HomeMy WebLinkAbout94-12_Selion, Michael_19941220CAMA GENERAL PERMIT BEACH BULLDOZE
APPLICANT'S NAME
ADDRESS 3 /
(Permanent mailingAddress)
CITY
GP _ /01-
PROJECT
LOCATION
(BLOCK, LOT,
STREET ADDRESS,
SUBDIVISION)
13 0a
_Y- % Fol
dean lV - -
NAME OF CONTRACTOR /c,U
TE PERMITTED:
EXPIRES
CONDITIONS UNDER WHICH ALL BEACH BULLDOZING MUST BE COMPLETED:
1. THE AREA ON WHICH THIS ACTIVITY IS BEING PERFORMED MUST
MAINTAIN A SLOPE OF ADEQUATE GRADE SO AS TO NO ENDANGER THE PUBLIC
OR PUBLIC'S USE OF THE BEACH AND SHOULD FOLLOW THE PREEMERGENCY
SLOPE AS CLOSELY AS POSSIBLE. THE MOVEMENT OF MATERIAL UTILIZING A
BULLDOZER, FRONT END LOADER, BACKHOE, SCRAPER, OR ANY TYPE OF EARTH
MOVING OR CONSTRUCTION EQUIPMENT SHOULD NOT EXCEED ONE FOOT IN
DEPTH MEASURED FROM THE PRE -ACTIVITY SURFACE ELEVATION.
2. THE ACTIVITY MUST NOT EXCEED THE LATERAL BOUNDS OF THE
APPLICANT'S PROPERTY UNLESS HE HAS PERMISSION OF THE ADJOINING LAND
OWNER (S).
3. MOVEMENT OF MATERIAL FROM SEAWARD OF THE LOW WATER LINE
WILL REQUIRE A CAMA MAJOR DEVELOPMENTā¢ AND STATE DREDGE AND FILL
PERMIT.
4. THE ACTIVITY -MUST NOT SIGNIFICANTLY INCREASE EROSION ON
NEIGHBORING PROPERTIES AND MUST NOT HAVE A SIGNIFICANT ADVERSE
EFFECT ON IMPORTANT NATURAL OR CULTURAL RESOURCES.
S. THE ACTIVIT Y BE UNDERTAKEN TO PROTECT THREATENED ON -
SITE WA TE DISP AL TENS AS WELL AS THE THREATENED STRUCTURE'S
FOUNDA ON.
/AOPL ANT'S SIGNATURE LOCAL CAMA PERMIT OFFICER
First Stable Line of Vegetation _feet Date: