Loading...
HomeMy WebLinkAbout194-08 OVERSIZE PLANS\ \ GRAPHIC SCALE: I "= 10' \ 0 5 10 20 30 ~ ~ \ FEET \ \ 1 � e ~ \ \ "IN Top of bank/ \ edge of creek \ \ \ \CO Needle Grass ~ �,\ �� v• �Q- Marsh Area o \ \ \ ~ \ \ \ Burnettes 47 \ \ \ 0-0.30 \ I--� p�pos g� 0-�0 branch. ecr \ 00. -0.80 - 10 d \ \ \ pq \ \ \ X1.20 - 20 \ HISS 0 0 0-2.30 — \ -1 9� 0.60 ` , — Tie Contours to \ \ \ \ \ \ f r / �41, Existing Bottom -3.00 & Bank Grades \ \ \ X-0.20 _ —1t-1.70 0 \ _ 0-2:20-- — — — — _ \ \ \ \ ram..•— -0-70 4 3 30 .70 0-0.50 \ X-1.20 10 _8(0.50 \ \i I S F , o g 3 -�tr O 67 N `\� �Q r- O or J� >V� / �Q2 / �g9 Top of bank { ¢ edge of creek 8" Die. Piling -� 8' O.0 (typ) Begin Excavated Gravel Ramp Field Verify Existing Grade Intersection With Ramp This Location End 14' Wide Excavated \ 1 \ 1 \ Reinforced Concrete Ramp \Normal �-ligh W\terline \ ` 1 �646 \ \\ \ \\ \ \ � per DCI� 11l28/(�7 \ 1 i1G, \ Proposed Bulkhead I Retaining � over Stone Base �-- (Vinyl-typ) � Proposed Ripfap (5ft Length) To mirl,oize propeller wash- scouring g sedirneht suspension during boat \ \ \ \ \ \ v \ \ \ \ \ \ V I launching & retrieval Queen, V A \ \ V A \ \ 1 V LandwaM Extent of Coastal \ \ \ \ \ \ \ \ \ Wetlands / Vegetation Creek \ \ \ \ Per DC�I Agent v v �` v v v 5 ®Total Est. Dredge Volume 50cy Below NHW Total Est. Cut Volume 250cy Upland Concrete Ramp D-ATUJV ELEV -5 —5.00 0+00 0+10 GR" Bohicket Landing SECTION C/L of Boat Ramp Scales 1'=5' Section Through Proposed Boat Ramp & Access Basin Begin 14' Wide Excavated Reinforced Concrete Ramp over Stone Base (1ft Above NHW) LEGEND Existing Contour 3.00 Proposed Contour NHW Normal High Water NLW Normal Low Water LF Linear Foot - - - - -- - - - - - - - - - - - ----- I ----------------- --- Existing Grade - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - Proposed Excava1 I -------- H_ --------- Proposed Excavation ------------------------------------------------------------------- Grade------------- - - - - - - - - - - - - - - - - - - - - - - - - - - ------------- ------------------- Proposed Concrete Ramp ------------------------------------------- ------------------------------------------ --------------------- ---------------------- ---------------------- ------------------- _J ------------------ - ------------------- ------------------------------------------ Rip Rap I ------------------------------------------- Proposed Retaining Wall 5 F Vinyl (typ) ICU 0+20 0+30 0+40 0+50 0+60 0+70 0+80 Note: Reinforced Concrete Ramp sections to be prefabricated (formed, poured and cured) on high ground prior to final placement below NHW ISF - Iron Stake Found High Water Line \ 36 , -Adjoining Lot Number - Coastal Wetlands / Vegetation PT Pressure Treated _ U.S. Army Corps of Engineers Cy Cubic Yard Jurisdictional Wetlands Limits Spot Elevation Below NHW Excavation Area CAMA 75' AEC Upland Excavation V//R// Area a . Concrete _Proposed Retaining Wall Vinyl (typ) ti Grade 0+90 Note: Structural design of reinforced concrete, stone base and retaining walls not within the scope of these plan drawings Y4" per foot 1Max � E Compacted Fill as Required Existing Grade / Vanes _ 1 Tvoical Gravel Road Section 1-1 a = - - - w~ - - - - - - - - _ --------- - -- - - NHW --------- — — — — — — — — — — 0 ———--- — — —— --.------- — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — — ———-- — — — — —— = o — — — — — — — — — — — 0 - - - - - - - - - - - - : NLW = Existing Grade -2 z-- — DATUV AZEVS =----------------------------- = --------- -------- ------------ - —5. 00 0+00 0+10 0+20 GROUP Bo#-dcket Landing SECTI3N C/I, of Excavation In Burnettes Branch - Scate, 1'=5' Section Through Proposed Boat Ramp Access Route Centerline 0+30 0+50 0+60 0+70 0+80 0+90 1+00 1+10 C/L Vanes I - 18' to 60' Dia Y4" per foot 0 0 U) c -E 'v m L6 REVISIONS 2 3 2008 10/10/05 Elev. Ramp rev, per CAMA 8/14/06 Per additional survey data L' 8/24/06 Excavated Romp 3/13/07 Per additional survey data 4/10/07 Per meeting W/ surveyor _ 4/17/07 Per oWner 8/17/07 per additional survey data 7 9/10/07 per owner 12/26/07 per Como ✓ 4/21/08 per CAMA(DCM) do USACOE a T o Nrn o O S .� I.n L W (N M c °= .� Q a O m U- UJ U = z +(a-� >-= O c V ° otn > W N W t 1 •� C: W _ W O h �i V ' �d V = a `;+,.a.�.s.-fir �•� , � _ y 0 z o U U -0 J 3 yO � z tcy �z t d a. Q) 10 E _ iA b� W ►pit � �O N n Ir C �� m 11 0 O C w� X Qw W cr-' O Q !L i w v (L � v DATE: 6/14/20'`` PROJECT: 07-080 DRAWN BY: JF & A' SHEET 3 of 3 r. Ln in F IRM