HomeMy WebLinkAbout1.26.23 Hatteras Inlet Pre-Con Meeting NotesHatteras Inlet Pre -con 1/26/23 KW 13' event- but first use of Miss Katie and first dredging of new channel Lot of discussion about cables- are believed to be above -15' elev Applied a 100' buffer along all sides 100 ' buffer from SAV also shown- distances shown 2 channel segments to be dredged- porb focusing more on southern section east of the cable Some 7' depths 200' stretch Pre -con process- coordinate with OITF and EJE/Miss katie Coordinating with agencies and ACE nav Hope to start work tomorrow Will file report at end Jordan decent weather window- just finished up a week at OI (24 hrs) En route and plan to be there from 6-10 days Just get familiarized with channels and AIWW and do some work before window Intent is to come back again before March KW @me- already covered everything- just a confirmation of the moratorium, max dredge depth, buffers, all excavation and placement to occur only in approved areas, and sidecast only to be done to create pilot channel for hopper dredging believe intent that just going to use the hopper dredge- knowing can change quickly - Not allowed to dredge onto shoals — so something for EJE to be aware of @JP- says 1500' off Ocracoke in -10' water- ACE has provided shape @EJE- let them know if encounter unsafe area- may need to coordinate adjustment with us Who made the oval? KW believe back in 2016 TH basically what original authorization was- said at least 1500' from end of island from 10-14' depths Would go out and survey to find- but target that oval area KW also language about NARW monitoring— know if they can verify whether they have to observe protocols Jp have recent guidance that can provide- once in ocean NARW monitoring comes into play TH same issue- get emails and coordinates are automated messages can receive KW @RT anything to add about DWR? RT no- nothing (mic issue) As far as SAV monitoring- agencies have asked that SAV monitoring be conducted prior to moratorium- and if dredging in season, a post -project report be provided Will conduct conditional SAV survey where channel is within 1000' of previously mapped SAV And if dredge within 1000' will resurvey- plan to do in March And will provide coordinates of DA to Jordan Allen in dump site- has there been any recent placement KW no- been at least a year