Loading...
HomeMy WebLinkAbout94-1_Harris, Cleo_19941128CJVTIA GWFRAL PTT2MIT BEWH BU LWZ. - GP I--- APPLICANT'S NAME I&frl CITE'IYI PRO.1 E(7I' Ur -AT I CAN ( BLOCK , lf7)T , STREET ADDRESS, SUBDIVISION) � OA'I'E PERMITTED: . ,ems /-Q n J p EXPIRES I 001iZITIONS UNDER WHICH ALL BEACH BULLDOZING MUST BE COMPLETED: 1. Any bulldozing request to reconstruct or repair frontal and/or primary dunes is defined as the process of moving natural beach material from any point seaward of the first line of stable vegetation to repair damage to frontal and/or primary dunes caused by a major storm event. This permit shall not apply to the Inlet Hazard Area of Environmental Concern. 2. Beach bulldozing (moving sand from any point seaward of the first line of stable vegetation to create a protective dike or for any other purpose) may be permitted if all the following conditions are met: a. Beach material is removed no deeper than one foot below the existing surface elevation. b. The movement of material maintains a slope that does No7- AomFdt h e public's use of the beach; tc. The project does not go beyond the bounds of the applicant's prop<rty without the permission of the neighboring property owners; d. The project does not increase erosion on neighboring properties; e. No material is removed from below the mean low-water line; f. The project does not damage important natural or cultural resources; and _ g. The movement of material protects the threatened structure's foundation or threatened on -site waste isposal system. AFPLICAT,TF'S SIGNATURE LOCAL AMA PERMIT OFFICER First Stable Line of Vegetation Z feet Date: �%' 0.7 Z (.'MIA (204MAL PIMMIT i3EIVIi P.UL.LEOZE GP / APPLICAr,47' S` NANE r_ e ADNES.S / U 0c pof 1, CITE" �nq 0�14k/ :1 � • PROJECT L(:X"_ FICN (BIJ)CK, U)T, STREET ADDRESS, SUBDIVISIUN) 1&) 6- 11 /, -t-4— ) 3 - - - NkTz, C'1' 0,CT4 FiACMIR V % DATE PERPv9ITTED: EXPIRES Cr,r,. ?ITIUJS' UNDER WHICH ALL BEACH BULLDOZING MUST BE CON2LETED: 1.. Any l_ulldozing request to reconstruct or repair frontal and/or primary dunes is defined as the process of moving natural beach material from any point seaward of the first line of stable vegetation to repair damaige to frontal .end/or primary dunes caused by a major storm event. This permit shall not apply to the Inlet Heard Area of Environmental Concern. 2. Beach bulldozing (moving sand from any point seaward of the first line of stable vegetation to create a protective dike or for any other purpose) may be permittei if all the following conditions are met: :_i. Beach material is; removed no deeper than one foot below the. existing SUrface elevation. b. The movement of material maintains a slope that does t h e public's use of the beach; c. T'ne project does not go beyond the bounds of the applicant's property without the permission of the neighboring property owners; d. The project does not increase erosion on neighboring proFx.rties; e. No material is removed from below the mean low-water line.; f. The project does not damage important natural or cultural rcsources; and Q.The movement of material protects the threatened structure's foundation or threatened on -site waste disposal system. FT NT' S S,IG-NATURE LOCAL CANT PEFNIT OFFICER First Stable Line of Vegetation �� feet Date CAMA GENERAL PERMIT BEACH BULLDOZE GP APPLICANT' S NAME CC N S 4cyi ADDRESS Ale., S e ,�aOJ 9 (Permanent mailing add ess) CITY PROJECT LOCATION (BLOCK, LOT, STREET ADDRESS, SUBDIVISION) NAME_OF—CONTRACTOR / a Q -e, DATE PERMITTED: q/% y EXPIRES a r�,l CONDITIONS UNDER WHICH ALL BEACH BULLDOZING MUST BE COMPLETED: 1. THE AREA ON WHICH THIS ACTIVITY IS BEING PERFORMED MUST MAINTAIN A SLOPE OF ADEQUATE GRADE SO.AS TO NO ENDANGER THE PUBLIC OR PUBLIC'S USE OF THE BEACH AND SHOULD FOLLOW THE PREEMERGENCY SLOPE AS CLOSELY AS POSSIBLE. THE MOVEMENT OF MATERIAL UTILIZING A BULLDOZER, FRONT END LOADER, BACKHOE, SCRAPER, OR ANY TYPE OF EARTH MOVING OR CONSTRUCTION EQUIPMENT SHOULD NOT EXCEED ONE FOOT IN DEPTH MEASURED FROM THE PRE -ACTIVITY SURFACE ELEVATION. 2. THE ACTIVITY MUST NOT EXCEED THE LATERAL BOUNDS OF THE APPLICANT'S PROPERTY UNLESS HE HAS PERMISSION OF THE ADJOINING LAND OWNER(S). 3. MOVEMENT OF MATERIAL FROM SEAWARD OF THE LOW WATER LINE WILL REQUIRE A CAMA MAJOR DEVELOPMENT• AND STATE DREDGE AND FILL PERMIT. 4. THE ACTIVITY MUST NOT SIGNIFICANTLY INCREASE EROSION ON NEIGHBORING PROPERTIES AND MUST NOT HAVE A SIGNIFICANT ADVERSE EFFECT ON IMPORTANT NATURAL OR CULTURAL RESOURCES. 5. THE ACTIVITY MAY BE UNDERTAKEN TO PROTECT THREATENED ON SITE WASTE DISPOSAL SYSTEMS AS WELL AS THE THREATENED STRUCTURE'S FOUNDATION. APPLICANT'S SI NATURE LOCAL C A PERMIT OFFICER First Stable Line of Vegetation 10 feet Date: CAMA GENERAL PERMIT BEACH BULLDOZE APPLICANT'S NAME jj9 m e S GP 9//— ADDRESS ��`t !� ��JNC�S �/ CITY (Permanewa Z/A add ) �%��-3 PROJECT LOCATION (BLOCK, LOT, STREET ADDRESS, SUBDIVISION)_ NAME OF C r_AW-423 DATE PERMITTED: % 9 XP IRES lA CONDITIONS UNDER WHICH ALL BEACH BULLDOZING MUST BE COMPLETED: 1. THE AREA ON WHICH THIS ACTIVITY IS BEING PERFORMED MUST MAINTAIN A SLOPE OF ADEQUATE GRADE SO AS TO NO ENDANGER THE PUBLIC OR PUBLIC'S USE OF THE BEACH AND SHOULD FOLLOW THE PREEMERGENCY SLOPE AS CLOSELY AS POSSIBLE. THE MOVEMENT OF MATERIAL UTILIZING A BULLDOZER, FRONT END LOADER, BACKHOE, SCRAPER, OR ANY TYPE OF EARTH MOVING OR CONSTRUCTION EQUIPMENT SHOULD NOT EXCEED ONE FOOT IN DEPTH MEASURED FROM THE PRE -ACTIVITY SURFACE ELEVATION. 2. THE ACTIVITY MUST NOT EXCEED THE LATERAL BOUNDS OF THE APPLICANT'S PROPERTY UNLESS HE HAS PERMISSION OF THE ADJOINING LAND OWNER (S). 3. MOVEMENT OF MATERIAL FROM SEAWARD OF THE LOW WATER LINE WILL REQUIRE A CAMA MAJOR DEVELOPMENT,AND STATE DREDGE AND FILL PERMIT. 4. THE ACTIVITY MUST NOT SIGNIFICANTLY INCREASE EROSION ON NEIGHBORING PROPERTIES AND MUST NOT HAVE A SIGNIFICANT ADVERSE EFFECT ON IMPORTANT NATURAL OR CULTURAL RESOURCES. a 5. THE ACTIVITY MAY BE UNDERTAKEN TO PROTECT THREATENED ON - SITE WASTE DISPOSAL SYSTEMS AS WELL AS THE THREATENED STRUCTURE'S FOUNDATION. APPLICANT'S SIGNATURE , First Stable Line of Vegetation feet LOCAL CAMA PERMIT OFFICER Date • �ZU f Z CAMA GENERAL PERMIT BEACH BULLDOZE GP` APPLICANT'S NAME oe- rG �C1 I© � N s111)•J ADDRESS (Permanent mailing address) CITY PROJECT LOCATION (BLOCK, LOT, STREET ADDRESS, SUBDIVISION) NAME OF CONTRACTOR---- DATE PERMITTED: %a 0 EXPIRES CONDITIONS UNDER WHICH ALL BEACH BULLDOZING MUST BE COMPLETED: 1. THE AREA ON WHICH THIS ACTIVITY IS BEING PERFORMED MUST MAINTAIN A SLOPE OF ADEQUATE GRADE SO AS TO NO ENDANGER THE PUBLIC OR PUBLIC'S USE OF THE BEACH AND SHOULD FOLLOW THE PREEMERGENCY SLOPE AS CLOSELY AS POSSIBLE. THE MOVEMENT OF MATERIAL UTILIZING A BULLDOZER, FRONT END LOADER, BACKHOE, SCRAPER, OR ANY TYPE OF EARTH MOVING OR CONSTRUCTION EQUIPMENT SHOULD NOT EXCEED ONE FOOT IN DEPTH MEASURED FROM THE PRE -ACTIVITY SURFACE ELEVATION. 2. THE ACTIVITY MUST NOT EXCEED THE LATERAL BOUNDS OF THE APPLICANT'S PROPERTY UNLESS HE HAS PERMISSION OF THE ADJOINING LAND OWNER(S). 3. MOVEMENT OF MATERIAL FROM SEAWARD OF THE LOW WATER LINE WILL REQUIRE A CAMA MAJOR DEVELOPMENT -AND STATE DREDGE AND FILL PERMIT. 4. THE ACTIVITY ;MUST NOT SIGNIFICANTLY INCREASE EROSION ON NEIGHBORING PROPERTIES AND MUST NOT HAVE A SIGNIFICANT ADVERSE EFFECT ON.IMPORTANT NATURAL OR CULTURAL RESOURCES. 5 THE ACTIVITY MAY BE UNDERTAKEN TO PROTECT THREATENED.ON_ =: SITE STE DISPOSAL YSTEMS AS WELL AS THE THREATENED STRUCTURE'S' FOU TION 'APPLICANTRE LOCAL CAM PERMIT OFFICER FIRSLAB E ,,NE OF VEGETATION Jim Mercer AZ � J Division of Coastal Management EPHEN C. HARRELL, LOCAL CAMA OFFICER PO Box 769 Morehead City, NC 28557 CAMA GENERAL PERMIT BEACH BULLDOZE APPLICANT'S NAME 04. s ADDRESS 00 FM b let-cm, (Permanent mailing address) GP y UC 7� - .2 /12_ CITY PROJECT LOCATION (BLOCK, LOT, STREET AD/D�RESS, SUBDIVISION) b� 4/ _Za& NAME OF CONTRACTOR DATE PERMITTED: 6Z `, EXPIRES O6 v CONDITIONS UNDER WHICH ALL BEACH BULLDOZING MUST BE COMPLETED: 1. THE AREA ON WHICH THIS ACTIVITY IS BEING PERFORMED MUST MAINTAIN A SLOPE OF ADEQUATE GRADE SO AS TO NO ENDANGER THE PUBLIC OR PUBLIC'S USE OF THE BEACH AND SHOULD FOLLOW THE PREEMERGENCY SLOPE AS CLOSELY AS POSSIBLE. THE MOVEMENT OF MATERIAL UTILIZING A BULLDOZER, FRONT END LOADER, BACKHOE, SCRAPER, OR ANY TYPE OF EARTH MOVING OR CONSTRUCTION EQUIPMENT SHOULD NOT EXCEED ONE FOOT IN DEPTH MEASURED FROM THE PRE -ACTIVITY SURFACE ELEVATION. 2. THE ACTIVITY MUST NOT EXCEED THE LATERAL BOUNDS OF THE APPLICANT'S PROPERTY UNLESS HE HAS PERMISSION OF THE ADJOINING LAND OWNER (S). 3. MOVEMENT OF MATERIAL FROM SEAWARD OF THE LOW WATER LINE WILL REQUIRE A CAMA MAJOR DEVELOPMENT -AND STATE DREDGE AND FILL PERMIT. 4. THE ACTIVITY -MUST NOT SIGNIFICANTLY INCREASE EROSION ON NEIGHBORING PROPERTIES AND MUST NOT HAVE A SIGNIFICANT ADVERSE EFFECT ON IMPORTANT NATURAL OR CULTURAL RESOURCES. a 5. THE ACTIVITY MAY BE UNDERTAKEN TO PROTECT THREATENED ON - SITE WASTE DISPOSAL SYSTEMS AS WELL AS THE THREATENED STRUCTURE'S FOUNDATION_ APPLI ANT'S SIGNATURE First Stable Line of Vegetation feet LOCAL CA A PERMIT OFFICER Date: /a lv -/ CAMA GENERAL PERMITBEACHBULLDOZE APPLICANT'S NAME & 1' ( S 41"u M a r ADDRESS 0?0 0 f�2rt c� �� voc, (Permanent ma ling address) q•/_ 7 CITY PROJECT LOCATION (BLOCK, LOT, STREET ADDRESS, SUBDIVISION) ocec NAME OF CONTRACTOR 11 . ". —Vr& -DATE PERMITTED: /_ EXPIRES CONDITIONS UNDER WHICH ALL BEACH BULLDOZING MUST BE COMPLETED: 1. THE AREA ON WHICH THIS ACTIVITY IS BEING PERFORMED MUST MAINTAIN A SLOPE OF ADEQUATE.GRADE SO AS TO NO ENDANGER THE PUBLIC OR PUBLIC'S USE OF THE BEACH AND SHOULD FOLLOW THE PREEMERGENCY SLOPE AS CLOSELY AS POSSIBLE. THE MOVEMENT OF MATERIAL UTILIZING A BULLDOZER, FRONT END LOADER, BACKHOE, SCRAPER, OR ANY TYPE OF EARTH MOVING OR CONSTRUCTION EQUIPMENT SHOULD NOT EXCEED ONE FOOT IN DEPTH MEASURED FROM THE PRE -ACTIVITY SURFACE ELEVATION. 2. THE ACTIVITY MUST NOT EXCEED THE LATERAL BOUNDS OF THE APPLICANT'S PROPERTY UNLESS HE HAS PERMISSION OF THE ADJOINING LAND OWNER (S). 3. MOVEMENT OF MATERIAL FROM SEAWARD OF THE LOW WATER LINE WILL REQUIRE A CAMA MAJOR DEVELOPMENT• AND STATE DREDGE AND FILL PERMIT. 4. THE ACTIVITY MUST NOT SIGNIFICANTLY INCREASE EROSION ON NEIGHBORING PROPERTIES AND MUST NOT HAVE A SIGNIFICANT ADVERSE EFFECT ON IMPORTANT NATURAL OR CULTURAL RESOURCES. 5. THE ACTIVITY MAY BE UNDERTAKEN TO PROTECT THREATENED ON - SITE WASTE DISPOSAL SYSTEMS AS WELL AS THE THREATENED STRUCTURE'S FOUNDATION. APPL ANT'S SIGNATURE First Stable Line of Vegetation feet om R19�{- o� way LOCAL CAMff PERMIT OFFICER Date: CAMA GENERAL PERMIT BEACH BULLDOZE APPLICANT'S N//y-/ i NAME 6 cb(J a ADDRESS �Qb Ghes+nck+ (Permanent mailing CITY SS) PROJECT LOCATION (BLOCK, LOT, STREET ADDRESS, SUBDIVISION) l��?, 1,3-• 'r-. j $"cam kj—�:-- NAME OF CONTRACTOR— — , DATE PERMITTED: EXPIRES I/ 9 I sc- CONDITIONS UNDER WHICH ALL BEACH BULLDOZING MUST BE COMPLETED: 1. THE AREA ON WHICH THIS ACTIVITY IS BEING PERFORMED MUST MAINTAIN A SLOPE OF ADEQUATE GRADE SO AS TO NO ENDANGER THE PUBLIC OR PUBLIC'S USE OF THE BEACH AND SHOULD FOLLOW THE PREEMERGENCY SLOPE AS CLOSELY AS POSSIBLE. THE MOVEMENT OF MATERIAL UTILIZING A BULLDOZER, FRONT END LOADER, BACKHOE, SCRAPER, OR ANY TYPE OF EARTH MOVING OR CONSTRUCTION EQUIPMENT SHOULD NOT EXCEED ONE FOOT IN DEPTH MEASURED FROM THE PRE -ACTIVITY SURFACE ELEVATION. 2. THE ACTIVITY MUST NOT EXCEED THE LATERAL BOUNDS OF THE APPLICANT'S PROPERTY UNLESS HE HAS PERMISSION OF THE ADJOINING LAND OWNER(S). 3. MOVEMENT OF MATERIAL FROM SEAWARD OF THE LOW WATER LINE WILL REQUIRE A CAMA MAJOR DEVELOPMENT -AND STATE DREDGE AND FILL PERMIT. 4. THE ACTIVITY -MUST NOT SIGNIFICANTLY INCREASE EROSION ON NEIGHBORING PROPERTIES AND MUST NOT HAVE A SIGNIFICANT ADVERSE EFFECT ON IMPORTANT NATURAL OR CULTURAL RESOURCES. 5. THE ACTIVITY MAY BE UNDERTAKEN TO PROTECT THREATENED ON - SITE WASTE DISPOSAL SYSTEMS AS WELL AS THE THREATENED STRUCTURE'S FOUNDATION. (L'771 -}s' A PLICANT S SIGNATURE LOCAL CAMA PERMIT OFFICER 1. First Stable Line of Vegetation J feet Date: '1 (s '.i CAMA GENERAL PERMIT BEACH BULLDOZE _ GP APPLICANT'S NAME s� ADDRESS (P,r�erma nentma�li e W VCITY ng j add eS ) O PROJECT LOCATION (BLOCK, LOT, STREET ADDRESS, SUBDIVISION NAME OF CONTRACTOR DATE 'PERMITTED:___ A�- -- EXPIRES CONDITIONS UNDER WHICH ALL BEACH BULLDOZING MUST BE COMPLETED: �. THE AREA ON WHICH THIS ACTIVITY IS REIN MAINTAIN A SLOPE OF ADEQUATE GRADE SO p G PERFORMED MUST OR PUBLIC'S USE OF THE BEACH AND SHOULDTO NO ENDANGER THE PUBLIC SLOPE AS CLOSELY AS POSSIBLE. C BULLDOZER, FRONT END LOADER THE MOVEMENT FOLLOW LMATERIAL PUTILIZING A MOVING OR CONSTRUCTION EQgIPMENT OSHOULD NOT UTILIZING A DEPTH MEASURED FROM THE PRE -ACTIN SCRAPER, OR ANY TYPE OF EARTH PRE -ACTIVITY SURFACE ELEVATION ONE FOOT IN 2- THE ACTIVITY MUST NOT EXCEED THE LATER APPLICANT'S PROPERTY UNLESS HE HAS PERMISSION OWNER(S). � AL BOUNDS OF THE OF THE ADJOINING LAND 3• MOVEMENT OF MATERIAL FROM SEAWARD WILL REQUIRE A LAMA MAJOR DEVELOPMENT, AND ST THE LOW WATER PERMIT. ATE DREDGE AND LINE _ FILL 4- THE ACTIVITY MUST NOT SIGNIFICANTLY NEIGHBORING PROPERTIES AND MUST NOT EFFECT ON INCREASE EROSION ON IMPORTANT NATURAL OR CULTURAL ARES RESOURVE A CES. ADVERSE 5- THE ACTIVITY MAY BE UNDERTAKEN TO PROTECT SITE WASTE DISPOSAL SYSTEMS AS WELL AS THE THR FOUNDATION. THREATENED ON - SITE STRUCTUREI'S APPLICANT'S SIGNATURE 'irst Stable Line of Vegetation Q . eet LOCAL CAMA PERMIT OFFICER Date: CAMA GENERAL PERMIT BEACH BULLDOZE GP ? —1C APPLICANT'S JNAME 01 S C}1 Q V ADDRESS ' `� % / z �t-�-�er CITY W vc, . (Permanent mailing address) zZ Ys�- PROJECT LOCATION (BLOCK, LOT, STREET ADDRESS, SUBDIVISION) fo kA< I Lot 13-,326-C - 7- NAME OF CONTRACTOR DATE -PERMITTED • �a jam �� EXPIRES CONDITIONS UNDER WHICH ALL BEACH BULLDOZING MUST BE COMPLETED: 1. THE AREA ON WHICH THIS ACTIVITY IS BEING PERFORMED MUST MAINTAINA SLOPE OF ADEQUATE GRADE SO AS TO NO ENDANGER THE PUBLIC OR PUBLIC'S USE OF THE BEACH AND SHOULD FOLLOW THE PREEMERGENCY SLOPE AS CLOSELY AS POSSIBLE. THE MOVEMENT OF MATERIAL UTILIZING A BULLDOZER, FRONT END LOADER, BACKHOE, SCRAPER, OR ANY TYPE OF EARTH MOVING OR CONSTRUCTION EQUIPMENT SHOULD NOT EXCEED ONE FOOT IN DEPTH MEASURED FROM THE PRE -ACTIVITY SURFACE ELEVATION. 2. THE ACTIVITY MUST NOT EXCEED THE LATERAL BOUNDS OF THE APPLICANT'S PROPERTY UNLESS HE HAS PERMISSION OF THE ADJOINING LAND OWNER (S). 3. MOVEMENT OF MATERIAL FROM SEAWARD OF THE LOW WATER LINE WILL REQUIRE A CAMA MAJOR DEVELOPMENT -AND STATE DREDGE AND FILL PERMIT. 4. THE ACTIVITY MUST yNOT SIGNIFICANTLY INCREASE EROSION ON NEIGHBORING PROPERTIES AND MUST NOT HAVE A SIGNIFICANT ADVERSE EFFECT ON IMPORTANT NATURAL OR CULTURAL RESOURCES. 5. THE ACTIVITY MAY BE UNDERTAKEN TO PROTECT THREATENED ON - SITE WASTE DISPOSAL SYSTEMS AS WELL AS THE THREATENED STRUCTURE'S FOUNDATION. — /1 APPLICANT'S SIGNATURE First Stable Line of Vegetation feet LOCAL CAMA OERMIT OFFICER Date: 14S f v