Loading...
HomeMy WebLinkAbout89805A - NCDOT - Tyrell - Kilkenny Rdill v1CAMA ❑DREDGE & FILL NI?89805 r A a C D a Previous permit i GENERAL PERMIT Date previous permit issued " 2 New ❑ Modification ❑ Complete Reissue ❑ Partial Reissue As authorized by the State of North Carolina, Departs ent of Environmental Quality and the Coastal Resources Commission in an area of environmental concern Pursuant to: I SA NCAC O • ^ . Iiaw ❑ Rules attached. VGeneral Permit Rules available at the following link: www.deo.nc.gov/GAMArules Applicant Name tqC-DOF Authorized Agent gOKI;PT G LLV Address 1 �1 AIr"e0Qf F> , f �1 i+l E 100 Project Location (County): �11 L�/' LLe \ {,., City �c'r'rog Sate �L ZIP ra17gM Street Address/Sat�e[Road/L=#(s) 4L QE (/IN8K-moo Phone#(t�) 1 5 WSW d) klL `E41��1%N Email �L f l f f\CQ 'T Q Y Subdivision City (�Qtf^(F7.r ZIP o' Affected ❑ CW ❑ EW PTA ❑ ES ❑ pfS Adj. Wtr. Bodyv?44 fi I To L1M v TA 1M (nat(6,)6nk) AEC(s): ❑OEA ❑IHA ❑I1W ❑SPIMA ❑PWS Closest Maj. Won Body IL i �lL� —wfe ORW: yes/& PNA: yes/no Access Length �. �r A..t� kjD W t—i5P &C- Ej, WTV I lF r `fri Pler (dock) length Fixed Platforms) ON` Il �'�r Ow 10S 40,A Floating Platform(s) Finger pler(s) Total Platform area Groin length/g Bulkhead/Riprap length Avg distance offshore Breakwater/Sill ' Max distance/ length Basin, channel Cubicyards Boat amp Boathouse/Boatlift Beach Bulldozing Other FAPn(L S ` kF SAV observed: Yesdj Moratorium: n/a yes ley) Site Photos: yes n� Rioarian Waiver ACached: yes %noJ �°[CAMA ❑ DREDGE & FILL N° 8.9805 A B C D �� GENERAL PERMIT Previous permit _ Date previous permit issued [New ❑Modification ❑Complete Reissue ❑Partial Reissue ofNorth Carolina, Department of Environmental Quality and As authorized by the State`- ] ( the Coastal Resources Commission in an area of environmental concern pursuant to: I SA NCAC 1 D ^ . •bu ❑ Rules attached. VGeneral Permit Rules available at the following link: www.decl.nc goy/CAMArules Applicant Name T4C-06prp Authorized Agent goBELtT L&'j`flL0 j` a Address n /i1�QaR-T FD . �J IU .2DO Project Location (County): 79 1— LLLb. r City DeNTOAI State %rL ZIP : %7g3l , f Street Address/State Road/Lot#(s) t`c qt ,c^ A tax. 0'�Jf Phone #(J& WSW dFkILOMNI KD) 1 Email Subdivision City ZIP C76,L& Affected ❑ CW ❑ EW [' PTA ❑ ES ❑ PTS Adj. Wtr. BodyVk! 14 TO .11,6AToL CNM (na 6 nk) AEC(s): ❑ OEA ❑ IHA ❑ UW ❑ SPIMA ❑ PWS Closest Maj. Wtr. Body ORW: yes/0 PNA: yes/0 Type of Project/ Activity J1 ISTAi FysTiNL:� UuLkelic, �Ila Shoreline Length ,- Access Length Pier (dock) length Fixed Platform(s) Floating Platform(s) Finger pier(s) Fb+s1�c F DDPILOC-FGK VfD INTO PEKM IT: 'A ONF1)DgTl% 09los 1.0a Total Platform area Groin length/# Bulkhead/ Riprap length s Avg distance offshore Breakwater/Sill Max distance/ length Basin, channel Cubic yards �• Boat ramp Boathouse/ Boatlift Beach Bulldozing Other �dPwR LF SAV observed: yes �ziiov) Moratorium: n/a yes Site Photos: es Riparian Waiver Attached: yes no A building perm it/� permit may be required by: ConditionJS r17- ]DFSPermit N6T (Scale: NA ) WffBPAM/NEUSE/BUFFER (circle one) See note on back regarding River Basin rules ❑ See additional notes/conditions on back I AM AWARE OF STATUTES, CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) 646 DAI�q Agent or Applicant PRINTED Name Permit Officer's PRINTED /%Name Signature '*Please read compliance statement on back of permit•• Signature $Hcv c�r� was 1P�. oa991 ul Gol; 61 0lo1Aa Application Feels) Check #/Money Order Issuing Date I —I Expiration Dater ;REDGEA & FILL a GENERAL PERMIT N° 89805 Previous permit Date previous permit issued A B C D New ❑Modification []Complete Reissue ❑Partial Reissue As authorized by the State of North Carolina, Department of Environmental Quality and the Coastal Resources Commission in an area of environmental concern pursuant to: l / I SA NCAC !"1 A� ❑ Rules attached. General Permit Rules available at the following link: www.dea nc gov/CAMArules Applicant Name 't °q CCL C 0 Authorized Agent JT`�I• (^� %,f4z!f-it,0 Address 01 f:1 &O-Py"( ^T''• t 20o Project Location (County): r - rK�L(- City P=F i rvTol-I ;rate Nf- zip Street Address/State Roadd//Lot#(s) Phone # (xVo ) L uo,-. LU5 W ( kl `!fie Ni1i� 1 Email 1) !IC ct t.^ • C,-V Subdivision ^t �` ! City,-f�ll(. V'{I't.C• ZIP f.•a v Affected ❑CW ❑EW MPTA ❑ES ❑pTs Adj. Wtr. aodyv,'4` (1./fut10 }il.t{{Cn i0rL (-Nf"o- (nat/man/unk) AEC(s): ❑OEA ❑IHA ❑UW ❑SPIMA ❑PINS Closest Mal. Wtr. Body h)l.I/-r�lf: F-•�4g ORW: yes/no PNA: yes/,19 V Type of Project/ Activity �l"'�>T kL •14.t.� {}� `IfAfaI v tZ . i VCM1x/F6 (Scale: r(% ) Access Length Pier (dock) length Fixed Platform(s) Lr {rr ■.■■��� C■C�CCCC�C�CIC.0 ANC C: Floating Platform(s) ■ ■ ■� ■C • C■ MEN C '� rM Total Platform area Groin Bulkhead/ Riprap length Avg distance offshore Max distance/ lengt Basin, channel Other CA..� ■■n■C Ills ME ME CC �CCCCCCa�'CC M��CC ■■ C M CC .....C.'C.. .. .C..CC�■: ..■.■...C..C..■ ■■■ .■MEMO . . ■ . CC CCCC CC� C OCCCCCCIIICC�.. ' CC� C C■■ CCCC��O'.'CC: CCCC■■■ CC�CC 'CCCC CC CCC®CCM C • o :. .. CC.�In .. ■ 0 M■■CC ri ICIC■. M■SC 11 __ MEN, A building permit/zoning permit may be required by: -l" Lf e Permit Conditions - ' ��k' '4�' Ili' f£i� TO (47414 oi'l ;; i/F4i /�opic, f-2."alcNs.,%�)i,M—c4`.�F�4 CT' �•f u%'_F t [V;,, ! a i.-..r1 e4Rruf". A'd 111ir <',I-Ir l,2f--TC i'c/_ r ❑TAR(PAM/NEUSE/BUFFER(circle one) See note on back regarding River Basin rules ❑ See additional notes/conditions on back I AM AWARE OF STATUTES, CRC RULES AND CONDITIONS THAT APPLY TO THIS PROJECT AND REVIEWED COMPLIANCE STATEMENT. (Please Initial) Agent or Applicant PRINTED Name Signature **Please read compliance statement on back of permit`* Permit Officer's PRINTED Name Signature Issuing Date —I Expiration Date—�F t- uZl 1 _(- Application Feels) Check p/Money Order Daisey, Greg From: Castello, Robert C Sent: Tuesday, April 9, 2024 4:24 PM To: Daisey, Greg Cc: Williams, Paul C Subject: CAMA GP 1900 Request for NC 94 in Tyrrell County Attachments: 2024 CAMA GP 1900 Packet - NC 94 Pipe Liner - Tyrrell County.pdf Mr. Daisey, NCDOT is requestingforthe issuance of a General Permit .1900 for a temporarycoffer dam dewatering structure that will be constructed to install a pipe liner in the pipes on NC 94, just south of Kilkenny Road, in Tyrrell County. The structures wilt be in place for no longer than 4-6 days while the pipe liners are being installed by Nu Pipe. I have been contacted by our team and have been told that NuPipe will be mobilizing to a nearby area starting tomorrow and would like to expedite this as quickly as possible. Attached is the Permit Packet containing the location map, permit drawings, MP-1 Form, and the signed Adjacent Riparian Owner Form waiving any objections to the proposed activity. Also, if you look at the tax maps for Tyrrell County, one of the pieces of property belongs to a Mr. Dodge. I was told today that Mr. Dodge is deceased and the property was underway of being sold and transitioning into Mr. Jeff and Mrs. Edna Gibbs' ownership (the other riparian owners). This transaction should be finalized in the latter part of 2024. As always, NCDOTwill use our best management practices for dewatering and construction of the pipe liner. If you have any questions or concerns please feel free to contact me. Thank you. Robert C. Castello, III (Cas) Division Environmental Specialist Division One NC Department of Transportation (252) 482-1864 office (252) 287-8883 mobile (252) 482-8722 fax rccastelloOncdot. gov 113 Airport Dr. Suite 100 Edenton, NC 27932 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION Roy COOPER GOVERNOR April 09, 2024 Greg Daisey NC Division of Coastal Management 401 S. Griffin St., Ste. 300 Elizabeth City, NC 27909 JOEY R. HOPKINS SECRETARY Subject: Request for a CAMA General Permit .1900 for a Temporary Structure on NC 94 in Tyrrell County. WBS # 1B.201511 Dear Mr. Daisey, The North Carolina Department of Transportation is requesting the issuance of a GP .1900 permit for the installation of a temporary dewatering structure for a proposed pipelining activity. This culvert is located on NC 94 in Tyrrell County. The culverts are located approximately 0.04 miles southwest of Kilkenny Loop Road on an unnamed canal to the Alligator River. The existing (2) 72"x53' CMP will be dewatered using NCDOT's best management practices and will then be repaired and lined with an environmentally friendly concrete liner from the contractor, NuPipe. This temporary coffer dam structure should not be installed longer than 4-5 days. NCDOT is also coordinating with the USACOE and NCDWR to acquire a nationwide permit for the culvert replacement. Included with this letter are the location map, permit drawings, MP -I form, and adjacent landowner notification forms. If you have any questions, please contact me at rccastello@ncdot.gov or (252) 482-1864. The permit fee can be charged to WBS # IB.108911. RECEIVED Aprit 9, 2024 DCM- Elizabeth City Mailing Address: NC DEPARTMENT OF TRANSPORTATION DIVISION ONE 113 AIRPORT DRIVE, SUITE 100 EDENTON. NC 27932 Sincerely, Clemmon W. Bridgers, P.E. Division One Engineer Robert C. Castello, III Division One Environmental Specialist Telephone: (252) 482-1850 Fax: (252)482-8722 Customer Service.' 1-877-368.4968 Website: w ncdot gov Location: 113 AIRPORT DRIVE, SUITE 100 EDENTON, NC 27932 rs. April 9, DCM i I 35.639300°,-76.2119000 Pipe Liner Activity Will pipe line existing (2) 72"x53' CMP's with a concrete liner from NuPipe. Will construct coffer dams on both the inlet Ind outlet ends for dewatering purposes 9 NCDOT GIS Unit, North Ca olina Center for Geographic Information and Analysis, State of North Carolina DOT, Esri, HERE, Garmin, INCREMENTP, USGS, METI/NASA, EPA, USDA, NCDOT GIS Unit, North Carolina Center for Geographic Information and Analysis NC 94 55 Date: o4/09/2024 Pipe Liner Activity Author: Robert C. Castello III Tyrrell County Quad: Fairfield NW Sources: NCDOT, NCOne Map, ESRI 0 0.25 0.5 1 Miles oars MPa APPLICATION for RECEIVED Major Development Permit April 9, 2024 DCM - Elizabeth City (last revised 12/27/06) North Carolina DIVISION OF COASTAL MANAGEMENT 1. Primary Applicant/ Landowner information Project Name (if applicable) Business Name NC 94 (South of Kilkenny Road) - Pipe Liner Activity - Tyrrell N.C. Department Of Transportation P County Applicant 1: First Name MI Last Name Robert C Castello, III Applicant 2: First Name MI Last Name If additional applicants, please attach an additional pages) with names listed. Mailing Address PO Box City State 113 Airport Road, Suite 100 1 Edenton NC ZIP Country Phone No. FAX No. 27932 1 252-482.1864 ext. 252-482-8722 Street Address (if different from above) City State ZIP Email rocastello@nodot.gov 2. Agent/Contractor Information Business Name Agent/ Contractor 1: First Name -MI Last Name Agent/ Contractor 2: First Name MI Last Name Malting Address PO Box City state ZIP Phone No. 1 - ext. Phone No. 2 - - ext. FAX No. Contractor# Street Address (if different from above) City State ZIP Email <Form continues on back> 252.808-2808 :: 1-888.4RCOAST :: www.nccoastalmonagement.net Form DCM MP-1 (Page 2 of 5) APPLICATION for Major Development Permit 3. Project Location County (can be multiple) Street Address State Rd. # Tyrrell NC 94, approximately 250' WSW of Kilkenny Road NC 94 Subdivision Name City State Zip Fairfield NC 27826 - Phone No. Lot No.(s) (if many, attach additional page with list) ext. a. In which NC river basin is the project located? b. Name of body of water nearest to proposed project Tar -Pamlico Unnamed canal to the Aligator River c. Is the water body identified In (b) above, natural or manmade? d. Name the closest major water body to the proposed project site. ❑Natural ®Manmade ❑Unknown Alligator River a. Is proposed work within city limits or planning jurisdiction? f. If applicable, list the planning jurisdiction or city limit the proposed ❑Yes SNo work falls within. 4. Site Description a. Total length of shoreline on the tract (ft.) b. Size of entire tract (sq.fL) 50 ft. 1,000 c. Size of individual lolls) d. Approximate elevation of tract above NHW (normal high wafer) or NWL (normal waterlevel) (If many lot sizes, please attach additional page with a list) 3' ®NHW or ❑NWL e. Vegetation on tract Various roadside grasses on the maintained road shoulder. RECEIVED f. Man-made features and uses now on tract April 9, 2024 NC 94 DCM - Elizabeth City g. Identify and describe the existing land uses adjacent to the proposed project site. Wooded Area h. How does local government zone the tract? I. Is the proposed project consistent with the applicable zoning? Residential, Undeveloped (Attach zoning compliance certificate, if applicable) ®Yes ❑No ❑NA j. Is the proposed activity part of an urban waterfront redevelopment proposal? ❑Yes SNo k. Hasa professional archaeological assessment been done for the tract? If yes, attach a copy. []Yes SNo ❑NA If yes, by whom? I. Is the proposed project located in a National Registered Historic District or does it involve a Yes SNo ❑NA National Register listed or eligible property? <Form continues on next page> m. (i) Are there wetlands on the sae? SYes []No (it) Are there coastal wetlands on the site? ❑Yes SNo (it!) If yes to either (i) or (ii) above, has a delineation been conducted? ❑Yes SNo (Attach documentation, if available) 252.808-2808 .. t-888.4RCQAST .. 'w vrw.nccoa stalm.anac3emcnt. net Form DCM MP-1 (Page 3 of 5) APPLICATION for Major Development Permit n. Describe existing wastewater treatment facilities. None RECEIVED Aprit 9, 2024 o. Describe existing drinking water supply source. DCM -Elizabeth City None p. Describe existing storm water management or treatment systems. None 5. Activities and Impacts a. Will the project be for commercial, public, or private use? [jC mmercial ®Public/Government ❑Pdvate/Community b. Give a brief description of purpose, use, and daily operations of the project when complete. This repair project would allow the continuance of safe transportation along NC 94 by repairing the existing damaged culverts with a pipe liner from NuPipe. Once the culverts are repaired, the roadway facility would continue to provide connectivity and safe access for the traveling public and residents within the area of NC 94. c. Describe the proposed construction methodology, types of construction equipment to be used during construction, the number of each type of equipment and where it Is to be stored. The culverts would be repaired using NCDOT best management practices and construction techniques. The culverts would be repaired "in the dry" during dewatering of the site. The culverts will be repaired using a concrete pipe liner, which would be installed by NuPipe. d. List all development activities you propose. NCDOT plans on installing a temporary coffer dam on both the inlet and outlet ends of the pipe to dewater the two existing (73"45W) CMAPs. NuPipe will then repair the pipes as needed and will then line the pipes with an environmental friendly concrete. After the concrete drys, the temporary cofferdams will be removed to continue water connectivity. e. Are the proposed activities maintenance of an existing project, new work, or both? Maintenance f. What Is the approximate total disturbed land area resulting from the proposed project? 250 ®Sq.Ft or ❑Acres g. Will the proposed project encroach on any public easement, public accessway or other area ❑Yes ®No ❑NA that the public has established use of? h. Describe location and type of existing and proposed discharges to waters of the state. Surface runoff from NC 94. This runoff is not concentrated and generally runs through the grassed shoulder in a diffuse manor. 1. Will wastewater or stormwater be discharged into a wetland? ❑Yes ❑No ®NA If yes, will this discharged water be of the same salinity as the receiving water? ❑Yes []No ®NA j. Is there any mitigation proposed? ❑Yes ®No ❑NA If yes, attach a mitigation proposal. <Form continues on back> 6. AddifionalInformation In addition to this completed application form, (MP-1) the following items below, if applicable, must be submitted in order for the application package lobe complete. Items (a) — (0 are always applicable to any major development application. Please consult the application instruction booklet on how to property prepare the required items below. a. A project narrative. b. An accurate, dated work plat (including plan view and cross -sectional drawings) drawn to scale. Please give the present status of the proposed project. Is any portion already complete? If previously authorized work, clearly indicate on maps, plats, drawings to distinguish between work completed and proposed. c. A site or location map that is sufficiently detailed to guide agency personnel unfamiliar with the area to the site. 252-808-2808 .. 1.888.4RCOA5T .. www.nccoastaimanagement.net Form DCM MP-1 (Page 4 of 5) APPLICATION for Major Development Permit d. A copy of the deed (with state application only) or other instrument under which the applicant Gains title to the affected properties. e. The appropriate application fee. Check or money order made payable to DENR. f. A list of the names and complete addresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a copy of the application and plats by certified mail. Such landowners must be advised that they have 30 days in which to submit comments on the proposed project to the Division of Coastal Management. Name JEFF G & EDNA GIBBS Phone No. RECEIVED Address 20763 NC 94 Fairfield, NC 27826 April 9, 2024 DCM - Elizabeth Ci Name Phone No. Address Name Phone No. Address g. A list of previous state or federal permits issued for work on the project tract. Include permit numbers, peanittee, and issuing dates. h. Signed consultant or agent authorization form, if applicable. 1. Wetland delineation, if necessary. j. A signed AEC hazard notice for projects in oceanfront and inlet areas. (Must be signed by property owner) k. A statement of compliance with the N.C. Environmental Policy Act (N.C.G.S. 113A 1-10). if necessary. If the project involves expenditure of public funds or use of public lands, attach a statement documenting compliance with the North Carolina Environmental Policy Act. 1 7. Certification and Permission to Enter on Land I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to the conditions and restrictions contained in the permit. I certify that I am authorized to grant, and do in fact grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. 1 further certify that the information provided in this application is truthful to the best of my knowledge. Date 04/09/2024 Print Name Ro rt C. Castello,II II' Signature Please indicate application attachments pertaining to your proposed project. ❑DCM MP-2 Excavation and Fill Information ❑DCM MP-5 Bridges and Culverts ❑DCM MP-3 Upland Development ❑DCM MP-4 Structures Information 252-808.2808 .. 1.888.4 R CO AST .. •Nww. n c coast a lm a na gem en4.n et RECEIVED April9, 2024 DCM - Elizabeth City ADJACENT RIPARIAN LANDOWNER STATEMENT (Tyrrell County: Pipe Linning Activity on NC 94, South of Kilkenny Loop Road) General Statute 113-229 requires that riparian landowners with property adjoining a proposed development in an Area of Environmental Concern (AEC) be given ten (10) days in which to comment on the proposed development. This form allows the adjacent riparian landowner to express either: (1) that he objects to the project; or (2) that he does not object and desires to waive his/her right to the 10-day period so that the processing of the application can progress more rapidly. Of course, the adjacent riparian landowner need not sign this form at all if he/she so chooses. No response within 10 days following receipt of this letter and form will be construed to mean the adjacent riparian landowner has no objections. I, J E-cr 6-t Q (3 S , am an adjacent riparian property owner and am aware of the North Carolina Department of Transportation's plans to repleeeeTipwen �[✓ ��{ as proposed on the attached drawings. I am further aware JG J that this work will occur in an AEC and therefore will require authorization from the Division of Coastal Management in accordance with the Coastal Area Management Act (CAMA). 94 ns45' I have no objection to the project as presently proposed and hereby waive that right of objection as provided in General Statute 113-229. are attached. I have objections to the project as presently proposed and my comments Signature of Adjacent Landowner Date: , . , ,% 0 QD } - §. - ={ 5 g \ \ : , , §i » ( �^ Ln co . ° NJ = / , , \ _ , - , - - - -�� OD e ; r2 <- �n 2 , , ; o 7;z0Z \ $ lM;�@; \ „; ° e 2 ;mdg;` / - \ - @ r\ @> Mm � ® / q 00 = o ( } 2 G § p /m_ _ _ _ tau 03 kb §§[§�0 Zr- e<- � jV) \ \\ \\ M§2;y00 G §§ tD § � ° { k