HomeMy WebLinkAbout99-20 Letter of RefinementROY COOPER
Governor
ELIZABETH S. BISER
Secretary
TANCRED MILLER
Director
Mr. Marshall C. Taylor
218 Riverside Dr.
Washington, North Carolina 27889
Dear Mr. Taylor:
NORTH CAROLINA
Environmental Quality
1 April 2023
This letter of refinement is in reference to your 28 March 2023 request for a modification
of Major CAMA Permit No. 99-20 issued to Marshall C. Taylor. CAMA Major Permit No. 99-20
was issued to Marshall C. Taylor on 7 October 2020 for the installation of a riprap revetment, pier,
platform, 2 boatlifts, kayak launch and the rebuilding of an existing pier. A letter of refinement
was issued on 28 July 2023 to forgo the permitted riprap alignment along the existing wooden
bulkhead and replace ±200' of bulkhead a max of 2' waterward of the existing alignment.
Your most recent request to amend permit 99-20 to extend the newly installed bulkhead
alignment landward behind the identified wetland line as well as slope and grade the working
corridor as shown on your updated plat dated 28 March 2023 is hereby authorized. Please note
that this refinement does not allow for any increase in the number of slips. All permit conditions
still apply and remain unchanged. Your modified plat attached to your 28 March 2023
correspondence will become a permanent part of the file.
Thank you for your time and cooperation in this matter. As a friendly reminder permit 99-
20 will expire on 31 December 2025 and can be renewed following the renewal process. If you
have any questions about this or related matters, please don't hesitate to contact me in the
Washington Regional Office.
Sincerely,
Kelly Spivey
District Manager
Washington Regional Office
cc: Gregg Bodnar - Major Permits Coordinator, DCM
Cameron Luck — Assistant Major Permit Coordinator, DCM
Ashley Grandy — Field Representative DCM
North Carolina Department of Environmental Quality I Division of Coastal Management
_E Washington Office 1 943 Washington Square Mall I Washington, North Carolina 27889
252,946.6481
( P) g4q,T;;c-I
"��^ Project Name:
Date Page
STOCKS & TAYLOR
C O N S T R U C T I O N Subject
(_c= (. Er►D
o a..)IR%'C—R j)FPI-Ns
i N iW iN rqlZ o t,. e L/ P i f; 2S L/
PtC2 A
PxoPos
C Jile rp C3� r G 00,
d
tin ( 0 Li►-r r3x.(�'
0 el c n
Q
l+
)60
N c-- w
�t f71` l ��•-mac
y�
WL
V-1 It
:� S 1
/y 2e 1
Xtss�✓�'
s
ca.
t-ie rGN I
� l,a 3/a o a c)
r4".ffc, TY6-
(MPT To 5clacam,
)L
,RECEIVED
JUN 2 3 2020
DCIbI^VVA1' O