Loading...
HomeMy WebLinkAbout64-23 Exemption Number – EX 64-23 January 17, 2024 James Smith c/o Island Time Cleaning and Construction/Samantha Martin 2329 New River Inlet Road North Topsail Beach NC 28460 RE: EXEMPTED PROJECT (Statutory Exclusion) – MAINTENANCE AND REPAIR OF EXISTING STRUCTURES - [G.S. 113-103(5)(B)(5) and 151 NCAC 7K.0103(a)] PROJECT ADDRESS – 2329 New River Inlet Rd, North Topsail Beach NC AREA OF ENVIRONMENTAL CONCERN – Ocean Hazard AEC Dear Mr. Smith: I have reviewed your inquiry concerning the necessary filing of an application for a minor development permit under the Coastal Area Management Act. After making a site inspection on January 9, 2024, I have determined that the activity you propose is exempt from needing a minor development permit as long as it remains consistent with your site drawing submitted on December 12, 2023, and meets the conditions specified below. If your plans should change and your project will no longer meet these conditions, please contact me before proceeding. MAINTENANCE AND REPAIR - [G.S. 113-103(5)(B)(5) and 151 NCAC 7K.0103(a)] – Maintenance and repairs (excluding replacement) necessary to repair damage to structures caused by the elements are specifically excluded from the definition of development under the conditions and in the circumstances set out in G.S. 113A-103(5)(b)(5). Individuals required to take such measures within an AEC shall contact the local CAMA representative for consultation and advice before beginning work. Structures may be repaired in a similar manner, size, and location as the original structure. No expansions or additions are permissible. The repairs are limited to 50% of the market value of the existing structure and the following specific conditions. 1. The project consists of the repair of the back deck as shown on the project drawing. 2. The proposed repairs shall be consistent with all other applicable local ordinances and North Carolina Building Code standards. 3. No expansions or enlargements of any kind are authorized by this permit. All work must occur in the original footprint. The change in deck stair location you proposed on your drawing is not considered an enlargement of footprint. 4. No other work is authorized by this exemption letter. 5. The Permittee and/or the Permittee’s Authorized Agent shall be responsible for obtaining all necessary authorizations, approvals, or zoning and building permits from the local government having jurisdiction (Town of North Topsail Beach and/or Onslow County) prior to commencing work. This exemption to CAMA permit requirements does not alleviate the necessity of your obtaining any other State, Federal or Local authorization and N.C. Building Permits. This exemption expires 90 days from the date of the letter. Sincerely, Jonathan Lucas NC Division of Coastal Management 400 Commerce Ave., Morehead City, NC 28557 Cc: Kate Winzler, Town of North Topsail Beach