Loading...
HomeMy WebLinkAboutHatteras Inlet Project Report 4/18/2019APTIM April 18, 2019 David Bemhmt FIRMS —Protected Resources Division 26313th Avenue South St Petersburg, FL 33701 Subject Hatteras Inlet Project Report (USACE Action ID. SAW-2016-02140) Dear Mr. Bemhart: Kenneth Willson Program Manager Apdm Coastal Planning & Engineering ofNorth Carolina, Inc. 4038 Masonboro Loop Road Wilmington, North Carolina Tel:+1 910-791-9494 Kenneth.Willson@aptim.com This letter serves as the proj ect report required by special condition #24 of the above referenced permit, which allowed Dare County to conduct maintenance dredging within the Connector Channel Condor located between Ocracoke I sland and Hatteras Island, North Carolina. Special condition#24 requires that a project report summarizing the results of the dredging and the sea turtle take (if any) be submitted to NMFS within 30 working days of completion and that the reports shall contain information on project location, start-up and completion dates, cubic yards of material dredged, incidental tangs (include photographs, if available) and sightings of protected species, mitigating actions taken, screening type (inflow, overflow) utilized, daily water temperatures, name of dredge, names of endangered species observers, percent observer coverage, and any other information the contractor deems relevant Project Description: On March 16, 2019, the US Army Corps of Engineers (USACE) operated Sidecast Drulge Merritt began dredging in the Connector Channel/South Ferry Channel in the vicinity of Hatteras Inlet The Dredge Merritt conducted maintenance dredging in the channel for approximately 20 days between March 16 and Apn111, 2019. The Wilmington District USACE provided hydrographc survey charts showing the pre -construction (February 26, 2019) and post -construction (April 11, 2019) depths in the channel. The USACE survey group also conducted a conditional survey on March 28, 2019. Maps showing all three (3) of these surveys are included as an attachment to this letter (Attachment 1 — Connector Channel Maps). A comparison of the precomtruction survey conducted on February 26, 2019 and post -construction surveys conducted on April 11, 2019, indicated that approximately 11,000 cubic yards of material was removed from the channel. The removal of the material resulted in controlling depths between -8 It and -9 It mean lower low water (MLLW) though the South Ferry Channel. The resulting channel is between 150 feet and 200 feet wide Mitigation Actions and Observations: In accordance with the permit, the applicant notified the USACE Regulatory Division prior to dredging activities that dredging may occur between Apri11 and September 30. In a letter dated March 6, 2019, Dare County requested up to fifteen (15) days of relief in April, to complete the maintenance event In support of the request, Dare County stated that no mainteance dredging was required of the channel in 2018 during the dredge moratorium and although the channeld conditions are highly dependent on weather conditions, the County is using the best available data to maintain the channel in such a way as to minimize the need for dredging will= the dredge moratorium. On March 18, 2019 Heather Coats of the North Carolina Division of Coastal Managment provided a letter authorizing the extensions of the moratorium to allow the work through April 15, 2019. Likewise, in a lettter dated March 18, 2019, David Lekson of the USACE Washington Regulatory Field Office granted relief through April 15, 2019 for this particular dredge event. The modified permit allows for maintenance of a 200 ft. wide channel to a depth of -12 ft. MLW. The Goal of the March/April 2019 maintenance eventwas to remove approximately 28,600 cy of material to achieve a channel depth of -10 ft. MLW within the proposed channel, which includes a 150-footwide channel, a 50-footwidener in the area pinched between the two shoals encroaching on the channel and 1V:3H side slopes. APTIM staff coordinated closely with both NC DCM and USACE regulatory staff on the progress of the project. In accordance with the permit construction activities complied with the "Guidelines for Avoiding Impacts to the West Indian Manatee". Furthermore, the project did not place any material above the MLW to avoid impacts to federally listed Seabeach Amaranth, Piping Plover, Red Knot Green sea turtle, Hawksbill sea turtle, Kemp's ridley sea turtle, Leatherback sea turtle, Loggerhead sea turtle, and their habitat. To the knowledge of the contractor, no protected federally listed species was killed, injured, captured, harassed, or otherwise harmed by the conduct of the maintenance activities (i.e. no incidental takings(. No protected species were observed during the conduct of the work, however, protected species observers were not required as a condition of the permit. Furthermore, in accordance with the permit material excavated by the Sidecast Dredge Memtt was placed at least 100 linear feet from known SAV resources. Please feel free to contact me should you have any additional questions regarding this project. Very truly yours, APTIM COAS AL PLANNING & ENGINEERING OF NORTH CAROLINA, INC. Ken Willson Project Manager CC: Josh Pelletier — USAGE Fritz Rhode — NMFS-HCD Heather Coats — NC DCM Gregg Bodnar — NC DCM Bobby Outten — Dare County Attachments: Attachment 1 — Pre -Construction and Post -Construction Survey Charts Attachment 2 — Construction Drawings ATTACHMENT 1 PRE -CONSTRUCTION AND POST -CONSTRUCTION SURVEY CHARTS February 26, 2019 (Pre -Construction Survey) March 28, 2019 (Conditional Survey) April 11, 2019 (Post -Construction) APTIM COASTAL PLANNING & ENGINEERING OF NORTH CAROLINA, INC. 75°47'0"W 5"W ii iI O Z 4 • NOTES: 1. ELEVATIONS ARE IN FEET AND REFER TO NOAA'S REPORTED MEAN LOWER LOW WATER (MLLW) RELATIVE TO THE 1983-2001 TIDAL EPOCH. 2. PROJECT SURVEYED WITH DISTRICT SURVEY VESSEL,,KNOWLTON ", USING RTK GPS HORIZONTAL POSITIONING EQUIPMENTAND 200 KHZ SOUNDING EQUIPMENT. 3. HORIZONTAL DATUM NAD 1983. VERTICAL DATUM M.L.L.W.. 4. TIDE GAGE LOCATED AT VILLAGE MARINA USE OF TIDE VALUES FOR THIS GAGE ARE RESTRICTED TO QUALITY ASSURANCE PURPOSES FOR VERIFICATION OF RTK TIDES. THE WILMINGTON DISTRICT WILL ONLY USE STAFF GAGE TIDAL VALUES FOR FINAL MAPPING AND QUANTITY CALCULATIONS IF RTK GPS IS UN- AVAILABLE AT THE TIME OF SURVEY. 5. THE INFORMATION DEPICTED ON THIS SURVEY MAP REPRESENTS THE RESULTS OF SURVEYS MADE ON THE DATES INDICATED AND CAN ONLY BE CONSIDERED AS INDICATING THE GENERAL CONDITIONS EXISTING AT THAT TIME. THESE CONDITIONS ARE SUBJECT TO RAPID CHANGE DUE TO SHOALING EVENTS. A PRUDENT MARINER SHOULD NOT RELY EXCLUSIVELY ON THE INFORMATION PROVIDED HERE. REQUIRED BY 33 CFR 209.325 7. NAVIGATION AIDS LOCATED WITH DISTRICT SURVEY VESSEL, ACCURACY +1-3 METERS. 8. SURVEY CONDUCTED BY US ARMY CORPS OF ENGINEERS, WILMINGTON DISTRICT. 3 2 2 3 3 3 3 3 4 4 4 4 _ 4 4 - 4 4 4 5 4 4 4 4 4 4 _ 4 4 4 4 a 4 4 4 a 6 4 5 4 1 4 5 5 ` � t1 4 4 4 4 6 6 W NIP 6 6 6 6 6 _ 4 5 6 6 ] 8 9 12 14 16 18 20 22 24 25 24 23 28 26 23 24 23 20 12 6 7 9� 11 13 15 17 20 22 23 24 26 28 27 24 29 28 27 24 21 16 9 8 7 10 11 14 17 20 21 23 25 26 29 31 30 29 26 25 22 16 7 10 13 17 20 23 24 26 28 28 28 27 26 27 24 18 12 8 $ 5' 6 7 6 6 6 6 6 7 6 7 6 6 7 6 6 6 6 6 6 8 11 15 18 21 24 25 28 29 30 32 30 28 25 20 16 6 6 6 6 7 6 6 6 6 5 i� u 7 $ 6 6 6 6 6 6 6 6 6 6 6 6 6 8 6 6'I����1����" 16 6� �D. 6 ] 14. _- 6 5] 6 g 6 8 6 6 6 8 6 6 fi 6 6 5 6 '.S ',6 6 5qi 8 6 Si pIII �I�6 5 5 10 yr VIS 06 g 6 {'I 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 1 I 5 ` 6 7 6 6 6 6 6 i fi 5 5 6 5 6 7 6 6 6 6 7 7 6 6 6 7 6 6 7 6 6 6 6 S 5 '`�1111II� 7 7 7 7 6 7 10 7 6 6 6 6 8 6 y■6 6 6 6 6 6 7 7 8 7 7 7 7 7 7 5� 6 7 7 7 10 7 8 8 7 6 7 5 6 6 6 g $ "1 61 6 6 6 6 6 7 7 7 7 7 7 6 6 6 �II6 ]7]B 777778777877666766666 6566SF 4401Al 6-566]]77]7889898778766 8 g 8 7 8 8 7 7 ] 8 ] 8 7 7 7 7 81 7 7 7 7 6 6 6 6 6 }4 6 6 7 7 7 8 ] 7 7 7 6 7 6 7 7 8 7 7 7 7 7 7 7 8 7 8 7 8 7 7 ] 7 ] ] 8 6 6 6 6 5 6 6 6 7 6 6 6 8 7 8 8 8 9 9 7 8 8 7 7 7 10 6 ] 7 8 ] 8 8 7 a 7 7 8 8 8 8 8 7 8 8 7 7 7 8 7 7 6 7 7 6 6 7 7 6 8 6 7 7 7 7 7 7 8 8 9 9 8 8 8 8 8 7 7 7 8 8 9 8 9 8 8 8 8 7 9 8 7 8 8 8 8 9 8 7 6 6 9 11 11 10 10 10 9 9 9 8 9 8 8 9 8 g 8 9 8 8 9 9 8 9 9 8 9 7 8 8 8 7 7 7 6 16 - 12 12 12 11 10 9 9 9 9 9 9 9 8 9 8 8 9 9 8 8 B 8 B 8 8 8 7 7 6 15 16 13 11 10 8 9 8 9 9 9 /� 7 10 14 14 19 9 10 9 10 10 9 10 8 9 8 8 vq 8 7 8 7 7 6 A 16 16 15 12 12 11 11 11 10 10 10 9 11 9 9 9 9 9 10 9 9 9 9 O 9 9 9 9 9 8 7 7 13 12 g 8 9 8 7 7 18 iq 15 14 11 11 11 70 10 10 10 10 9 10 y 9 10 8 9 10 9 9 9 9 14 13 14 13 13 12 12 12 11 11 10 9 10 10 10 10 11 10 9 9 11 9 9 10 9SI4 70 9 8 9 11 B 8 B 15 13 13 13 13 12 12 13 13 11 if 10 17 10 10 10 10 10 17 9 70 9 9 9 9 8 9 8r8 9 8 7 8 7 - 14 13 12 13 12 11 11 11 11 10 10 11 11 10 10 9 9 8 8 9 109 9 8 8 9 10 8�8 6' 3 4 6 73' 3 4 6 7 75 14 14 3 2 12 11 11 11 10 10 10 10 9 to 9 9 9 8 10 8 ] 8�.:-�.:- 13 13 12 12 13 f 11 11 11 10 10 10 9 9 9 8 9 8 g 8 7 7 g fi 11 12 11 11 10 10 10 9 8 8 8 7 6 g 10 10 10 10 9 9 8 7 7 7 6 6 1 1:3,000 N Aids to Navigation Can Nun a Green Lighted Buoy Red Lighted Buoy 2S Junction Marker LEGEND 800 ii Feet 1 Green Light Depth In Feet 4 and Shallower Red Light = 6 - 4 Green Daybeacon 7-6 8-7 Red Daybeacon _ 10 - 8 Q Danger Sign 12-10 0 Mileboard 14 12 -15-14 Tide Gage - 15 and Deeper Matchlines I'7a13efaS Ifllei 21 24 27 29 30 30 29 27 24 19 15 10 6 _ 24 26 28 30 32 31 26 21 19 15 11 6 27 29 31 31 31 30 27 25 22 18 14 8 5 27 28 29 29 30 28 26 24 21 18 15 12 4 30 29 28 26 23 19 15 12 8 29 30 29 26 25 22 20 17 14 11 7 4 4S30 30 27 26 24 21 18 16 13 6 29 30 29 30 29 24 21 18 13 11 8 7 4 7 6 7. 33 33 33 30 25 21 16 6 4 8 9 1 31 33 33 33 30 28 25 21 18 14 11 9 6 8 8 7 8 9 8 29 32 32 31 29 31 30 29 28 27 25 22 19 16 13 10 7 6 4 6 6 7 ] 8 6 ] 1 .29 6 7 9 32 31 31 29 27 26 25 23 21 18 13 10 8 16 3S 9 30 29 27 26 25 23 20 6 -8 28 27 6 22 20 18 1VA 11 8 6 28 26 24 1 24 26 26 28 26 26 24 22 19 17 15 12 10 8 7 8 1 23 P9 27 26 24 23 201� 26 9 11 8 8 9 9 1 9 21 22 25 23 24 22 22 20 18 16 12 9 9 9 9 9 15 18 20 21 22 23 23 24 23 22 21 19 18 14 12 10 10 TYPICAL SECTION --------------- RILL.L.W. 3 100, 'I NOT TO SCALE 7 N M C M, H CAROLINA Morehead ATLANTIC OCEAN X UI to N O 0) O NI U I— U = Z c> U (L O �I 0I K m m 0 W < Z O Y 0 Y m WLL1 to W O aw d Z W J LL Q W to z W O O O N N W IY ca O N Q Q 00 W LL H X W Z W 03 LWL N LU x in W W O 0 O M O W J Q 0 W N W Q 0 111 --I U U Q } W H 0 0 rn Q Q Q N W y 4-1 0 a O O o00QJJJ N o i V O 5"W TYPICAL SECTION M.L.L.W. NORTH CAROLINA x OI CD N M O W O N UI 2 co _ U ❑ 0}0 ❑ } LU N p Z a0 Y ❑ a Z a O Y coLU W co co O a �I 0I U � Z n < W U) Z W U � J N CZ Q 0 N M ON = U ofc M O N IL' < coZ LL o W W x m O � Q ❑ W N W Q ❑ LLI J V cn 0 } K W ❑ rn co Q 2 Q Q N p i M w i } ia•:. Ocracoke Island rim w ATTACHMENT 2 CONSTRUCTION DRAWINGS Dated March 5, 2019 APTIM COASTAL PLANNING & ENGINEERING OF NORTH CAROLINA, INC. HATTERAS INLET MAINTENANCE PROJECT PAMIrCO SOUND PROJECT AREA HATTERAS HATTERAS OCRACOKE INLET ISLAND ATLANTIC OCEAN 0 7500��ls GRAPHIC SCALE IN FT RALEIGH O�NP CHARLOTTE N.T.S. NOT FOR CONSTRUCTION FOR REGULATORY REVIEW ONLY CAPE FEAR DARE COUNTY, NORTH CAROLINA HATTERAS CAPE PROJECT LOCATION REHEAD CRY LOOKOUT ATLANTIC OCEAN SHEETINDEX 1 COVER SHEET 2 PROJECT OVERVIEW 3 CONNECTOR CHANNEL PLAN VIEW 4 CONNECTOR CHANNEL CROSS SECTIONS GENERAL NOTES: 1. COORDINATES ARE IN FEET BASED ON NORTH CAROLINA STATE PLANE COORDINATE SYSTEM, NORTH AMERICAN DATUM 1983, (NAD83). 2. ELEVATIONS ARE REFERENCED TO MLW. 3. DATE OF AERIAL PHOTOGRAPHY: CS-1 AND PV-1 ESRI ]ANUARY 2016, PV-2 NCDOT HATTERAS IMAGE MARCH 2O16. 4. SURVEY DATA COLLECTED BY US ARMY CORPS OF ENGINEERS. FEBRUARY 26, 2019. 5. BATHYMETRIC CONTOURS REPRESENT THE CONDITIONS OF THE CHANNEL ON FEBRUARY 26, 2019 AND SHOULD NOT BE RELIED ON FOR NAVIGATION PURPOSES. LEGEND —••—••— MEAN LOW WATER LINE ®[[' MEAN HIGH WATER LINE — — — CROSS SECTION LINE Q HAT-03-V-18 HATTERAS INLET BORINGS 2003 AND ID j NEARSHORE DISPOSAL AREA a � ) SUBMERGED AQUATIC VEGETATION AND 100 FT. BUFFER i i ASBUILT EXISTING CABLE ROUTE (CALDWELL CABLE VENTURES) EXISTING CABLE ROUTE(UTLTTY ELECTRICAL CONSULTANTS, PC) ASBUILT NEW CABLE ROUTE CS-1 PAMLICO SOUND I��a1 CONNECTOR CHANNEL CORRIDOR CHARTED WRECK AVOIDANCE AREA — \ 0 HAT-03-V-6 0 HAT-03-V-7 0 HAT-03-V-90 0 HAT-03-V-8 HAT-03-V-1 HATTERAS' 0 HAT-03-V-11 \ 0 GHAT-03-V-12 j\ HAT-03-V-17 \ HAT-03-V-13 hj 0 HAT-03-V-15 HAT-03-V-14 AT-03-V-18 0 HATTERAS )_ HAT-03-V-19 \ INLET i OCRACOKE -' ISLAND LIFE SAVING STATION AVOIDANCE AREA BREAKING SHOAL J ` PROPOSED f — / AVOIDANCE AREA CHANNEL l �J� NEARSHORE DISPOSAL LOCATION NOT FOR CONSTRUCTION FOR REGULATORY REVIEW ONLY j .y 0 1�0`2000 GRAPHIC SCALE IN FT Am ee z g' W LL W z a z W z IL e g a gs� O a 0? v °=o tEY� a+ 3 LL �3 �I �I PV-1 SHEE 2 OF 4 BOTTOM OF CUT/ CHANNEL COORDINATE TABLE POINT ID NORTHING EASTING ELEVATION A 540131.0 2963818.0 -10.0 B 540284.0 2965297.0 -10.0 C 540334.0 2965295.0 -10.0 D 540356.0 2966080.0 -10.0 E 540306.0 2966081.0 -10.0 F 540339.0 2967247.0 -10.0 G 540189.5 2967250.9 -10.0 H 540135.5 2965311.9 -10.0 I 539981.0 1 2963833.0 V V w� a1n/ [ a� ouow�'. °O o r� a o � uo� o0 o°c� 0 1 W'� m LIFE SAVING STATION \ AVOIDANCE AREA NOT FOR CONSTRUCTION FOR REGULATORY REVIEW ONLY \ u �6 CHARTED WRECK \ z �� 'z AVOIDANCE AREA \ W z z \ W \ 0 200 \ 2200400 �11004 GRAPHIC SCALE IN Ff _ 3 ys, tiJ d \ `� I ( \\ IL L 2f 5 i 1 �1 0 00 Z. 0�osi 0 oa D v d oho CONNECTOR CHANNEL ✓w� O�Q O `W o -7 o CORRIDOR I €vQ0D0 �00 4 v m . .� of = c' b HATTERAS INLET BREAKING SHOAL AVOIDANCE AREA PROPOSED CONNECTOR CHANNEL w w LL 3 z O Q w J W NOT FOR CONSTRUCTION FOR REGULATORY REVIEW ONLY ] CROSS SECTION A -A' B-IJ' C-C' 5 5 'MHW EL. +0.42' 'MLW EL. +0.00' I I FEBRUARY 26, 2019 . EXISTING GRADE 5 ..... ..... ..... ..... ... -5 -10 ' u _7m------ --- ------ - -- ---------------'------ -15 TARGET tD EL. = -10.0' MLW I �.. .... I -15 CONNECTOR CHANNEL EXTENDS TO EQUAL DEPTH AT I MAXIMU M AD EL. _ -12.0' MLW 20 . TIME OF CONSTRUCTION I I I 20 -251 -25 CROSS SECTION B-B' A -A' 5 MHW EL. +0_42' 0 MLW EL. +0.00' -5 . . . _10 3 . I CHANNEL -15 t WIDTH'150" DISTANCE ALONG SECTION (FEET) FEBRUARY 26, 2019 EXISTING GRADE —.. — 0 .i. . . . . . . . . . + -5 EL' 1�+ -10 J \7 TARGET AD EL. = -10.0' MLW -15 MAXIMUM AD AD EL. = -12.0' MLW -20 DISTANCE ALONG SECTION (FEET) CROSS SECTION C-C' A -A' 5 5 FEBRUARY 26, 2019 MHW EL. +0.42' EXISTING GRADE 0 MLW EL. +0.00' —. 0 w -5 ?� fL _ J 1. 3 3 EL. -10.0' MLW 10 _10 Z O I J_15 CHANNEL WIDTH 200' -15 W Ed TARGET AD EL. = -10.0' MLW _20 -20 MAXIMUM AD EL. _ -12.0' MLW -25- _ _ _ _ _ _ _ -25 DISTANCE ALONG SECTION (FEET) 0 5 10 VERTICAL GRAPHIC SCALE IN FT 0` 250 500 HORIZONTAL GRAPHIC SCALE IN FT I a„ X SXEEi 4 O�F4