Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
17-08 Existing Land Development 8/2008 OVERSIZED PLANS
SITE DATA: TOTAL ACREAGE...........................................18.00 'IN#..........................................................150222334 LEGEND 4 CONTOUR µ 4.00 SPOT ELEVATION = NEW STORM DRAIN = EXISTING WATER MAIN = EXISTING PRESSURE MAIN = 50' RIPARIAN BUFFER FX. = EXISTING TYP. = TYPICAL C 8/27/08 REVISED PER DCM COMMENTS EHA PA 7/18/08 REVISED PER COMMENTS EHA 5/27/08 1 ISSUE FOR PERMITTING EHA REV. NO. DATE REVISIONS BY THE EAST GROUP, P.A. ■ Engineering ■Architecture ■ Surveying ■Technology 324 Evans St., Greenville, NC 27858 252-758-3746, 252-830-3954 (Fax) PROJECT TITLE BEAUFORT POINTE PHASE 2 Beaufort County, North Carolina DRAWING TITLE LAMA -Existing Land Development SCALE DEPARTMENT AS NOTED CIVIL DRAWN BY DATE STARTED SHEET No. EHA 12/12/07 3 OF 5 ALH DRAWING NO. SLJ COm3 APPROVED PROJECT NO. 20050319 15 1 114 13 12 11 10 9 8 7 6 5 4 3 2 1 "�To 64 17 CITY OF so ., \WASHINGTON MAINTENANCE PLAN: SEEDING SCHEDULE: CONSTRUCTION SEQ �� i J �, \. 6 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE PERMANENT SEEDING UENCE: �% �K 0 TMERN CHECKED FOR STABILITY AND SEPARATION FOLLOWING EVERY DATE 1. OBTAIN AND POST A COPY OF CERTIFICATE OF SOIL EROSION RUN-OFF PRODUCING RAINFALL, BUT IN NO CASE LESS THAN JAN 1-MAR 31 COMMON BERMUDA GRASS 20 LBS/ACRE AND SEDIMENT CONTROL PLAN APPROVAL. NOTIFY NCDENR P pRFO \... _ 32 ,---\ ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE UNHULLED DIVISION OF LAND RESOURCES, WASHINGTON REGIONAL OFFICE Ll" TWASHINGTON \PARK'\ t\ IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. APR 1-JUL 31 COMMON BERMUDA GRASS 15 LBS/ACRE AT 252-946-6481 PRIOR TO COMMENCING CONSTRUCTION. pq i!i \\ 2. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT (HULLED) 2. CONSTRUCT TEMPORARY CONSTRUCTION ENTRANCE/EXIT, .. ML7�0 \ \�\ FENCE WHEN 1T BECOMES 0.5 FT DEEP AT THE FENCE. THE CENTIPEDE 5 LBS/ACRE INCLUDING GRAVEL ENTRANCE. NCS\.. R7jeR j� « I,�e\ SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO AUG 1-DEC 31 TALL FESCUE 60 LBS/ACRE 3. CLEAR LAND ONLY AS NECESSARY TO INSTALL TEMPORARY ,7 17ss s� �, j \\_ ,- ! ._._ - `--� MAINTAIN A BARRIER. COMMON BERMUDA GRASS 20 LBS/ACRE EROSION AND SEDIMENT CONTROL DEVICES. AS �.. .. 18 1 1 3. EROSION CONTROL MATTING SHALL BE MAINTAINED UNTIL ALL (HULLED) CONSTRUCTION PROGRESSES, INSTALL ADDITIONAL EROSION \z SITE II •' � I 11 WORK IS COMPLETE. AREAS SHALL BE RESEEDED AND YEAR ROUND AGRICULTURAL LIMESTONE 2 TONS/ACRE AND SEDIMENT CONTROL DEVICES AS NEEDED OR AS �U T II • ` AND MATTING SHALL BE REPLACED AS NEEDED. YEAR ROUND FERTILIZER 10-10-10 ANALYSIS 1000 LBS/ACRE DIRECTED BY THE ENGINEER. • ® Bq I - `, _ 4. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT WILL BE YEAR ROUND MULCH 2 TONS (APPROX. 80 BALES) 4. STRIP TOPSOIL & STOCKPILE ON LOTS 95 - 98 FOR LATER USE. c, 4; ' ,- , 33 1 ;11 \\ 11;�- I \\. \ \ ----'\,---, �. J \�__ INSPECTED PERIODICALLY. WHEN MUD BEGINS TO BUILD UP, SMALL GRAIN STRAW/ACRE 5. INSTALL SEDIMENT FENCE AND BEGIN GRADING THE ROADWAYS CHOCOWINlTY \ ``l __ __. \ \ '\---� \- \THE ENTRANCE WILL BE BLADED OFF REMOVING THE MUD. YEAR ROUND ANCHOR TACK WITH LIQUID ASPHALT & LOTS. VICINITY MAP ,Iii I \ �'\ 5. ALL SEEDED AREAS WILL BE FERTILIZED, RE -SEEDED AS TACK GAL/ACRE 6. INSTALL DRAINAGE PIPE WITH INLET & OUTLET STABILIZATION. ;,; NECESSARY AND MULCHED ACCORDING TO SPECIFICATION IN ' \` \ ` ��-= OR EMULSIFIED ASPHALT 7. GRADE DRAINAGE SWALES &DITCHES. INSTALL PREFORMED NOT TO SCALE! `; ; \ �._ THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS DENSE ROCK SILT CHECK DAMS AND TEMPORARY SEEDING. \ \` -' ' SCOUR HOLES I W: \ �., � �,1 �.______.\ `"\ _l :\, ©400 GAL ACRE , / , ti/ f\\. �_'A, i ; � \ � 1'1 ; ; ,I \ �\ \ -_-,• � CURVE DATA VEGETATIVE COVER. / i i / \ ; I ; \�\ \�__- 8. INSTALL TEMPORARY SEEDING AS NEEDED THROUGHOUT THE / :\ \\ \-�,r \ y r_ '+,+ \I 11 �t \ - CURVE #1 __._1\\ TEMPORARY SEEDING CONSTRUCTION PROJECT. \ /. /, , \ • y I / I' / \ \. - \ R=1482.98 ^\ VEGETATIVE PLAN: DATE 9. INSTALL WATER MAINS AND SEWER MAINS. ��/y?��\'\ \,i\ -- \-1 i ` '�. ice,\ `---'"'\� , L=115.75 \� \ APR 15-AUG 14 GERMAN MILLET ' S0 LBS/ACRE / \ 'r \ \ ,-/ / \ ! '\ � ' \ \ -- `\� TAN=57.90 VEGETATIVE COVER SHALL BE IN ACCORDANCE 10. BEGIN CONSTRUCTION OF ROADWAYS, INCLUDING THE PLACEMENT / \ ` -" \ I \ \ \' A=4.28'20" WITH THE SEEDING SCHEDULE AND THE OF AGGREGATE BASE COURSE. N \'._--\, .-_' +WI ` I AUG 15-APR 14 RYE (GRAIN) 50 LBS/ACRE �, ' % t - / r! ;1 `, \ FOLLOWING SPECIFICATION SECTIONS: 11. COMPLETE CONSTRUCTION OF ROADWAYS, INCLUDING PLACEMENT _ OF ASPHALT. /� \\f / I i l \\ YEAR ROUND FERTILIZER 10-10-10 ANALYSIS 400 LBS/ACRE �, �\ \ // \ \ ", t \ \ ` \'. CURVE #2 ^```__ SECTION 02110 SITE CLEARING /` I \ R-310.00 \ __. \ SECTION 02120 EROSION & POLLUTION CONTROL /\ ' � % ` \ \ / ", ! ` I \ \ -""\ 12. INSTALL LANDSCAPING AND MULCH AND SEED ALL /` L=521.87 WTION 02228 CLEAN-UP & SEEDING DISTURBED AREAS. ANY SLOPES LEFT EXPOSED WILL WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE A /� \ \_�, /'; I \ \ TAN=347.0" �, / y�/\- }i /"I I j \\ \ \� �_,\ OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH \ \ CURVE #3 - \ Pa ' \� \ TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR �' \, ` STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PROVIDE PERMANENT . I / '\ - /A1 R=740.00 ' _ ` � �,\ \ t; 11) { / \, a \ 0 f?i ---1`,, GROUND COVER FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS \ W �• / �' ; ', `\ . k \ i `� � f \ \ �® L=188.85 \; {er , t � \ \` / !. _ _ I \ \ ---` �-' OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING \t \, \ / \ \ I -".4- ' _ \ TAN=94.94 \� \_- \ \ / k \ :, , I' \ --� �--- - A=14'3T20" - \___,, `_ COMPLETION OF CONSTRUCTION OR DEVELOPMENT. M �'. \ ��� j f Q �\�; �- - \\ ; - -; - /\�:'� ; � \ \. \ ` ` \ 13. UPON SITE STABILIZATION AND INSTALLATION OF ALL 1 -4_ _ PERMANENT EROSION CONTROL DEVICES, REMOVE ALL `W \ / i/, .cr, \, - / / __.-�-'' - .,.,, l: \ \ S i", R.11.' � t< i Y L i i i ': J i �' L ±`: i. iVi i�. ` N �� L �, %` =- _y- i ;'I 4 - L ��" TEMPORARY EROSION CONTROL MEASURES. ;\ r'i•`; i l I J i! 3• =ICE G.A E< LIRE J= TyF , �` �r \ " """<-':.. f'';: v _y__ -! r _ \. \ \ �` 2 0423ti 50 RIPARIAN 75' AEC, TYP. �- EXISTING PIER 1 �� / t '-! �; "5 �/ , -` ` i - I _ I \` 27�8, £ P'•"v'i_ICC RIVER, (HEY !DER_ L BUFFER TYP _ p NE TO REMAIN I '\, _ �l- / • , , i .�5= 1 jr ti- 1 1 _r \ \� 'V 1 '�.. `5 :L ia.: 'n.: '_C n;, t I e _ - _ ,"' " � T" \ : �' \10 ,;� y I' _ i_ / I r ��' �:,� \� \ `� ; \ f'\ L NCE.,+ _s-67'402'�--E' S 5124�36" \ �� EX. JETTY \"_ y_� \.. / 1 / � �\ _ ... _ - 4.83 g 4 E \ �� / , , i`"" l�j I/ ' �.'� _\ i / / ' j \� \ ",r M ��'-� 1 6579'56" E _.- 16 8.9 ' bir \---,.-- , 11, "I i i 4; \ / �-- /' /; % _ ! / "\ \ _ �- �' j __ \ " / j \ f \ ��^ _ _ 134a4- � / N , \� �*\/ I'� v / _i _ I Cam\- \ l \ I t _4'`J i N \ 1 ' \ c - _' I I I � i 11,` \; . \, IL/ . \. / �,' ; , f - i ' _� j 1'-\ \ `` , P`v'�j / _' \ / 1 N \ I \. �� - I s J .: '"o" . i 11 . o ;, i I -1 / I 17f In _-� 'I aev 1 I \ ` d' ^ I T 1 \ I ' _�- ® il...- ; 11\` tL ? ^•\__, . i r jr + 1 \ ��r f� / t / / I - - -'" � 1 / \"1 \ V - - -I-- -o- _-- ` \ l I 4, I \ I \ -1 -- %' %`` \ I`✓ %; ; \__ tt ; \ t r ., \ \ .JO` !C.%j _ \\\ \ �/ 5` 5 7 18 _ E \ / \� ;,\ �!/�-- -` r n i I \ I i 59 I 60 I -61 1 E'>2 -4-.( ) I / 11- / I i I / i 1 Cl I i �. V^ \ /. t .\ j - _\i\'-TEMPORA}RY -- -� \ � \ � p . '; � _ 0 y / ,o _ tt \ �.:�>� CONSTRUCTION EX. CO Q \ ,\ i \ I ROCK i 1 -. x 85 /� 1 t', ' / \� o % j N �X /';+ t; l` - % ENTRANCE EXISTING �IEyV VALVE - \ 30' MBL I \ CHECK ILT / j / y \ �� o __ ,\ // ' 1- t` � i / t t 7 \ l I PAVEMENT PAVEMENT `\ \ r - I \ I I DAM, \ -� �\ \�. / i • - I - - '� " - --' I 30' MBL I \ f f v' i ; . �. / _� � y \ / J i I y..r_ \ ; EX. ROAD '� __ L ; %/ % + ��. ° -�- - \ i I 6 6 K i / i / / 11 I / \ - --- EX. 3" PVC PRESSURE MAIN - X _ - _ v _ _ _ -X j \ I (: ) . . % ;' \:', / a r / ,I ` J � ----- - - - _._.. �_._ C"- --�\ \ ---+-- .� I p t ', \__i ,- - '-- ^ - - -- - - -- \ - / it \ /\ /' /// N r\ ` ji / -i L -y r l - - __ Lane aoaoa.. - - -sill --..._ / � 1 , \ \ "\ __, -1--' _ � �' - ' _ _ _ rd _ vi: _ - �__ _�.77�76--- _ - -k- - _�- ._._ --- ----_ - --_ - _ AD --._ .__ -�---` 9:1I1-- - -- ; ,;• - - N __--.-___ - - -�_..- _ # - - -- \ \ /%f \ /� EXISTING PIER �.^\ -_ -_ - \ -- - _ _ _ •Y ` �.=_�-Try EX 6 PAC WATER !MAIN - o -- - -®.. TO REMAIN \ -�{36- G\1 -0 PSI \ \ \ !. \,. - --- p 10 11 05 ----= __ _.. ----- ._.. - - -- - - - - -- - - - _ _ - - - - - --- --'--- - - I ` \ TYP. ��` / \ \ s��/, 11 �-` EX STORM PE _ - --_ ___ - =107 8 - ..�.`. IIIiiI - -- / _ _ 11 _ T� PM\ i \ , / � st 16,\� // // \ PI 1-1 TYP. ( BE REM D __ _ - - 1 `� \ --- -- �'f _ _ _-__- _ _- _ 9 EX JETTY / \ -- - __- �- ° 1 \ 1 EQUATION I ` �_� x ---,..__- r • \ % � \\ -��� FE X 5 \ \ R _- - 2 I\ - e STA: 12+33.99 3O' RELOCATED /x z X �>;_�_..=X --___ \---- --- -_ -- _ _� \w ' / ?,, \ \\\, S 4?>� %y --- - - I \ I -STA. 0+0 MBL I x. ' _ _ _------�- I / - - - _ . \ --- / x `�� ^�, �,' \_ FH ASSEMBLY 10' UTILITY TEMPORAf _ - --\ �rk I FENCE, - ,o,, 7.2 t--S-56 -- /, J !} \ _ �, _- e �� y`\ EASEMENT, TYP.. SILT _ I - I 1 iL� t 11 !, y� 1�� _� �- =_. ; �`\ -� �1 �� \ - 6 8 \; / , �S� 02'46" �/1 //� ~\, 11 I ( Z 111 110 I 10 9 S10 7 _.1 _ ' I (P R 0 0 S E D 5 I P_R I V A TE -1 - -�hl _- " P `C 8L = - - - \ \" \`� ; %,� a 3 5 �, 3> 648, S 6 '17'54" E r __\ J 113 112 ; I _ - I \ _ X y -- µ T ,`` _ \ .1 ,ems .. - __ �� \_„ M i 1 a 0 5 i -- 4- \ F ,, - \ I__] __ I VM 4 1 04 . jI '-ate---r -1,. 1 J I i ,% _a - 11 ____--- -- 1 I 102 Exl 101 ' 100 /` �' - \ / ? '\ � = �\ NWL % I `tt ao ` _ I _ - _ _ _.. _.�- - + i % i 75 AEC, TYP. Ai •,Jf : ;ENT \ x � x / %} 11 �� I I 0 �� �- i f:I .f�Ii\f! 41(JFR I l ,;%11 1 \ \ ,�,,, V. :tv - +t .-- -il 50' RIPARIAN �. f� ; \ { 'Ir oI \ __.,f... j I KEI i_Y� .r ,7i'_. 4>i: PROPOSED 115 DRAINAG \ i I Z --T- t I BUFFER TYP. \ `I I 20' DRAINAGE 9 8 h i \ .._/x __._. _ _ I t BULKHEAD EASEMENT '"'�^i PROPOSED lI O " -7 I ,r-o \_ �- H _ I ! I - _ - - I - 'NWL J " \ ' \ f SWALE, TYP.1` EASEMENT �,� x \ \' / 0 '/" I ��.. �•l( ) \\r �" t, _ _ _i -4-- - I- .\ "l 58'S8 43 TC m I \,'' "�-� \ T� 1 \ ! �� `\ `�" i� �''"" 50' RIPARIAN \ I i _ -- - I \ N66'2T59 W ° ° 34"W r1�; 39. \ .i BUFFS TYP Q i { 1 I 7 _.._ x , - - '4 r \ \\ \ �' N64 8' - t 1 1�_ - \ s j... k--' 1.22.52' 1. ` , IN \ �" \ - II _ _ \ : 1 485 OF PROPOSED \, . �� "- 3.00 I PREFO ED `EX f O '\ ' /'" 1 1 \_ ;t �- I N65.49'04"W 1y� BULKHEAD, k-�" - ,, c 25 to SCOUR 'j Bq WAR SLID \ ¢. \ INV. 0 Vs M I / " + _` - t NG CANAL \__"-,\ 27 26 0 / HOLE #2)I"z . + SIN TO B E \ 3.50 9 7 i- F - y -- -_ --- _ ; "W ,, Q 239.66 \EXl S l _ 28 0 1 " • \ CLEANED E I \ 1\ x \ ', _� -' I , - = N67.04 04 29 -`\ - -- - �-_ 76.86 k NWL END OF EXISTING �_k%�;_ 3 31 � 30 �90'00'00� - b - 1A\ / \ { \� AIVD FIL�EpUT If; \` \ \ \\ \i x tcn \. _ r, BULKHEAD O 0 9 91 \ !r \ �\ %1 \ J °: r 56T2'5$ 33 _ / x �\ Jam/ t I - A16' ' 34 0 101 A 102A tA �_ MPORARY,/ �I® ` �, 93 \ I \'_ \ 35 157.91 a L} it �\ \ \ 1 I i - c .P� NOTE: ti: _ . 13.64 N 36 0 100A r r r r r r r - SILT FENCE® I \ 1 } - . \^ PR4PCB 6-' _-.-_ -.. - -- - - -- -- - - TYP. \ ''' / \ , _ ' ;;�z 75' AEC, TYP. f \ --' G SUPS 25 THROUGH 36 WIN1 8E 99A/,, -- WOODEN 11 FN -- --- \ -_'' r EX. ROAD DEEDED-11MTH INT�IOR LOTS 91 I 98A r r SS �;'\ _ , f`f \ \ f _ _ 1 97A _ _ _ / BOARDWALK EMBLY �� ;''' 95 INV. ( ) \ c,O I t _ �' \. - ---- w S3 ROUGH 103 - i - .."6�- r h -`NWL �\ _ / -� �'`• ASE AGE ` rx 3.70 ,(QQ `tQ\\i \ \ i _ \ t, \_.. \_ J - k-. s g3, - - - - -- LIMITS OF '� s 2 09C 0 VC WATER1 -I , _ MEN7 '�--' a .���'(\ ` '_ j ' _-- 2 �\ 25 DISTURBANCE -- �__ __ ;` _ - S --•\ . t END QF PROPOSED % --� , a; \ _ i w _ BULKHEAD - 1 ___.._.� -__ i �O�13L t TEMP®BABY C � N 96 ---�---_- -_P- -- _-_ _. ----- _ - °r° ;� I - - - 4 77 / x x " 04✓K SILT o r ' �(_ HECK DA \�`s CHAR; ES HUCM.-EBERR . �N r / FE ! -P11f ' `'�� � '\ 1, -z1`f M, 30 HIB -' �'� . r� QlA _ _ - / / 15' D x�_ I` _ -'-- ice, � L \ EX, JETTY 15L6;'060g /\`�-. N a, 5 22 j _� `\ - 6" RAINgGE x �` \ - �, Q.__A z f ice;' �~ �~'-0. }5_ CgOr p VC wi R EN INV. I u % , = r + t l i( FE I x ---. _ MAIN 1.05 1 "/ _ ; \ ;\ I.t:i s FrCwl .'Oi��`:ER C>ROrJ( ) 5.70 / / - _-_. I� P / _" 7 \ \ \ \� 6731'03" E �f _ _- _._- __ _ R35 _ - __--- ____ 1 1 ��", C^ � - / _. I �� .. - P_` ` �' '- ' - -- -- --4-- -- ,� INV U. g5 �� \ .\ �\, 48.0 �-- _" --- F _ E BULKHEAD R50 %'- x , r--- , RESS \ _� -- ' _ z_- EP ___ I to. --v . . " - . . ' SEM t `"GPM 18, FE \ 1 INV. 1.2 _ -ol --- --- , i P E: . tt 1i, Y, i M r ,',� ' \ 5.2 , ..� . • I [] (� i' / / ��. �y 1 Y• ? ^ �$ 2". 1 V \ .2Q 1' ' 1 ` I i t .' 't • + -,i' I _ - \ �n �, f '� ' 4Q 8 7 I /`SJ YV1 I - ; _� M-�i' _-~ 1 PM-RCH �1 --_ R35' ` \ \ I I rr.; 4 ER ._:NE OF Ti E . \ � ROAD & UTILITY / 5.40 ' 0 AfA _ EP _ _.. 3 ) N. rl Fd 1 LINE x 26 3.9 *' f w ±S TtiE i i ,Y h 1 A T I _ "r ,-;I\ IMPROVEMENTS \ [ 8 -=- PQ �`� �--- 0 9 - R55' / v PlIL°CO n. I /` -. l l r C UPO ��/�/� � FE'` i I 1 PPRJ„L• .•. Ct :IvIJ t PREVIOUSLY APPROVED - i 1`-'1.:: x -� i s , 1►'1 E / r-� _ \ �- ,, P V 4.4� �\ � E UNDER COASTAL _ -� t (' �� l� O P jC N�R±vIf L H .vr. 6 DIST�tJRBAE \ / 'tl. \ TEMPORAR 84 !f R �_ /--- / \ \ ` : vi �,;,- ;,,;. `; RESOURCES PERMIT ; / I I t I _\ �- � i � 83 VA TE - RT _ INv. '\ ,., _ S f / \ ; �;�, �.; '� 17-08 SILT�FENCE, -�11 i 82 1 iR/�/`/ - --� - __II gO f � 47 `+ , i % \ l ` T1"I�. `_ ��± s..--� '; ` }� ' �. `'` , 33p 3S" - � I 11 ", t:'\ / �--� -�, / \\ ,,, I x, �' \ '11 i i,+ i4J P \p ,� �• u- , ;, _._:\_._._ _-� `�� E\70� 10' ACCESS T -� !' 1 ; - f +� -- 11 81 ; I vl , � � '�/ -�-_ �8 EMT.__ E ,i `\ ' / /' U C.� `\ ,� I I i I ..i 8 0 _ " i 1 �r�`�_, n \ � �---t- %' v f I �•\I�.._.�^ J9 �, '\ 0 % 1' �\ �'_ i -C '+ gS. NWL 11 / 45 F PROPOSED ± -.i �� BERT IEF ERSON \ / \ ,06; ll r ;� ;' _- - --- --..._ ...__ - \_ i r �� Rir •ARIL N:NE° -7 Q i v / 1 ':, �, --�' `�-- \ - 14BULKHEAD i o _S :'� / 9 3 ---�1... --, ,�276 ,,� V /� y 70' OF PROPOSED �`t ,°�' :0- } �' ., \ - \ Q . - E. =ARL ^ j _ 1 J o M a BULKHEAD 18 '3' (o mod. ;� L: P'vl•A.PI JR. ' p = I \\�\, N = °;� \ / 7 �' ,� w / 8 /? { 1 - \� Q N ! �y ! ¢: •c�v M 2`21 o` j BR: P�; - y f r 1 i� y � \ \ \ 0'22 b w I j ; 'r •- c 4 N I Z "iiiiiiiiiiiiiiiiiiiiiiiiiiiiiii' %50>> N66' Q3"W i \� ' s= - - -- - _... _. I � �\ �l \\ \ yea\%1 3%• w rp`� I U Z i � 69•35'20" Ng9'2214 W 92 ©' �\ W� -r .. I II, o f i1' J I I , I -_ ,' \ \\ :, O� ° 'rn i- \11 Ir I, 11v EX. STORM PIPE r ,. ` % nw -In 4 �� VI 38.74 VEXISTING BOAT ^ r�IyEX. BULKHEAD = I i > �'; ` �/\ \ DRAINAGE x ,' % / i \ ` \ ~� EX. ROAD T RAMP �30' ly, ,\ 5'2 33.17' j \ c„ i U / �'18 51• EX. PIER RAMP TO BE -- I i - , TO BE REMOVE6 ��, i \ ----\ Z i N T29 Do t TO REMAIN \ ( ESMT. ' 1 EX. DECK 9 ti ;` i i \ 1 RECONSTRUCTED - 4L .7-A o� - \, i y= Ni ; " 111.86 N \\_ -a N 480g " o./ 1 INV. }I r10' ACC S II CONTIGUOUS �A•.8� yam` 1 ' W NWL! EX. PIER 31 ;� \ PROPERTY TO S o (n ' ,1•33 04 ;. k'' 1$5 w -�. j i '-- 0.50 \.. ,� ' I \ J 6,, "` \ N' x 50' RIPARIAN 2 �, ,• NV ES ,; �G.,.. �3 D 8' - a 3g.\ / \, P \ j I \ \\ • 3 -,. 7 LOT 92 f s[1 W 37.47 BUFFER TYP. <' S1 b FOR \ I ". / \ iW ;I X >,.- EX. PIER , ,' RE >_ k \ \ ,�/EX. JETTY I �g EX. BULKHEAD X'" r " OUR J h\ I\ M :I i sC �M�bh'_ \ r z __�, ELEVATION OF CHANNEL 10 56 33'S}_ 6� 3 W �OL ,' \i \ • % `,. ' \ �`` l.'� �1 O \ ---\ EX. BULKHEAD 11 i k - L ' \ i ; w, 6' t E 1 I ( 1 c \\\ \ +n !I �_� _ BOTTOM TO DETERMINE 75 AEC, TYP. a I ; 78.p$' # ` \ !/o �^\ _ ' ___ J� - DEPTH FROM NORMAL WATER \, I -%" / ,,� yid i - \ _ __ ` _ .._ -_~ `4 `�� ELEVATION SUBTRACT\,. a �\ \ __ \ . \(a \ a EX. CONCRETE \11 y \�c. BOTTOM ELEVATION FROM `� \�_ __� I I �._ H '` I \ \ \`_ __ NWL '..,,, �. h O SIDEWALK __ 7 _ �. �` ELEVATION 0.40 FEET " - F �\ I \ (,t r \ ^\ `_� �X� 9�• N 3 \ I _ `� EX. DECK EX. PIER O l 208 ' �' � :,; W, ` \ ^`, k _ - \ _ l \.. ., C'.q EX. BULKHEAD i „���„, ,', �,. 07 634 W �, \ ;1::;:<s �. 4 \ x rrr<:;P- ry i._I'• E TH _ \ --1 ' �" \ '` EX. BULKHEAD ��_ \ �rl C s . 1v, Ri�j -- .- u+LH i`r'9'E _II`J_. ;'v1EtIJ K ` \ f ' T#" •ci - v Y� -,.�� LINL iti TH:' APPROXI>v. TI \`-�\ I 0 ' � „� - "#ll.: e ---C OC�l Avid Cr T-?L NOF"M -�i " i:H �\ ` ' �e / 5 ~ i . k 0-11 y T -� _ - ,� TLp i 'NE.) - ,< \A I ,' .::; \o,.„ BEAUFORT POINTS �� \_1\ _ _ _ - \� IL -J . z :a �'s \ O / YACHT CLUB _ ---- �.._�\ \ - .V 'v I, \\ BOATAMINIUM \ _ - _ yo \ \ �O Ao , ^ ... (EXISTING MARINA) ^\_- \�� L 1 X EX. CONCRETE �, \ �6 BUILDING PAD \'�-�'-` r a-_-- ,,�\ V^\_-� EX. PIER, \`__ \1 ,_,�,\ \_! , TYP. ;t ,, 11 t -___ i. �/ i , \ t';i \ EXISTING MARSH tiil TO REMAIN �`°� �a 4 e:} a \` Owner f Developer: } \\\ .- \1 NC Land Partners A11 -\-'/% c/o Derrick Smith 50 25 0 50' 3237 Whichards Lane t _\ Chocowinity, NC 27817 1"=50'-0" Phone: (252) 948-1385 ,,% ,, Pax: (252) 948-1390 THIS DRAWING IS THE PROPERTY OF THE ST GROUP, P.A. ANY USE, REUSE, REPRODUCTION, DISPLAY OR SALE OF THIS DRAWING WITHOUT WRITTEN CONSENT OFFE EAST GROUP, P.A. IS STRICTLY PROHIBITED. COPYRIG THE EAST GROUP. P.A. 2007 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 P A M L K J H G F E D C IM A I ���� ��G , ���S� �0 �,�v ��\G Q1Ql� ���5 , lG \V SITE DATA: TOTAL ACREAGE..........................................18.00 ACC' ..'' OPEN SPACE................................................0.74 AC.f ACREAGE IN R/W........................................2.32 AC.f LINEAR FEET OF STREETS.............................1,837 LF NUMBER OF LOTS....................................................58 AVERAGE LOT SIZE.....................................0.25 AC.f PIN#..........................................................150222334 DISTURBED AREA TOTAL...........................245,815 SF DISTURBED AREA WITHIN AEC......................6,155 SF IMPERVIOUS AREA TOTAL.........................233,683 SF IMPERVIOUS AREA WITHIN AEC.....................1,790 SF GENERAL NOTES: 1. ALL VEGETATION AND TOPSOIL SHALL BE STRIPPED FROM FILL AREAS PRIOR TO PLACING FILL. ANY QUESTIONABLE OR UNSUITABLE SOIL CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 2. ALL FILL SHALL BE COMPACTED TO AT LEAST 957 OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D698). 3. GRADING CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS IN ACCORDANCE WITH THE SPECIFICATONS WITHIN 21 DAYS COMPLETION OF GRADING WORK. UPON COMPLETION OF THE PROJECT, THE GENERAL CONTRACTOR SHALL INSTALL PERMANENT SEEDING FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT AS OUTLINED IN THE SPECIFICATIONS. ALL DRAINAGE PIPES SHALL BE CLEANED BY THE GENERAL CONTRACTOR TO REMOVE ANY SEDIMENTS THAT HAVE ACCUMULATED. 4. ALL PLANTING AREAS SHALL BE BACKFILLED WITH TOPSOIL AND RAKED DOWN, REMOVING ALL CLODS AND ROOTS, AND LEFT READY FOR SEEDING AND PLANTING. 5. ALL UTILITY TAPS, CONNECTIONS AND EXTENSIONS SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL CODES, 6. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE. _,"t. ', CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND COORDINATE Cl `. ' NECTION WITH PROPER AUTHORITIES. CALL "NC -ONE -CALL" AT 1-800-632-4949 48 HOURS BEFORE ANY EXCAVATION IS BEGUN. 7. ALL PERMITS AND FEES REQUIRED FOR CONSTRUCTION OF IMPROVEMENTS ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. 8. ALL WETLANDS AREAS ARE CONSIDERED DRAINAGE EASEMENTS AND ARE SUBJECT TO THE HOME OWNER ASSOCIATION AND NCDENR RULES AND LAWS 9. ALL LOTS TO BE SERVED BY CENTRAL WATER SUPPLY AND CENTRAL SANITARY SEWAGE SYSTEM. 10. AN NCDOT DRIVEWAY PERMIT IS NOT REQUIRED. 11. AN NCDOT ENCROACHMENT AGREEMENT IS NOT REQUIRED. 12. AN EROSION AND SEDIMENTATION CONTROL PLAN SHALL BE APPROVED PRIOR TO CONSTRUCTION. 13. A STORM WATER MANAGEMENT PLAN IS REQUIRED. 14. ALL ELECTRIC LINES SHALL BE UNDERGROUND. ROADS ARE PROPOSED TO BE ACCEPTED BY THE NCDOT OR PRIVATE AS SHOWN ON PLAN. 15. POTABLE WATER PROVIDED BY BEAUFORT COUNTY WATER CORPORATION. 16. SANITARY SEWER PROVIDED BY THE CITY OF WASHINGTON. 17. HOMEOWNER'S ASSOCIATION WILL BE ESTABLISHED BY THE DEVELOPER . 18. GENERAL CONTRACTOR SHALL VERIFY INVERTS ON EXISTING STORM DRAINAGE PRIOR TO CONSTRUCTION. 19. CONTRACTOR SHALL NOT COMMENCE CONSTRUCTION OF WATER MAINS OR SEWER SYSTEMS PRIOR TO APPROVAL OF ALL PERMITS. 20. THERE ARE NOT ANY WETLANDS LOCATED IN PHASE 2 OF THIS DEVELOPMENT. BLUE LINE STREAMS INCLUDE ALL CHANNELS DIRECTLY CONNECTED TO THE PAMLICO RIVER AND CHOCOWINITY BAY. LEGEND ^ CONTOUR +4.C;'C SPOT ELEVATION -• -- - = EXISTING STORM DRAIN ® =NEW STORM DRAIN - W - - = EXISTING WATER MAIN ---i [-- = NEW WATER MAIN --PM-- = EXISTING PRESSURE MAIN PM = NEW PRESSURE MAIN - - - = 50' RIPARIAN BUFFER = 75' AEC LINE RCP =REINFORCED CONCRETE PIPE FES =FLARED END SECTION EX. = EXISTING FFE = FINISHED FLOOR ELEVATION FE = FINISHED ELEVATION EP =EDGE OF PAVEMENT INV = INVERT TYP. = TYPICAL CO = CLEAN OUT RED. = REDUCER G.V. = GATE VALVE ESMT. = EASEMENT FH = FIRE HYDRANT B.O. = BLOW OFF ST = SIGHT TRIANGLE SE = SIGN EASEMENT TYPICAL LOT SETBACKS: FRONT: 30' SIDE: 1O' REAR: 25' C 8/27/08 REVISED PER DCM COMMENTS EHA B 7/18/08 REVISED PER COMMENTS EHA A 5/27/08 ISSUE FOR PERMITTING EHA REV. NO. DATE REVISIONS BY THE EAST GROUP, P.A. ■Engineering ■Architecture ■ Surveying ■Technology 324 Evans St., Greenville, NC 27858 252-758-3746, 252-830-3954 (Fax) PROJECT TITLE BEAUFORT POINTE PHASE 2 Beaufort County, North Carolina DRAWING TITLE CAMA-Proposed Land Development SCALE DEPARTMENT AS NOTED CIVIL DRAWN BY DATE STARTED SHEET No. EHA 12/12/07 4 OF 5 CHECKED DRAWING NO. ALH 0,4 APPROVED PROJECT NO. 20050319 L SEAL 0�1 1�c Cp A8/27/08 REVISED PER DCM COMMENTS EHA 7/18/08 REVISED PER COMMENTS EHA 5/27/08 ISSUE FOR PERMITTING EHA REV, NO. DATE REVISIONS BY THE EAST GROUP, P.A. n Engineering -Architectures Surveying -Technology 324 Evans St., Greenville, NC 27858 252-758-3746, 252-830-3954 (Fox) PROJECT TITLE BEAUFORT POINTE PHASE 2 Beaufort County, North Carolina DRAWING TITLE CAMA — Details Bulk Head and Boat Ramp SCALE AS NOTED DEPARTMENT CIVIL DRAWNSY EHA DATE STARTED 12/12/07 SHEET No. 5 OF 5 CHECKED ALH DRAWING NO. COn5 APPROVED PROJECT NO. -20050319