HomeMy WebLinkAbout27-08 OVERSIZED PLANSLu
>
d�
T
0[if
<
HARKERS ISLAND
NOTES:
This plan document is for CAMA
permitting purposes.
Owner Wor Contractor
responsible to insure all project
construction is consistent with
owners intended uses.
Owner Wor contractor
responsibility for project
compliance with all applicable
codes, ordinances and
regulations including building
codes, setbacks, on -site
wastewater system specifications,
built upon area requirements, et
cetera.
Contractor responsibility to
inspect site and identify field
conditions and related project
cost implications thereof.
"1 11
Proposed Dredging Area
Existing Dredged Channel
Coastal Wetland
Riparian Corridor Boundaries ................
Per DCM Agent
SCALE Iff = 50"
Survey / Base Map & Elevation Data provided by
Property Owner from Previous Survey Utilized
for DCM Permitted Existing Dredging
Revised & Submitted 11/17/06
NOT FOR CONVEYANCES OR RECORDING
Section A -A
Scale lit = 101
A
0= NLW --I _41 1 ........... I ........
Proposec
Boat Lift
Verify Pil
& Install I
Manufact
Existing Bottom
2h:1v (Typ Min)
REVISIONS
� 0 O
11/27/07-Per Wner ner-
1/10/08 Per DCM
----------
-------------
V)
1
C—
rn
00
•
LU
V)
X
C
0
<
C
U
Z)
LLJ
"70
T_
4-J
A-J
C
Q)
>_7
<
3: 0
V)
E
(D
(0
C
(D
1
0
0
L-) U)
U
>
'Z:
L'J
L'J
ul
4-J
>
oo LLJ
Z
U
0T
U
a_
4I®
C/0
o
CO
o> CQ
r-Z
E-4
sting Pier
Platform
41�
Ica
J 1 4
Enlarged Proposed Boat Lift & Excavation Area kAqroh d City DCM
Scale 1 20'
PERMITTING SET DATE: 1'1/20/2007
PROJECT: 07069
NOT RELEASED FOR CONSTRUCTION
DRAWN BY: JF
Until All Appropiri�ate Permits & Approvals Received
SHEET 1 of 1