HomeMy WebLinkAbout124-03 Currituck County Permit Class Permit Number NEW 124-03 STATE OF NORTH CAROLINA Department of Environment and Natural Resources and Coastal Resources Commission Ctmtrt for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Issued to Currituck County, PO Box 38, Currituck, NC 27929 Authorizing development in Currituck County at Currituck Sound, 8955 US 158, Point Harbor , as requested in the permittee's application dated 7/l/03 (MP-1. MP-3 &MP- 4), 7/15/03 (MP-2), inc. att workplan dwgs (2),dated Sheet 1 of 2 dated rev. 6/11/03, Sheet 2 of 2 dated rev.4/22/03 This permit, issued on fiPntemhPr 2, 2003 , is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation of these terms may be subject to fines, imprisonment or civil action; or may cause the permit to be null and void. Shoreline Stabilization 1) The alignment of the permitted bulkhead must be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of any construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of construction. 2) The bulkhead will not extend waterward more than 2 feet from the normal water level at any point along its alignment at the time of construction. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or Signed by the authority of the Secretary of DENR and the other qualified persons within twenty (20) days of the issuing Chairman of the Coastal Resources Commission. date. An appeal requires resolution prior to work initiation or continuance as the case may be. This permit must be accessible on-site to Department 1_ personnel when the project is inspected for compliance. �] I;foffna D. Moffitt, Director Any maintenance work or project modification not covered Division of Coastal Management hereunder requires further Division approval. ana g All work must cease when the permit expires on This permit and its conditions are hereby accepted. December 31, 2006 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signature of Permittee County of Currituck Permit#124-03 Page 2 of 4 ADDITIONAL CONDITIONS 3) The bulkhead must be constructed prior to any backfilling activities. 4) The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. 5) The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by department personnel. No excavation is permitted except for that which may be required for the construction of the authorized bulkhead wall, riprap, deadmen cables, etc. 6) The backfill material will be clean and free of any pollutants except in trace quantities. 7) All backfill material will be obtained from a high ground source and confined behind the permitted bulkhead. 8) No backfill material is to be placed within 30 feet of the normal high water line, except that which will be used to backfill the area behind the permitted bulkhead. 9) All fill material to be placed below normal water level will be confined behind the permitted bulkhead. Concrete Boat Ramps 10) The concrete boat ramps must be poured on high ground and pushed or placed into the water once hardened. No live concrete may come into contact with the water. Boardwalk and Walkways 11) In accordance with 07H .0209(d)(10), any portions of the permitted boardwalk or walkways constructed 30 feet landward of the normal water level (Public Trust Shoreline AEC) shall be elevated, slated and made of wood. The boardwalks must not exceed six feet in width. Courtesy Piers 12) This permit authorizes only the boardwalk and piers, and other structures located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, may become a permanent part of this docking facility without permit modification. No non-water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 13) The piers and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. County of Currituck Permit#124-03 Page 3 of 4 ADDITIONAL CONDITIONS 14) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 15) The authorized structure and associated activity must not cause an unacceptable interference with navigation. 16) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 17) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure or work, or injury which may be caused from existing or future operations undertaken by the United States in the public interest. 18) The permittee must install and maintain at his expense any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors should be attached to the structure in order to make it more visible during hours of darkness or inclement weather. 19) This permit authorizes no permanent boat dockage. Upland Development 20) All excavated materials resulting from clearing and grading activities will be confined above mean high water, landward of regularly or irregularly flooded marsh and behind adequate retaining structures to prevent spillover of solids into any marsh or surrounding waters. NOTE: The Department of Environment and Natural Resources, Land Quality Section approved of this project on 10/18/02 and 7/15/03. 21) In order to protect water quality, runoff from construction must not visibly increase the amount of suspended sediments in adjacent waters. 22) Appropriate sedimentation and erosion control devices, measures or structures must be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property (e.g. silt fence, diversion swales or berms, sand fence, etc.). Stormwater Management 23) The N.C. Division of Water Quality approved this project under stormwater management rules of the Environmental Management Commission under Stormwater Permit No. SW7030611 on 8/11/03. Any violation of the permit approved by the DWQ will be considered a violation of this CAMA permit. County of Currituck Permit#124-03 Page 4 of 4 ADDITIONAL CONDITIONS General 24) The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the state of North Carolina. No claim shall be made against the United States or the state of North Carolina on account of any such removal or alteration. 25) No vegetated wetlands will be excavated or filled outside of the area indicated on the attached workplan drawings. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non-water dependent activities are not authorized within 30 feet of the normal high water level. NOTE: The N.C. Division of Water Quality has authorized the proposed project under General Water Quality Certification No. 3400 (DWQ Project No. 030917), which was issued on 8/25/03. NOTE: The U.S. Army Corps of Engineers authorized the proposed project under General Permit No. 1978001256, General Permit No. 197800080, and Nationwide Permit No. 18 (COE Action Id. No.200310877) which was issued on 7/23/03. NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr.,Secretary September 3, 2003 Currituck County P.O. Box 38 Currituck,NC 27929 Dear Sir or Madam: The enclosed permit constitutes authorization under the Coastal Area Management Act, and where applicable, the State Dredge and Fill Law, for you to proceed with your project proposal. The original(buff-colored form) is retained by you and it must be available on site when the project is inspected for compliance. Please sign both the original and the copy and return the copy to this office in the enclosed envelope. Signing the permit and proceeding means you have waived your right of appeal described below. If you object to the permit or any of the conditions,you may request a hearing pursuant to NCGS 113A-121.1 or 113- 229. Your petition for a hearing must be filed in accordance with NCGS Chapter 150B with the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27611-6714, (919) 733-2698 within twenty (20) days of this decision on your permit. You should also be aware that if another qualified party submits a valid objection to the issuance of this permit within twenty (20) days, the matter must be resolved prior to work initiation. The Coastal Resources Commission makes the final decision on any appeal. The project plan is subject to those conditions appearing on the permit form. Otherwise, all work must be carried out in accordance with your application. Modifications, time extensions, and future maintenance require additional approval. Please read your permit carefully prior to starting work and review all project plans, as approved. If you are having the work done by a contractor, it would be to your benefit to be sure that he fully understands all permit requirements. From time to time, Department personnel will visit the project site. To facilitate this review, we request that you complete and mail the enclosed Notice Card just prior to work initiation. However, if questions arise concerning permit conditions, environmental safeguards, or problem areas, you may contact Department personnel at any time for assistance. By working in accordance with the permit,you will be helping to protect our vitally important coastal resources. Sincerely, Douglas V.Huggett Major Permits and Consistency Manager Enclosure 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-22931 FAX: 919-733-14951 Internet: http://dcm2.enr.state.nc.us An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: County of Currituck - Southern Park 2. LOCATION OF PROJECT SITE: 1.4 miles north of Wright Memorial Bridge, East of US Hwy 158, Point Harbor, Currituck County, adjacent Currituck Sound. Photo Index - 2000: 189-2294 J/K 3/4 1995: 189-1982 K 9/10 1989: 138-3 N 5/6 1984: 127-71018/9 1979: N/A State Plane Coordinates - X: 2947600 Y: 867800 3. INVESTIGATION TYPE: CAMA/D&F 4. INVESTIGATIVE PROCEDURE: Dates of Site Visit - 05/01/03 Was Applicant Present - Yes (Represented) 5. PROCESSING PROCEDURE: Application Received - 07/16/03 Office - Elizabeth City 6. SITE DESCRIPTION: (A) Local Land Use Plan - Currituck County Land Classification From LUP - Conservation, Transitional (B) AEC(s) Involved: EW, ES, PT (C) Water Dependent: Yes (D) Intended Use: Public (E) Wastewater Treatment: Existing - None Planned - On-site Septic System (F) Type of Structures: Existing - None Planned - Bulkhead, Boat Ramps, Bath House, Parking, Tennis Courts (G) Estimated Annual Rate of Erosion: Less Than 1' Source - Aerial Photos and Applicants Observation 7. HABITAT DESCRIPTION: [AREA] FILLED QTUER (A) Coastal Wetlands 50 sq. ft. (B) Upland Disturbed 900,000 sq. ft. (C) Estuarine/Public Trust 1,780 sq. ft. Shaded 1,094 sq. ft. Shallow Water Habitat (D) Total Area Disturbed: 902,924 sf(20.7 acres) (E) Primary Nursery Area: No (F) Water Classification: SC Open: N/A Currituck County - Park in Point Harbor Field Investigation Report Page 2 8. PROJECT SUMMARY: Construct bulkhead, boatramps, access piers, gazebos, boardwalks, softball fields, tennis courts, volleyball courts, paved parking and bath house at County's 25-acre Southern Park site in Point Harbor adjacent the Currituck Sound. Project Setting The County of Currituck owns a 24 1/2 - acre parcel of undeveloped land, formerly in agricultural use, in Point Harbor, Currituck County, adjacent the Currituck Sound. The parcel fronts the Currituck Sound a distance of 485 linear feet. To access the parcel turn east off US Highway 158 onto a 10" wide soil road located 1.4 miles north of the Wright Memorial Bridge. The developable portion of the 500' wide flag-shaped parcel starts 750' from the edge of pavement on US Highway 158 and extends another 1,900' to the Normal Water Level (NWL) of Currituck Sound. Elevation of the tract ranges 1' - 9' above Mean Sea Level. Vegetation noted growing within the level areas formerly under cultivation and along the 7' high bank located 6' - 10' landward of NWL includes Loblolly Pine (Pinus taeda), Atlantic White Cedar (Chamaecyparis thoides), Wax Myrtle (Myrica cerifera), Greenbriar (Smilax spp.) and Common Reed (Phagmites Australis). Scattered and unstable fronds of Salt Meadow Hay (Spartina patens) were noted growing around chunks of old concrete riprap located along the shoreline. The poorly maintained riprap located along the shoreline was the only man-made feature noted within the subject property. Bank elevation and vegetation found along the unprotected shorelines of the neighboring properties are similar to those noted on the County's parcel. However, the adjacent escarpments exhibit a more severe slope and the presence of wetland vegetation was not noted anywhere along the adjacent shoreline. The waters of Currituck Sound in the vicinity of the project are classified as SC by the NC Environmental Management Commission. These waters are classified as Joint Fishing Waters by the NC Marine Fisheries Commission and NC Wildlife Resources Commission and as Estuarine and Public Trust Waters by the NC Coastal Resource Commission. Water depths in the project area (out to 123' in the Sound) measure .5' - 3.0' below NWL. The presence of submerged aquatic vegetation was not noted in the vicinity of the project. Review of available information suggests that there are no known archeological sites or geological formations associated with the applicants' property. Project Descri tp ion Currituck County proposes to construct the following: • Four hundred nineteen (419) linear feet of wooden/vinyl bulkhead a maximum distance of 2' waterward of the NWL and an average distance of 1'. • Two 17' wide by 40' concrete boat ramps by placing the concrete on unexcavated bottom. • Three access piers adjacent to the double boat ramp (two 4' x 40' piers and a 6' wide by Currituck County - Park in Point Harbor Field Investigation Report Page 3 123' pier on the north side which will angle to the north). • A 6' x 370' long wooden slatted boardwalk just landward of and parallel to the bulkhead. • Four 314 square-foot hexagonal gazebos 2' -3' landward of the 30' buffer and four 6' wide boardwalks averaging 11 linear feet in length to connect the gazebos to the 370' long shore parallel boardwalk. • An asphalt drive immediately landward of the concrete boat ramps (3,715 sq ft of asphalt is proposed within the Estuarine Shoreline AEC). • On highground, outside the .Estuarine Shoreline AEC, softball fields, tennis courts, volleyball courts, playing fields, 128 parking spaces, 28 trailer spaces, 30' x 36' bathhouse and a 50' x 100' fenced playground. • A one-mile long 6' wide asphalt walkway, which will surround the tennis and volleyball courts and the two multi-purpose playing fields. Anticipated Impacts • The construction of the 419' long wood/vinyl bulkhead and associated backfilling would eliminate 50 square feet of Coastal Wetlands vegetated with Salt Meadow Hay (Spartina patens). • The construction of the bulkhead and two boat ramps would result in the filling of 1,780 square-feet of Estuarine/Shallow Water Habitat. • The construction of the 3 access piers would shade 1,094 square-feet of Estuarine/Public Trust Waters. • The construction of an asphalt driveway landward of the concrete ramps, four gazebos, and a 23' long section of 6' wide asphalt walkway would create 4,976 square-feet of impervious surface within the Estuarine Shoreline AEC. Resultant lot coverage would equal 13.6%. • The construction of the park facilities outside the Estuarine Shoreline AEC will result in the disturbance of 900,000 square feet of uplands. Submitted by: M. Edward Harrell Date: July 16, 2003 Form DCM-MP-1 APPLICATION (To be completed by all applicants) d. Is proposed work within city limits or plannin 1. APPLICANT jurisdiction? X Yes No a. Landowner: e. Name of body of water nearest project (e.g. rives Name Currituck County(Attn: Jason Weeks) creek, sound,bay) Currituck Sound Address PO Box 38 3. DESCRIPTION AND PLANNED USE City Currituck State NC OF PROPOSED PROJECT Zip 27929 Day Phone (252) 232-2504 Fax a. List all development activities you propose (e.g building a home, motel, marina, bulkhead, pier, an( excavation and/or filling activities. b. Authorized Agent: See proiect narrative and site plans Name Ouible&Associates.P.C. b. Is the proposed activity maintenance of an existing Address PO Drawer 870 project, new work, or both? New c. Will the project be for public,private or commercial City Kitty Hawk State NC use? Public Zip 27949 Day Phone(252)261-3300 d. Give a brief description of purpose, use, methods of construction and daily operations ofproposed project. If more space is needed, please attach additional Fax (252)261-1260 pages. _See nroiect narrative c. Project name(if any)Currituck County Southern Park NOTE: Permit will be issued in name of landowner(s),and/or 4. LAND AND WATER project name. CHARACTERISTICS 2. LOCATION OF PROPOSED PROJECT a. Size of entire tract 24.57 acres b. Size of individual lot(s) N/A a. County Currituck b. City, town, community or landmark Point Harbor,--1.3 mi North of Wright Mem. Bridge c. Street address or secondary road number 8955 U.S. 158 (Caratoke Highway) Form DCM-M -1 down" and residential discharges.) Surface runoff c. Approximate elevation of tract above MHW or NWL —8'above NWL o. Describe existing drinking water supply source. d. Soil type(s) and texture(s) of tract NA Conetoe loamy sand,Munden loamy sand 5. ADDITIONAL INFORMATION e. Vegetation on tract Pinus taeda, Chamaecyparis thvoides, myrica cerifera. Smilax sop., PhraQmites In addition to the completed application form, the following australis and Spartina patens items must be submitted: f. Man-made features now on tract Rip-rap shoreline • A copy of the deed (with state application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the g. What is the CAMA Land Use Plan land classification owner of said property, then forward a copy of the deed or of the site? (Consult the local land use plan.) other instrument under which the owner claims title, plus written permission from the owner to carry out the project. Conservation X Transitional _Developed Community • An accurate, dated work plat (including plan view and Rural Other cross-sectional drawings) drawn to scale in black ink on an 8 ''/z" by 11" white paper. (Refer to Coastal Resources h. How is the tract zoned by local government? Commission Rule 7J.0203 for a detailed description.) Residential and General Business Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or i. Is the proposed project consistent with the applicable other larger plats are acceptable only if an adequate number zoning? X Yes No of quality copies are provided by applicant. (Contact the (Attach zoning compliance certificate,i(applicable) U.S.Army Corps ofEngineers regarding that agency's use of larger drawings.) A site or location map is a part of plat j. Has a professional archaeological assessment been requirements and it must be sufficiently detailed to guide done for the tract? Yes X No agency personnel unfamiliar with the area to the site. If yes, by whom? Include highway or secondary road (SR) numbers, landmarks,and the like. k. Is the project located in a National Registered Historic District or does it involve a National Register listed or • A Stormwater Certification, if one is necessary. eligible property? Yes X No • A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed 1. Are there wetlands on the site? Yes X No return receipts as proof that such owners have received Coastal (marsh) Other a copy of the application and plats by certified mail. If yes, has a delineation been conducted? Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the (Attach documentation,if available) Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been M. Describe existing wastewater treatment facilities. provided. None Name Alfred& Lilean Bandelean Address 716 D. Street,Chesapeake,VA 23324 Phone n. Describe location and type of discharges to waters of Name Ronald Earl Evans the state. (For example, surface runoff, sanitary Address 7063 Woodsedge Dr., Cincinnati,OH 45230 wastewater, industrial/commercial effluent, "wash Phone Form DCM-MP-1 S • A list of previous state or federal permits issued for Please indicate attachments pertaining to your propose work on the project tract. Include permit numbers, project. permittee, and issuing dates. X DCM MP-2 Excavation and Fill Information None X. DCM MP-3 Upland Development X DCM MP-4 Structures Information • A check for $250 made payable to the Department of DCM MP-5 Bridges and Culverts DCM MP-6 Marina Development Environment,Health,andNatural Resources(DEHNR) -- to cover the costs of processing the application. NOTE. Please sign and date each attachment in th • A signed AEC hazard notice for projects in space provided at the bottom of each form. oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy Act(N.C.G.S. 113A-1 to 10) If the project involves the expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 6. CERTIFICATION AND PERNIISSION TO ENTER ON LAND I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge,the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. This is the 1 day of 2003. Print Name Jason Weeks Signature 9Z, 0 -A,,�n} Landowner or Authorized Agent Form DCM-MP-2 RECEIVEDA ATION E� V JUL 16 2003 AND FILL COASTAL MANAGEMENT ELIZABETH CITY (Except bridges and culverts) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other 1. EXCAVATION NA sections of the Joint Application that relate to this proposed project. a. Amount of material to be excavated from below Describe below the purpose of proposed excavation or MHW or NWL in cubic yards fill activities. All values to be given in feet. b. Type of material to be excavated Average Final Existing Project c. Does the area to be excavated include coastal Length Width Depth Depth wetlands (marsh), submerged aquatic vegetation Access (SAVs) or other wetlands? _Yes No o channel Approx. (MLW)or(NWL) d. Highground excavation in cubic yards Canal 2. DISPOSAL OF EXCAVATED Boat MATERIAL NA Approx. basin a. Location of disposal area (Mooring area) Boat b. Dimensions of disposal area ramp 68' 38' 0.5' (concrete) RockAN31,1�t c. Do you claim title to disposal area. groin Yes No If no, attach a letter granting permission from the ; � Ufaatl owner. Rock . breakwater � ' `^ ' ,�� d. Will a disposal area be available for future O�, �r ,r a fiyr� r.�k i maintenance? _Yes _No Other 419' 5' 3' If yes,where? (bulkhead e. Does the disposal area include any coastal wetlands backfi►l) (marsh), SAVs or other wetlands? Yes No £ Does the disposal include any area in the water? Yes No 3. SHORELINE STABILIZATION 5. GENERAL a. Type of shoreline stabilization a. How will excavated or fill material be kept on site and X Bulkhead Riprap erosion controlled? Silt fencing and seeding/planting b. Length 419 LF(new) c. Average distance waterward of MHW or NWL Oft b. What type of construction equipment will be used(for d. Maximum distance waterward of MHW or NWL example, dragline,backhoe, or hydraulic dredge)? 2 ft backhoe, dump truck,roller e. Shoreline erosion during preceding 12 months <1' c. Will wetlands be crossed in transporting equipment to (Source of information) Observation, aerial photography project site? Yes X No f. Type of bulkhead or riprap material If yes, explain steps that will be taken to lessen Wood and vinyl environmental impacts. g. Amount of fill in cubic yards to be placed below water level (1) Riprap N/A (2) Bulkhead backfill 7.8 cu yds Jason Weeks h. Type of fill material sand Appl' ant or Project Name i. Source of fill material on-site sand Signat re � 7S 103 Date 4. OTHER FILL ACTIVITIES Form DCM-MP-2 (Excluding Shoreline Stabilization) a. Will fill material be brought to site? boat ramp concrete X Yes No If yes, RKEIVEQ (1) Amount of material to be placed in the water G �/ —27.1 cu vds (2) Dimensions of fill area 40'x 38'x Of (3) Purpose of fill boat ramp concrete JUL 16 2003 COASTAL MANAGEMENT ELIZABETH CITY b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? Yes X No If yes, (1) Dimensions of fill area (2) Purpose of fill Form DCM-MP-3 UPLAND DEVELOPMENT (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major system with a designated repair area Permit,Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. j. Have the facilities described in Item i.above received state or local approval? Currently seeking approval a. Type and number of buildings, facilities, units or from Abemarle Regional Health Services structures proposed 1 bath house, 4 gazebos (Attach appropriate documentation) k. Describe location and type of proposed discharges to b. Number of lots or parcels One waters of the state (for example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges). c. Density(give the number of residential units and the Surface runoff. units per acre) NA 1. Describe proposed drinking water supply source(e.g. d. Size of area to be graded,filled or disturbed including well, community,public system, etc.) roads, ditches, etc. Surface grading is to take place Currituck County Water Distribution over the maiority of the property(see narrative) m. Will water be impounded? Yes X No e. If the proposed proj ect will disturb more than one acre If yes,how many acres?Site has dry infiltration areas of land,the Division of Land Resources must receive an erosion and sedimentation control plan at least 30 n. If the project is a oceanfront development,when was days before land disturbing activity begins. If the lot(s)platted and recorded? NA applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? X Yes No Jason Weeks If yes, date submitted Submitted 9/27/02, A Iicant or Project Name Issued 10/18/02 Cc> — -� Signature f. List the materials(such as marl,paver stone,asphalt, 3 0 or concrete)to be used for paved surfaces. Bate Asphalt and concrete g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by impervious and/or built-upon surfaces, such as pavement, buildings, rooftops, or to be used for vehicular driveways or parking. 13.6% h. Projects that require a CAMA Major Development Permit may also require a Stormwater Certification. Has a site development plan been submitted to the Division of Environmental Management for review? Yes X No If yes, date submitted (being prepared) i. Describe proposed method of sewage disposal. Proposed on-site conventional septic treatment Al/AC Form DCM-MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major f. Mooring structure(boatlift,mooring pilings, etc.) Permit, Form DCM-MP-1. Be sure to complete all other boat ramps sections of the Joint Application which relate to this (1) _Commercial X Community—Private proposed project. (2) Number 2 (3) Length 68 ft a. Dock(s) and/or Pier(s) (4) Width 17 ft (1) X Commercial_Community_Private (2) Number 3 g. Other(Give complete description) (3) Length Combined length: 284 LF (4) Width 4 ft and 6 ft (5) Finger Piers _Yes X No (i) Number (ii) Length (iii) Width (6) Platform(s) Yes X No (i) Number (ii) Length Jason Weeks (iii) Width AppAcant or Project Name (7) Number of slips proposed 0 z"t , (8) Proximity of structure to adjacent riparian signature property lines 24 ft (0 .3 (9) Width of water body —3.75 miles (10) Water depth at waterward end of pier at NEW Date or NWL _3.1 ft b. Boathouse (including covered lifts) N/A (1) Commercial Private (2) Length (3) Width c. Groin (e.g.wood, sheetpile, etc.) N/A (1) Number (2) Length(s) d. Breakwater(e.g. wood, sheetpile, etc.) N/A (1) Length (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands e. Mooring buoys N/A (1) _Commercial_Community_Private (2) Number (3) Description of buoy (Color,inscription, size, anchor,etc.) (4) Width of water body (5) Distance buoy(s)to be placed beyond shoreline Currituck County Southern Park-Major CAMA Permitting Project Narrative-Revised June 25,2003 The subject property consists of approximately 24.57 acres of buildable land located in Point Harbor, approximately 1.4 miles north of the Wright Memorial bridge in mainland Currituck County. The property, owned by the County of Currituck, lies at approximately 36°05'35"N latitude and 75°47'58" W longitude. The land is currently undeveloped, but a former land use includes agriculture. The property includes approximately 485 linear feet(If) of frontage on the Curritck Sound. Much of the land is clear of natural vegetation,but existing vegetation includes Pinus taeda, Chamaecyparis thyoides, myrica cerifera, Smilax spp., Phragmites australis and Spartina patens. Currently existing along the shoreline is rip rap for shoreline stabilization. The rip rap is located at approximately normal water level and mostly consists of broken concrete slab. There is an area of the shoreline towards the north side of the property that does not contain rip rap and has a noticeable higher erosion rate than the rest of the shoreline. Soils on the property consist of Conetoe loamy sand and Munden loamy sand according to the Currituck County USDA Soil Survey. The average elevation on the tract is approximately 8 ft above mean sea level. Elevations gradually decrease towards the Sound throughout the majority of the property, but there is a more distinct slope immediately adjacent to the shoreline. With a fetch greater than three miles, this northeast facing shoreline is susceptible to moderately heavy seas during northeast wind events. Currituck County is planning a public park on the subject property as shown on sheet one that includes sporting fields,tennis courts,bath house,boat ramps,parking,bulkhead, walkways and gazebos. Work requiring Major CAMA permitting includes everything within the 75 ft estuarine area of environmental concern (AEC) including the boat ramps, a portion of the driveway,bulkheading,wood walkways and pier and covered gazebos. There are two proposed boat ramps with slotted wood piers on both sides and in between. The wood pier on the north side of the boat ramps extends approximately 123 ft waterward of NWL. The purpose of this pier is for a temporary mooring area and boat access for recreational purposes.The pier can also be used for line fishing and crabbing. Water depths were taken on May 1, 2003 by Quible and DCM. The normal water depth at the end of this proposed pier is approximately 3.5 ft deep. The boat ramps extend 40 ft waterward of NWL and slope down to the existing bottom depth of 3.1 ft at the end of the proposed ramps. Both ramps are proposed to be 17 ft wide. The bulkhead is proposed to approximately lie along NWL with a total length of 419 If. The proposed alignment is depicted on the site plans. Bulkhead backfill will come from sandy material located on the property. No material will have to be brought in from an off-site location. According to DCM.There will be no measurable disturbance to coastal wetlands in association with this proposed bulkhead construction in the alignment shown. The minor presence of wetland vegetative species (Spartina patens and Phragmites australis) is primarily located on sandy embankments above areas of normal flooding. There is a pile supported wood walkway proposed on the landward side of the bulkhead. There are four proposed wood gazebos with roofs and open sides. The total impervious coverage within the 75 ft AEC is 4,976 SF (13.6%). No channel dredging is proposed in association with this project. DIVISION OF COASTAL MANAGEMENT APPLICATION TRANSMITTAL AND PROCESSING RECORD- 1) APPLICANT: County of Currituck— Southern Park County: Dare LOCATION OF PROJECT: 1.4 miles north of Wright Memorial Bridge, East of US Hwy 158, Point Harbor, Currituck County, adjacent Currituck Sound DATE APPLICATION RECEIVED COMPLETE BY FIELD: July 16, 2003 FIELD RECOMMENDATION: NO To Be Forwarded: YES CONSISTENCY DETERMINATION: Attached: NO To Be Forwarded: YES FIELD REPRESENTATIVE: Applicant DISTRICT OFFICE: Elizabeth City DISTRICT MANAGER REVIEW: I S. B) DATE APPLICATION RECEIVED IN RALEIGH: '7 a3 03 FEE REC'D:$ yb X PUBLIC NOTICE REC'D: END OF NOTICE DATE: $ 15 3 ADJ. RIP. PROP NOTICES REC'D: DEED REC'D: APPLICATION ASSIGNED TO: ��s�n ON: 7 Z3 -c13 C) 75 DAY DEADLINE: tu,to 150 DAY DEADLINE: MAIL OUT DATE: 1 �� STATE DUE DATE: I 1 I FEDERAL DUE DATE: FED COMMENTS REC'D: $a PERMIT FINAL ACTION: ISSUE DENY DRAFT ON AGENCY DATE COMMENTS OBJECTIONS: NOTES RETURNED YES NO Coastal Management- Regional Representative -7 13 3 O3 ✓ oo Coastal Management- LUP Consistency Division of Community Assistance ,l 2 8103 ✓ Land Quality Sectionlor`ov5 Division of Water Quality �/ Q 04C7 3YA>0- zr 3 Storm Water Management(DWQ) g i� °3 S W10-5g,1I State Property Office $ -7 to3 Division of Archives &History Q Division of Environmental Health S 03Ce Division of Highways $ �.p3 �/ Wildlife Resources Commission Division. of Water Resources Division of Marine Fisheries 5 63 Submerged Lands (DMF) kb-W po310 811 Ge j%i sC 125 or1 -II Ib3 GP ►om000p N w P 1% Permit# i a -03 DCM Coordinator: f�S MAILING DISTRIBUTION: Permitee: �"�'K Agent: Q���IJLR DCM Field Offices: Elizabeth City Morehead City Washington Wilmington US Army Corps of Engineers(USACE): Washington: Mike Bell(NCDOT) Bill Biddlecome(NCDOT) Raleigh Bland Wilmington: Dave Timpy(NCDOT) Henry Wicker Others: Cultural Resources: Renee Gledhill-Early Environmental Health: Beverly Sanders Marine Fisheries: Mike Street NCDOT: Roberto Canales Shellfish Sanitation: Patty Fowler State Property Office: Joseph Henderson Water Quality: John Domey John Hennessy(NCDOT) Water Resources: John Sutherland Wildlife Resources: David McHenry Bennett Wynne David Cox(NCDOT) Travis Wilson(NCDOT) FAXING DISTRIBUTION: Permitee at Agent at DCM Field Offices: Elizabeth City Morehead City Washington Wilmington US Army Corps of Engineers(USACE): Washington: Mike Bell (NCDOT) Bill Biddlecome(NCDOT) Raleigh Bland Wilmington: Dave Timpy(NCDOT) Henry Wicker Updated as 2 M03 . a i J, .S •r i rNI. �a i t t1 1 I V J V t... �OF WA rt' Q Michael F.Easley,Governor William G.Ross Jr.,Secretary North Carolina Department of Environment and Natural Resources > Alan W.Klimek,P.E.Director Division of Water Quality Coleen H.Sullins,Deputy Director Division of Water Quality DIVISION OF WATER QUALITY August 11, 2003 Mr. Daniel F. Scanlon, II P.O. Box 38 Currituck, NC 27929 Subject: Stormwater Permit No. SW7030611 Currituck County Southern Park Currituck County Dear Mr. Scarlon: The Washington Regional Office --received the completed Stormwater Application for the subject project on June 16, 2003. Staff review of the plans and specifications has determined that the project, as proposed, will comply with the Stormwater Regulations set forth in Title 15A NCAC 2H.1000. We are forwarding Permit No. SW1030611 dated August 11, 2003 to Currituck County for grassed swales and an infiltration basin to serve Currituck County Southern Park located in Currituck County, NC. This permit shall be effective from the date of issuance until August 11, 2013 and shall be subject to the conditions and limitations as specified therein. Please pay special attention to the Operation and Maintenance requirements in this permit. Failure to establish an adequate system for operation and maintenance of the stormwater management system will result in future compliance problems. If any parts, requirements, or limitations contained in this permit are unacceptable, you have the right to request an adjudicatory hearing upon written request within thirty (30) days following receipt of this permit. This request must be in the form of a written petition, conforming to Chapter 150B of the North Carolina General Statutes, and filed with the Office of Administrative Hearings, P.O. Drawer 27447, Raleigh, NC 27611-7447 . Unless such demands are made this permit shall be final and binding. him N.C,Division of Water Quality 943 Washington Square Mall Washington,N.C.27889 Telephone(252)946-6481 FAX(252)946.9215 [ ti�V.S ..S HIY'M .�U ItJIC iJ fIU H:SJVi. G:JL G6I Daniel Scanlon August 11, 2003 Page Two If you have any questions, or need additional information concerning this matter, please contact Roger K. Thorpe at (252) 946-6481, extension 214 . Sincerely, -Jim ulligan Water Quality Regional Supervisor Washington Regional Office cc: V16uible & Associates Doug Huggett Currituck County Inspections WaRO Stormwater Files Central Files 3:4(F'M;Uu I l)I e 81"IC1 ASSOC. ; 1 2b2 ;eo 1 1 zbu •ri o State Stormwater Management Systems Permit No. SW7030611 STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY STATE STORMWATER MANAGEMENT PERMIT HIGH DENSITY DEVELOPMENT In accordance with the provisions of Article 21 of Chapter 143, General Statutes of North Carolina as amended,' and other applicable Laws, Rules, and Regulations PERMISSION IS HEREBY GRANTED TO Currituck County FOR THE construction, operation and maintenance of stormwater management systems in compliance with the provisions of 15A NCAC 2H. 1000 (hereafter referred to as the "stormwater rules") and the approved stormwater management plans and specifications and other supporting data as attached and on file with and approved by the Division of Water Quality and considered a part of this permit ' for grassed swales and an infiltration basin to serve Currituck County Southern Park located in Currituck County, NC. This permit shall be ' effective from the date of issuance until August 11, 2013 and shall be subject, to the following specified conditions and limitations: I. DESIGN STANDARDS 1 . This permit is effective only with respect to the nature and volume of stormwater described in the application and other supporting data. 2 . This stormwater system has been approved for the management of stormwater runoff as described on page 2 of this permit, the Project Data Sheet, 3. Approved plans and specifications for this project are incorporated by reference and are enforceable parts of the permit. DIVISION OF WATER QUALITY PROJECT DATA Project Name: Currituck County Southern Park Permit Number: SW7030611 Location: Currituck County Applicant: Currituck County Mailing Address: P.O. Box 38 Currituck, NC 27929 Application Date: 6/16/2003 Water Body Receiving Stormwater Runoff: UT to Currituck Sound Classification of Water Body: SC Total Site Area: 24. 6 acres Total Impervious Surfaces Allowed: 3. 13 acres proposed Basin Depth: 1 . 0 feet Required Storage Volume: 14, 672 cf Provided Storage Volume: 44, 801 cf Overflow elevation 7 . 0 feet 4. No homeowner/lot owner/developer shall be allowed to fill in, alter, or pipe any vegetative practices (such as swales) shown on the approved plans as part of the stormwater management system without submitting a revision to the permit and receiving approval from the Division. 5. The following items will require a modification to the permit: a. .Any revision to the approved plans, regardless of size b. Project name change Z. Transfer of ownership. d. Redesign or addition to the approved amount of built- upon area e. Further subdivision of the project area. In addition, the Director may determine that other revisions to the project should require a modification to the permit. 6. The Director may notify the permittee when the permitted site does not meet one or more of the minimum requirements of the permit. Within the time frame specified in the notice, the permittee shall submit a written time schedule to the Director for modifying the site to meet minimum requirements. The permittee shall provide copies of revised plans and certification in writing to the Director that the changes have been. made. II. SCHEDULE OF COMPLIANCE 1 . The permittee will comply with the following schedule for construction and maintenance of the stormwater management system. a. The stormwater management system shall be constructed in its entirety, vegetated and operational for its intended use prior to the construction of any built-upon surfaces except roads. b. During construction, erosion shall be kept -to a minimum and any eroded areas of the system will be repaired immediately. i l 2. The facilities must be properly maintained and operated at all times. The approved Operation and Maintenance Plan must be followed in its entirety and maintenance must occur at the scheduled intervals. 3. The permittee shall at all times provide the operation and maintenance necessary to assure the permitted stormwater i system functions. at optimum efficiency including, but not limited to: f i a. Semi-annual scheduled inspections (every 6 months) b. Sediment removal C. Mowing and revegetation of side slopes d. Immediate repair of eroded areas e. Maintenance of side slopes in accordance with approved plans and specifications f. Debris removal and unclogging of outlet structure, orifice device and catch basins and piping. 4. Records of maintenance activities must be kept and made available upon request to authorized personnel of DWQ. The records will indicate , the date, activity, name of person performing the work and what actions were taken. 5. This permit shall become voidable unless the facilities are constructed in accordance with the conditions of this permit, the approved plans and specifications, and other supporting data. 6. Upon completion of construction and prior to operation of this permitted facility, a certification must be received from an appropriate designer for the system installed certifying that the permitted facility has been installed in accordance with this permit, the approved plans and specifications, and other supporting documentation. Mail the Certification ' to the Washington Regional Office, 943 Washington Square Mall, Washington, North Carolina, 27889, attention Division of Water Quality. 7. A copy of the approved plans and specifications shall be maintained on file by the Permittee for a minimum of five years from the date of the completion of construction. III . GENERAL CONDITIONS This permit is not transferable. In the event there is a desire for the facilities to change ownership, or there is a name change of the Permittee, a formal permit request must be submitted to the Division of Water Quality accompanied by an application fee, documentation from the parties involved, and other supporting materials as may be appropriate. The approval of this request will be considered on its merits and may or may not be approved. 2. Failure to abide by the conditions and limitations contained in this permit may subject the Permittee to enforcement action by the Division of Water Quality, in accordance with North Carolina General Statute 143-215. 6 (a) to 143-215. 6 (c) . 3. The issuance of this permit does not preclude the Permittee from complying with any and all statutes, rules, regulations, or ordinances which may be imposed by other government t agencies (local, state, and federal) which have jurisdiction. 4. In the event that the facilities fail to perform satisfactorily, including the creation of nuisance conditions, the Permittee shall take immediate corrective action, including those as may be required by this Division, such as the construction of additional or replacement stormwater management systems. 5. The permit may be modified, revoked and reissued or terminated for cause. The filing of a request for a permit modification, revocation and reissuance or termination does not stay any permit condition. Permit issued this the 11 th day of August, 2003 . NORTH CAROLINA ENVIRONMENTAL MANAGEMENT COMMISSION Lv Alm Klimek, P.E. , Director Division of water Quality By Authority of the Environmental Management Commission Permit Number SW7030611 ri WA FqCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G.Ross Jr., Secretary July 22, 2003 ]RAMVED MEMORANDUM: J1A 2 8 2003 TO: Mr. William A. McNeil, Director MOM L Division of Community Assistance FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: County of Currituck - Southern Park Project Location: 1.4 miles north of Wright Memorial Bridge, East of US Hwy 158, Point Harbor, Currituck County, adjacent Currituck Sound. Proposed Project: To construct bulkhead, boatramps, access piers, gazebos, boardwalks, softball fields, tennis courts, volleyball courts, paved parking and bath house at County's 25-acre Southern Park site in Point Harbor adjacent the Currituck Sound. Please indicate below your agency's position or viewpoint on the proposed project and return this form by August 12, 2003. If you have any questions regarding the proposed project, please contact M. Edward Harrell, at (252) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY: This agency has no objection to the project as proposed. L/ This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached comments. SIGNED �� - DA TE 7 2 3- 6 3 IULI I, Ity, iVortr, Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper s J /VY NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F.Easley,Governor Donna D. Moffitt, Director William G.Ross Jr.,Secretary July 25,2003 MEMORANDUMc �ED TO: Mr. Joseph H. Henderson, Director AUG 0 7 200J State Property Office Department of Administration Of,OFCOA S G w RA M- FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA PERMIT APPLICATION REVIEW APPLICANT: COUNTY OF CURRITUCK - SOUTHERN PARK PROJECT LOCATION: 1.4 MILES NORTH OF WRIGHT MEMORIAL BRIDGE, EAST OF US HWY 158, POINT HARBOR, CURRITUCK COUNTY, ADJACENT CURRITUCK SOUND. PROPOSED PROJECT: CONSTRUCT BULKHEAD, BOATRAMPS, ACCESS PIERS, GAZEBOS, BOARDWALKS, SOFTBALL FIELDS, TENNIS COURTS, VOLLEYBALL COURTS, PAVED PARKING & BATH HOUSE AT COUNTY'S 25-ACRE SOUTHERN PARK SITE IN POINT HARBOR ADJACENT THE CURRITUCK SOUND. Please indicate below your agency's position or viewpoint on the proposed project and return this form by August 25, 2003. If you have any questions regarding the proposed project, please contact Doug Huggett at (919) 733-2293, ext. 245. When appropriate, in-depth comments with supporting data is requested. REPLY V This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. This agency objects to the project for reasons described in the attached comments. SIGNED / DATE 638 Mail Service Center, Raleigh, North Carotin 4 27 99-1638 Phone: 919-733-2293\FAX: 919-733-1495\ Internet: http://dcm2.enr.state.nc.us An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper WCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr.,Secretary July 22, 2003 MEMORANDUM: TO: Mr. Preston P. Pate, Jr., Director !` 3 Q Division of Marine Fisheries FROM: Doug Huggett G iI���A S I TAT Major Permits Processing Coordinator SUBJECT: CAMA/DREDGE & FILL Permit Application Review Applicant: County of Currituck — Southern Park Project Location: 1.4 miles north of Wright Memorial Bridge, East of US Hwy 158, Point Harbor, Currituck County, adjacent Currituck Sound. Proposed Project: To construct bulkhead, boatramps, access piers, gazebos, boardwalks, softball fields, tennis courts, volleyball courts, paved parking and bath house at County's 25-acre Southern Park site in Point Harbor adjacent the Currituck Sound. Please indicate below your agency's position or viewpoint on the proposed project and return this form by August 12, 2003. If you have any questions regarding the proposed project, please contact M. Edward Harrell, at (252) 264-3901. When appropriate, in-depth comments with supporting data is requested. REPLY: 41 This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project only if the recommended changes are incorporated. See attached. This agency objects to the project for reasons described in the attached common s. SIGNED rlty,Tforth (; --1- — o 3 JULI I, Eliza', Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper ,Q •� I AUG 2 0 2003 NCDENR W'W*WA%"'1�Torth Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr.,Secretary July 25,2003 ((LI D -- MEMORANDUM AUG 1 3 2003 TO: Mr. Roberto Canales State Construction/Materials Branch DISTRICT 1OFFICE, Division of Highways FROM: Doug Huggett Major Permits Processing Coordinator SUBJECT: CAMA PERMIT APPLICATION REVIEW APPLICANT: COUNTY OF CURRITUCK- SOUTHERN PARK PROJECT LOCATION: 1.4 MILES NORTH OF WRIGHT MEMORIAL BRIDGE, EAST OF US HWY 158, POINT HARBOR, CURRITUCK COUNTY, ADJACENT CURRITUCK SOUND. PROPOSED PROJECT: CONSTRUCT BULKHEAD, BOATRAMPS, ACCESS PIERS, GAZEBOS, BOARDWALKS, SOFTBALL FIELDS, TENNIS COURTS, VOLLEYBALL COURTS, PAVED PARKING & BATH HOUSE AT COUNTY'S 25-ACRE SOUTHERN PARK SITE IN POINT HARBOR ADJACENT THE CURRITUCK SOUND. Please indicate below your agency's position or viewpoint on the proposed project and return this form by August 25, 2003. If you have any questions regarding the proposed project, please contact Doug Huggett at (919) 733-2293, ext. 245. When appropriate, in-depth comments with supporting data is requested. REPLY /\Y This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. This agency objects to the project for reasons described in the attached comments. SIGNED aadaz- DATE 8 - 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293\FAX: 919-733-1495\Internet: http://dcm2.enr.state.nc.us An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper t A7jA AUG;1 5 2003 WCDENR 0.0K.-_rraSAAA1291emm ft North Carolina Department of Environment and Natural Resources PALOW Division of Coastal Management Michael F.Easley,Governor Donna D. Moffitt, Director William G.Ross Jr.,Secretary July 25, 2003 MEMORANDUM 0 : D TO: Mike Kelly, Acting Director Division of Environmental Health AUG i FROM: Doug Huggett SHELLFISH SANITATION Major Permits Processing Coordinator SUBJECT: CAMA PERMIT APPLICATION REVIEW APPLICANT: COUNTY OF CURRITUCK - SOUTHERN PARK PROJECT LOCATION: 1.4 MILES NORTH OF WRIGHT MEMORIAL BRIDGE, EAST OF US HWY 158, POINT HARBOR, CURRITUCK COUNTY, ADJACENT CURRITUCK SOUND. PROPOSED PROJECT: CONSTRUCT BULKHEAD, BOATRAMPS, ACCESS PIERS, GAZEBOS, BOARDWALKS, SOFTBALL FIELDS, TENNIS COURTS, VOLLEYBALL COURTS, PAVED PARKING & BATH HOUSE AT COUNTY'S 25-ACRE SOUTHERN PARK SITE IN POINT HARBOR ADJACENT THE CURRITUCK SOUND. Please indicate below your agency's position or viewpoint on the proposed project and return this form by August 25, 2003. If you have any questions regarding the proposed project, please contact Doug Huggett at (919) 733-2293, ext. 245. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. This agency objects to the project for reasons described in the attached comments. SIGNE;�7 ����C jV ��� �C rrG DATE d-Ig D 1638 Mail Service Center, Raleigh, North Carolina 27699-1638 Phone: 919-733-2293\FAX: 919-733-1495\ Internet: http://dcm2.enr,state.nc.us An Equal Opportunity\Affirmative Action Employer—50%Recycled 110%Post Consumer Paper M yV Jt11 28 200 NCDENR F�q Tf North Carolina Department of Environment and Natural ResourcOTORIG'PFEESERVA 04OFFICE Division of Coastal Management Michael F.Easley,Governor Donna D. Moffitt, Director William G. Ross Jr.,Secretary July 25,2003 J 0 2 8 MEMORANDUM Eg p g/1' TO: Ms. Renee Gledhill-Earl y, Director Division of Cultural Resources Archives & History Building UNED FROM: Doug Huggett Major Permits Processing Coordinator AUG 2 R euuj SUBJECT: CAMA PERMIT APPLICATION REVIEW 0WOROAVAL PALM APPLICANT: COUNTY OF CURRITUCK - SOUTHERN PARK PROJECT LOCATION: 1.4 MILES NORTH OF WRIGHT MEMORIAL BRIDGE, EAST OF US HWY 158, POINT HARBOR, CURRITUCK COUNTY, ADJACENT CURRITUCK SOUND. PROPOSED PROJECT: CONSTRUCT BULKHEAD, BOATRAMPS, ACCESS PIERS, GAZEBOS, BOARDWALKS, SOFTBALL FIELDS, TENNIS COURTS, VOLLEYBALL COURTS, PAVED PARKING & BATH HOUSE AT COUNTY'S 25-ACRE SOUTHERN PARK SITE IN POINT HARBOR ADJACENT THE CURRITUCK SOUND. Please indicate below your agency's position or viewpoint on the proposed project and return this form by August 25, 2003. If you have any questions regarding the proposed project, please contact Doug Huggett at (919) 733-2293, ext. 245. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. This agency has no comment on the proposed project. RECEIVW agency approves of the project, only if the recommended changes are incorporated. tn 2 2 ff iagency objects to the project for reasons described in the attached comments. SIGNED DATE 1638 Mail Service Center eigh, North Carolina 7699 1638 Phone: 919-733-2293\FAX: 919- 3-1495\ Internet: http://dcm2,enr.state.nc.us An Equal Opportunity\Affirmative Action Employer—50%Recycled\10%Post Consumer Paper AUG 0 4 2003 NCDENR JUL North Carolina Department of Environment and Natural Resources D1VJ&)if OF Division of Coastal Management WATER RESGURCES Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr.,Secretary July 25,2003 MEMORANDUM TO: Mr. John Sutherland, Chief Water Planning Section SEP 1 9, Z003 Division of Water Resources FROM: Doug Huggett JN.OfCO RAI.L�0H AGEMEN Major Permits Processing Coordinator SUBJECT: CAMA PERMIT APPLICATION REVIEW APPLICANT: COUNTY OF CURRITUCK - SOUTHERN PARK PROJECT LOCATION: 1.4 MILES NORTH OF WRIGHT MEMORIAL BRIDGE, EAST OF US HWY 158, POINT HARBOR, CURRITUCK COUNTY, ADJACENT CURRITUCK SOUND. PROPOSED PROJECT: CONSTRUCT BULKHEAD, BOATRAMPS, ACCESS PIERS, GAZEBOS, BOARDWALKS, SOFTBALL FIELDS, TENNIS COURTS, VOLLEYBALL COURTS, PAVED PARKING & BATH HOUSE AT COUNTY'S 25-ACRE SOUTHERN PARK SITE IN POINT HARBOR ADJACENT THE CURRITUCK SOUND. Please indicate below your agency's position or viewpoint on the proposed project and return this form by August 25, 2003. If you have any questions regarding the proposed project, please contact Doug Huggett at (919) 733-2293, ext. 245. When appropriate, in-depth comments with supporting data is requested. REPLY This agency has no objection to the project as proposed. G This agency has no comment on the proposed project. This agency approves of the project, only if the recommended changes are incorporated. This agency objects to the project for reasons described in the attached comments. SIGNED DATE / a 0 1638 Mail Service Center, Raleigh, North Carolina 27 99-1638 Phone: 919-733-2293\FAX: 919-733-1495\ Internet: hftp://dcm2.enr.state.nc.us An Equal Opportunity 1 Affirmative Action Employer—50%Recycled\10%Post Consumer Paper NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley,Governor Donna D. Moffitt, Director William G.Ross Jr.,Secretary MEMORANDUM: REMWED TO: Doug gg J Hu ett Major Permits Coordinator DCM THROUGH: Ted Sampson, District Manager JUG 9 ;3 2003 ON.OFOM FROM: M. Edward Harrell, astal Management Representative SUBJECT: Recommendations for County of Currituck— Southern Park DATE: July 21, 2003 I have reviewed the proposal and CRC Rules T15A:07H.0206 (Estuarine Waters), 07H.0207 (Public Trust Areas) and 07H.0209 (Coastal Shorelines). The proposal appears consistent with all Use Standards. If a permit is issued, I recommend that the following conditions be incorporated into the permit. Boat Ramp/Access Piers 1) This permit authorizes only the construction of the docks, piers and ramps and uses located in or over the water that are expressly and specifically set forth in the permit application. No other structure, whether floating or stationary, may become a permanent part of this facility without permit modification. No non-water dependent uses of structures may be conducted on, in or over public trust waters without permit modification. 2) The authorized boat ramps shall not exceed a width of 17 feet and shall not extend greater than 40 feet waterward of the normal water level contour. To ensure compliance with this condition, a representative of the Division of Coastal Management (DCM) must approve the waterward limit of the boat ramp. 3) The concrete boat ramp must be poured on high ground and pushed or placed into the water. No live concrete may come in contact with the water. 4) This permit does not authorized excavation in any manner, including "kicking" with boat propellers. 5) No attempt will be made by the permittee to prevent the full and free use by the public of all navigable waters at or adjacent to the authorized work. 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper Recommendations for County of Currituck—Southern Park July 21, 2003 Page 2 6) The authorized structure and associated activity must not cause an unacceptable interference with navigation. 7) The permittee will maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he abandons the permitted activity without having it transferred to a third party. 8) This permit does not authorize the interference with any existing or proposed Federal project, and the permittee will not be entitled to compensation for damage to the authorized structure of work, or injury, which may be caused from existing or future operations undertaken by the United States in the public interest. 9) The permittee must install and maintain at his expense, any signal lights or signals prescribed by the U.S. Coast Guard, through regulation or otherwise, on the authorized facilities. At a minimum, permanent reflectors should be attached to the structure in order to make it more visible during hours of darkness or inclement weather. NOTE: This permit does not authorize the placement of mooring pilings in association with the public ramps/access facility. 10)The pier and associated structures shall have a minimum setback distance of 15 feet between any parts of the structure and the adjacent property owner's riparian access corridor, which is determined by drawing a line parallel to the channel, then drawing a line perpendicular to the channel line that intersects with the shore at the point where the upland property line meets the water's edge. Shoreline Stabilization 1 The alignment of the authorized bulkhead must be staked by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of any construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, will require the alignment to be restaked by DCM within a maximum of 30 days prior to the new expected start of construction. T2)The bulkhead will not extend waterward more than 2 feet from the normal water level at an Y point along its alignment at the time of construction. 13)The bulkhead must be constructed prior to any backfilling activities. 14)The bulkhead must be structurally tight so as to prevent seepage of backfill materials through the structure. Recommendations for County of Currituck— Southern Park July 21, 2003 Page 3 15)The bulkhead must be solid and constructed of treated wood, concrete slabs, metal sheet piles or other suitable materials approved by Department personnel. No excavation is permitted except for that which may be required for the construction of the bulkhead wall, riprap, deadmen cables, etc. This permit does not authorize any excavation waterward of the approved alignment. 16)The fill material will be clean and free of any pollutants except in trace quantities. 17)All backfill material will be obtained from a high ground source and confined behind the permitted bulkhead. 18)No vegetated wetlands will be excavated or filled. 19)No fill material will be placed at any time in the surrounding waters outside of the alignment of the fill area indicated on the workplan drawings. 20)The temporary placement or double handling of excavated or fill materials within waters or vegetated wetlands is not authorized. Sedimentation and Erosion Control 21)In order to protect water quality, runoff from construction must not visibly increase the amount of suspended sediments in adjacent waters. 22)Appropriate sedimentation and erosion control devices, measures or structures must be implemented to ensure that eroded materials do not enter adjacent wetlands, watercourses and property(e.g. silt fence, diversion swales or berms, etc). 23)All disturbed areas shall be properly graded and provided a ground cover sufficient to restrain erosion within thirty days of project completion. Upland Development 24)The authorized upland development associated with construction of the park facilities shall be done in accordance with the attached workplan drawings. 25)The fill material will be clean and free of any pollutants except in trace quantities. 26)No excavated or fill material will be placed at any time in any vegetated wetlands or surrounding waters. Recommendations for County of Currituck—Southern Park July 21, 2003 Page 4 27)All excavated materials resulting from clearing and grading activities will be confined above mean high water, landward of regularly or irregularly flooded marsh and behind adequate retaining structures to prevent spillover of solids into any marsh or surrounding waters. General 28)This permit does not eliminate the need to obtain any additional State, Federal or Local permits, approvals or authorizations that may be required. This includes any permits that may be required by the NC Division of Water Quality, Stormwater Management Section. 29)The permittee understands and agrees that, if future operations by the United States requires the removal, relocation, or other alteration of the structure or work authorized by this permit, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate or alter the structural work or obstructions caused thereby, without expense to the United States or the State of North Carolina. No claim shall be made against the United States or the State of North Carolina on account of any such removal or alteration. NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division of Coastal Management at (252) 264-3901 prior to the commencement of any such activity for this determination. NOTE: The permittee and/or permittee's contractor is urged to meet with a representative of the Division of Coastal Management prior to project initiation. cc: Charles Jones,Assistant Director,DCM Morehead City Raleigh Bland,US Army Corps of Engineers NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley,Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary June 24, 2003 Brian Rubino Quible & Associates, P.C. P. O. Drawer 870 Kitty Hawk, NC 27949 Re: Currituck County Southern Park Project (Pd. No. 00127) Dear Mr. Rubino: The NC Division of Coastal Management hereby acknowledges receipt of your application on June 16, 2003, for State approval for the development of the referenced project. An initial screening of the submittal package has been conducted. This revealed certain deficiencies, which must be corrected before the application package can be accepted as complete. To assist you in expediting the permitting process as much as possible, I am notifying you of these deficiencies immediately so that they can be quickly corrected to facilitate the detailed review by the Field Representative. Because the deficiencies are easily correctable, I am not returning the original application package. Please make the needed changes, and submit the appropriate documentation. With the retained copy of the application, the Field Representative can commence the detailed review. Please understand that the subsequent detailed review may reveal additional areas where further information or documentation is required to demonstrate compliance with the rules directly applicable to the proposed development. If this occurs, you will be notified of such issues separately by the Field Representative. Our initial screening has identified the following deficiencies: 1. The appropriate application forms must be submitted. On the DCM-MP-1 Form, you have indicated that one of the attachments to the application is the DCM-MP-6 Form for Marina Development. However, no DCM-MP-6 Form was attached, and neither the narrative, nor the plat indicate any marina development. Please clarify this matter. 2. Not all questions on the application have been answered, or indicated as "not applicable." Please address the following item: Form DCM-MP-3, Item "m," about water impoundment. 3. Adequate Work Plans or Drawings have not been submitted. Please address the following items: ■ When drawings are larger than 11 inches by 17 inches, 29 copies must be provided; I note from your transmittal document that these copies will be provided once all corrections have been made and the package is ready for distribution. ■ A Plan View must be submitted that: 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Brian Rubino June 24. 2003 Page 2 - Indicates Marshlands. The plat does not reflect any coastal wetlands, and Item "1" of the DCM-MP-1 Form indicates that there are no wetlands on the site; yet, Item "e" of this Form indicates that one of the coastal wetland species, Spartina patens exists on the tract. It is possible that this plant exists at an elevation beyond where occasional flooding would occur, and therefore not constitute a Coastal Wetland Area of Environmental Concern. Please clarify this point. - Indicates Adjacent Property Owners' Names; the application indicates that Babette K. Lewis is a riparian property owner, but the plat indicates Point Harbor Beach Subdivision. Please clarify this discrepancy. - Establishes adequacy of Bulkhead or Dike to Confine Fill Material; I note that no filter cloth is indicated to be placed landward of the bulkhead. Is it intended to rely solely on the Vinyl Bulkhead to confine the fill material? 4. A letter is needed that documents your authorization to act as agent for the applicant. 5. Documentation of Notification of Riparian Property Owners must be provided. Please submit Certified Return-Mail Receipts for this notification once they have been received. To expedite our response to your permitting request, we will commence the detailed review of your application for a permit pending the receipt of the additional information requested above. However, the statutorily provided 75/150 days allowed for review cannot commence until such time as we have received a complete application package. Once your application has been accepted as complete, you will receive a separate notification letter. I am also sending a copy of this letter to you by Fax to try to expedite the review process. New procedures provide for the processing clock to not be suspended if we receive a reply from you within 3 working days of the Fax, or within 5 working days from the date of this letter, that provides adequate responses to the issues that have been raised. Please do not hesitate to contact me, or the assigned Field Representative, Mr. Ed Harrell, at our Elizabeth City office (252 264 3901) if you have any questions regarding this letter or the permitting process. Sincerely, lr ., ,,Ted Sampson District Manager TS:tb cc: Charles Jones, Assistant Director, NC Division of Coastal Management Doug Huggett, Major Permits Coordinator, NC Division of Coastal Management Jason Weeks, Currituck County DCM% DWQ% Development Type FEE (14300 1601 A35100093 1625 6253) (74300 1602 435100095 2341 I. Private,non-commercial 100°ib(5250) O%(SO) development that does not involve S250 the filling or excavation of any wetlands or open water areas: II. Public cr commercial development 100%(5400) 0%(SO) that does not involve the filling or S400 excavation of any wetlands or open water areas: III. For development that involves the filling and/or excavation of up to 1 acre of wetlands and/or open water areas,determine if A,8,C,or D below applies: III(A). For Private,non-commercial 0%(SO) development,if General water Quality $250 100%($250) Certification No.3301 (see attached) can be applied: III(8): For public or commercial O%(SO) development,if General water Quality $400 100%(S400) Certification No.3301(see attached) can be applied: III(C). If General Water Quality Certification No.3301(see attached) could be applied,but DCM staff 60%(S240) 40%(5160) determined that additional review and $400 written DWQ concurrence is needed because of concerns related to water quality or aquatic life: III(D). If General Water Quality 5400 60%(S240) 404%(S160) Certification No.3301(see attached) can not be applied: IV. For development that involves 40%(S190) the filling and/or excavation of more S475 60"b(52E5) than one acre of wetlands and/or open water areas: fen June 17, 2003 JUN Mr. Edward Harrell Q*AS�;;L DCM Field Officer ! 1367 US 17 South Elizabeth City, North Carolina 27909 Re: Major CAMA Permitting for Currituck County Southern Park Point Harbor, Currituck County,North Carolina Dear Mr. Harrell: As the attached form would indicate I have returned the letter stating that I have no serious objection to the construction of the above project. I do, however, have a concern about an escalating erosion problem of my adjoining property. As I understand the proposal a seawall or bulkhead will be constructed on the county park property. My problem is, if the bulkhead stops at the property line and I do not have a wall or bulkhead, I feel that the water would wash around the end and escalate an erosion problem for my property. This would be worsened with a Northeaster storm which this area has frequently. As we discussed on the phone on Monday, I would like to apply for a permit to install riprap to protect my property. This, however, will take time in the due process of submitting forms and finding a contractor, etc. In the meantime, I would hope that the county has a short term solution to my concern. I spoke with Jason Weeks today and he assurred me that the county would do everything possible to eliminate this problem. I told Jason I would be in the area in July and would stop by his office to discuss this as the final plans are drawn up. Thank you for mailing me the forms to get things started. Sincerely, Ronald Earl Evans Attachment cc: Quible &Associates, P.C. Attention: Andy Deal NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F, Easley, Governor Donna D. Moffitt, Director William G. Ross Jr.,Secretary July 22, 2003 CEl JUL 2 3 2003 ON.OF MANAGF.�BHT Legal Advertisement Section The Daily Advance P.O. 588 Elizabeth City, NC 27909 Re: Public Notice - County of Currituck Southern Park Dear Sir: Please publish the attached Notice in the Friday, July 25, 2003 issue of The Daily Advance. The State Office of Budget and Management requires an original Affidavit of Publication prior to payment for newspaper advertising. Please send the affidavit, an original copy of the published notice, and an original invoice to Jaye Poole, NC Division of Coastal Management, 1638 Mail Service Center, Raleigh, North Carolina 27699-1638, Telephone (919) 733-2293. Thank you for your assistance in this matter. If you should have any questions, please contact me at our Elizabeth City office. Sincerely, Tammy Bunting Administrative Assistant Enclosure cc: Doug Huggett, DCM Major Permits Coordinator, Raleigh Charles Jones, DCM Assistant Director, Morehead City File 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www.nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper NOTICE OF FILING OF APPLICATION FOR CAMA MAJOR DEVELOPMENT PERMIT The Department of Environment and Natural Resources hereby gives public notice as required by NCGS 113A-119(b) that application for a development permit in an Area of Environmental Concern as designated under the CAMA was received on July 16, 2003. According to said application, the County of Currituck, Southern Park proposes to construct bulkhead, boatramps, access piers, gazebos, boardwalks, softball fields, tennis courts, volleyball courts, paved parking and bath house at County's 25-acre Southern Park site in Point Harbor adjacent the Currituck Sound. A copy of the entire application may be examined or copied at the office of M. Edward Harrell, NC Division of Coastal Management, located at 1367 US 17 South, Elizabeth City, NC, 27909, (252) 264-3901 during normal business hours. Comments mailed to Donna D. Moffitt, Director, Division of Coastal Management, 1638 Mail Service Center, Raleigh, NC, 27699-1638, prior to August 15, 2003, will be considered in making the permit decision. Later comments will be accepted and considered up to the time of permit decision. Project modification may occur based on review and comment by the public and state and federal agencies. Notice of the permit decision in this matter will be provided upon written request. PUBLISHED ON: Friday, July 25, 2003 NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary July 22, 2003 Brian D. Rubino Quible & Associates, P.C. P.O. Drawer 870 Kitty Hawk, NC 27949 RE: County of Currituck Southern Park Dear Mr. Rubino: The Division of Coastal Management hereby acknowledges receipt of your application for State approval for development of property located at 1.4 miles north of Wright Memorial Bridge, East of US Hwy 158, Point Harbor, Currituck County, and adjacent Currituck Sound. It was received on July 16, 2003, and appears to be adequate for processing at this time. The projected deadline for making a decision is October 6, 2003. An additional 75-day review period is provided by law when such time is necessary to complete the review. If you have not been notified of a final action by the initial deadline stated above, you should consider the review period extended. Under those circumstances, this letter will serve as your notice of an extended review. However, an additional letter will be provided on or about the 75th day. If this agency does not render a permit decision within 70 days from July 16, 2003, you may request a meeting with the Director of the Division of Coastal Management and permit staff to discuss the status of your project. Such a meeting will be held within five working days from the receipt of your written request and shall include the property owner, developer and project designer/consultant. NCGS 113A-119(b) requires that Notice of an application be posted at the location of the proposed development. Enclosed you will find a "Notice of Permit Filing" postcard which must be posted at the property of your proposed development. You should post this notice at a conspicuous point along your property where it can be observed from a public road. Some examples would be: Nailing the notice card to a telephone pole or tree along the road right-of-way fronting your property; or at a point along the road right-of-way where a private road would lead one into your property. Failure to post this notice could result in an incomplete application. 1367 U.S. 17 South, Elizabeth City, North Carolina 27909 Phone: 252-264-3901 1 FAX: 252-264-37231 Internet: www,nccoastalmanagement.net An Equal Opportunity 1 Affirmative Action Employer—50%Recycled 110%Post Consumer Paper An onsite inspection will be made, and if additional information is required, you will be contacted by the appropriate State or Federal agency. Please contact me if you have any questions and notify me in writing if you wish to receive a copy of my field report and/or comments from reviewing agencies. Sincerely, M. Edward Harrell Coastal Management Representative MEH/tb Enclosure cc: Doug Huggett— DCM Permit Coordinator, Raleigh Ted Sampson — DCM District Manager, Elizabeth City Jason Weeks, Currituck County, P.O. Box 38, Currituck, NC 27929 r i 0 AM ^ - - MIT APPLI F R PROJECT:1 o C�►�5-4 �r�,�c b�-Ll y yhca-c9, boor aYr sy CLCccuS al ef-S QceZ-c� ti d��� PCs SC 'bcl I I 4r y- i s C-00,r ks V-0 I I e�►fa 11 0— o u,. r�5 lo O-1J�d Q 1�1 Vt a.—rLC� C� ��-cuC r e Sc�v�e r Oa c I C �14e_ I,YA �Dk 'VA - arbor Soov1oP , o-4 l.q Ylbf VA- c)-F u--j-4-l! V4 ry)c vy)C)r't cd �)y t 6�2 uS 1 { u��( l Sg+ pen to r COMMENTS ACCEPTED THROUGHT»- d3 APPLICANT: FOR MORE DETAILS CONTACT THE LOCAL PERMIT OFFICER BELOW: - Q 10 Quible Quible &Associates, RC, P.O.Drawer 870 IQtty Hawk,NC 27949 ENGINEERING•ENVIRONMENTAL SCIENCES•PLANNING Phone:252-261.33M SINCE 1959 Fox:252-261-1260 PRINCIPALS Sean C.Boyle,P.E. Joseph S.Lossifer.C.E.P. CERTIFIED MAIL Eduardo J.ValdMeso,P.E. RETURN RECEIPT REQUESTED A.%OCATEs Joseph J.Anlaut P.E. David S.Neff June 25, 2003 Alfred and Lillian Bandelean 716 D Street, South Norfolk Chesapeake,VA 23324 Re: Major CAMA Permitting for Currituck County Southern Park Point Harbor,Currituck County,North Carolina Ms.Sir/Madam: The purpose of this correspondence is for Quible&Associates,P.C.to inform you as an adjacent riparian property owner to property owned by Currituck County,of the proposed work proposed within the 75'Estuarine Area of Environmental Concern(AEC). The proposed work involves construction of two boat ramps,piers,walkways and four gazebos within the AEC. Work of this scope requires Major CAMA permitting through the NC Division of Coastal Management(DCM). A component of the permitting process is to inform adjacent riparian land owners. All of the proposed work is depicted on the accompanying site plan. Should you have no objections to the proposed work,please check the statement below,sign and date the blanks below the statement and return one copy of this letter to:Brian Rubino,Quible&Associates P.C.,PO Drawer 870, Kitty Hawk,NC 27949 as soon as possible. Keep the second copy for your files. Should you have objections to this proposal,please supply your comments to Mr.Edward Harrell,DCM field officer at 1367 US 17 South,Elizabeth City,NC 27909. Written comments must be received within 30 days of receipt of this notice. Failure to respond in either method within 30 days will be interpreted as no objection. Sincerely, Quible and Associates,P.C. Brian D. Rubino I have no objection to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. I have objections to the project as presently proposed and have enclosed comments Signature Date Form DCM-MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major f. Mooring structure (boatlift, mooring pilings,etc.) Permit, Form DCM-MP-1. Be sure to complete all other boat ramps sections of the Joint Application which relate to this (1) _Commercial X Community_Private proposed project. (2) Number 2 (3) Length 68 ft a. Dock(s)and/or Pier(s) (4) Width 17 ft (1) X Commercial_Community_Private (2) Number 3 g. Other(Give complete description) (3) Length Combined length: 284 LF (4) Width 4 ft and 6 ft (5) Finger Piers _Yes X No (i) Number (ii) Length (iii) Width (6) Platform(s) Yes X No (i) Number (ii) Length Jason Weeks (iii) Width Apr or Project Name (7) Number of slips proposed 0 21-IF-I (8) Proximity of structure to adjacent riparian Signature property lines 24 ft r 0 3 (9) Width of water body —3.75 miles Date (10) Water depth at waterward end of pier at MLW or NWL --3.1 ft b. Boathouse (including covered lifts) N/A (1) Commercial Private (2) Length (3) Width c. Groin(e.g. wood, sheetpile, etc.) N/A (1) Number (2) Length(s) d. Breakwater(e.g. wood, sheetpile, etc.) N/A (1) Length (2) Average distance from MHW, NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands e. Mooring buoys N/A (1) _Commercial_Community_Private (2) Number (3) Description of buoy (Color, inscription, size, anchor,etc.) (4) Width of water body (5) Distance buoy(s)to be placed beyond shoreline Revised 03/95 Quible Quible &Associates,P.C, P.O.Drawer870 Iatfy Hawk,NC 27949 ENGINEERING•ENVIRONMENTAL SCIENCES•PLANNING Phone:252-261-M SINCE 1959 Fax 252-261-1260 PRINCIPALS Sean C.Boyle,P.E. Joseph S.L.assIter,C.E.P. CERTIFIED MAIL Eduardo J.Vddlvleso,P.E. RETURN RECEIPT REQUESTED AssOCLATEs Joseph J.Anlaut P.E. y L p i David S.Neff May 19,2003 1V0^8 T t Babette K.Lewis 179 New Beach Road Point Harbor,NC 27964 Re: Major CAMA Permitting for Currituck County Southern Park Point Harbor, Currituck County,North Carolina Ms.Lewis: The purpose of this correspondence is for Quible&Associates,P.C.to inform you as an adjacent riparian property owner to property owned by Currituck County,of the proposed work proposed within the 75'Estuarine Area of Environmental Concern(AEC). The proposed work involves construction of two boat ramps,piers,walkways and four gazebos within the AEC. Work of this scope requires Major CAMA permitting through the NC Division of Coastal Management(DCM). A component of the permitting process is to inform adjacent riparian land owners. All of the proposed work is depicted on the accompanying site plan. Should you have no objections to the proposed work,please check the statement below, sign and date the blanks below the statement and return one copy of this letter to:Brian Rubino, Quible&Associates P.C.,PO Drawer 870, Kitty Hawk,NC 27949 as soon as possible. Keep the second copy for your files. Should you have objections to this proposal,please supply your comments to Mr.Edward Harrell,DCM field officer at 1367 US 17 South,Elizabeth City,NC 27909. Written comments must be received within 30 days of receipt of this notice. Failure to respond in either method within 30 days will be interpreted as no objection. Sincerely, Quible and Associates,P.C. Brian D. Rubino I have no objection to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. I have objections to the project as presently proposed and have enclosed comments Signature Date U.S. Postal Service ru CERTIFIED MAIL RECEIPT (DomesticOnly; Provided) CD Ln m Postage $ .83 r CO Certified Fee 2.30 p Return Receipt Fee - P H (Endorsement Required) cO Restricted Delivery Fee O (Endorsement Required) fU Total Postage&Fees $ 4.88 O C3 SentTo r` Babette K. Lewis •--- '----------------------------••------•-------_--_---_------------------------------ Street,Apt.No.; or PO Box No. 179 New Beach Rd. -•-------•-----------^-----------------------------------------•-•----•-•------------ crty,stare,zlP+4 point Harbor NC 27964 :11 gza, Pill Postal (Domestic Mail Only;No Insurance Coverage Provided) CERTIFIED MAIL RECEIPT ru u •. is ,a •hxs m a Ln Postage $ .83 rp Certified Fee tinark• Return Receipt Fee ere 0 (Endorsement Required) 1.75 999 2 r?(if M A O Restricted Delivery Fee O (Endorsement Required) i. � Total Postage&Fees $4•8 8 Ln c3 Sent To Ronald Earl Evans Street,Apt.C3 or PO boxNo.No.; 7063 Woodsedg e Dr O O ------•----------------------------------•------------------------------- � Clty,State,ZIP+4 Cincinnati OH 45230 'PS Form • .r IF L ('C,)ASTAL n/W IAGEV,--N•F Quible Quible &Associates, RC, P.O.Drawer870 fOtty Hawk,NC 27949 ENGINEERING•ENVIRONMENTAL SCIENCES•PLANNING Phone:252-261= SINCE 1959 Fax:252-261-1260 PRINCIPALS Sean C.CERTIFIED MAIL Joseph S Lassiter.C.E.P. RETURN RECEIPT REQUESTED Eduardo J.Valdivleso,P.E. ASSOCIATES Joseph J.Anlaut RE. I David S.Neff May 19,2003 F 7 Ronald Earl Evans1`''� 7063 Woodsedge DrivelaST ., Cincinnati, OH 45230 Re: Major CAMA Permitting for Currituck County Southern Park Point Harbor,Currituck County,North Carolina Mr. Evans: The purpose of this correspondence is for Quible&Associates,P.C.to inform you as an adjacent riparian property owner to property owned by Currituck County,of the proposed work proposed within the 75'Estuarine Area of Environmental Concern(AEC). The proposed work involves construction of two boat ramps,piers,walkways and four gazebos within the AEC. Work of this scope requires Major CAMA permitting through the NC Division of Coastal Management(DCM). A component of the permitting process is to inform adjacent riparian landowners. All of the proposed work is depicted on the accompanying site plan. Should you have no objections to the proposed work,please check the statement below, sign and date the blanks below the statement and return one copy of this letter to: Brian Rubino,Quible&Associates P.C.,PO Drawer 870, Kitty Hawk,NC 27949 as soon as possible. Keep the second copy for your files. Should you have objections to this proposal,please supply your comments to Mr.Edward Harrell,DCM field officer at 1367 US 17 South,Elizabeth City,NC 27909. Written comments must be received within 30 days of receipt of this notice. Failure to respond in either method within 30 days will be interpreted as no objection. Sincerely, Quible and Associates,P.C. Brian D.Rubino I have no objection to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. I have objections to the project as presently proposed and have enclosed comments Signature Date it Quible Quible &Associates, P.C. P.O.Drawer870 i0fly Hawk,NC 27949 ENGINEERING•ENVIRONMENTAL SCIENCES•PLANNING Phone:252-261,3300 SINCE 1959 Fax:252-261-1260 PRINCIPALS Sean C.Boyle,P.E. CERTIFIED MAIL Joseph S.Lcwffer.C.E.P. RETURN RECEIPT REQUESTED Eduardo J.Valdlvleso PE ASSOCIATES Joseph J.AnW P.E. David S.Nerf May 19,2003 Ronald Earl Evans 7063 Woodsedge Drive Cincinnati, OH 45230 Re: Major CAMA Permitting for Currituck County Southern Park Point Harbor,Currituck County,North Carolina Mr.Evans: The purpose of this correspondence is for Quible&Associates,P.C.to inform you as an adjacent riparian property owner to property owned by Currituck County, of the proposed work proposed within the 75'Estuarine Area of Environmental Concern(AEC). The proposed work involves construction of two boat ramps,piers,walkways and four gazebos within the AEC. Work of this scope requires Major CAMA permitting through the NC Division of Coastal Management(DCM). A component of the permitting process is to inform adjacent riparian land owners. All of the proposed work is depicted on the accompanying site plan. Should you have no objections to the proposed work,please check the statement below, sign and date the blanks below the statement and return one copy of this letter to:Brian Rubino,Quible&Associates P.C.,PO Drawer 870, Kitty Hawk,NC 27949 as soon as possible. Keep the second copy for your files. Should you have objections to this proposal,please supply your comments to Mr.Edward Harrell,DCM field officer at 1367 US 17 South,Elizabeth City,NC 27909. Written comments must be received within 30 days of receipt of this notice. Failure to respond in either method within 30 days will be interpreted as no objection. Sincerely, Quible and Associates,P.C. Brian D.Rubino I have no objection to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. I have objections to the project as presently proposed and have enclosed comments Signature Date �Z SENDER: DELIVERY ■ Complete items 1,2,and 3.Also complete A. !gnat item 4 if Restricted Delivery is desired. ❑Agent ■ Print your name and address on the reverse ❑Addressee so that we can return the card to you. (Printed Name) C. Date of Delivery ■ Attach this card to the back of the mailpiece, �S or on the front if space permits. D. Is delivery address different from item 1? ❑Yes 1. Article Addressed to: If YES,enter delivery address below: ❑ No i Ronald Earl Evans 7063 Woodsedge Dr Cincinnati OH 45230 3. Service Type ❑Certified Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise i ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery?(Extra Fee) ❑Yes i 2. Article Number v (Transfer from service label) 7002 0 510 0001 6451 3247 l PS Form 3811,August 2001 Domestic Return Receipt 102595-02-M-1035 COMPLETE •N COMPLETE THIS SECTIONON DELIVERY ■ Complete items 1,2,and 3.Also complete A. Si natur 111 item 4 if Restricted Delivery is desired. Agent ■ Print your name and address on the reverse X G -� ressee so that we can return the card to you. B. Re ■ Attach this card to the back of the mailpiece, ��yeived b Pri ted Name) C. Date of Delivery or on the front if space permits. D. Is delivery address different from item 1? ❑Yes 1. Article Addressed to: If YES,enter delivery address below: ❑No 1 Alfred & Lillian Bandelea 716 D Street, South Norfo k Chesapeake, VA 23324 3. Service Type ❑Certified Mail ❑ Express Mail ❑ Registered ❑ Return Receipt for Merchandise ❑ Insured Mail ❑ C.O.D. 4. Restricted Delivery?(Extra Fee) ❑ Yes 2. Article Number (Transfer from service label) PS Form 3811,Au, """ ^ --^-- 102595-02-M-1035 7002 0860 0003 5686 5873 .ti Aa i BOOK 528 P40E 923 FILED PIS cuaarrucx cou '01 M 25 1 Olarr as/�s/zoal �12DO.o CHARLEtJE Y, DOW" ae.lSH REMTH -O DEEDS tINA 1, 6 Real Estate CUkRI T UCt CCUi1 f Y N.C. Excise TaIt .IDtelee 29s S 1,200.00 Recordlor Mina,Hook and Pace Tsx Lot No.,........................................................................................ Parcel Identifier No. 0132-000.043A-000 ....................... Verifiedby................................................................. County on the................day of by ......................................................................................... .....................................................................................................„......,„,.. Mail after recording to JOHN S MORRISON,THE TWIFORD LAW FIRM,LLP,102-C MOYOcK COMMONS.. DRIVE, ..,,...,,..,..,.....................,.,.........................- MOYOCI�NC27958 ...............•.,..,,,.,..,,.. ..................'..'........ ....................................................................................................................,.,.,................................................,..,..,.,...,.,.....,.1..................I....,.,.....,.... This instrument was prepared by TFIE TWIFORD LAW PIRM,LLP,102-C MOYOCK COMMONS DRIVE,MOYOCK,NC 27958 Brief description for the Index i -. NORTH CAROLTNA� GENERAL WARRANTY DEED THIS DEED made this...22nd, day of................ 1�Y 2001 by and between GIIANTOR GRANTEE MELVIN L EVANS and wife,DEBORAH A EVANS,tu d COUNTY OF CURRITUCK,A BODY POLITIC ROY 0 EVANS,SR,unmarried AND POLITICAL SUBDIVISION OF THE STATE OF ROUTE I BOX 43A NORTH CAROLINA MOYOCK,NC 27958 POBOX39 CURRITUCK,NC 27929-0039 Enter in appropriate Drook for each party:name,address,sad,U apDreprlate,ebaraeter of WHY,e.q.eoryorsilon or partnenblp. I The designation Grantor and Grantee as used herhn shall include said parties,their heirs,aucceasors,and aeslgns,and shall include singular, plural,masculino,faminiae pr neuter as required by context. SVSTNESSETH, that the Grantor, for a valuable (consideration paid by the Grantee, the receipt of which is hereby acknowledged, has and by theso presents does grant, bargain, sell and convey unto the Grantee in fee simple, all that certain lot or parcel of land situated in the City of ,FOINTHARBOR POPLARBPAN CH Township, RITCK •••.•.....— .1,1U ...............County,North Carolina and more particularly described as follows: Being Tract 2 as shown and delineated on that certain map or plat entitled in part"SURVEY FOR COUNTY OF CURRI'I'UCK A BODY POLITIC AND POLITICAL SUBDIVISION OF T M ST TE OF NORTH CAROLINA&FRANK C.BERNARD,M PHYLLIS A BERNARD,PROPERTY LINE RECOMBINATION,POPLAR BRANCH,CURRITUCK COUNTY,NORTH LIMA" by Will am T.robbitu,Proffesioml Laced Surveyor,L 2677,under date of May 9,2001 and duly recorded ja Pkt Cabinet Slide a l7 of the Currituck County Public Registry. t THIS CONVEYANCE TO THE COUNTY OF CURRITUCK IS MADE PURSUANT SECTION 1033 IRC, ,JUN I G Z0t13 LAND TRANSFER`T,� COASTAL MANAGEMENT AM0UNTPAID � FLIZABETH CITY ; DATE_ 55a5 suss COLLECTOR i soaK 528 PLE 924 The Property berelnabove described wen acquired by Grantor y Instrument recorded in B°ok 329,Pale 890;Book 329, Page 892 ................................ page—................ .. .......,..................,.................,,,... A map showing the above described property is recorded in Plat Hoak,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, aY e...,,.......,.... TO HAVE AND TO SOLD the aforesaid lot or parcel of land and all privileges and appurtenances thereto belonging to the Grantee in tee simple. And the Grantor covenants with the Grantee, that Grantor Is seized of the premises In fee simple,has the right to convey, the sam e in fee simple,that title is marketable and free and clear of all encumbrances,and that Grantor will warrant slid defend the title against the lawful claims of all persona whomsoever except for the exceptions hereinafter stated. Title to the property bereinabove described is subject to the following exceptions: ANY EASEMENTS,RIGHTS OF WAY AND RESTRICTIONS OF CORD. iN WITNxsa WHLR[o R, the Ofaater tun h.r.unte .ot his hand a—a.or u eofDente ha.—s.a tat.In. A—At to D.l—d la eta corporal.name by its duly.umoriz.d eau.6 lied it.seat to he sor.aato mx.d D autaorltY of IU board of DU.alore,the dog an6 y..r fret •acre weltua. ..............—-----------------—-------..___—:.--__._.-.—. (B1LAL) (C.rporal.Natty) a r.VANS t ._ ._._.�........... tL � ay:.................................................—____.-__ (atrw) 7CSVAR$ •___________________ __—-----------------—-----rr.sld..t i ATTxaT: I G ____ ...``\`,��`� tc.ryoraw 94.1) w ................................................--:-----_.-(e 8 NocTa CAAOMNA...........CLMMUCK ty, I,a X.tary rublle of tad county as slice atomwo,terary that MA7"'(JJjf E'ANSendwifetDEBORAR y ti O B`\6 i�,- AHVANS and ROY G EVANS SR_ unmarried � �,., U '-'••'•--••'-••••...................i-,•.j�^-,--•----------• -------orator. ���iNK11CO�?\```` DDaa.aot otr(a4trytaawroeeo.),ttttr aZ�a aq edj.d-tna a:..uNMa ma r.r.eoln.'[Harr t.001 w)tn...aoY 1 --- -- ---....--- - ^--- aD•e.wraWloa auple.ee March 28t,1005 .. I•___�..__ •.•-- xot.ry rosLa siAL.aTAMr MOATS CABOLQRA,..........—........ -- ------- aaaty, L a xotay r.DUa of the co.aq Lee site alo ww,cortuy that Darro.any oxen.batero toe dais day and}dtawWdod that..._A.U-----_'------- ._.._— -.awr.tat7 d __--------------------------—...._.... a North careL oe ea eoraoratl ,and that by aataerrtr dal, T airs.lid u tie oat et tL aarDa[.tlae,Po feror.ltt�Iwtrumeet wa[.Iraed L.tin na.to DY Lr..._-------I -- S rnsidest,owed vita Its oarD.rsu ran)a�d atusudl by-----------ae W---------------------------6.0r.4y. CWlttuu MY Lad ua e911eW zl.nD ar a.L thU.».—.dar of......—................—�.__-.._.._. xy eeareW..u..%ptr........... L--------- I Th.tereraln.c.rutta•ta(e)oe a 1e -Hur et•Notary of PasQuotank_Co_—NF• .._..._.. .... ..._...-------------------' ...................................••--..--.._------...._.....•..........._....___--..--.._.---------•-------•••••----.__------------- Ie/ace eertifled to be eercea6 Thl.Inettnmeat ad 0"cettLlul.u.daly reatepred at the do"aa4 ttma gad 1.the Book and Per.Six—m the rim D.ro h►r•ol. �� ............. 4id.hYP.`E,_. -. RROTrTttt OD DLins roa-_.._Ct1Tri CUB ---------------COUttrt r .. _._ __- DeDoty/Ae.tate.l�arptur of beedo 1 N.r-D.r Auoc Form No, L-3 m 1976,Rrrlted®1977 NCBA 001JUN FL i i