HomeMy WebLinkAboutEX - Slash Creek Condo Unit Owners0
1
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environmental Quality and the Coastal Resources Commission in an area of
environmental concern pursuant to 15 NCAC Subchapter 7K
ApplicantgqName fat — <L �Nk e_ ,J- Q/1J bp1n�S _PhoneNumber7sZ-Zrp/`/Ia
Address_ 0 ", �' /3 27
City Nexqs /l a.e-ci —State ` Zip 2-7 4-s�
The proposed project to be located and constructed as
described above Is hereby certified as exempt from the
CAMA permit requirements. This exemption to CAMA
permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local
authorization.
This certification of exemption from requiring a CAMA permit
Is valid for 120 days from the date of Issuance. Following
expiration, a re-examination of the project and project site may
be necessary to continue this certification.
I AEC(S): /: 'S I/•5 //, /l) l it SCALE: tj (-S,
I 1 I 1 1 1 I 1
I I I 1 1 I I I
r--r--r--r--r--r--r--r--
I
I 1 1 1 I 1 1 1
r--r--r--r--r--r--r--r--
1 1 1 I I 1 1 1
I i 1 1 1 1 1 1
r--r--r--r--r--r--r--r--
1 1 1 I 1 1 I 1
1 I 1 I 1 1 I IY-
r-r--r--r--r--r--r- r
I 1 1 1 1 1 1 1
r--r--r--r--r--r--r--r-r
I I I 1 1 I 1
1 1 1 1 I 1 A 1
r-`r--r--r--r--r--r--r--
I 1 1 1 I 1 1 1
I 1 I
f__k__T__k__T__T__
1 I I I I
I 1 I 1 I I I I
I 1 1 I 1 I 1 1
1 1 1 1 I 1 I 1
I I 1 1 1 I 1 I
1 1 1 I 1 I 1 I
1 1 1 1 I 1 1 1
I I I I 1 1 1 1
I I 1 1 1 I 1 1
L--4--4--4--L--4--4--
I 1 I 1 I I 1 1
I 1 1 1 1 1 1
r-------
Any person who proceeds with a development without the con-
sent of a CAMA official under mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that the
applicant will abide by the conditions of this exemption
i i i i i i
1 1 I I 1 I
I I I I 1 1
1 1 I 1 1 I
I I 1 1 1 1
I I 1 I I I
I I 1 i I I
--r--r--1--r--r--r--
I I I 1 I I
- r--r--1---r--r--T--
1 1 I I 1 I
I 1 1 1 I 1
--T --f-'1---i-- i-- T--
1 1 I I I I I 1 I 1 1 I I
I N I ( I I 1 1 1 I I
4 1 1 I 1 I I I I
I 1"lTi 1�1"%I I 1 I I
J 1 Lt/ 1.�1 •�I 1 I I I
1 i 1 1 1 1 1 I I I
/ / I
�.*tcsnt's signature E1K Ati
MA Official's signature
`�Iz�� /i �� l
Issuing data Expiration Date
CERTIFICATION OF EXEMPTION
Applicant
Address I
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environmental Quality and the Coastal Resources Commission in an area of /
environmental concern pursuant to 15 NCAC Subchapter 71< or NCGS 113A-103 (5) (b) (5)! .
-00
Z� " CS a
� ufn"`� —Phone Number,S2-�(Pr /'_�'
City State zip Z-7
Type and Dimensions of Project`
The proposed project to be located and constructed as
described above is hereby certified as exempt from the
CAMA permit requirements. This exemption to CAMA
permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local
authorization.
This certification of exemption from requiring a CAMA permit
is valid for 120 days from the date of issuance. Following
expiration, a re-examination of the project and project site may
be necessary to continue this certification.
AEC(S): G_ 5 1^--3- �i%LS �� % R�- SCALE: 14 1:'
I 1 I 1 1 I I I I I I I 1 I I I I 1 I 1 1 1 I
I I I I I I I I I I I I I 1 I I I 1 I 1 1 I I
F--r--�--r--+--r--r--+--r--+--r--+--y--r--r--r--+--r-�---+--r--*--+
1 I 1 1 I I 1 1 I I I I I I I I I I I I I 1 I
I I I I I I 1 1 1 I I I I I I 1 I I I 1 I I 1
r--r--r--r--r--r--r--r--r--r--r--r--Y--r--r--r--r--r--1---r--r--r--r
I 1 1 I I I I I I I I 1 I I I 1 1 I I I I I 1
I I I I I I I I I I I I I I 1 I I I I I I I 1
r--r--r--r--r--r--r--r--r--r-r r�-r--r-- --r--r-r--r--r--r--r
I I I 1 I I 1 I I 1 I I I I I I I I I I
r--r--r--r--r--r--r- r - ---r--r--�----r--r--r--r-�---r--r--r--r
I I I I 1 I I I I 1 1 I 1 1 1 1 1 I I
1 I 1 1 I I I I I I 1 1 I I I I I 1 I 1 I I
r--r--r--r--r--r--r--r-- ---r--r--�--r--r--r--r--r-�---r--r--r--r
I I 1 I I I I I I I I I I I I I I I 1 I I I
I 1 I I I 1 I I I I I I I I 1 I I I 1 I I I
r--r--r--r--r--r--r--r--r--r--r--r--T--r--r--r--r--r--I---r--r--r--r
1 I I I I I I 1 I 1 1 I I I I I I I I I I I 1
r_4_4_4__T__r__r__1
1 I 1 I I I 1 1 I I I 1 I I 1 I I 1 1 1 1 1
I I 1 1 I I 1 I 1 I I 1 I I I I I I 1 6 1 I I
I 1 1 1 I I I I 1 I 11 I I I I I I
L _ L_
I 1 1 1 1 I I I I L I 1 I 1 I I I
—�_4__;--)- -!_ _1�1__1__a
I 1 1 1 I I I I 1 I I 1 Imo-
I 1 1 1 I I I I I I 1 r 1- 1� ---
"1} — 4I}/— 4
4— _i_ }_
1 I 1 1 I I 1 I ! r"z l T+71�-w1 !, � 7 (�. t-2 %✓t 4
Any person who proceeds with a development without the con-
sent of a CAMA official under mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that the
applicant will abide by the conditions of this exemption.
-- ' - - � - & - - & - - ' - - �
-+--r--r--r--+
I L 1 I
I I 1 1 I
-r-r--r--r--�
I I 1 1 I
I 1 1 1 I
-r-r--r--r--�
1 I I I 1
1 1 I I 1
-r-r--r--r--i
1 I I I I
1 I I 1 I
I I 1 1 I
I I 1 I I
-r-r--r--r--t
I 1 1 I I
I 1 1 I I
I\I 1 I 1 I
I I 1 1 I
I 1 1 I I
I 1 1 I
rl 1 I I I
--L--L--L__J
I I I I I
I I I I 1
I I 1 1 I
1 1
1 1 1 1 I
1 1 I I I
Applicant's signature 5 -iL 4 W c� d
"-1
,91�A O icial's signature
Issuing date Expiration Date
CERTIFICATION OF EXEMPTION
FROM REQUIRING A CAMA PERMIT
as authorized by the State of North Carolina,
Department of Environmental Quality and the Coastal Resources Commission in an area of
environmental concern pursuant to 15 NCAC Subchapter 7K or NCGS 113A-103 (5) (b) (5)
Applicant Name
Address '
City
Project Location (County, State Road, Water Body, etc.)
Type and Dimensions of Project
The proposed project to be located and constructed as
described above is hereby certified as exempt from the
CAMA permit requirements. This exemption to CAMA
permit requirements does not alleviate the necessity of
your obtaining any other State, Federal, or Local
authorization.
Phone Number
State
Zip
i
This certification of exemption from requiring a CAMA permit
is valid for 120 days from the date of issuance. Following
expiration, a re-examination of the project and project site may
be necessary to continue this certification.
AEC(S): SCALE:
I I 1 I I I I 1 I I I I I I I I I I I I I I I l i t
I I 1 I I
I I 1 I I I I I I I I I I I I I I I I I I I I li I I '1 I
I I 1 I I I I I I I I I I I I I I I I I 1 I I I I I I I I
I I I I I I I I I I I I I I I I I I I I 1 I I 1 I I I 1 I
r--r--I-- r--*--r--t--r--r--r--r--r--'+--r--�--r--r--r--1---*--t--*--*--r--r--r--r--r--+
r--r--r--r--r--r--r--r--r--r--r--r---1--r--Y--r--r-r-7---r--r--r--7--rr-r�-r--r--r--i
1 1 1 1 I I I I I i I I I I I I I I 1 I I I I I I I I I 1 1 1
r--r--r--r--r--r--r--r--r--r-r,--r--�--r--r-r--r--r-r--r--r--r--T--r�-r�-r--r--r--�
I I I I I I I I I '.II L 1 I I I
r--r--r--r--r--r--r-I`r--r'-r--r--T--�--r--T--r--T--r-� --- r--r--T--T--r`i-r�-r--r--r--i
I I I 1 1
r--r--r--r--T--r--r--r--r--T--r--T--l--r--T-T--T--r-I---T--T--T--T--r;--T` I I I I
I I 1 I I I I 1 I I I I 1 I i I I I I I I I I I I l i I I I I
I I I I I I I 1 I I I I I I 1 I I I I I I I I I I I I I I
r--r--r--r--r--r--r--r--r--T--r--T--�--r--T--r--T--r-I---r--r--T--T--r� r -r--r--r--1
I I 1 I I I I I I I I I I I I I I I I I 1 I I 1 I I I I I
r-_ _- I_I1
I r r--T--r--r--T--I I I I -I--r--�--r--T--r--r--T--T--T- 1 r TI-r--r--r--1
J___1__1__S__1__I_i
___1__1__1__1
1 I I I I I I I 1 I I 1 I I I 1 1 I I
1 1 1 1 I I I I I I I 1 1 I I 1 1 I I I I I I I I I I 1 1
.1 I I I I �,I
I 1' 1 I I' I 1 I I I I 1 I I I I I I
Any person who proceeds with a development without the con-
sent of a CAMA official under mistaken assumption that the
development is exempted, will be in violation of the CAMA if there
is a subsequent determination that a permit was required for the
development.
The applicant certifies by signing this exemption that the
applicant will abide by the conditions of this exemption.
Applicant's signature
CAMA Official's signature
Issuing date Expiration Date
DocuSinn Envelcpe ID: 441ABE1B-89E3-4B3E-B226-A7658649B39A
AGENT AUTHORIZATION FOR CAMA PERMIT APPLICATION
Name of Property Owner Requesting Permit: Slash Creek Condo Unit Owners
Mailing Address:
Phone Number:
Email Address:
PO Box 1327
Nags Head, NC 27959
252-261-1200
shannon@seaside-management.com
I certify that I have authorized Emanuelson and Dad
Agent / Contractor
to act on my behalf, for the purpose of applying for and obtaining all CAMA permits
necessary for the following proposed development: replace 20 linear feet of existing
bulkhead with new 10' tall bulkhead
at my property located at 57436 NC 12 Hwy, Hatteras
in Dare County.
/ furthermore certify that 1 am authorized to grant, and do in fact grant permission to
Division of Coastal Management staff, the Local Permit Officer and their agents to enter
on the aforementioned lands in connection with evaluating information related to this
permit application.
Property Owner Information:
l 'f
Signature
Shannon Bracy
Print or Type Name
Association Mnager
Title
121112 T /
Date
This certification is valid through I
Carver, Yvonne
From:
Sent:
To:
Subject:
Attachments:
Good afternoon Lorelei,
Carver, Yvonne
Tuesday, March 12, 2024 12:54 PM
Lorelei Zumbrunnen (Emanuelson6705@outlook.com)
Slash Creek Condo Exemption
SLASH CREEK CONDO UNIT EX-03122024125044.pdf
Attached you will find a Certificate of Exemption issued for the Slash Creek Condo Unit
Owners' bulkhead repair project located in Hatteras, Dare County.
In orderto validate this Exemption:
• Please review, print and sign the Exemption on the line marked `Applicant's
signature'.
• Scan and return a copy back to me.
Your prompt attention to this matter would be appreciated. Failure to return the signed
copy may void the Exemption.
If you have any questions regarding this correspondence, please don't hesitate to call
me.
Thankyou.
vo�
Yvonne B. Carver
Environmental Specialist II
Division of Coastal Management
NC Department of Environmental Quality
252-621-6453
401 S. Griffin St., Suite 300
Elizabeth City, NC 27909