Loading...
HomeMy WebLinkAbout127-07 Oversized PlansSTA: 0+75.87 A = 900 00'00" RT. BEGIN 721 LEVEL LANDING ® STA. 0+24.00 DECK ELEV. = 6.0' 6'-0"W X 13'6" TREATED TIMBER WALKWAY - CONSTRUCT TOP FLUSH WITH GRADE AND 6 FT. MIN. FROM EDGE OF PAVEMENT -� 00. NORMAL HIGH WATER LEVELEX. MANHOLE APPROX. LOCATION OF PROPERTY LINE EX. FENCE LINE 1 / WALLACE VI, >�(3ARNER/ D.B. 788 PO_.._ 67)@- EX. POWER POLE - STORM SIZE UNKNOWN EX. MANHOLE PLAN VIEW SCALE: 1 "=50' cpoNjY CAR�ERET ACCESS PRE PN TE END LEVEL LANDING ® STA. 10+30.22+ BEGIN LEVEL LANDING ® STA. 10+16.71 END BOARDWALK ® STA. 10+54.22+ DECK ELEV. = 6.3' DECK ELEV. = 4.3'+ APPROX. LOCATION OF ` CARTERET CO. PROPERTY LINE s1A EDGE OF MARSH �RTERET COUNTY 6►� ` ^�O'N R�PAPPRpX�MA END LEVEL DECK ® STA. 9+96.31 ` \ � r -9� DECK ELEV. = 8.0 \ tiu� c `\ ` / ��,t � � STA: 9+15.88 0 = 33° 00'00" LT. Ek GN STA: 8+98.79 ! / 0 = 15000'00" LT. STA: 8+86.87 A= 15000'00" RT. !' } x 1l, INV=-2.14 INV=-2,49 y / INV=-2.54 INV=-2 01 (3 EDGE OF MARSH l s\ /RAP P APPROX. LOCATION OF TOWN �: GJ ���� \ ;` X. RIP, OF BEAUFORT PROPERTY LINE cl (DB 1052 PG 425) �W fINC TOWN CREEK r<' - V - INV.=-2.66 INV.=-2.95 (WO CLASSIFICATION SC) / INV.=-2.68 EX. POWER PO-E INV.=-3.03 / i �� EX. EDGE OF MARSH, TYP. NORMAL HIGH WATER LEVEL x/z O0Q�P�\PP� EDGE OF MARSH APPROXIMATE LIMITS OF MARSH r/ ,= S STA: 2+54.93/. 0= 15°00 00,E LT. / / STA: 2+39.55 �x �> -.-`f ;, r' APPROXIMATE LIMIT OF 75 FT. 0 = 15000'00" RT. %��` f / WIDE COASTAL SHORELINE AEC �/ r / STREET RIGHT-OF-WAY / BOUNDARY LINES EDGE OF MARSH Xx LAN6WARD EDGE OF MARSH ,fix 'IN / STA: 0+61.29 i 0 = 90000'00" LT. 14, 00 BEGIN LEVEL BOARDWALK ® STA. 0+54.00 ELEV. = 8.0' G10.00 8.0o !r' BEGIN BOARDWALK STA. 0+00.00 DECK ELEV. = 4.0'± >6.00 LEI 4,00 EX. POWER POLE EX. CONCRETE SIDEWALK EX. 30" CURB & GUTTER 4.00 z 1100 0 10.00 Q 8,00 Lu 4,0Q J ", 1 Lit �( � o 0,00 2. 00 0.00 -m- 2. 00 X-SECTION B-B SCALE: 1 =10 +10 4-40 1-60 +830 _+00 4+20 X-SECTION A -A SCALE:1 "=10' STA: 10+23.46 0 = 45' 00'00" RT. r / /EDGE OF WOODS EX. WET WELL EX. MANHOLE EX. 8 DIP INV.=1.80 EX. ELECTRICAL PANEL \- EX. POWER POLE 4.4- 40 NOTES CONCERNING PILE DRIVING AND PILE DEPTH (ALSO SEE DWG NO 81) WOOD PILES SHALL BE TREATED SOUTHERN PINE PILES CONFORMING TO ASTM D-25 AND WITH MINIMUM LOAD CARRYING CAPACITY OF 4 KIPS/EACH. THE MINIMUM PILE DIAMETER SHALL BE 8 INCHES. THE DEPTH(S) TO WHICH PILES ARE TO BE DRIVEN SHALL BE DETERMINED AS FOLLOWS: 1. ALL PILES, INCLUDING TEST PILES, SHALL BE DRIVEN WITH POWER OR GRAVITY HAMMERS. 2. THE CONTRACTOR SHALL PROVIDE TO THE ENGINEER AT LEAST 15 DAYS PRIOR TO THE PLANNED START OF TEST PILE DRIVING OPERATIONS THE SPECIFICATIONS FOR THE PILE DRIVING HAMMER, CAP BLOCK, AND CUSHIONING MATERIAL HE PROPOSES TO USE TO DRIVE THE PILES. THE ENGINEER WILL DETERMINE THE DRIVING CRITERIA FOR THE TEST PILES WITHIN 15 DAYS OF RECEIPT OF ADEQUATE SPECIFICATIONS FROM THE CONTRACTOR. 3. THE CONTRACTOR SHALL FURNISH AND DRIVE AT LEAST TWO TEST PILES. THE TEST PILES SHALL BE AT LEAST 20 FEETIIJ LENGTH. TEST PILES SHALL BE LOCATED SO THAT THEY MAY BE CUT OFF AND BECOME PART OF THE COMPLETED STRUCTURE. AT LEAST ONE TEST PILE SHALL BE AT THE LOCATION OF THE PROPOSED OBSERVATION PLATFORM. AT LEAST ONE TEST PILE SHALL BE LOCATED ALONG THE PROPOSED RAMP AT THE Wf,TERWARD (OCEAN SIDE) OF THE PROPOSED PLATFORM. 4. TEST PILES SHALL_ BE DRIVEN IN ACCORDANCE WITH THE DRIVING CRITERIA PROVIDED BY THE ENGINEER AND UNTIL THE BEARING CAPACITY REQUIREMENT PROVIDED AS PART OF THE DRIVING CRITERIA IS ACHIEVED. 5. THE CONTRACTOR SHALL PROVIDE TO THE ENGINEER DRIVING RECORDS FOR EACH TEST PILE WITHIN 7 DAYS OF COMPLETION OF TEST PILE DRIVING OPERATIONS. DRIVING RECORDS SHALL, AT A MINIMUM, INCLUDE BLOW COUNT DATA, DEPTH BELOW LAND SURFACE TO WHICH THE PILE TIP WAS DRIVEN AND A DESCRIPTION OF UNUSUAL OCCURRENCES DURING PILE DRIVING, IF ANY. 6. THE ENGINEER WILL PROVIDE TO THE CONTRACTOR A RECOMMENDATION AS TO THE LENGTH(S) OF THE PRODUCTION PILES WITHIN 7 DAYS OF RECEIPT OF THE TEST PILE DRIVING RECORDS. 7. PRODUCTION PILES SHALL BE DRIVEN WITH THE SAME TYPE AND CAPACITY OF EQUIPMENT THAT WAS USED FOR DRIVING TEST PILES. THE CONTRACTOR SHALL PROVIDE TO THE ENGINEER DRIVING RECORDS FOR EACH PRODUCTION PILE WITHIN 15 DAYS OF COMPLETION OF PRODUCTION PILE DRIVING OPERATIONS. EACH RECORD SHALL INCLUDE A PILE IDENTIFICATION NUMBER THAT IS REFERENCED TO A MAP AND PROVIDED BY THE CONTRACTOR. MAY 2 3 2007 RA- 4.1- 80 0 CA Sl` L 12145 VNN� !�o co cm U W uh O CV m N ..,, (� a co co co x 10 to 0 m co U WU ° Z a } C % co B0 cm Mr.. cm co cm N 0 ft►ft r- m a `V CL v Z W r 910 '.� Q N nir^`I .J x m a o Ld F a U Z W Vr ^ o Q J w � Q O m m a 0 SCALE: AS SHOWN DATE: JULY 22, 2005 DRWN. BY: D. PRICE/GKM CHKD. BY: G.K. MESHAW PROJECT NUMBER G05035 DRAWING NO. G2 SHEET NO. 2 OF 2