Loading...
HomeMy WebLinkAbout17-08 Existing Land Development 1/2008 OVERSIZED PLANSSITE DATA: TOTAL ACREAGE ................. PIN# .................................. Ul ........................18.00 ACt .......................150222334 l-?-dc 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 To 84 77 CITY OF 5D MAINTENANCE PLAN: SEEDING SCHEDULE: �..\c�'F`\ WASHINGTON TO - CONSTRUCTION SEQUENCE: \ I 64 BATH FERN 1. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE PERMANENT SEEDING 1. OBTAIN AND POST A COPY OF CERTIFICATE OF SOIL EROSION CHECKED FOR STABILITY AND SEPARATION FOLLOWING EVERY DATE / NORFOUK ° RUN-OFF PRODUCING RAINFALL, BUT IN NO CASE LESS THAN JAN 1-MAR 31 COMMON BERMUDA GRASS 20 LBS/ACRE AND SEDIMENT CONTROL PLAN APPROVAL. NOTIFY NCDENR P ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE DIVISION OF LAND RESOURCES, WASHINGTON REGIONAL OFFICE (UNHULLED) \._ s2 AT 252-946-6481 PRIOR TO COMMENCING CONSTRUCTION. -� IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. APR 1-JUL 31 COMMON BERMUDA GRASS 15 LBS/ACRE L, WASHINGTON ;,,� ,, 2. CONSTRUCT TEMPORARY CONSTRUCTION ENTRANCE/EXIT, P '-,-PARK .`; - `:\ 2. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT (HULLED) INCLUDING GRAVEL ENTRANCE. q'h4/co V �;\ FENCE WHEN IT BECOMES 0.5 FT DEEP AT THE FENCE. THE CENTIPEDE 5 LBS/ACRE � R7 � �;,,. SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO AUG 1-DEC 31 TALL FESCUE 60 LBS ACRE 3. CLEAR LAND ONLY AS NECESSARY TO INSTALL TEMPORARY N66R\...� ER . / = . 11 _ _.-.,\ MAINTAIN A BARRIER. COMMON BERMUDA GRASS 20 LBS/ACRE EROSION AND SEDIMENT CONTROL DEVICES. AS 11�17 N�-�.. I'I ------ 3. EROSION CONTROL MATTING SHALL BE MAINTAINED UN11L ALL (HULLED) CONSTRUCTION PROGRESSES, INSTALL ADDITIONAL EROSION \� '8 SITE AND SEDIMENT CONTROL DEVICES AS NEEDED OR AS �2 WORK IS COMPLETE. AREAS SHALL BE RESEEDED AND YEAR ROUND AGRICULTURAL LIMESTONE 2 TONS/ACRE DIRECTED BY THE ENGINEER. OHoO'`. AND MATTING SHALL BE REPLACED AS NEEDED. YEAR ROUND FERTILIZER 10-10-10 ANALYSIS 1000 LBS/ACRE �...�W1N1rY YEAR ROUND MULCH 2 TONS (APPROX. 80 BALES) 4. STRIP TOPSOIL &STOCKPILE ON LOTS 95 - 98 FOR LATER USE. 4. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT WILL BE Q 33 \ qy I :• _.,,\ _ ,\ INSPECTED PERIODICALLY. WHEN MUD BEGINS TO BUILD UP, SMALL GRAIN STRAW/ACRE 5. INSTALL SEDIMENT FENCE AND BEGIN GRADING THE ROADWAYS 1;. - E ENTRANCE WILL BE BLADED OFF REMOVING THE MUD. &LOTS. THE YEAR ROUND ANCHOR ASPHALT - : \, 5 . INSTALL DRAINAGE PIPE WITH INLET & OUTLET STABILIZATION. CHOCOWINITY TACK WITH LIQUID A 6 11 , - . ALL SEEDED AREAS WILL BE FERTILIZED, RE -SEEDED AS @400 GAL/ACRE VICINITY MAP NECESSARY AND MULCHED ACCORDING TO SPECIFICATION IN 7. GRADE DRAINAGE SWALES & DITCHES. INSTALL PREFORMED \' THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE OR EMULSIFIED ASPHALT SCOUR HOLES, ROCK/SILT CHECK DAMS, AND TEMPORARY SEEDING. NOT TO SCALE - @400 GAL/ACRE ;\ '. CURVE DATA VEGETATIVE COVER. 8. INSTALL TEMPORARY SEEDING AS NEEDED THROUGHOUT THE ,/ - a � �• ` CONSTRUCTION PROJECT. / t�RVE #1 TEMPORARY SEEDING '� x' / - i i \ ` 9. INSTALL WATER MAINS AND SEWER MAINS. ``'\\ v, / __ R=1482.98 -" ^'\ VEGETATIVE PLAN: DATE ' / \ ' \ VEGETATIVE COVER SHALL BE IN ACCORDANCE APR 15-AUG 14 GERMAN MILLET 50 LBS ACRE 10. BEGIN CONSTRUCTION OF ROADWAYS, INCLUDING THE PLACEMENT ` `, / TAN=57.90 WITH THE SEEDING SCHEDULE AND THE X \ i/ ii - i A=4'28'20" _-- AUG 15-APR 14 RYE (GRAIN) 50 LBS/ACRE OF AGGREGATE BASE COURSE. N /`11 / = i Is__; FOLLOWING SPECIFICATION SECTIONS: 11. COMPLETE CONSTRUCTION OF ROADWAYS, INCLUDING PLACEMENT // ,,C. , / i , \ CURVE 2 ` _.._ SECTION 02110 SITE CLEARING YEAR ROUND FERTILIZER 10-10-10 ANALYSIS 400 LBS/ACRE OF ASPHALT. x ' / # �'V "y SECTION 02120 EROSION & POLLUTION CONTROL 12. INSTALL LANDSCAPING AND MULCH AND SEED ALL /, .Y \ i /,, j R=310.00 I.r / ; `, SECTION 02228 CLEAN-UP & SEEDING \ ; L=521.87 DISTURBED AREAS. ANY SLOPES LEFT EXPOSED WILL, ,/' ; ; `x / t, ", j " I \`'\ TAN=347.0 - WITHIN 21 CALENDAR DAYS OF COMPLETION OF ANY PHASE %�. � \ �' �-._ ^� -- ^'\ 0=96'2T17" OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH �- '`\ `-_ TEMPORARY OR PERMANENT GROUND COVER, DEVICES, OR t / ` /, -' __ K/ LOT 30 OWNER: _. v -- . i / _..y_ _ ;i, 1\ J.D. & GLENDA ILEY �.._- , }�, ,•:•` Xt•!', , INk`' _.-� , , ; , \ �\ BR CURVE #3 - \ \ \--'�., STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PROVIDE PERMANENT } / ,• / / � ' ' \.__.- \ 1,``,, 1P \` �,/ GROUND COVER FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS , w / . ' V "~\. 1,, i i ;,. \ L=188.85 `, y h _ OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING \• `' ; x �•• I i ; I TAN=94.94 &ive, �__ COMPLETION OF CONSTRUCTION OR DEVELOPMENT. /-� ; ,\", / z(((`/ \' / ---� `�;,/ 1 ` _ t- ' �14'37'20" f -- 13. UPON SITE STABILIZATION AND INSTALLATION OF ALL IYI __ _ PERMANENT EROSION CONTROL DEVICES, REMOVE ALL ,+ ` t; /� /`\ �� ;' \, y=- r"�"+` ;'-'` _ --- t 3g•21 - // TEMPORARY EROSION CONTROL MEASURES. •;tt l� /,/�@ ,7f... :i.�' Y��' _.t__,� _ �. `R��-"_% Y �i:. i:. ^�V �.ivi il, NWL `" :, -�= j 39 3•` C dvA. c '". - /�-- EXISTING PIER _,4 qx,, ,, -- _-- I \ 21' '�._ 4 D42 �„ , 50' RIPARIAN 75' AEC, TYP. j. '/ _/ /x..• `\ 2� , EPAM �I.ER. i:E;''`, tR dE BUFFER TYP. _ __._�... __ _ TO REMAIN ` , „`ll, j�f �•' qj . _j % _ .;'=-'=' - - 1 _._. -_ vi .-- ! -~-. - I , 6' -�V N." :. i� IV; ,'v .-r _ O C A ' , `�; ' - " � •�, / - ''! r` \.,. Tip- .v U:�'.E�A-:I,,;*1 :,,:,iA a ,�� �/ " / i, *' - -,i . Lr i % �``..=, _---� `� n' 6T40 22 E' S , 24'3 " _' / `�j`L . EX. JETTY \ i I '` �' ` " __.. _.__----- 164.83 66.18' 15. 98.94' 9 --- t \ 5 0 I �/ E _ 6 �_ 65-19 5 �' 8 f - / i r I ' y' \ _ 1' _...a.34.94 - 7 4.71' 3.-36' . j 11 N _,^,1, t\ /. - �� ^ 60.21' 36.37' 23.9 \ t i ./ /� , i a,c � '\ _ li I �> -.j -� v � ,v _ 2.8�j' 38.36' �' / N r e N ///\�� _ - (S Y _ L. 2 _k- ''w^ 57 -,58 59 60 0 62 - .( 'r ` , / 1 / j /, - _. �' 1 f \_ - REMOVE EX. I `. vJ M 1 rt. 3 0 \ -='\ __ I 64 / - . CO &INSTALL - 10,634 SF o 'n", ` - - '� \ i ,\ { 10,341 SF 10,064 SF .e /' _� ` '_;' / ` _3+' 45' BEND \ 8,929 SF 8,085 SF 8610 - F __ �, ,A EX. 8 569 Y 290 SF i ; SF I /I / r _ _ _ -- p ` 1 OS o \ _, I% , / \ .TEMPOS-ARY... 1,2 5 ` ® // _._ -- CONSTRUCT>ON EX. I C Q �: ,\ DI LIMII�S OE CROCK SILT SF Q d, `` ' O \ / , ii' k -- EXI VALV , S1UR8 HECK `� ''� ��. `� / /` / I ENTRANCE STING EW \ 30 MBL ANCE DAM \ .\ - 1 22 ' ---. -- \\ PAVEMENT A ........._.......__ `� - - A - - TyP' 0' a �'O_�'s / ` ; ; VEME F �' / / ,/ - ;, \ MBL ; / _j{' } i ._ -r . _ E _ �. - - N� EX ROD �� 3 , 6 6 I ', ' _. ----- EX. 3" PVC PRESSURE MAIN ` "' - - , - - _ .-. - K -- 9 --- - -.� - - - \ i --- -- -- _ - '� .� - 10 SF t /k -_ -'-' _ -- _- I - _ .-..-__.-..-- - Y /- .\ 76.5 65.11' 6 0' 60 0 .., d .� 13 9 i i ; __.- - /, / / y_ 0 60.0 ', ; , - _ e - n ;1 - \ pM 3" SDR21 PVC PRESSURE MAIN --------: ar - - 6 r. 0.00 2. �' u� C L_._._._ .--.aa__..._.._ _ E X G v� . FE--- - --- ' Sp -- -- _:._:.w h .--- _. I- ,�, r - ____ ______ _ EX. ROAD R �1 _--- ' -----776 - .....�. _ . - _ --- --- - - - _.--.. __--.__ ------------- _-- --- � _ \ PEA ------ G�1 --- ---_..._--� __ --- .----__-' i 1 _ ....._ __ _ t; :,: _ __ '_ _ _ � TO REMAIN _._._..__._ - _._.-_. ---h-u.- ' n `� ♦ "� •� \ %�i �---- EXISTING PIE \`' - --__ ,� _ - _�:- -Ta#� 9 { 1T ---- -0. . _ ----_ - --_--- -_ __ ' _.__ - � ` - -''--.-, _._ _ -- ;,, _ - -.EX_ 6" PVC WATER AIN - - _._.._ _ - - -- -..._ _ - _-. ---- d=1 0' 11 ob - _ _.____ _ -__-__-__---__5• '� -5- _ EX. STORM PIPE \" S7.61' � � �67 � \ `�,�� �% �' -_ 8'Ot3. 60.10' _._.._._._.._._-- 68. 3'-._Y. - -- _--___--_S�iD'1 __. - -_.-- - - 80.89' ----'- - -_- _:.-_ 6 C900 PVC WATER MAIN-,t _----- ---__ E ` \10, 6 SF R9• EX. JETTY `Y; _- 08' 6 7 8 - __- -'-- , EQUATION 0.06' O _._._ _._-._ -- - _ 4 �...._ z_.=._._.___ __. 1� 68.00' 60.00' 1 --- _._-_ , MBL FH ASSEMBLY .Sc =� -- 6Q00' 1.74.22 -- _ f ` \ 2g, ;` FH ASSEMBLY 10' UTILITY TEMPORARI' T/�% % /� �,q� `� \ Q \� ? ��'' •` 0'46"% ,Y 1 _.,, --- _ - -- `�_ ®-- EASEMENT, i i 1t1 'M CJ J -- _ ® ,� S FENCE r1f-� - --_ _� __� 6• 5�0�. 39.53' - ?�,`' " _� \ - s Z 111 110 10 7 (P R 0 0 S E D 5 P_RI-V,-TE _/_W_ _- -. '" P VM BL E _ - ``\• 9,245 SF 0 IX; ( \ � __ \ 3's ¢8, 6 03.314 _ �'�` / S E l - _. _ J 113 112 N 1, 479 SF -__ air 105 M � \ 3- _ -- �._ ! 0 11,235 SF N __ �` � i� .._. --�.. � \ �\ '�' ` .,, / i I it 11 i \ °' 1. 221 SF pi \ a' N o r -� N 104 N 101 N 100 __ NWL 10,223 SF c0 _- ' T 9,676 SF O' ' m - 1 102 ° `-s "� \ "'`" \ ` � .^ � \ Z'I w 10,046 SF -_ ui 8,091 SF T 7879 SF <+ x ` 10,579 SF n 0 9 9 4 \ _ ,/ n" i `° _ _. 75' AEC, TYP. 8623 SF / -8655 SF 7,594 SF 7,554 %F. 7,510 S N � } , � e��µ `L25� ! _ - �, 1Md cr, ----- EX-STE�RM _ , i --"^ --'" 6,941 SF +\ \ i�� {�` i2,004 SF,21 ��- 0 I{' __ _ 0) � 1 PIPE " j,1111 _o -__ _.-._ 50' RIPARIAN 15' DRAWINA P 20' DRAINAGE \ S� \7 c0 \`' - I _-__ z BUFFER, TYP. l 'NWL 1.75' EASEMENT .-' "' ROPOSED EASEMENT \ \` �G� �� \ - -- \ " �._ --- i `� SWALE, TYP. 3.36' 1 - , r'o \ \ 7 0 _ l 8•98. 5 \ I o. - �3 50 RIPARIAN _ - 8° T� -t-, I H - 48 Sr BUFFER, TYP. - 1- - --.. --.. - - -- 58.5 S8 43 --- 0 67.81' o " ��:48.1 p r k \ G �2g.� i R ^ 15.05' 45.p2' 60.00' 6 00' 4 96 Q' 49. 5' 4 7 3 >, t4.11\ �, 20,363 SF V , _ , = _ ° - --- N64'48 34 W Q \-67.�kT _ -- _ - � . -+- ------,- -� _ DIS NCE 69: 9' 60.69 69 � \o 1' 6 N66'27'59"w ___1.22.52' ` - �; S. + ® A 1- ' LIMITS OF \ :INS \ s TURBA �._ PREFO ED 16?3I.:- - 60.01' " 141.63' ` --_-,\ '� '3.00 , SCOUR EX. HrATE �, r INV. 9S ems\ G o ` �o \` Q- 60,12' N65'49'04 W - EX. PILING, L CASIN 0 gE k - AL� ` / HOE #2 B T LIO 11 3 50 7 \ F ^ .. _. - � '' N _ _- _ - _ _ _ __ - � „W 239.66' ._.._-\ EXISTING CAN -, TYP. - i f :( AN UT T \ --- `' ~\_- i- _ - " \ ` _ _.__-' =-_ _-- N67'0404 -- END OF EXISTING` `., - ___-- - 1" L/ \ FILLED �o 6,972'SF y l 1 csi°� \. - 76.86 NWL \_ _.__ BULKHEAD _ _---„- 0 91 0S S� �!� �� END OF EXISTING\ --_- _ o -----o S61•06 24 E �0 9 2 y - x" `� rr' sr� 9 \ I _ BULKHEAD _---___� -=-`0 32' - MPORARY; 0o _ - �'' LOT 31 OWNER: - _._Z28, --- T€ - 9 3 25,153 SF _ `\ \. _ ---- •-y - SILT FENCg, � 5,786 SF 4 �, FH ' ' a' 75' AEC, TYP. EQUITY TRUST CO. CUSTODIAN/ - - ` 13.64' N S67.2T5$"E ® � SF TYP r 6'" SF + ASSEMBLY EX R 3p6 �7 ._ ANDREW PFEIFER #30137 - _ ..__. _ S AC,1= ...15,658 _, = 7,373 SF , �- ROAD -- Op �t FH i i X X\. 1 - G / M ELEMENT% /, �F�,��, 1 \ 7,925 SF 95 INV. CP -� 1 t '', -- - - o NWL �,'OM ON 1 116e97' 06'�•�� DRAWINq s j 3.70 pP P\\- w ` ` w ` -__ ,\ - ``' cv 134.41'._..._ ' - _� 4. g00 VC WATER 6CIT� DISTUR$gN x �10,273 SF a BO(: )G ! t 72 __ _ ___ _ - __ .- ...._. _ _ _ 25.93 ,OS �6 g 2 C ----{ Cj I / �- o� �_ 96 - - �_._C3 6 _ 7 0' MBL x R0' (: ) "? \ % % I o w =- ....EP_ --------...._..._. .. _. ____D- __ ... __ 0.0� , v .T 3 CK 02 c�; .Op' >; ao. ; _-- "..____._ ._ 2" X 1 1 2" " _ / ��-X 12,446 SF CH SILT i � w � SI 20 4 SF 4.77 / REDUCER 6_.__pLU _ 60.00 -� K DAM, 3 ' S \ ' a?'Ncr. 1�10 - G TAPP_ \ / ��- o ' - 0 MB 60.9 U, v� EX. JETTY N M o' FE -.�_ ED 2" - -- - - 6" 94. 4 7 51DRAINA`- X CO � : \ o `o. /t 11 _ -.. N � 5.22 t PAI-�,♦ - -�` C900 PVC yyA 7' EN E INV. y I" (l,h' 6" ?v 2„ ., N:S v'Nf :I Rt r ,^R,O N l `- - z - �- (FE 90.77 x 70.00' 67.66'-0.1.5-76__~-- - _ - _ �R MAIN DTI- 1.05 1� i IPPPEID ,o - r " __ ' _ ---�•-- 7 \(: ) t , 3 E -- - sy CO 0 Pb- - __ 1 0.95' 'RCP ♦ .I " \ \S 6T 1 03 �. i ( 16,908 SF 5.70 �. 0 ©' " _. - <, - , O 2 PVC \ 48.04'y_- - - --_ ;L- - Y, 25. 0' L SDR21 PVC _ _ ___ _ WATER MAIN - - _._ __Y R35 1 1 /2' ..' _ 1 , _. MAIN x '� INV 0 95 W rn �o PRESSURE - - - ' ;:�% "t _ -` s`; 561 3502 SF r ' `� SDR21 p R50 �„ V PRE�S R PA/� Typ• SSA' 24' rt F _- EX. BULKHEAD w .4 o LIMIT ' �' _ OrOp' MAN _ __ - I j \ 220 \ __; ~ d 16508 0. �IS`iUR C SASE i7L17y _ �• 60•p0' '�•PA/�_ `-.18� X 28 1 --` FIE INV. 1,20 / \ -, �,,. r• ,:, Nr LIMITS OF EP a in �ME7yp "' ,� 2 ARC ` 4.FO 20 \ _ _I:r ;E ,� n,,,, �ro, DISTURBANCE 5.2 / 87 c0 86 .' ... 60. - H - i%v) , . rt '' - _ N -tT �� n c0 ® -3Q M /� .' PAS_ __._ R35 1 1%2" SDR21 PVC - - 52.24' u> m _ i BL °i T �" '� 60.00, _ _ - ---- - _ - R55' EP o PRESSURE MAIN _ / n w :T _ \ . '( ----- ---, - \\ Z . I/ - - 9,483_SF -- 85 P OP ___ j - _. _ 6 0.26q FE, 3.9 O j �f� �` PPP i ', t` ram^ -- Un 2" 8. 0. -�'1 5 m �. 8. g \ _ - 10, 5 8 SF _ S 5� C' 7 4.45 � I �'� ^ ?`` r? _l \ASSEMBLY O P O� " •. / � �,cn cv . �` -- - TEMPORAR 8,656 SF 84 83 _ RI Vq TE _� - INV. �' S CO S Y - / 4 -� Z o� I ! SILT -FENCE 82 ' `/vV , ' _a.80� " \ 413p' + g Q _ TYP � _ -� -_7___ J ` rn TE \ . o I ._._/ � d 2 P _ � � - \ 3�" E 10' ACCESS U t o COMMON; 8,552 F �n 9,518 SF fn 81 _G.1/ --- S4� \70�8 3 S '' 22,880 SF ___ 9, a - i2 " S�) - __ _ 2 0 S - _ \ ELEfiil .° ` 79 F �; l X e._ E�M V EN IM C� 11 i `I _ 8 8 28.16 1 T� I' CO 8 0 I�RuE®17CER � !- � g, � / ` g� 8 a � OTgG � \N WL \ -- E Z i`^ �, r,: w OPEN N 7 9 J 1 - �o_oo' _ _ _ .. - -.�,-. s 4I'll- NWL ' ' ai iv .� 10,052 SF ai ] I� ♦ ,: -Q, _ �' v \ ��/ `� _ ��19,01� SF 16,94.CEF O`.. 8.45' 1fi 76'0 9,96-6 S_F I N I� ' '' ASEMBLY 4 �0°22'53 ' w �- SPAO. _ cfl1. c� / N ' W � n1 W o M i f 18.33 P 50.26' 28 21 .. �• 10,618 SF I Iv�"i 8 r 2";"S \ / 71.1 '- 1b w . , N 41.95' O� tea: --^ N j- j i cv n , t " ire .►o ] DR21 2" ,,X 1 1 .2" 1 r ! \ 1� M z - " �20�• N66'40'3 W 6, ,q;= - - _ - ` o PUC1. iiEL2UER D� j� �\ - 30 SF z 69i 7;•35'20" N69°2219 W 92.1 O \ �- IQ10,4 i , IyRESS(IRE \ �`l \� ® " 108.24 ; I - \"' a MAIN . \ EX. BOAT RAMP 6 .,.f 8 � � �' 20' �' r 7524 33.17' EX. STORM PIPE DRAINS 4 12, g S !�, co "�47"\N 38.74' 76.68, EX. ROAD \ ti O� N EXISTING EX. BULKHEAD ,n `-EX. DECK I 918"'N 51.37f EX. PIER BOAT RAMP _ _ s ;.�, (TO BE REMOVED)- .� ESMT. 1 . �' T 'ti , a A' / it 7'2 \,--,,-, N -� a10 ACC S :: CONTIGUOUS 2� 98� v �`/ ` n" N7 , 00\ 48. \ - INV. \ TO Ss, �___11, 1.86 EX. PIER Og 31" , \ ,.--.\ Eg \ PROPERTY TO 03 4"W 11 NWL 50' RIPARIAN 1 g5.28• W 11.91' 1V 395�50 PREFp\'' m �3 v t k ; LOT 92 3� ��r\�\ EX. JETTY D1 / . BUFFER, TYP. _ n 0'" SCO ,1 R .I 7 \ -�,\ EX. PIER 60.15 1' RME' %37.47 6 UR 7 \'\ w 1 Q EX. BULKHEAD EX. BULKHEAD --' \ 'V 56.33'S7" yL ; � - 4 36' .n HOLE i to ,L... '\ 75' AEC, TYP. 78.08' # 1� F �o �d \\`\ li _ - _ _ . 9, 265 SF ; ' `` S 13, ''� v� EX. CONCRETE ��\, \ `. \ � � . f' NWL ...h fig•\ �" °„+� 8>, 11,296 SFIj 1 Q 7 SIDEWALK �. 11 --- `- \,. I �' _. ��9j�y 2 N 1` EX. DECK �. co, ^ht \ \ EXIS , ,\ -' '',� LNG cq EX. PIER EX. BULKHEAD L �� "bTl�"-•"^ �` " 1D� 63¢3 hi 2S, 4 x' M, Vic. o` `�7 - \ \ \ �- i ® 5. ' \ �c c' r\ TH= A ' �' „� 5 4�' EX. BULKHEAD `_ �` _ I I , E . ._ O'Q to �' H CH -• SIC I yTl f' rR,� xl:.`V' I `\`` \ � �r �e \n I "' ,. # v k - 7­_R -�IJ` 1 L7,. r� �I1.; !\! ar I.:L I\f :hrti: t._ l;l"I ------ `.,J w 1� �' o _ -- :`,A'"FR ' IV- , �\ _ � J ,5 .y � \ BEAUFORT POINTS -" '\ �_. __ ' (D YACHT CLUB __- \\q PRIVATE f3�W--(-SEE "PLAN FOR WIDTH)-- `�\�' \` _ �� ,ti ® 1, .w _ ~_., , \ 1 "\ BOATAMINIUM \e J______ �\ �o (EXISTING MARINA) \ �\ � - -- - _ --- -- 3 EX. CONCRETE -- --.-------- VARIES, � ` BUILDING PAD \____, \ 6 A 15 Of 6' 20' PAVEMENT 6' 6' I VARIES I- L MIN. 2" SF 9.5A �.._ I ASPHALT 1" PER FT 1/4 11 PER FT. V, PER FT. ,11 Ac•� �IIIIIIIli- , 1 4. 1 MIN. 8" AGGREGATE BASE COURSE I (PER N.C.D.O.T. STANDARDS) COMPACTED SUBGRADE TYPICAL ROAD SECTION - 20' PAVEMENT Y - N.T.S. P R I V A T E R/ W 14 1 13 1 12 \I ��,,,- 1 , !,, .5 -...> EXISTING MARSH TO REMAIN 0 0 EX. PIER, P 0 N M L K 9 H G 0 A 1I7 101 B CS 35' RADIUS 6' 6' 8' =LO 2" 1-2 SLOPE AS REQUIRED 4 :��,� a 1 8" AGGREGATE BASE COURSE SL (PER N.C.D.O.T. STANDARDS) Owner%Developer: A NC Land Partners c/o Derrick Smith A 15E. rlion Blvd. 2 CUL-DE-SAC DETAIL Greenville, NC 27858 Suite E C®, N.T.S. Phone: (252) 355-9288 Fax: (252) 355-4740 THIS DRAWING IS THE PROPERTY OF THE ST GROUP, P.A. ANY USE, REUSE, REPRODUCTION, DISPLAY OR SALE OF THIS DRAWING WITHOUT WRITTEN CONSENT OF E EAST GROUP, P.A. IS STRICTLY PROHIBITED. COPYRIG ,THE EAST GROUP. P.A. 2007 7 6 5 4 3 2 1 �0 ,:�,� 1�13 v�G QO� QO� FO FO SITE DATA: TOTAL ACREAGE..........................................18.00 ACt OPEN SPACE................................................0.74 AC.t ACREAGE IN R/W........................................2.32 AC.t LINEAR FEET OF STREETS.............................1,837 LF NUMBER OF LOTS....................................................58 AVERAGE LOT SIZE.....................................0.25 AC.f PIN#..........................................................150222334 DISTURBED AREA TOTAL...........................245,815 SF DISTURBED AREA WITHIN AEC......................6,155 SF IMPERVIOUS AREA TOTAL.........................233,683 SF IMPERVIOUS AREA WITHIN AEC.....................1,790 SF GENERAL NOTES: 1. ALL VEGETATION AND TOPSOIL SHALL BE STRIPPED FROM FILL AREAS PRIOR TO PLACING FILL. ANY QUESTIONABLE OR UNSUITABLE SOIL CONDITIONS SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER. 2. ALL FILL SHALL BE COMPACTED TO AT LEAST 95% OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY (ASTM D698). 3. GRADING CONTRACTOR SHALL SEED AND MULCH ALL DISTURBED AREAS IN ACCORDANCE WITH THE SPECIFICATIONS WITHIN 21 DAYS COMPLETION OF GRADING WORK. UPON COMPLETION OF THE PROJECT, THE GENERAL CONTRACTOR SHALL INSTALL PERMANENT SEEDING FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT AS OUTLINED IN THE SPECIFICATIONS. ALL DRAINAGE PIPES SHALL BE CLEANED BY THE GENERAL CONTRACTOR TO REMOVE ANY SEDIMENTS THAT HAVE ACCUMULATED. 4. ALL PLANTING AREAS SHALL BE BACKFILLED WITH TOPSOIL AND RAKED DOWN, REMOVING ALL CLODS AND ROOTS, AND LEFT READY FOR SEEDING AND PLANTING. 5. ALL UTILITY TAPS, CONNECTIONS AND EXTENSIONS SHALL BE DONE IN ACCORDANCE WITH ALL APPLICABLE STATE AND LOCAL CODES. 6. LOCATIONS OF EXISTING UTILITIES AS SHOWN ARE APPROXIMATE. CONTRACTOR SHALL FIELD VERIFY LOCATIONS AND COORDINATE CON- NECTION WITH PROPER AUTHORITIES. CALL "NC -ONE -CALL" AT 1-800-632-4949 48 HOURS BEFORE ANY EXCAVATION IS BEGUN. T ALL PERMITS AND FEES REQUIRED FOR CONSTRUCTION OF IMPROVEMENTS ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR, 8. ALL WETLANDS AREAS ARE CONSIDERED DRAINAGE EASEMENTS AND ARE SUBJECT TO THE HOME OWNER ASSOCIATION AND NCDENR RULES AND LAWS 9, ALL LOTS TO BE SERVED BY CENTRAL WATER SUPPLY AND CENTRAL SANITARY SEWAGE SYSTEM. 10. AN NCDOT DRIVEWAY PERMIT IS NOT REQUIRED. 11. AN NCDOT ENCROACHMENT AGREEMENT IS NOT REQUIRED. 12. AN EROSION AND SEDIMENTATION CONTROL PLAN SHALL BE APPROVED PRIOR TO CONSTRUCTION. 13. A STORM WATER MANAGEMENT PLAN IS REQUIRED. 14. ALL ELECTRIC LINES SHALL BE UNDERGROUND. ROADS ARE PROPOSED TO BE ACCEPTED BY THE NCDOT OR PRIVATE AS SHOWN ON PLAN. 15. POTABLE WATER PROVIDED BY BEAUFORT COUNTY WATER CORPORATION. 16. SANITARY SEWER PROVIDED BY THE CITY OF WASHINGTON. 17. HOMEOWNER'S ASSOCIATION WILL BE ESTABLISHED BY THE DEVELOPER. 18. GENERAL CONTRACTOR SHALL VERIFY INVERTS ON EXISTING STORM DRAINAGE PRIOR TO CONSTRUCTION. 19, CONTRACTOR SHALL NOT COMMENCE CONSTRUCTION OF WATER MAINS OR SEWER SYSTEMS PRIOR TO APPROVAL OF ALL PERMITS. 20. THERE ARE NOT ANY WETLANDS LOCATED IN PHASE 2 OF THIS DEVELOPMENT. BLUE LINE STREAMS INCLUDE ALL CHANNELS DIRECTLY CONNECTED TO THE PAMLICO RIVER AND CHOCOWINITY BAY. LEGEND '� _ CONTOUR .. - SPOT ELEVATION -- - - = EXISTING STORM DRAIN ® = NEW STORM DRAIN = EXISTING WATER MAIN F--- = NEW WATER MAIN --=,M- = EXISTING PRESSURE MAIN PM = NEW PRESSURE MAIN - - - = 50' RIPARIAN BUFFER = 75' AEC LINE RCP =REINFORCED CONCRETE PIPE FES = FLARED END SECTION EX. = EXISTING FFE = FINISHED FLOOR ELEVATION FE = FINISHED ELEVATION EP =EDGE OF PAVEMENT INV = INVERT TYP. = TYPICAL CO =CLEAN OUT RED. = REDUCER G.V. = GATE VALVE ESMT. = EASEMENT FH = FIRE HYDRANT B.O. = BLOW OFF ST = SIGHT TRIANGLE SE = SIGN EASEMENT TYPICAL LOT SETBACKS: FRONT: 30' SIDE: 1O' REAR: 25' A1/4/08 REVISED PER COASTAL BPB MANAGEMENT COMMENTS Al2/26/07 ISSUE FOR PERMITTING BPB REV. N0. DATE REVISIONS BY THE EAST GROUP, P.A. ■Engineering ■Architecture ■ Surveying ■Technology Box 7305, 324 S. Evans St., Greenville, NC 27834 252-758-3746, 252-830-3954 (Fax) PROJECT TITLE BEAUFORT POINTE PHASE 2 Beaufort County, North Carolina DRAWING TITLE CAMA-Proposed Land Development SCALE DEPARTMENT AS NOTED CIVIL DRAWN BY DATE STARTED SHEET No. BPB 12/12/07 2 OF 2 CHECKED DRAWING NO. SLJ COn2 APPROVED PROJECT NO. 20050319 0