this project under stormwater management rules of the Environmental Management Commission is covered by way of Stormwater Permit No. SWG020012, which was issued on 4/10/23. Any violation of the permit approved by the DEMLR shall be considered a violation of this CAMA permit. Sedimentation and Erosion Control 7) In order to protect water quality, runoff from construction shall not visibly increase the amount of suspended sediments in adjacent waters. 8) Appropriate sedimentation and erosion control devices, measures or structures shall be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses or properties. General 9) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 10) All construction debris associated with the removal or construction of the permitted development shall be contained within the authorized project area and disposed of in an approved upland location. 11) The permittee and/or their contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. rE,CI~IOJEf� NOTE: The U.S. Army Corps of Engineers authorized the project by way of Pro gf�lnm4iel eral Permit 198000291 (Action ID SAW-2023-00285). J LL.. M!! NOTE: The N.C. Division of Water Resources authorized the proposed projecpp iotM "andividual Water Quality Certification 5773 and assigned the project DWR Project No. 202300150v1. Bailey Pointe Subdivision HOA Permit No. 58-23 Page 3 of 3 ADDITIONAL CONDITIONS NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at(252)946-6481 prior to the commencement of any such activity for this determination. The permittee is further advised that many land disturbing activities are not authorized within 50 feet of the normal water level unless specifically exempted by Environmental Management Commission's(EMC)Tar Pamlico buffer regulations in place at the time of such development. NOTE: An application processing fee of$400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources. RECEIVED JUL 0 12023 DCM-MHD CITY