Loading...
HomeMy WebLinkAbout27-08 OVERSIZED PLANSLu > d� T 0[if < HARKERS ISLAND NOTES: This plan document is for CAMA permitting purposes. Owner Wor Contractor responsible to insure all project construction is consistent with owners intended uses. Owner Wor contractor responsibility for project compliance with all applicable codes, ordinances and regulations including building codes, setbacks, on -site wastewater system specifications, built upon area requirements, et cetera. Contractor responsibility to inspect site and identify field conditions and related project cost implications thereof. "1 11 Proposed Dredging Area Existing Dredged Channel Coastal Wetland Riparian Corridor Boundaries ................ Per DCM Agent SCALE Iff = 50" Survey / Base Map & Elevation Data provided by Property Owner from Previous Survey Utilized for DCM Permitted Existing Dredging Revised & Submitted 11/17/06 NOT FOR CONVEYANCES OR RECORDING Section A -A Scale lit = 101 A 0= NLW --I _41 1 ........... I ........ Proposec Boat Lift Verify Pil & Install I Manufact Existing Bottom 2h:1v (Typ Min) REVISIONS � 0 O 11/27/07-Per Wner ner- 1/10/08 Per DCM ---------- ------------- V) 1 C— rn 00 • LU V) X C 0 < C U Z) LLJ "70 T_ 4-J A-J C Q) >_7 < 3: 0 V) E (D (0 C (D 1 0 0 L-) U) U > 'Z: L'J L'J ul 4-J > oo LLJ Z U 0T U a_ 4I® C/0 o CO o> CQ r-Z E-4 sting Pier Platform 41� Ica J 1 4 Enlarged Proposed Boat Lift & Excavation Area kAqroh d City DCM Scale 1 20' PERMITTING SET DATE: 1'1/20/2007 PROJECT: 07069 NOT RELEASED FOR CONSTRUCTION DRAWN BY: JF Until All Appropiri�ate Permits & Approvals Received SHEET 1 of 1