Loading...
HomeMy WebLinkAbout88-09 Sound Rentals, LLCp A LLJ Q CO Qi In r•l C) CD (U 0 In 3 tA c3 3 d QJ ry N L s 0 o: VEGETATIVE STABILIZATION COMPACTED SOIL PER SEEDING SPECIFICATIONS 2' MINIMUM � ,err♦ �, ';: h:1: r �C � � L . AS REQ'D 7SI; a' 14IN 3 : � *"`�';;- `:�I,-6, I 1 /FLOW �` •i.:1•••�:;<'e''�% `�;°.t.`•`r�`t:ir',r.i: MINIMUM LINE CENTER OF SWALE W/ SOD (PINNED TO PREVENT 6' TYPICAL DISLODGEt4ENT) Swale Detail Tempe Diversion Ditch NO SCALE NO SCALE 1. D = INSIDE DIAMETER OR MOTH OF CULVERT Soo Schedule 2. MINIMUM STONE THICKNESS TO BE TWO TIMES SPECIFIED STONE DIAMETER. D See Schedule " M 9W t 0 1/2 D RIP RAP 1/3 D INSTALL 0 (PT� PER �PTERFABRIC UNDER FLAN VIEW SECTION VIEW Rip Rap Scour Pad 12 GAUGE 4'X4' OR 2'x4' WELDED NRE HOOKED ONTO PFAFORYED CHANdELS ON METAL POSTS, OR FASTENED TO amm OR WOOD POSTS VAiN NO. a STAPLES. R/W ULTRAVIOLET RESISTANT (BLACK) M"n FABRIC OR EQUIVALENT SECURED TO UK KITH METAL CUPS OR WIRE AT E' OFF CDOM 7 MAXMUM SEDNENT STORAGE LEVEL REMOVE SEMAO(T WHEN IIRS LEVEL 13 REACHED OR AS DAdECTED BY INSPECTOR. 4� NATURAL GRADE COVER NTH SOW. AND TAMP EACKFiLL CARRY S' OF NRE INTO TW4CK CARRY APPROX. it OF FABRIC INTO TRUCH FW:YAL. CADM OR 4'X4' TREATED HOOD POSTS ATai CENTER MA1*IMAL CEOM AND WOW POSTS SHOULD X DOW t4EteAL51. E.C.M. 11 Fill Exist. Sw le rn `-I J U I / c 0 O 1 Note: r' Use Pond for temporary sediment storage C during construction. Contractor shall over 1 excavate pond or remove accumulated sedln,ent after site is stabilize.". 1 ►h f Special Note Concerning Wetlands: The proposed development on this tract I� does not Impact any known Sect. 404 Wetlands. I Silt Fence Detail _ -OPEN DECKS NO SCALE 27.0 8.0' p n!f •�• fC A' 1 ^ o O EXISTING ROAD c� 0 (SEE NOTE) PLAN VIEW L Stone size - Use MSHA size No. 2 (2-1/2' to 1') or AASHTO dalgnation M43, size No. 2 ( 2-1/2' to 1-1/2'). Use crushed stone. 2. Length - As effectivs, but not Is" than 50 lest. 3. Thickness - Not lees than six (6) inches. 4. width - Not less than full width of alt points of 5. ingress or Minimum of 12'. Washing - when necessary, whesis shall be domed to remove sediment prior to entrance onto public right-of- way. When washing Is rewired, It shall be done on an area stabilized with crushed stone which droins Into an approved sediment trap or sediment basin. All sediment shall be prevented from entering an storm drain, ditch, or watercourse through use of sandbags, gravel, boards or other approved methods. 6. Maintenance - The entrance *hall be maintained In a condition which will prevent tracking or flowing of sediment onto public rights -of -way. This may require periodic tap dressing with additional stone a* conditions demand and repair and/or domout of any measures used to trap sediment. All sediment, spied. dropped. washed or tracked onto public rights -of -way must be removed immedlatsiyr Temp. Construction Entrance NO SCALE 0 Id 16.0' 16.0' o f6:0 0 16.0 * 11.0fc 11.0' 11.0' 0 0 10.0'COWRED w b ro.o' i ACCESS Buiiding Dimension Detail NO SCALE R/W - SET IL4G lWK C/L Wr. _ N.C. HWY. 24 & HK.L ST. N 5z 53 $ w DAMES D. GU THRIE 8K. 850, PG. 215 v 0 >E 0 1 I ( I I v` CI c) 3 VW - WHIT -E 0 A X RIVER (ALONG MEAfI FEGN WATER LiME) N 62'19 J6�,201�;� N.I.R. R.R.S.P. No. 3 C/� EX1517NG SWALE EXTEND EXIST 18" RC I 58 59 E. AUSIIN GUTHRIE 8K. 722, PG. 364 R.R. S.P. No. 2 115" FES jInv.-4.0 rr is c I� N j 5" FES 'Inv,-4.5 I� i I I I FES irv.=5.6 1 1)5" FES Irv.=5.98 I JI "B" St e (itch Linin b i Legend �1 TEMPORARY GRAVEL CONSTRUCTION ENT/EXT SODDING O MULCHING O RIPRAP-LINED CHANNEL s�eley SOD -LINED CHANNEL C4 e b LEVEL SPREADER e4 OUTLET STABILIZATION STRUCTURE EXCAVATED DROP INLET PROTECTION (TEMP) FABRIC DROP INLET PROTECTION (TEMP) I I ++3 BLOCK & GRAVEL INLET PROTECTION (TEMP) TEMPORARY SEDIMENT TRAP �^ SILT FENCE ----sf ROCK DAM n CHECK DAM PROPOSED FINISH GRADE PROPOSED TOP OF CURB GRADE i PIPE LA13EL » �» EROSION CONTROL NOTES 1. Sediment control devices and structures eh011 be installed, maintained and amended as needed to provide effective control of accelerated sedimentation until the contrbuting watersheds are stabilized. 2. Cans ru -tion Smuenee• A. Notify Engineer, Owner and Land Quality Section prior to beginning construction. S. Install stabilized construction entrance(s). C. Silt fence shall be installed at edge of clearing where so indicated, on off down slopes Immediately after area is cleared. Sit fence shill be maintcined until the area Is stabilized competefy. pads. Install awdea and storm drainc9e plpinq and outlet protection. E. Immediately wood, mulch and Install sod Ilnere In swales.. F. Maintain erosion control measures as needed to assure full functlonabl Pity. G. Place CABC over compacted subgrode: Install asphalt surface course. H. Reseed and mulch shoulders and ditches, Install liners on all remaining swdes (and provide ground cover on all exposed slopes.) 1. Seed, fertilize, and mulch all disturbed areas within 15 days of completing any phase of the grading work. J. Permanent groundoover for all disturbed areas within 15 working days or no more than 90 calendar days following completion of construction. K. Remove all temporary devices after Per -anent groundcover Is established. 3. Saading G+t Apply lime andeclflcGfertloilinszer and work into 4-6 Inches of soil. Seed mixture shall be distributed uniformly and covered with a clean straw mulch. All mulch shall be crimped « asphalt tacked to help hold In place. Material and application rotelr are as follows: Met Annlication Rate Fertilizer (10-10-10) 1000 Iba./arc. Mulch 800 lbs./arc, Permanent Seedlna 1.S tons/arc. Common Bermuda (Unhulled Sept. 1 - April 1) 100 Iba./ac. (Hulled April - Sept. 1) 75 Iba./arc. 'Rebel' Foams 50 Iba./ac. Rye Grain (Sept. 1 - April 1 only) 50 lbs./ac. German Millet (April 1 - Sept. 1 only) 50 lbs./arc. Dee a , 5 - April 1 05 Kobe Lespedeza 50 lbs./ac. Rye Grain loD Ibs /aa April 15 - Sept. 1 German Millet 40 lbs./ac. Sept. , - Dec. 15 Rye Grain 100 lbs./arc. 4. Contractor is responsible for maintaining Gill erosion control measures and amend measures as required to prevent accelerated erosion from taking place on this site. Contractor Inspect all erosion control devices after every rainfall event repair, remove accumulated sediment, Of supplement measures may be necessary to prevent erosion do retain sediment on site. 5. Once all areas have been stabilized, contractor Is to remove temporary erosion control measures, regrade, old mulch to restabNize these areas. 6. For additional requirements, see the approved erosion and sedimentation permit. - S 68'2B 42w .200..57' SIDEWA/ K - TO iJ 6vw W C/L ANT N.C: HWr 24 ! BELL Sr. N. C. HWY 24 I'i 00' R/lI)---- OWNER/DEVELOPER: SOUND RENTAL` LL MR. E. A. GUTHRIE, JR. 225 BLUFF RD. CEDAR POINT, N.C. 28584 (252) 393-6272 REVISIONS N. C. 58 April 12, 2005 Added Bulkl!N Dknenalm Detail April 2DO5 Per CROATAN DWQ St r MM d GuDn s Per y JW 13. 2005 Par DA Stormwater �C2p 1118 1114 1 SWANSBORO 113 N.C.N•C. 1214 1t _ TRACOASTA! WAY I N N.C. 56 SITE ATLsWr1C OCEAN VICINITY MAP NOT TO SCALE DRAINAGE PIPE CHART OUTLET AREA Ql0 DIAMETER GRADE LENGTH VELOCITY PIPE (acres) (cf; ) --a (inches) ( ) (lf) (f s) "A" 0.52 1.3C 15" 0.75 40* 5.0 "13" 0.93 2.33 15" 0.62 60* 4.6 "C" 3.09 7.75 181, 2.00 42* N/A "D" 3.09 7.'15 18" 1.00 16* 6.8 * Incl. FES(s) If Area <10 Ac If Area > 10 Ac Q-CiA Q=281 x DA RCP = Reinforced Concrete Pipe tc=5 min. where DA-A/640 LF Linear Feet i10=7.17 in/hr. FPS Feet per Second C=0.35 NOTE: 1. Contractor shall use NCDOT approved RCP or CMP for all pipes underneath NCDOT and/or Private roadways. 2. Contractor may use NCDOT approved RCP or HDPE (2 wall) in all other areas including driveway pipes. RIP RAP SCOUR PAD SCHEDULE Sized using NYDOT Dissipator Charts. VELOCITY LENGTH WIDTH TYPE RRiP # (fps) ZONE (feet) (feet) STONE 5.0 - 1 8 4 C1"B" 2 4.6 2 8 4 Cl"B" 3 6.8 2 9 5 C11.13" MAINTENANCE PLAN 1-ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STA1131LITY AND OPERATION FOLLOIMNG EVERY RUNOFF - PRODUCING RAINFALL BUT IN NC CASE LESS THAN ONCE: A WEEK. ANY NEEDED REPAIRS WiLL B: MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 2-SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5 FT DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN Ave BARRIER. 3-ALL SEEDED AREAS WILL BE i ERTLIZED, RESEEDED AS NECESSARY, .,: � e,� AND MULCHED ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATVE COVER. MAR 4 2009. 4-SEDIMENT WILL BE REMOVED FROM THE POND ONCE SITE IS STABILIZED. 5-AF7ER CONSTRUCTION HAS 3i:EN COMPLETED THE OWNER WiLL PERPETUALLY A/� Morehe MAINTAIN ALL DEVICES THAT CONVEY STORMWATER AND ALL VEGETATIVE AREAS TO MINIMISE THE EFFECTS OF EROSION. Disturbed Area = 3.5 Ac. SURVEY & BASEMAP BY: BELL & PHI I IPS ct R PING PL 604-E CEDAR POINT BLVD. CEDAR POINT, N.C. 28584 (252) 393-6101 O NOT RELEASED FOR C NSTRUCTION GRAPHIC SCALE ( III FEET ) 1 inch = 60 ft. /Q Qi rn �7 C _C I 00 N C N M ' LU _ N cm " r LLJ s- C .� to E X V m W 15 aZ } 4J C: acts O C'O 0 °> C:)0 O I U aM W O � M C ^ .Oi 00 LtJ L U � U a. J sTas sTss - Q • 00 �r `u; Z: Z -U 00 P fy! Q J CL • WCr- ly o �0-4 V) o Z � W J O �1 Z 0 I i U � i Z WLLJ h--1 Q 0 ZI 0 0 U C)u 0 � UjZ w QLj a LaJ ate. p O 0 SCALE: 1 to= 60' DATE: 3/14/2005 PROJECT: 05�-0012 0 DRAWN BY: JC/DKN SHEET 1/1