Loading...
HomeMy WebLinkAbout98-09, 8-22-07 Oversized PlansDEC 7 7007 7 v LEGEND - S SEWER LINE N`}TES: - _ _-------- W WATER LINE RCP REINFORCED CONCRETE PIPE 1. S .E DETAILS A, B & E SHEET Clib nl.pTYPICAL ROAD DETAILS. D + PROPOSED SPOT ELEVATION (GRADE 2� o EVENLY BETWEEN SPOT ELEVATIONS) ?.SEE DETAIL C, SHEET C16 FOR NEW PAV[-MENT SECTION. PC G, SL 135-C� SIL' ! EN''E G SEDIMENT TRAP E o � DROP !HEFT C4 CIs c4 cts 3. SEE DETAIL D, SHEET C16 FOR SIDEWALK _.ONSTRUCTION. 4. REVECETATE ALL DISTURBED AREAS 1N r ''RDANCE ----- C c1s c I� 7 404 WE � LAND:, I \ ; --� WITH THE PROJECT VEGETATION PLAN, SL J r\ (TO REMAIN UNDISTURBED)� ouTLEr PROTECTION H � vAL�E �� VALVE Box a DETAIL Pd, SHEET C16, CLASSIFICATION C. SW, NSW 87,61138 SE cacl -c4c'i 5. SEE DETAIL_ H, SHEET Cl7 -"OR TYPICAL TRFraLr; SECTION. 2.011 AC ± SCOUR HOLE I PERMANENT 2" BLOWOFF 6 � - � � � FIRE HYDRANT � _'� S'v0 1_t 1 � 5E+��ER SERVICE _ �f I C4 C16 7 C4 C17 " J G` i. CHECK DAM 1 WATER SERVICE �- - 1- -' THRI!ST BLOCK , PRI -';T MANHOLE OS DCI NOTE: ALL MARINA WORK IS PROPOSED AND IS BEING PERMITTED THROUGH THE NC DIVISION OF COASTAL MANAGEMENT, AND IS NOT PART OF THE UPLAND DEVELOPMENT DEPICTED ON THIS PLAN. NO WORK SHALL BE CONDUCTED WITHIN THE DELINEATED WETLANDS AREAS OR NEUSE RIVER RIPARIAN BUFFER AREAS. NOTE: ALL RUNOFF FROM IMPERMEABLE SURFACES SHALL BE DIRECTED TO DRAIN TO THE SUBDIVISION ROAD SYSTEM. RUNOFF SHALL BE DIVERTED BY SURFACE GRADING TO THE EXTENT POSSIBLE. ROOF GUTTERING SHALL BE INSTALLED WHERE NECESSARY TO DIRECT ROOF RUNOFF TO THE STORMWATER SYSTEM FOR THE SUBDIVISION. TOTAL AREA OF WETLANDS = 94,997 SF, 2.18 AC. WOOD WALKWAY 5 �5 / '9 I - {�SILT FENCE N � h SET ON BUFFE 0 RP � 160 / � � � � �1��� LIMIT as STILLWATER HARBOUR A-I)OCK 15'X40 SLIPS 1 (0) ' ,y� 1p i \ _ - t� A\. �V OPEN SHELTER �� i - 24 � - ,� � 7.00 v wnoo waxwAY N,Vl C SILT FENCE 28LF 15' RCP 12� 0 C16 SET ON BUFFER I ; �/ 1a �� l LIMIT /'11 SCOUR HOLE �\ �� W� 12 24' cM C4 C16 o x� I �� /p0?� LIMITS OF DISTURBANCE 1 'r 21.87 ACRES - J - - S T I V.ATER HARBO{_''R TED -_ . I j 404 WETLANDS -NIT I o I �' (TO REMAIN UNDISTURBED) 7,378.72 SF NO WD�& 6i ±M X AREA Oy" 6 GRAPNCAL ONLY. I� ` SCOUR HOLE I SILT FENCE O I SET ON B!,= C16 I I LIMIT I I J :ATED t 7 MENT 2 � ' 50' NEUSE RIVER II I 2 J RIPARIAN BUFFER I \ o 50' NEUSE RIVER LIMITS OF DISTURBANCE RIPARIAN BUFFEE WOOD WALKWAY 21,87 ACRES ± % \ I � 17 V 16 .� 18. v\ m `'� %V 24 50' NEUSE RIVER 28LF 18" RCP � ! 3 II 1 \ S RIPARIAN BUFFER I '1 � (rI I �t61.F 1��) i (V)28LF 15" RCP 134LF 18' RCP 63 i (D j 61 Q2 RIGHT -OE -WAY DMADIS l ZK 2 RPARIAN OM M TE AREA Nova SNAIL / �I OGCUi UK 8A0( OE OR IN THIS ARfA �-y 48" VALLEY i J ✓ / ; i'' 248LF 24' RCP }\ ' ',28LF 15' RCP ' ! � / /\ 15� GUf1ER � �� i I •RCP '---- ---� m ► 4 36 3 ,34 flob t► I} 12- 40 39 38 33 32 - - ��i; + �--- - It 62LF 24' CMP FE�l$2 13.00 940RNE 28LF i " LF PSIRCP 50 � 1 to�S i --, \ � tl t zo� 56 � / / 2 � t t 54 15J / R 1965 51 t t / N " F GRAVEL CONTROL w iI- I t t C4 1 ENTRANCE 0r1 60 10 177Lf 4' RCP MA1� 24' RCP i o cv SEEARGE® VlTS1#�f CP OVERALL SITE GRADING & EROSION CONTROL SCALE 1 `100' ,APHIC SCALE 100 400 /35FES 18" RCP 5 LF 18: R� 2) . POND #3 2 S -RCP Vffw LIMITS OF DISTURBANCE 21.87 ACRES ± (TOTAL) SCOUR HOLE I C4 C1 c -JPOND 12 I _j E ENLARGED Vlht"r, '_'d HT C9 MAINTENANCE PLAN: 1. ALL EROSION AND SEDIMENTATION CONTROL DEVICES SHALL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL EVENT AND IN NO CASE LESS THAN ONCE EVERY WEEK, ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL DEVICES IN THE OPERATING CONDITIONS INTENDED, 2. ALL AREAS WILL BE SEEDED, FERTILIZED, AND RESEEDED AS NECESSARY AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATION PLAN IN ORDER TO ESTABLISH AND MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. 3. ANY SEDIMENT TRACKED ONTO THE ADJACENT PUBLIC ROAD SHALL BE REMOVED ON A DAILY BASIS. 4. SEDIMENT SHALL BE REMOVED FROM BEHIND SIl. T FENCING & CHECK DAMS WHEN THE SEDIMENT ACCUMULATES TO A DEPTH OF ONE FOOT, 5. SEDIMENT SHALL BE REMOVED FROM THE STORMWATER RETENTION POND UPON COMPLETION OF CONSTRUCTION AND PRIOR TO FINAL PLANTING. SEdl t r -- -�A11UN: 1. SECURE PROJECT PERMITS. 2. CONDUCT PRE -CONSTRUCTION CONFEREN(_,.. 3. INSTALL GRAVEL CONTROL ENTRANCE, 4. INSTALL SILT FENCING. 5. INSTALL STORMWATER RETENTION POND. 6. INSTALL & FINE GRADE & STABILIZE ROAD & DRAINAGE AREAS. 7. INSTALL SITE IMPROVEMENTS 8. SEED AND MULCH ALL DISTURBED AREAS/ESTABLISH PERMANENTVEGETATION 9. RESEED AS NECESSARY TO ESTABLISH VEGETATION, NOTE - ALL FILL MATERIAL NEEDED TO COMPLETE THE PROJECT NOT GENERATED FROM ON SITE GRADING ACTIVITIES SHALL BE '"OBTAINED FROM A PROPERLY PERMITTED BORROW PIT FACILITY DRAINAGE STRUCTURE SUMMARY DS ft# STATION RIM INVERT REMARKS 1 2+00 13.5 11.4 CURB INLET 2 2+00 13.5 11. CURB INLET CURB INLET 3 0+53.61 12.9 _= 4 0+53.61 129 I �.` 1 O.Cl CURB INLET 5 7+80.75 13.0 CURB INLET 6 +80.75 5+50 13.0 9.(, _ 11.? 11_(? CURB INLET 7 14.0 CURB INLET e I- _50 14.0 CURB INLET a - - 14.5 9.1 DROP INLET - 14.5 8.2 DROP INLET - 14.0 9.6 DROP INLET - _ 14.0 8.0 5.3 DROP INLET 4+81.91 8.6 C IJRB INLET 1 4+81 _91 _ 8.6 5.1 CURB INLET 8+30 5.9 3.9 CURB INLET 8 + 3 0 5.9 3.7_ CURB INLET 17 1 +53.70 _ 6.0 4.3 CURB INLET ', 8 1 +53.70 6.0 4.1 CURB IN[ E T Roil THE LAP._ -TURBING LIMITS FOR THIS PROJECT SHALL BE AS DELINEA"" 'N THIS SHEET THE T`_`,TAL DISTURBED AREA FOR THIS PROJEC- 1. N I _ A' - -E FOR GRADED SLOPES AND FILL SHALL BE NO GREATER THAN -E ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER 0--'ER ADEOI E EROSION CONTROL DEVICES OR STRUCTURES. IN ANT EVENT, =S LEFT EXPOSED WILL, WITHIN 21 CALENDAR DAYS OF COMPCE1I0ANY PHASE OF GRADIr,IG, BE PLANTED OR OTHERWISE PRE, DED WITH TEMPORAR'1' OR PERMANENT GROUND C' DEVICE-, 7IR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. I I I M I O ^.l - ter• I D Cl a� < s d ,' i C Q' O ELI aE J h .� u ' r� H r� 0 f ( IN FEET ) 1 inch = 100 fk, 06033.DIN( f