Loading...
HomeMy WebLinkAbout94-48_McKenzie, Butch_19940705TOWN OF EMERALD ISLE o �rzynnrv" -.. 7500 EMERALD DRIVE ` EMMALD ISLE, NC 28594 JUL Q 7 tl//tl/�tlY/1$�m� July 5, 1994 Butch McKenzie 5412 Sunset Lane Emerald Isle, NC 28594 Re: EX94-48 5412 Sunset Lane, BLock 22, Emerald Isle Dear Mr. McKenzie: We have reviewed the information submitted to this office in your request to construct a pier, with a tee, and find you are exempt from needing a Minor Development Permit as long as it meets the specifications below: Your letters have been received -and -are' -on file in this office to the adjoining property owners to advise of the project; All pilings shall be a minimum of 611x6" square and shall have an 8' minimum tip penetration. Prior to construction, piling depths must be certified, either by an engineer or having the building inspector on site at the time of piling placement; Construction must conform to all applicable state and local construction requirements as illustrated in Bogue Sound Pier/Boat lift specifications (Section 6-84). A pier is not to exceed 200' in length, or 4' of water at low tide, not to exceed 200 square feet for any tee(s); nor shall the pier exceed 6' in width. Any variation of the above will require a CAMA permit; also, this certification of exemption from requiring a CAMA permit is valid for 90 days from the date of issuance. Following expiration, -a re-examination of the project and project site may be necessary to renew this certification. Sincerely, Carol Angus, Local CAMA Permit Officer